Limedale Quarry
Metal/Non-Metal, Surface·Crushed, Broken Limestone NEC·Independence, Arkansas·Mine ID 0300050
Operator Arkansas Lime Company·Controller United States Lime & Minerals Inc·MSHA status Active since Jul 4, 1976
What MSHA has on file for this mine
MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Inspections
Verbal Hazard Complaint InspectionsJun 8 to Jun 11, 2026Inspectors 1 | Hours on site 8.5Began: Jun 8, 2026Ended: Jun 11, 2026Activity: Verbal Hazard Complaint InspectionsInspectors: 1Hours on site: 8.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 8, 2026
- Closed outINSPECTION_END_DT
- Jun 11, 2026
- ActivityACTIVITY
- Verbal Hazard Complaint Inspections
- Activity codeACTIVITY_CODE
- E04
- Program areaPROGRAM_AREA
- M/NM--Verbal Hazard Complaint Inspections
- Event numberEVENT_NO
- F038648
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 22
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 6 to Apr 16, 2026Inspectors 1 | Hours on site 39Began: Apr 6, 2026Ended: Apr 16, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 39Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Closed outINSPECTION_END_DT
- Apr 16, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F038640
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 39
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 58
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 27 to Oct 30, 2025Inspectors 1 | Hours on site 18.5Began: Oct 27, 2025Ended: Oct 30, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 18.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 27, 2025
- Closed outINSPECTION_END_DT
- Oct 30, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F025879
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 18.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 39.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Verbal Hazard Complaint InspectionsJul 16, 2025Inspectors 1 | Hours on site 2.5Began: Jul 16, 2025Ended: Jul 16, 2025Activity: Verbal Hazard Complaint InspectionsInspectors: 1Hours on site: 2.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 16, 2025
- Closed outINSPECTION_END_DT
- Jul 16, 2025
- ActivityACTIVITY
- Verbal Hazard Complaint Inspections
- Activity codeACTIVITY_CODE
- E04
- Program areaPROGRAM_AREA
- M/NM--Verbal Hazard Complaint Inspections
- Event numberEVENT_NO
- 6938277
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 7
- Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- 2.5
- Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- 7
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Regular Safety and Health InspectionJun 16 to Jun 25, 2025Inspectors 1 | Hours on site 27Began: Jun 16, 2025Ended: Jun 25, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 27Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 16, 2025
- Closed outINSPECTION_END_DT
- Jun 25, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F013D62
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 27
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 46.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
103 (g) Written Notification Hazard Complaint InspectioMay 7, 2025Inspectors 1 | Hours on site 3Began: May 7, 2025Ended: May 7, 2025Activity: 103 (g) Written Notification Hazard Complaint InspectioInspectors: 1Hours on site: 3Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 7, 2025
- Closed outINSPECTION_END_DT
- May 7, 2025
- ActivityACTIVITY
- 103 (g) Written Notification Hazard Complaint Inspectio
- Activity codeACTIVITY_CODE
- E03
- Program areaPROGRAM_AREA
- M/NM--103 (g) Written Notification Hazard Complaint Inspecti
- Event numberEVENT_NO
- 6938266
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6.5
- Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- 3
- Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- 6.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Regular Safety and Health InspectionJan 6 to Jan 8, 2025Inspectors 1 | Hours on site 19.25Began: Jan 6, 2025Ended: Jan 8, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 19.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 6, 2025
- Closed outINSPECTION_END_DT
- Jan 8, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F013D3E
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 19.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 32.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionSep 19 to Sep 23, 2024Inspectors 1 | Hours on site 27.5Began: Sep 19, 2024Ended: Sep 23, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 27.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 19, 2024
- Closed outINSPECTION_END_DT
- Sep 23, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 7046656
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 27.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 40.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Special Emphasis ProgramsMay 22, 2024Inspectors 1 | Hours on site 0.5Began: May 22, 2024Ended: May 22, 2024Activity: Special Emphasis ProgramsInspectors: 1Hours on site: 0.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 22, 2024
- Closed outINSPECTION_END_DT
- May 22, 2024
- ActivityACTIVITY
- Special Emphasis Programs
- Activity codeACTIVITY_CODE
- E17
- Program areaPROGRAM_AREA
- M/NM--Special Emphasis Programs
- Event numberEVENT_NO
- F00554F
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionDec 11 to Dec 15, 2023Inspectors 2 | Hours on site 65Began: Dec 11, 2023Ended: Dec 15, 2023Activity: Regular Safety and Health InspectionInspectors: 2Hours on site: 65Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 11, 2023
- Closed outINSPECTION_END_DT
- Dec 15, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6938701
- InspectorsNBR_INSPECTOR
- 2
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 65
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 76.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionSep 19, 2023Inspectors 1 | Hours on site 11Began: Sep 19, 2023Ended: Sep 19, 2023Activity: Spot InspectionInspectors: 1Hours on site: 11Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 19, 2023
- Closed outINSPECTION_END_DT
- Sep 19, 2023
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6932162
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 12
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionSep 18 to Sep 19, 2023Inspectors 1 | Hours on site 4.75Began: Sep 18, 2023Ended: Sep 19, 2023Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 4.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 18, 2023
- Closed outINSPECTION_END_DT
- Sep 19, 2023
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6932161
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 7
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 14 to Aug 18, 2023Inspectors 1 | Hours on site 25.75Began: Aug 14, 2023Ended: Aug 18, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 25.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 14, 2023
- Closed outINSPECTION_END_DT
- Aug 18, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6932152
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 25.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 33
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionApr 10 to Apr 13, 2023Inspectors 1 | Hours on site 31Began: Apr 10, 2023Ended: Apr 13, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 31Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 10, 2023
- Closed outINSPECTION_END_DT
- Apr 13, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6890292
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 31
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 40
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
103 (g) Written Notification Hazard Complaint InspectioDec 28, 2022Inspectors 1 | Hours on site 3Began: Dec 28, 2022Ended: Dec 28, 2022Activity: 103 (g) Written Notification Hazard Complaint InspectioInspectors: 1Hours on site: 3Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 28, 2022
- Closed outINSPECTION_END_DT
- Dec 28, 2022
- ActivityACTIVITY
- 103 (g) Written Notification Hazard Complaint Inspectio
- Activity codeACTIVITY_CODE
- E03
- Program areaPROGRAM_AREA
- M/NM--103 (g) Written Notification Hazard Complaint Inspecti
- Event numberEVENT_NO
- 6806020
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionNov 9 to Nov 10, 2022Inspectors 1 | Hours on site 1.5Began: Nov 9, 2022Ended: Nov 10, 2022Activity: Spot InspectionInspectors: 1Hours on site: 1.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 9, 2022
- Closed outINSPECTION_END_DT
- Nov 10, 2022
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6889692
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Verbal Hazard Complaint InspectionsNov 9 to Nov 10, 2022Inspectors 1 | Hours on site 4.5Began: Nov 9, 2022Ended: Nov 10, 2022Activity: Verbal Hazard Complaint InspectionsInspectors: 1Hours on site: 4.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 9, 2022
- Closed outINSPECTION_END_DT
- Nov 10, 2022
- ActivityACTIVITY
- Verbal Hazard Complaint Inspections
- Activity codeACTIVITY_CODE
- E04
- Program areaPROGRAM_AREA
- M/NM--Verbal Hazard Complaint Inspections
- Event numberEVENT_NO
- 6889691
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 7.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 15 to Aug 18, 2022Inspectors 1 | Hours on site 30Began: Aug 15, 2022Ended: Aug 18, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 30Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 15, 2022
- Closed outINSPECTION_END_DT
- Aug 18, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6888868
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 30
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 37.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Verbal Hazard Complaint InspectionsMay 10, 2022Inspectors 1 | Hours on site 8Began: May 10, 2022Ended: May 10, 2022Activity: Verbal Hazard Complaint InspectionsInspectors: 1Hours on site: 8Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 10, 2022
- Closed outINSPECTION_END_DT
- May 10, 2022
- ActivityACTIVITY
- Verbal Hazard Complaint Inspections
- Activity codeACTIVITY_CODE
- E04
- Program areaPROGRAM_AREA
- M/NM--Verbal Hazard Complaint Inspections
- Event numberEVENT_NO
- 6888847
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMar 15 to Mar 18, 2022Inspectors 1 | Hours on site 20.75Began: Mar 15, 2022Ended: Mar 18, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 20.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 15, 2022
- Closed outINSPECTION_END_DT
- Mar 18, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6890212
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 20.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 24.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 19 to Jul 22, 2021Inspectors 2 | Hours on site 36.75Began: Jul 19, 2021Ended: Jul 22, 2021Activity: Regular Safety and Health InspectionInspectors: 2Hours on site: 36.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 19, 2021
- Closed outINSPECTION_END_DT
- Jul 22, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6884082
- InspectorsNBR_INSPECTOR
- 2
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 36.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 46.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJan 11 to Jan 14, 2021Inspectors 2 | Hours on site 57Began: Jan 11, 2021Ended: Jan 14, 2021Activity: Regular Safety and Health InspectionInspectors: 2Hours on site: 57Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 11, 2021
- Closed outINSPECTION_END_DT
- Jan 14, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6884941
- InspectorsNBR_INSPECTOR
- 2
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 57
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 74.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 8 to Jun 11, 2020Inspectors 1 | Hours on site 29.5Began: Jun 8, 2020Ended: Jun 11, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 29.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 8, 2020
- Closed outINSPECTION_END_DT
- Jun 11, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6807696
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 29.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 40
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionNov 4 to Nov 7, 2019Inspectors 2 | Hours on site 29.5Began: Nov 4, 2019Ended: Nov 7, 2019Activity: Regular Safety and Health InspectionInspectors: 2Hours on site: 29.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 4, 2019
- Closed outINSPECTION_END_DT
- Nov 7, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6807659
- InspectorsNBR_INSPECTOR
- 2
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 29.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 46.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 24 to Jun 27, 2019Inspectors 1 | Hours on site 20.25Began: Jun 24, 2019Ended: Jun 27, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 20.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 24, 2019
- Closed outINSPECTION_END_DT
- Jun 27, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6805467
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 20.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 35
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
25 most recent of 95 inspections and other MSHA visits since Feb 3, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Jun 9, 2026Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: None recordedDetails
The citation
- Citation or order numberVIOLATION_NO
- 5176205
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 9, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0837
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 9, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 9, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jun 9, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jun 9, 2026
- Terminated, timeTERMINATION_TIME
- 1101
- Termination typeTERMINATION_TYPE
- Terminated
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038648
- Inspection beganINSPECTION_BEGIN_DT
- Jun 8, 2026
- Inspection closed outINSPECTION_END_DT
- Jun 11, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (21)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID
Issued: Jun 9, 2026Type: CitationStandard: 56.20003(a)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: None recordedDetails
The citation
- Citation or order numberVIOLATION_NO
- 5176207
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 9, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1014
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 9, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 9, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1100
- Latest dueLATEST_TERM_DUE_DT
- Jun 9, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1100
- TerminatedTERMINATION_DT
- Jun 11, 2026
- Terminated, timeTERMINATION_TIME
- 0824
- Termination typeTERMINATION_TYPE
- Terminated
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038648
- Inspection beganINSPECTION_BEGIN_DT
- Jun 8, 2026
- Inspection closed outINSPECTION_END_DT
- Jun 11, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (21)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID
Issued: Jun 9, 2026Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: None recordedDetails
The citation
- Citation or order numberVIOLATION_NO
- 5176206
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 9, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0914
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 9, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 9, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jun 9, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jun 9, 2026
- Terminated, timeTERMINATION_TIME
- 1057
- Termination typeTERMINATION_TYPE
- Terminated
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038648
- Inspection beganINSPECTION_BEGIN_DT
- Jun 8, 2026
- Inspection closed outINSPECTION_END_DT
- Jun 11, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (21)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID
Issued: Apr 8, 2026Type: CitationStandard: 56.14115(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $398.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008386
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 8, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0843
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 8, 2026
- 30 CFR part and sectionPART_SECTION
- 56.14115(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 8, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 8, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 8, 2026
- Terminated, timeTERMINATION_TIME
- 0845
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 398
- Current proposed assessmentAMOUNT_DUE
- 398
- Amount paidAMOUNT_PAID
- 398
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 20, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 8, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 8, 2026Type: CitationStandard: 56.18002(a)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $1,968.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008390
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 8, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1700
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 8, 2026
- 30 CFR part and sectionPART_SECTION
- 56.18002(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 14, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 14, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 21, 2026
- Terminated, timeTERMINATION_TIME
- 2055
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 1968
- Current proposed assessmentAMOUNT_DUE
- 1968
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Last actionLAST_ACTION_CD
- Hearing Case Filed
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 8, 2026Type: CitationStandard: 56.14110S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $398.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008388
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 8, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1205
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 8, 2026
- 30 CFR part and sectionPART_SECTION
- 56.14110
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 8, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 8, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 14, 2026
- Terminated, timeTERMINATION_TIME
- 1120
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 398
- Current proposed assessmentAMOUNT_DUE
- 398
- Amount paidAMOUNT_PAID
- 398
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 20, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 8, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 8, 2026Type: CitationStandard: 56.12068S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $432.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008387
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 8, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0936
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 8, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12068
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 2
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 8, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 8, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 8, 2026
- Terminated, timeTERMINATION_TIME
- 0954
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 432
- Current proposed assessmentAMOUNT_DUE
- 432
- Amount paidAMOUNT_PAID
- 432
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 20, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 8, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 8, 2026Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $398.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008389
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 8, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1349
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 8, 2026
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 8, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 8, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 14, 2026
- Terminated, timeTERMINATION_TIME
- 1124
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 398
- Current proposed assessmentAMOUNT_DUE
- 398
- Amount paidAMOUNT_PAID
- 398
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 20, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 8, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 7, 2026Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $1,818.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008379
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 7, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0946
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 7, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 7, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 7, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 8, 2026
- Terminated, timeTERMINATION_TIME
- 0816
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 1818
- Current proposed assessmentAMOUNT_DUE
- 1818
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Last actionLAST_ACTION_CD
- Hearing Case Filed
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 7, 2026Type: CitationStandard: 56.4102S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $398.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008380
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 7, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1208
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 7, 2026
- 30 CFR part and sectionPART_SECTION
- 56.4102
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 7, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 7, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 14, 2026
- Terminated, timeTERMINATION_TIME
- 1108
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 398
- Current proposed assessmentAMOUNT_DUE
- 398
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Last actionLAST_ACTION_CD
- Hearing Case Filed
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 7, 2026Type: CitationStandard: 56.12008S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $398.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008381
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 7, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1239
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 7, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12008
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 7, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 7, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 14, 2026
- Terminated, timeTERMINATION_TIME
- 1112
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 398
- Current proposed assessmentAMOUNT_DUE
- 398
- Amount paidAMOUNT_PAID
- 398
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 20, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 8, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 7, 2026Type: CitationStandard: 56.12032S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $398.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008383
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 7, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1301
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 7, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 7, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 7, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 14, 2026
- Terminated, timeTERMINATION_TIME
- 1117
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 398
- Current proposed assessmentAMOUNT_DUE
- 398
- Amount paidAMOUNT_PAID
- 398
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 20, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 8, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 7, 2026Type: CitationStandard: 56.12018S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $398.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008385
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 7, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1602
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 7, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12018
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 7, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Apr 7, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Apr 7, 2026
- Terminated, timeTERMINATION_TIME
- 1603
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 398
- Current proposed assessmentAMOUNT_DUE
- 398
- Amount paidAMOUNT_PAID
- 398
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 20, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 8, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 7, 2026Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $1,818.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008384
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 7, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1454
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 7, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 7, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Apr 7, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Apr 8, 2026
- Terminated, timeTERMINATION_TIME
- 0809
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 1818
- Current proposed assessmentAMOUNT_DUE
- 1818
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Last actionLAST_ACTION_CD
- Hearing Case Filed
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 7, 2026Type: CitationStandard: 56.12008S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $398.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008382
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 7, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1240
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 7, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12008
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 7, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 7, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 14, 2026
- Terminated, timeTERMINATION_TIME
- 1115
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 398
- Current proposed assessmentAMOUNT_DUE
- 398
- Amount paidAMOUNT_PAID
- 398
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 20, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 8, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 6, 2026Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $1,818.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008375
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1500
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 6, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 6, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 6, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 6, 2026
- Terminated, timeTERMINATION_TIME
- 1633
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 1818
- Current proposed assessmentAMOUNT_DUE
- 1818
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Last actionLAST_ACTION_CD
- Hearing Case Filed
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 6, 2026Type: CitationStandard: 56.20003(a)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $9,004.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008371
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1247
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 6, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 6, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 6, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 8, 2026
- Terminated, timeTERMINATION_TIME
- 0736
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 9004
- Current proposed assessmentAMOUNT_DUE
- 9004
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Last actionLAST_ACTION_CD
- Hearing Case Filed
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 6, 2026Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $1,818.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008376
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1520
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 6, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 6, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Apr 6, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Apr 6, 2026
- Terminated, timeTERMINATION_TIME
- 1638
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 1818
- Current proposed assessmentAMOUNT_DUE
- 1818
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Last actionLAST_ACTION_CD
- Hearing Case Filed
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 6, 2026Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $1,818.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008373
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1353
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 6, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 6, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Apr 6, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Apr 6, 2026
- Terminated, timeTERMINATION_TIME
- 1628
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 1818
- Current proposed assessmentAMOUNT_DUE
- 1818
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Last actionLAST_ACTION_CD
- Hearing Case Filed
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 6, 2026Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $1,818.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008377
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1536
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 6, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 6, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Apr 6, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Apr 7, 2026
- Terminated, timeTERMINATION_TIME
- 1309
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 1818
- Current proposed assessmentAMOUNT_DUE
- 1818
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Last actionLAST_ACTION_CD
- Hearing Case Filed
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 6, 2026Type: CitationStandard: 56.14112(a)(1)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $398.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008374
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1426
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 6, 2026
- 30 CFR part and sectionPART_SECTION
- 56.14112(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 6, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Apr 6, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Apr 6, 2026
- Terminated, timeTERMINATION_TIME
- 1631
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 398
- Current proposed assessmentAMOUNT_DUE
- 398
- Amount paidAMOUNT_PAID
- 398
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 20, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 8, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 6, 2026Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $1,818.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008370
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1239
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 6, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 6, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 6, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 8, 2026
- Terminated, timeTERMINATION_TIME
- 0734
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 1818
- Current proposed assessmentAMOUNT_DUE
- 1818
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Last actionLAST_ACTION_CD
- Hearing Case Filed
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 6, 2026Type: CitationStandard: 56.14109(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $398.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008378
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1537
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 6, 2026
- 30 CFR part and sectionPART_SECTION
- 56.14109(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 6, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Apr 6, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Apr 7, 2026
- Terminated, timeTERMINATION_TIME
- 1309
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 398
- Current proposed assessmentAMOUNT_DUE
- 398
- Amount paidAMOUNT_PAID
- 398
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 20, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 8, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 6, 2026Type: CitationStandard: 56.20003(a)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $9,004.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5008372
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1300
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 6, 2026
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 6, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 6, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 8, 2026
- Terminated, timeTERMINATION_TIME
- 0738
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 9004
- Current proposed assessmentAMOUNT_DUE
- 9004
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Last actionLAST_ACTION_CD
- Hearing Case Filed
- Last action dateLAST_ACTION_DT
- Jul 14, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F038640
- Inspection beganINSPECTION_BEGIN_DT
- Apr 6, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 16, 2026
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 29, 2025Type: CitationStandard: 56.20003(a)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $959.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5007682
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1052
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 29, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Oct 29, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Oct 29, 2025
- Terminated, timeTERMINATION_TIME
- 1243
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 959
- Current proposed assessmentAMOUNT_DUE
- 959
- Amount paidAMOUNT_PAID
- 959
- Bill first printedBILL_PRINT_DT
- Dec 18, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 25, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 11, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 28
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 17
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Lime Company
- Operator IDVIOLATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Inspection eventEVENT_NO
- F025879
- Inspection beganINSPECTION_BEGIN_DT
- Oct 27, 2025
- Inspection closed outINSPECTION_END_DT
- Oct 30, 2025
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
461 citations and orders since Nov 21, 2000: 404 issued to the operator, 57 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Apr 8, 2026Citation number: 5008387Standard: 56.12068Proposed penalty: $432.00Current assessment: $432.00Paid against proposed penalty: $432.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008387
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 8, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 8, 2026
- Final order dateFINAL_ORDER_DT
- Jun 20, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 20, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12068
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 432.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 432.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 432.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 73
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 2
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 3.07
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 8, 2025
- History period endHISTORY_END_DT
- Apr 7, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 8, 2026Citation number: 5008388Standard: 56.14110Proposed penalty: $398.00Current assessment: $398.00Paid against proposed penalty: $398.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008388
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 8, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 8, 2026
- Final order dateFINAL_ORDER_DT
- Jun 20, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 20, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14110
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 398.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 398.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 398.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 72
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 3.07
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 8, 2025
- History period endHISTORY_END_DT
- Apr 7, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 8, 2026Citation number: 5008389Standard: 56.14100(b)Proposed penalty: $398.00Current assessment: $398.00Paid against proposed penalty: $398.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008389
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 8, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 8, 2026
- Final order dateFINAL_ORDER_DT
- Jun 20, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 20, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 398.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 398.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 398.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 72
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 3.07
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.071
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 8, 2025
- History period endHISTORY_END_DT
- Apr 7, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 8, 2026Citation number: 5008386Standard: 56.14115(b)Proposed penalty: $398.00Current assessment: $398.00Paid against proposed penalty: $398.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008386
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 8, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 8, 2026
- Final order dateFINAL_ORDER_DT
- Jun 20, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 20, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14115(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 398.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 398.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 398.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 72
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 3.07
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 8, 2025
- History period endHISTORY_END_DT
- Apr 7, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 8, 2026Citation number: 5008390Standard: 56.18002(a)Proposed penalty: $1,968.00Current assessment: $1,968.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008390
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 8, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 8, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.18002(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 1968.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 1968.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 92
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 3.07
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.071
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 8, 2025
- History period endHISTORY_END_DT
- Apr 7, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 7, 2026Citation number: 5008384Standard: 56.20003(a)Proposed penalty: $1,818.00Current assessment: $1,818.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008384
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 7, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 7, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 1818.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 1818.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 91
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
- 19
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 3.07
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 9
- Repeat violations per inspection dayRPID
- 0.643
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 7, 2025
- History period endHISTORY_END_DT
- Apr 6, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 7, 2026Citation number: 5008379Standard: 56.20003(a)Proposed penalty: $1,818.00Current assessment: $1,818.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008379
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 7, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 7, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 1818.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 1818.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 91
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
- 19
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 3.07
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 9
- Repeat violations per inspection dayRPID
- 0.643
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 7, 2025
- History period endHISTORY_END_DT
- Apr 6, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 7, 2026Citation number: 5008382Standard: 56.12008Proposed penalty: $398.00Current assessment: $398.00Paid against proposed penalty: $398.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008382
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 7, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 7, 2026
- Final order dateFINAL_ORDER_DT
- Jun 20, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 20, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12008
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 398.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 398.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 398.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 72
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 3.07
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 7, 2025
- History period endHISTORY_END_DT
- Apr 6, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 7, 2026Citation number: 5008385Standard: 56.12018Proposed penalty: $398.00Current assessment: $398.00Paid against proposed penalty: $398.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008385
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 7, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 7, 2026
- Final order dateFINAL_ORDER_DT
- Jun 20, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 20, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12018
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 398.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 398.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 398.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 72
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 3.07
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 3
- Repeat violations per inspection dayRPID
- 0.214
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 7, 2025
- History period endHISTORY_END_DT
- Apr 6, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 7, 2026Citation number: 5008380Standard: 56.4102Proposed penalty: $398.00Current assessment: $398.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008380
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 7, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 7, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4102
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 398.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 398.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 72
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 3.07
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 7, 2025
- History period endHISTORY_END_DT
- Apr 6, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 7, 2026Citation number: 5008383Standard: 56.12032Proposed penalty: $398.00Current assessment: $398.00Paid against proposed penalty: $398.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008383
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 7, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 7, 2026
- Final order dateFINAL_ORDER_DT
- Jun 20, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 20, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 398.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 398.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 398.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 72
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 3.07
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 7, 2025
- History period endHISTORY_END_DT
- Apr 6, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 7, 2026Citation number: 5008381Standard: 56.12008Proposed penalty: $398.00Current assessment: $398.00Paid against proposed penalty: $398.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008381
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 7, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 7, 2026
- Final order dateFINAL_ORDER_DT
- Jun 20, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 20, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12008
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 398.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 398.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 398.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 72
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 14
- Violations per inspection dayVPID
- 3.07
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 7, 2025
- History period endHISTORY_END_DT
- Apr 6, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 6, 2026Citation number: 5008373Standard: 56.20003(a)Proposed penalty: $1,818.00Current assessment: $1,818.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008373
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 6, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 6, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 1818.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 1818.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 91
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
- 19
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 3.31
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 9
- Repeat violations per inspection dayRPID
- 0.692
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 6, 2025
- History period endHISTORY_END_DT
- Apr 5, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 6, 2026Citation number: 5008371Standard: 56.20003(a)Proposed penalty: $9,004.00Current assessment: $9,004.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008371
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 6, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 6, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 9004.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 9004.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 111
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
- 19
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 3.31
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 9
- Repeat violations per inspection dayRPID
- 0.692
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 6, 2025
- History period endHISTORY_END_DT
- Apr 5, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 6, 2026Citation number: 5008375Standard: 56.20003(a)Proposed penalty: $1,818.00Current assessment: $1,818.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008375
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 6, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 6, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 1818.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 1818.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 91
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
- 19
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 3.31
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 9
- Repeat violations per inspection dayRPID
- 0.692
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 6, 2025
- History period endHISTORY_END_DT
- Apr 5, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 6, 2026Citation number: 5008372Standard: 56.20003(a)Proposed penalty: $9,004.00Current assessment: $9,004.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008372
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 6, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 6, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 9004.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 9004.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 111
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
- 19
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 3.31
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 9
- Repeat violations per inspection dayRPID
- 0.692
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 6, 2025
- History period endHISTORY_END_DT
- Apr 5, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 6, 2026Citation number: 5008378Standard: 56.14109(a)Proposed penalty: $398.00Current assessment: $398.00Paid against proposed penalty: $398.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008378
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 6, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 6, 2026
- Final order dateFINAL_ORDER_DT
- Jun 20, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 20, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14109(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 398.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 398.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 398.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 72
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 3.31
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 6, 2025
- History period endHISTORY_END_DT
- Apr 5, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 6, 2026Citation number: 5008370Standard: 56.20003(a)Proposed penalty: $1,818.00Current assessment: $1,818.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008370
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 6, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 6, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 1818.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 1818.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 91
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
- 19
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 3.31
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 9
- Repeat violations per inspection dayRPID
- 0.692
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 6, 2025
- History period endHISTORY_END_DT
- Apr 5, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 6, 2026Citation number: 5008376Standard: 56.20003(a)Proposed penalty: $1,818.00Current assessment: $1,818.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008376
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 6, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 6, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 1818.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 1818.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 91
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
- 19
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 3.31
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 9
- Repeat violations per inspection dayRPID
- 0.692
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 6, 2025
- History period endHISTORY_END_DT
- Apr 5, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 6, 2026Citation number: 5008374Standard: 56.14112(a)(1)Proposed penalty: $398.00Current assessment: $398.00Paid against proposed penalty: $398.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008374
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 6, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 6, 2026
- Final order dateFINAL_ORDER_DT
- Jun 20, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 20, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14112(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 398.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 398.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 398.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 72
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 3.31
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.077
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 6, 2025
- History period endHISTORY_END_DT
- Apr 5, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 6, 2026Citation number: 5008377Standard: 56.20003(a)Proposed penalty: $1,818.00Current assessment: $1,818.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5008377
- Assessment control numberASSESS_CASE_NO
- 000641397
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jun 9, 2026
- Citation issuedISSUE_DT
- Apr 6, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 6, 2026
- Bill first printedBILL_PRINT_DT
- May 14, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 1818.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 1818.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 91
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
- 19
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 43
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 13
- Violations per inspection dayVPID
- 3.31
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 9
- Repeat violations per inspection dayRPID
- 0.692
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 128479
- Size of mineSIZE_OF_MINE
- 128479
- Controller hours workedCONTROLLER_HRS
- 641254
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641254
- History period startHISTORY_START_DT
- Jan 6, 2025
- History period endHISTORY_END_DT
- Apr 5, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F038640
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 29, 2025Citation number: 5007682Standard: 56.20003(a)Proposed penalty: $959.00Current assessment: $959.00Paid against proposed penalty: $959.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007682
- Assessment control numberASSESS_CASE_NO
- 000633238
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 11, 2026
- Citation issuedISSUE_DT
- Oct 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 29, 2025
- Final order dateFINAL_ORDER_DT
- Jan 25, 2026
- Bill first printedBILL_PRINT_DT
- Dec 18, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 25, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 959.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 959.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 959.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 83
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 16
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 28
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 17
- Violations per inspection dayVPID
- 1.65
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 3
- Repeat violations per inspection dayRPID
- 0.176
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 119789
- Size of mineSIZE_OF_MINE
- 119789
- Controller hours workedCONTROLLER_HRS
- 643218
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 643218
- History period startHISTORY_START_DT
- Jul 29, 2024
- History period endHISTORY_END_DT
- Oct 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F025879
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 29, 2025Citation number: 5007679Standard: 56.16005Proposed penalty: $193.00Current assessment: $193.00Paid against proposed penalty: $193.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007679
- Assessment control numberASSESS_CASE_NO
- 000633238
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 11, 2026
- Citation issuedISSUE_DT
- Oct 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 29, 2025
- Final order dateFINAL_ORDER_DT
- Jan 25, 2026
- Bill first printedBILL_PRINT_DT
- Dec 18, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 25, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.16005
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 193.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 193.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 193.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 63
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 16
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 28
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 17
- Violations per inspection dayVPID
- 1.65
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 2
- Repeat violations per inspection dayRPID
- 0.118
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 119789
- Size of mineSIZE_OF_MINE
- 119789
- Controller hours workedCONTROLLER_HRS
- 643218
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 643218
- History period startHISTORY_START_DT
- Jul 29, 2024
- History period endHISTORY_END_DT
- Oct 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F025879
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 29, 2025Citation number: 5007681Standard: 56.14107(a)Proposed penalty: $288.00Current assessment: $288.00Paid against proposed penalty: $288.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007681
- Assessment control numberASSESS_CASE_NO
- 000633238
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 11, 2026
- Citation issuedISSUE_DT
- Oct 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 29, 2025
- Final order dateFINAL_ORDER_DT
- Jan 25, 2026
- Bill first printedBILL_PRINT_DT
- Dec 18, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 25, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 288.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 288.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 288.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 68
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 16
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 28
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 17
- Violations per inspection dayVPID
- 1.65
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 2
- Repeat violations per inspection dayRPID
- 0.118
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 119789
- Size of mineSIZE_OF_MINE
- 119789
- Controller hours workedCONTROLLER_HRS
- 643218
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 643218
- History period startHISTORY_START_DT
- Jul 29, 2024
- History period endHISTORY_END_DT
- Oct 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F025879
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (9)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 29, 2025Citation number: 5007680Standard: 56.16006Proposed penalty: $193.00Current assessment: $193.00Paid against proposed penalty: $193.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007680
- Assessment control numberASSESS_CASE_NO
- 000633238
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 11, 2026
- Citation issuedISSUE_DT
- Oct 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 29, 2025
- Final order dateFINAL_ORDER_DT
- Jan 25, 2026
- Bill first printedBILL_PRINT_DT
- Dec 18, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 25, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.16006
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 193.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 193.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 193.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 63
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 16
- Mine size pointsMINE_SIZE_POINTS
- 6
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 28
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 17
- Violations per inspection dayVPID
- 1.65
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 119789
- Size of mineSIZE_OF_MINE
- 119789
- Controller hours workedCONTROLLER_HRS
- 643218
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 643218
- History period startHISTORY_START_DT
- Jul 29, 2024
- History period endHISTORY_END_DT
- Oct 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Lime Company
- IDVIOLATOR_ID
- L11945
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Aug 20, 1989
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F025879
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 453 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Contested citations and decisions
Contested: Jun 9, 2026Citation issued: Apr 8, 2026Docket: CENT 2026-0210Standard: 56.18002(a)Proposed penalty: $1,968.00Penalty after decision: None recordedDecided: Not recordedDecision type: Not recordedDetails
The contest
- Citation or order numberCITATION_NO
- 5008390
- Citation issuedCITATION_ISSUE_DT
- Apr 8, 2026
- Hearing request receivedCONTEST_DT
- Jun 9, 2026
- Docket numberDOCKET_NO
- CENT 2026-0210
- Assessment typeASSESS_TYPE_CODE
- Regular
- Petition duePETITION_DUE_DT
- Jul 24, 2026
- Petition filedPETITION_FILED_DT
- Jul 14, 2026
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 1968.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.18002(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (15)
Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jun 9, 2026Citation issued: Apr 7, 2026Docket: CENT 2026-0210Standard: 56.20003(a)Proposed penalty: $1,818.00Penalty after decision: None recordedDecided: Not recordedDecision type: Not recordedDetails
The contest
- Citation or order numberCITATION_NO
- 5008384
- Citation issuedCITATION_ISSUE_DT
- Apr 7, 2026
- Hearing request receivedCONTEST_DT
- Jun 9, 2026
- Docket numberDOCKET_NO
- CENT 2026-0210
- Assessment typeASSESS_TYPE_CODE
- Regular
- Petition duePETITION_DUE_DT
- Jul 24, 2026
- Petition filedPETITION_FILED_DT
- Jul 14, 2026
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 1818.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (15)
Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jun 9, 2026Citation issued: Apr 7, 2026Docket: CENT 2026-0210Standard: 56.4102Proposed penalty: $398.00Penalty after decision: None recordedDecided: Not recordedDecision type: Not recordedDetails
The contest
- Citation or order numberCITATION_NO
- 5008380
- Citation issuedCITATION_ISSUE_DT
- Apr 7, 2026
- Hearing request receivedCONTEST_DT
- Jun 9, 2026
- Docket numberDOCKET_NO
- CENT 2026-0210
- Assessment typeASSESS_TYPE_CODE
- Regular
- Petition duePETITION_DUE_DT
- Jul 24, 2026
- Petition filedPETITION_FILED_DT
- Jul 14, 2026
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 398.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.4102
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (15)
Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jun 9, 2026Citation issued: Apr 7, 2026Docket: CENT 2026-0210Standard: 56.20003(a)Proposed penalty: $1,818.00Penalty after decision: None recordedDecided: Not recordedDecision type: Not recordedDetails
The contest
- Citation or order numberCITATION_NO
- 5008379
- Citation issuedCITATION_ISSUE_DT
- Apr 7, 2026
- Hearing request receivedCONTEST_DT
- Jun 9, 2026
- Docket numberDOCKET_NO
- CENT 2026-0210
- Assessment typeASSESS_TYPE_CODE
- Regular
- Petition duePETITION_DUE_DT
- Jul 24, 2026
- Petition filedPETITION_FILED_DT
- Jul 14, 2026
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 1818.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (15)
Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jun 9, 2026Citation issued: Apr 6, 2026Docket: CENT 2026-0210Standard: 56.20003(a)Proposed penalty: $1,818.00Penalty after decision: None recordedDecided: Not recordedDecision type: Not recordedDetails
The contest
- Citation or order numberCITATION_NO
- 5008376
- Citation issuedCITATION_ISSUE_DT
- Apr 6, 2026
- Hearing request receivedCONTEST_DT
- Jun 9, 2026
- Docket numberDOCKET_NO
- CENT 2026-0210
- Assessment typeASSESS_TYPE_CODE
- Regular
- Petition duePETITION_DUE_DT
- Jul 24, 2026
- Petition filedPETITION_FILED_DT
- Jul 14, 2026
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 1818.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (15)
Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jun 9, 2026Citation issued: Apr 6, 2026Docket: CENT 2026-0210Standard: 56.20003(a)Proposed penalty: $1,818.00Penalty after decision: None recordedDecided: Not recordedDecision type: Not recordedDetails
The contest
- Citation or order numberCITATION_NO
- 5008377
- Citation issuedCITATION_ISSUE_DT
- Apr 6, 2026
- Hearing request receivedCONTEST_DT
- Jun 9, 2026
- Docket numberDOCKET_NO
- CENT 2026-0210
- Assessment typeASSESS_TYPE_CODE
- Regular
- Petition duePETITION_DUE_DT
- Jul 24, 2026
- Petition filedPETITION_FILED_DT
- Jul 14, 2026
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 1818.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (15)
Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jun 9, 2026Citation issued: Apr 6, 2026Docket: CENT 2026-0210Standard: 56.20003(a)Proposed penalty: $1,818.00Penalty after decision: None recordedDecided: Not recordedDecision type: Not recordedDetails
The contest
- Citation or order numberCITATION_NO
- 5008370
- Citation issuedCITATION_ISSUE_DT
- Apr 6, 2026
- Hearing request receivedCONTEST_DT
- Jun 9, 2026
- Docket numberDOCKET_NO
- CENT 2026-0210
- Assessment typeASSESS_TYPE_CODE
- Regular
- Petition duePETITION_DUE_DT
- Jul 24, 2026
- Petition filedPETITION_FILED_DT
- Jul 14, 2026
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 1818.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (15)
Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jun 9, 2026Citation issued: Apr 6, 2026Docket: CENT 2026-0210Standard: 56.20003(a)Proposed penalty: $1,818.00Penalty after decision: None recordedDecided: Not recordedDecision type: Not recordedDetails
The contest
- Citation or order numberCITATION_NO
- 5008373
- Citation issuedCITATION_ISSUE_DT
- Apr 6, 2026
- Hearing request receivedCONTEST_DT
- Jun 9, 2026
- Docket numberDOCKET_NO
- CENT 2026-0210
- Assessment typeASSESS_TYPE_CODE
- Regular
- Petition duePETITION_DUE_DT
- Jul 24, 2026
- Petition filedPETITION_FILED_DT
- Jul 14, 2026
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 1818.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (15)
Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jun 9, 2026Citation issued: Apr 6, 2026Docket: CENT 2026-0210Standard: 56.20003(a)Proposed penalty: $9,004.00Penalty after decision: None recordedDecided: Not recordedDecision type: Not recordedDetails
The contest
- Citation or order numberCITATION_NO
- 5008371
- Citation issuedCITATION_ISSUE_DT
- Apr 6, 2026
- Hearing request receivedCONTEST_DT
- Jun 9, 2026
- Docket numberDOCKET_NO
- CENT 2026-0210
- Assessment typeASSESS_TYPE_CODE
- Regular
- Petition duePETITION_DUE_DT
- Jul 24, 2026
- Petition filedPETITION_FILED_DT
- Jul 14, 2026
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 9004.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (15)
Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jun 9, 2026Citation issued: Apr 6, 2026Docket: CENT 2026-0210Standard: 56.20003(a)Proposed penalty: $1,818.00Penalty after decision: None recordedDecided: Not recordedDecision type: Not recordedDetails
The contest
- Citation or order numberCITATION_NO
- 5008375
- Citation issuedCITATION_ISSUE_DT
- Apr 6, 2026
- Hearing request receivedCONTEST_DT
- Jun 9, 2026
- Docket numberDOCKET_NO
- CENT 2026-0210
- Assessment typeASSESS_TYPE_CODE
- Regular
- Petition duePETITION_DUE_DT
- Jul 24, 2026
- Petition filedPETITION_FILED_DT
- Jul 14, 2026
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 1818.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (15)
Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jun 9, 2026Citation issued: Apr 6, 2026Docket: CENT 2026-0210Standard: 56.20003(a)Proposed penalty: $9,004.00Penalty after decision: None recordedDecided: Not recordedDecision type: Not recordedDetails
The contest
- Citation or order numberCITATION_NO
- 5008372
- Citation issuedCITATION_ISSUE_DT
- Apr 6, 2026
- Hearing request receivedCONTEST_DT
- Jun 9, 2026
- Docket numberDOCKET_NO
- CENT 2026-0210
- Assessment typeASSESS_TYPE_CODE
- Regular
- Petition duePETITION_DUE_DT
- Jul 24, 2026
- Petition filedPETITION_FILED_DT
- Jul 14, 2026
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 9004.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (15)
Decided byDOCKET_DECISION_BY_CODE, Judge, first nameJUDGE_FIRST_NAME, Judge, last nameJUDGE_LAST_NAME, Decision typeDOCKET_DECISION_TYPE_CODE, DecidedDECISION_DT, Petition extension datePETITION_EXTENSION_DT, Penalty after the decisionDECISION_PENALTY_AMT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Sep 7, 2025Citation issued: Jun 24, 2025Docket: CENT 2025-0364Standard: 46.5(b)Proposed penalty: $6,708.00Penalty after decision: $2,021.00Decided: Jan 30, 2026Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 5001959
- Citation issuedCITATION_ISSUE_DT
- Jun 24, 2025
- Hearing request receivedCONTEST_DT
- Sep 7, 2025
- Docket numberDOCKET_NO
- CENT 2025-0364
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- David
- Judge, last nameJUDGE_LAST_NAME
- Simonton
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Jan 30, 2026
- Petition duePETITION_DUE_DT
- Oct 22, 2025
- Petition filedPETITION_FILED_DT
- Nov 19, 2025
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 6708.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 2021.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 46.5(b)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Order
- Type when decidedDECISION_CITATION_TYPE_CODE
- Order
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(g)(1)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(g)(1)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 2
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 2
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- HighNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Feb 14, 2024Citation issued: Dec 11, 2023Docket: CENT 2024-0136Standard: 56.14207Proposed penalty: $357.00Penalty after decision: $147.00Decided: Sep 19, 2024Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 9744752
- Citation issuedCITATION_ISSUE_DT
- Dec 11, 2023
- Hearing request receivedCONTEST_DT
- Feb 14, 2024
- Docket numberDOCKET_NO
- CENT 2024-0136
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- John
- Judge, last nameJUDGE_LAST_NAME
- Sullivan
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Sep 19, 2024
- Petition duePETITION_DUE_DT
- Apr 1, 2024
- Petition filedPETITION_FILED_DT
- Mar 28, 2024
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 357.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 147.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14207
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Aug 16, 2016Citation issued: Aug 1, 2016Docket: CENT 2016-0509Standard: 56.14100(b)Proposed penalty: $3,200.00Penalty after decision: $2,400.00Decided: Mar 2, 2017Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8859078-00025593A
- Citation issuedCITATION_ISSUE_DT
- Aug 1, 2016
- Hearing request receivedCONTEST_DT
- Aug 16, 2016
- Docket numberDOCKET_NO
- CENT 2016-0509
- Assessment typeASSESS_TYPE_CODE
- Special
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Alan
- Judge, last nameJUDGE_LAST_NAME
- Paez
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Mar 2, 2017
- Petition duePETITION_DUE_DT
- Sep 30, 2016
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 3200.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 2400.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14100(b)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(d)(1)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(d)(1)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Permanent
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Permanent
- Negligence when contestedORIGINAL_NEGLIGENCE
- HighNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- HighNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR600
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (3)
Petition extension datePETITION_EXTENSION_DT, Petition filedPETITION_FILED_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Aug 26, 2015Citation issued: Apr 15, 2015Docket: CENT 2015-0588Standard: 56.14100(b)Proposed penalty: $6,800.00Penalty after decision: $5,100.00Decided: Mar 2, 2017Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8859078
- Citation issuedCITATION_ISSUE_DT
- Apr 15, 2015
- Hearing request receivedCONTEST_DT
- Aug 26, 2015
- Docket numberDOCKET_NO
- CENT 2015-0588
- Assessment typeASSESS_TYPE_CODE
- Special
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Alan
- Judge, last nameJUDGE_LAST_NAME
- Paez
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Mar 2, 2017
- Petition duePETITION_DUE_DT
- Oct 13, 2015
- Petition filedPETITION_FILED_DT
- Aug 28, 2015
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 6800.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 5100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14100(b)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(d)(1)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Permanent
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Permanent
- Negligence when contestedORIGINAL_NEGLIGENCE
- HighNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- HighNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- SOL
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- SR600
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (1)
S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Apr 9, 2014Citation issued: Jan 15, 2014Docket: CENT 2014-0309Standard: 56.14206(b)Proposed penalty: $425.00Penalty after decision: $425.00Decided: Aug 20, 2014Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8769344
- Citation issuedCITATION_ISSUE_DT
- Jan 15, 2014
- Hearing request receivedCONTEST_DT
- Apr 9, 2014
- Docket numberDOCKET_NO
- CENT 2014-0309
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Aug 20, 2014
- Petition duePETITION_DUE_DT
- May 27, 2014
- Petition filedPETITION_FILED_DT
- Apr 16, 2014
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 425.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 425.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14206(b)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Permanent
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Permanent
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jul 18, 2013Citation issued: May 7, 2013Docket: CENT 2013-604MStandard: 56.4100(b)Proposed penalty: $100.00Penalty after decision: $0.00Decided: Nov 13, 2013Decision type: WithdrawalDetails
The contest
- Citation or order numberCITATION_NO
- 8688691
- Citation issuedCITATION_ISSUE_DT
- May 7, 2013
- Hearing request receivedCONTEST_DT
- Jul 18, 2013
- Docket numberDOCKET_NO
- CENT 2013-604M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Withdrawal
- DecidedDECISION_DT
- Nov 13, 2013
- Petition duePETITION_DUE_DT
- Sep 3, 2013
- Petition filedPETITION_FILED_DT
- Jul 25, 2013
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.4100(b)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as 0 (1)
Penalty after the decisionDECISION_PENALTY_AMT
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (9)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jul 18, 2013Citation issued: May 7, 2013Docket: CENT 2013-604MStandard: 56.4104(a)Proposed penalty: $100.00Penalty after decision: $100.00Decided: Nov 13, 2013Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8686106
- Citation issuedCITATION_ISSUE_DT
- May 7, 2013
- Hearing request receivedCONTEST_DT
- Jul 18, 2013
- Docket numberDOCKET_NO
- CENT 2013-604M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Nov 13, 2013
- Petition duePETITION_DUE_DT
- Sep 3, 2013
- Petition filedPETITION_FILED_DT
- Jul 25, 2013
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.4104(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Jul 18, 2013Citation issued: May 7, 2013Docket: CENT 2013-604MStandard: 56.4101Proposed penalty: $100.00Penalty after decision: $0.00Decided: Nov 13, 2013Decision type: WithdrawalDetails
The contest
- Citation or order numberCITATION_NO
- 8688693
- Citation issuedCITATION_ISSUE_DT
- May 7, 2013
- Hearing request receivedCONTEST_DT
- Jul 18, 2013
- Docket numberDOCKET_NO
- CENT 2013-604M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Withdrawal
- DecidedDECISION_DT
- Nov 13, 2013
- Petition duePETITION_DUE_DT
- Sep 3, 2013
- Petition filedPETITION_FILED_DT
- Jul 25, 2013
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.4101
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as 0 (1)
Penalty after the decisionDECISION_PENALTY_AMT
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (9)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Jul 18, 2013Citation issued: May 7, 2013Docket: CENT 2013-604MStandard: 47.41(a)Proposed penalty: $100.00Penalty after decision: $100.00Decided: Nov 13, 2013Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8686105
- Citation issuedCITATION_ISSUE_DT
- May 7, 2013
- Hearing request receivedCONTEST_DT
- Jul 18, 2013
- Docket numberDOCKET_NO
- CENT 2013-604M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Margaret
- Judge, last nameJUDGE_LAST_NAME
- Miller
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Nov 13, 2013
- Petition duePETITION_DUE_DT
- Sep 3, 2013
- Petition filedPETITION_FILED_DT
- Jul 25, 2013
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 47.41(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- NoLikelihood
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- NoLikelihood
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- NoLostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- NoLostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as 0 (2)
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Feb 7, 2013Citation issued: Nov 29, 2012Docket: CENT 2013-274MStandard: 50.30(a)Proposed penalty: $100.00Penalty after decision: $100.00Decided: Jun 12, 2013Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8679953
- Citation issuedCITATION_ISSUE_DT
- Nov 29, 2012
- Hearing request receivedCONTEST_DT
- Feb 7, 2013
- Docket numberDOCKET_NO
- CENT 2013-274M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- David
- Judge, last nameJUDGE_LAST_NAME
- Simonton
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Jun 12, 2013
- Petition duePETITION_DUE_DT
- Mar 25, 2013
- Petition filedPETITION_FILED_DT
- Feb 26, 2013
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 50.30(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- NoLikelihood
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- NoLikelihood
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- NoLostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- NoLostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- LowNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as 0 (2)
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Feb 7, 2013Citation issued: Nov 28, 2012Docket: CENT 2013-274MStandard: 56.12034Proposed penalty: $100.00Penalty after decision: $0.00Decided: Jun 12, 2013Decision type: WithdrawalDetails
The contest
- Citation or order numberCITATION_NO
- 8679949
- Citation issuedCITATION_ISSUE_DT
- Nov 28, 2012
- Hearing request receivedCONTEST_DT
- Feb 7, 2013
- Docket numberDOCKET_NO
- CENT 2013-274M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- David
- Judge, last nameJUDGE_LAST_NAME
- Simonton
- Decision typeDOCKET_DECISION_TYPE_CODE
- Withdrawal
- DecidedDECISION_DT
- Jun 12, 2013
- Petition duePETITION_DUE_DT
- Mar 25, 2013
- Petition filedPETITION_FILED_DT
- Feb 26, 2013
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.12034
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as 0 (1)
Penalty after the decisionDECISION_PENALTY_AMT
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (9)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Feb 7, 2013Citation issued: Nov 27, 2012Docket: CENT 2013-274MStandard: 56.9300(a)Proposed penalty: $334.00Penalty after decision: $334.00Decided: Jun 12, 2013Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8679948
- Citation issuedCITATION_ISSUE_DT
- Nov 27, 2012
- Hearing request receivedCONTEST_DT
- Feb 7, 2013
- Docket numberDOCKET_NO
- CENT 2013-274M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- David
- Judge, last nameJUDGE_LAST_NAME
- Simonton
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Jun 12, 2013
- Petition duePETITION_DUE_DT
- Mar 25, 2013
- Petition filedPETITION_FILED_DT
- Feb 26, 2013
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 334.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 334.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.9300(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Feb 7, 2013Citation issued: Nov 27, 2012Docket: CENT 2013-274MStandard: 56.4101Proposed penalty: $100.00Penalty after decision: $0.00Decided: Jun 12, 2013Decision type: WithdrawalDetails
The contest
- Citation or order numberCITATION_NO
- 8679946
- Citation issuedCITATION_ISSUE_DT
- Nov 27, 2012
- Hearing request receivedCONTEST_DT
- Feb 7, 2013
- Docket numberDOCKET_NO
- CENT 2013-274M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- David
- Judge, last nameJUDGE_LAST_NAME
- Simonton
- Decision typeDOCKET_DECISION_TYPE_CODE
- Withdrawal
- DecidedDECISION_DT
- Jun 12, 2013
- Petition duePETITION_DUE_DT
- Mar 25, 2013
- Petition filedPETITION_FILED_DT
- Feb 26, 2013
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.4101
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- LowNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as 0 (1)
Penalty after the decisionDECISION_PENALTY_AMT
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (9)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Nov 9, 2012Citation issued: Sep 6, 2012Docket: CENT 2013-98MStandard: 56.4102Proposed penalty: $100.00Penalty after decision: $100.00Decided: Apr 3, 2013Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8627774
- Citation issuedCITATION_ISSUE_DT
- Sep 6, 2012
- Hearing request receivedCONTEST_DT
- Nov 9, 2012
- Docket numberDOCKET_NO
- CENT 2013-98M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- David
- Judge, last nameJUDGE_LAST_NAME
- Simonton
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Apr 3, 2013
- Petition duePETITION_DUE_DT
- Dec 24, 2012
- Petition filedPETITION_FILED_DT
- Nov 28, 2012
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.4102
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
25 most recent of 60 contested citations and orders; decision types are MSHA's own text.
Imminent danger orders, section 107(a)
Issued: Oct 25, 2016Order number: 8959996Terminated: Dec 7, 2016Issued to: OperatorDetails
The order
- Order numberVIOLATION_NO
- 8959996
- IssuedVIOLATION_DATE_ISSUED
- Oct 25, 2016
- TerminatedTERMINATION_DATE
- Dec 7, 2016
- Issued toVIOLATOR_TYPE
- Operator
Who
- Operator at the timeOPERATOR_NAME_VIOLATIONS
- Arkansas Lime Company
- Controller at the timeCONTROLLER_NAME_VIOLATIONS
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID_VIOLATIONS
- M08976
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- StateSTATE_ABBREVIATION
- AR
- Coal or Metal/Non-MetalCOAL_OR_METAL
- M
Not recorded by MSHA (2)
ContractorCONTRACTOR_NAME, Contractor IDCONTRACTOR_ID
1 imminent danger order in MSHA's list, which starts July 1, 2010.
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- NO DYS AWY FRM WRK,NO RSTR ACT
- 46
- DAYS RESTRICTED ACTIVITY ONLY
- 16
- DAYS AWAY FROM WORK ONLY
- 16
- DYS AWY FRM WRK & RESTRCTD ACT
- 5
- OCCUPATNAL ILLNESS NOT DEG 1-6
- 3
- INJURIES DUE TO NATURAL CAUSES
- 2
- NO VALUE FOUND
- 1
- INJURIES INVOLVNG NONEMPLOYEES
- 1
Date: Aug 2, 2026Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: SLIP OR FALL OF PERSONAccident type: Fall to the walkway or working surfaceDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220262220011
- DateACCIDENT_DT
- Aug 2, 2026
- TimeACCIDENT_TIME
- 0845
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall to the walkway or working surface
- Accident type codeACCIDENT_TYPE_CD
- 17
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320262240017
Injury
- Activity at the timeACTIVITY
- Idle
- Activity codeACTIVITY_CD
- 034
- Source of injuryINJURY_SOURCE
- FLOOR,WALKING SURF-NOT UG
- Source of injury codeINJURY_SOURCE_CD
- 010
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- HEAD,NEC
- Part of body codeINJ_BODY_PART_CD
- 100
- Permanently transferred or terminatedTRANS_TERM
- Y
- Returned to workRETURN_TO_WORK_DT
- Aug 7, 2026
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Contractor IDCONTRACTOR_ID
- A9822
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO
Date: Dec 11, 2025Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDLING OF MATERIALSAccident type: Absorption of radiations, caustics, toxic and noxious substancesDays lost: 1Details
The report
- Document numberDOCUMENT_NO
- 220253560009
- DateACCIDENT_DT
- Dec 11, 2025
- TimeACCIDENT_TIME
- 0100
- Shift beganSHIFT_BEGIN_TIME
- 1800
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Absorption of radiations, caustics, toxic and noxious substances
- Accident type codeACCIDENT_TYPE_CD
- 38
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- ACIDS,ALKALI,WET CEMENT
- Source of injury codeINJURY_SOURCE_CD
- 021
- Nature of injuryNATURE_INJURY
- BURN,CHEMICL-FUME,COMPOUN
- Nature of injury codeNATURE_INJURY_CD
- 130
- Part of bodyINJ_BODY_PART
- HIPS (PELVIS/ORGANS/KIDNEYS/BUTTOCKS)
- Part of body codeINJ_BODY_PART_CD
- 440
- Days lostDAYS_LOST
- 1
- Returned to workRETURN_TO_WORK_DT
- Dec 18, 2025
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Contractor IDCONTRACTOR_ID
- A9822
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO
Date: Jan 10, 2025Degree of injury: DAYS AWAY FROM WORK ONLYClassification: SLIP OR FALL OF PERSONAccident type: Fall to the walkway or working surfaceDays lost: 2Details
The report
- Document numberDOCUMENT_NO
- 220250300010
- DateACCIDENT_DT
- Jan 10, 2025
- TimeACCIDENT_TIME
- 1500
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall to the walkway or working surface
- Accident type codeACCIDENT_TYPE_CD
- 17
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320250360008
Injury
- Activity at the timeACTIVITY
- Walking, Running
- Activity codeACTIVITY_CD
- 092
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- UNCLASSIFIED,NOT DETERMED
- Nature of injury codeNATURE_INJURY_CD
- 400
- Part of bodyINJ_BODY_PART
- CHEST (RIBS/BREAST BONE/CHEST ORGNS)
- Part of body codeINJ_BODY_PART_CD
- 430
- Days lostDAYS_LOST
- 2
- Permanently transferred or terminatedTRANS_TERM
- Y
- Returned to workRETURN_TO_WORK_DT
- Jan 31, 2025
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Contractor IDCONTRACTOR_ID
- A9822
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO
Date: Jan 18, 2024Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDLING OF MATERIALSAccident type: Struck against stationary objectDays lost: 5Details
The report
- Document numberDOCUMENT_NO
- 220240290005
- DateACCIDENT_DT
- Jan 18, 2024
- TimeACCIDENT_TIME
- 1700
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck against stationary object
- Accident type codeACCIDENT_TYPE_CD
- 01
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320240320004
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days lostDAYS_LOST
- 5
- Returned to workRETURN_TO_WORK_DT
- Jan 28, 2024
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Mar 16, 2023Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Rubbed or abradedDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220230790021
- DateACCIDENT_DT
- Mar 16, 2023
- TimeACCIDENT_TIME
- 0945
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Rubbed or abraded
- Accident type codeACCIDENT_TYPE_CD
- 25
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Returned to workRETURN_TO_WORK_DT
- Mar 16, 2023
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Contractor IDCONTRACTOR_ID
- A9822
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO
Date: Feb 1, 2023Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Caught in, under or between a moving and a stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220230330010
- DateACCIDENT_DT
- Feb 1, 2023
- TimeACCIDENT_TIME
- 1100
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- Accident type codeACCIDENT_TYPE_CD
- 21
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- MOTORS
- Source of injury codeINJURY_SOURCE_CD
- 039
- Nature of injuryNATURE_INJURY
- CRUSHING
- Nature of injury codeNATURE_INJURY_CD
- 170
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Returned to workRETURN_TO_WORK_DT
- Feb 1, 2023
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Contractor IDCONTRACTOR_ID
- B4411
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO
Date: Jan 24, 2023Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Struck by flying objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220230330023
- DateACCIDENT_DT
- Jan 24, 2023
- TimeACCIDENT_TIME
- 1030
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Struck by flying object
- Accident type codeACCIDENT_TYPE_CD
- 05
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- EYE(S) OPTIC NERVE/VISON
- Part of body codeINJ_BODY_PART_CD
- 130
- Returned to workRETURN_TO_WORK_DT
- Jan 24, 2023
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Contractor IDCONTRACTOR_ID
- A9822
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO
Date: Jan 11, 2023Degree of injury: OCCUPATNAL ILLNESS NOT DEG 1-6Classification: DISORDERS (PHYSICAL AGENTS)Accident type: Contact with heatDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220230230001
- DateACCIDENT_DT
- Jan 11, 2023
- TimeACCIDENT_TIME
- 0215
- Shift beganSHIFT_BEGIN_TIME
- 1800
- Degree of injuryDEGREE_INJURY
- OCCUPATNAL ILLNESS NOT DEG 1-6
- Degree of injury codeDEGREE_INJURY_CD
- 07
- ClassificationCLASSIFICATION
- DISORDERS (PHYSICAL AGENTS)
- Classification codeCLASSIFICATION_CD
- 30
- Accident typeACCIDENT_TYPE
- Contact with heat
- Accident type codeACCIDENT_TYPE_CD
- 32
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Mill equipment
- Activity codeACTIVITY_CD
- 063
- Source of injuryINJURY_SOURCE
- HEAT (ATMOS + ENVIRON)
- Source of injury codeINJURY_SOURCE_CD
- 058
- Nature of injuryNATURE_INJURY
- HEATSTROK,SUNSTR,HT EXHAU
- Nature of injury codeNATURE_INJURY_CD
- 250
- Part of bodyINJ_BODY_PART
- BODY SYSTEMS
- Part of body codeINJ_BODY_PART_CD
- 600
- Returned to workRETURN_TO_WORK_DT
- Jan 15, 2023
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Dec 14, 2022Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: SLIP OR FALL OF PERSONAccident type: Fall onto or against objectsDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220223630005
- DateACCIDENT_DT
- Dec 14, 2022
- TimeACCIDENT_TIME
- 0845
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall onto or against objects
- Accident type codeACCIDENT_TYPE_CD
- 18
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- SURFACE MINING MACHINES
- Source of injury codeINJURY_SOURCE_CD
- 076
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- MOUTH/LIP/TEETH/TONGUE/THROAT/TASTE
- Part of body codeINJ_BODY_PART_CD
- 142
- Returned to workRETURN_TO_WORK_DT
- Dec 15, 2022
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Bulldozer, Dozer, Crawler tractor, Push cat
- Equipment codeMINING_EQUIP_CD
- 08
- Equipment manufacturerEQUIP_MFR_NAME
- John Deere
- Equipment manufacturer codeEQUIP_MFR_CD
- 138
- Equipment model numberEQUIP_MODEL_NO
- 750
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Contractor IDCONTRACTOR_ID
- B7513
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO
Date: Jul 13, 2022Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220221990021
- DateACCIDENT_DT
- Jul 13, 2022
- TimeACCIDENT_TIME
- 0845
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- METAL COVERS & GUARDS
- Source of injury codeINJURY_SOURCE_CD
- 086
- Nature of injuryNATURE_INJURY
- CRUSHING
- Nature of injury codeNATURE_INJURY_CD
- 170
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Returned to workRETURN_TO_WORK_DT
- Jul 13, 2022
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Contractor IDCONTRACTOR_ID
- A9822
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO
Date: Oct 13, 2021Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDTOOLS (NONPOWERED)Accident type: Over-exertion in wielding or throwing objectsDays lost: 2Details
The report
- Document numberDOCUMENT_NO
- 220212920017
- DateACCIDENT_DT
- Oct 13, 2021
- TimeACCIDENT_TIME
- 1100
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Over-exertion in wielding or throwing objects
- Accident type codeACCIDENT_TYPE_CD
- 29
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- AXE,HAMMER,SLEDGE
- Source of injury codeINJURY_SOURCE_CD
- 046
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days lostDAYS_LOST
- 2
- Returned to workRETURN_TO_WORK_DT
- Oct 18, 2021
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Jun 30, 2021Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Caught in, under or between NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220211830010
- DateACCIDENT_DT
- Jun 30, 2021
- TimeACCIDENT_TIME
- 0900
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Caught in, under or between NEC
- Accident type codeACCIDENT_TYPE_CD
- 24
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Returned to workRETURN_TO_WORK_DT
- Jun 30, 2021
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Jul 29, 2020Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220202250021
- DateACCIDENT_DT
- Jul 29, 2020
- TimeACCIDENT_TIME
- 0430
- Shift beganSHIFT_BEGIN_TIME
- 0400
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320202370004
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- HGHWY ORE CARIER,LRGE TRK
- Source of injury codeINJURY_SOURCE_CD
- 104
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
- Part of body codeINJ_BODY_PART_CD
- 450
- Days of restricted workDAYS_RESTRICT
- 14
- Returned to workRETURN_TO_WORK_DT
- Aug 20, 2020
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Ore haulage trucks - off highway trucks
- Equipment codeMINING_EQUIP_CD
- 44
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- Equipment model numberEQUIP_MODEL_NO
- 769
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID
Date: Nov 17, 2019Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDTOOLS (NONPOWERED)Accident type: Fall to the walkway or working surfaceDays lost: 598Details
The report
- Document numberDOCUMENT_NO
- 220193570020
- DateACCIDENT_DT
- Nov 17, 2019
- TimeACCIDENT_TIME
- 2120
- Shift beganSHIFT_BEGIN_TIME
- 1500
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Fall to the walkway or working surface
- Accident type codeACCIDENT_TYPE_CD
- 17
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320220940005
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- CONTUSN,BRUISE,INTAC SKIN
- Nature of injury codeNATURE_INJURY_CD
- 160
- Part of bodyINJ_BODY_PART
- ELBOW
- Part of body codeINJ_BODY_PART_CD
- 312
- Days lostDAYS_LOST
- 598
- Returned to workRETURN_TO_WORK_DT
- Mar 28, 2022
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Sep 10, 2019Degree of injury: DYS AWY FRM WRK & RESTRCTD ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Caught in, under or between a moving and a stationary objectDays lost: 30Details
The report
- Document numberDOCUMENT_NO
- 220192550013
- DateACCIDENT_DT
- Sep 10, 2019
- TimeACCIDENT_TIME
- 2200
- Shift beganSHIFT_BEGIN_TIME
- 1900
- Degree of injuryDEGREE_INJURY
- DYS AWY FRM WRK & RESTRCTD ACT
- Degree of injury codeDEGREE_INJURY_CD
- 04
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- Accident type codeACCIDENT_TYPE_CD
- 21
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320193170017
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- JACKS-MECH,HYDRL,AIR,ETC
- Source of injury codeINJURY_SOURCE_CD
- 068
- Nature of injuryNATURE_INJURY
- CRUSHING
- Nature of injury codeNATURE_INJURY_CD
- 170
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days of restricted workDAYS_RESTRICT
- 17
- Days lostDAYS_LOST
- 30
- Returned to workRETURN_TO_WORK_DT
- Nov 12, 2019
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Schedule charge, daysSCHEDULE_CHARGE
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Jul 31, 2019Degree of injury: DAYS AWAY FROM WORK ONLYClassification: SLIP OR FALL OF PERSONAccident type: Over-exertion NECDays lost: 8Details
The report
- Document numberDOCUMENT_NO
- 220192770018
- DateACCIDENT_DT
- Jul 31, 2019
- TimeACCIDENT_TIME
- 1430
- Shift beganSHIFT_BEGIN_TIME
- 0630
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320192900011
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- KNEE/PATELLA
- Part of body codeINJ_BODY_PART_CD
- 512
- Days lostDAYS_LOST
- 8
- Returned to workRETURN_TO_WORK_DT
- Oct 16, 2019
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: May 16, 2019Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion in lifting objectsDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220191440006
- DateACCIDENT_DT
- May 16, 2019
- TimeACCIDENT_TIME
- 1506
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion in lifting objects
- Accident type codeACCIDENT_TYPE_CD
- 27
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320191490006
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- WHEEL-FROM CAR OR TRUCK
- Source of injury codeINJURY_SOURCE_CD
- 087
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- ABDOMEN/INTERNAL ORGANS
- Part of body codeINJ_BODY_PART_CD
- 410
- Days of restricted workDAYS_RESTRICT
- 6
- Returned to workRETURN_TO_WORK_DT
- May 28, 2019
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Sep 17, 2018Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Struck by flying objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220182710010
- DateACCIDENT_DT
- Sep 17, 2018
- TimeACCIDENT_TIME
- 1545
- Shift beganSHIFT_BEGIN_TIME
- 0542
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck by flying object
- Accident type codeACCIDENT_TYPE_CD
- 05
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- UNCLASSIFIED,NOT DETERMED
- Nature of injury codeNATURE_INJURY_CD
- 400
- Part of bodyINJ_BODY_PART
- MOUTH/LIP/TEETH/TONGUE/THROAT/TASTE
- Part of body codeINJ_BODY_PART_CD
- 142
- Returned to workRETURN_TO_WORK_DT
- Sep 17, 2018
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Contractor IDCONTRACTOR_ID
- FLC
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO
Date: Jul 24, 2018Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion in lifting objectsDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220182120006
- DateACCIDENT_DT
- Jul 24, 2018
- TimeACCIDENT_TIME
- 0830
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion in lifting objects
- Accident type codeACCIDENT_TYPE_CD
- 27
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320182200001
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- METAL COVERS & GUARDS
- Source of injury codeINJURY_SOURCE_CD
- 086
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days of restricted workDAYS_RESTRICT
- 10
- Returned to workRETURN_TO_WORK_DT
- Aug 6, 2018
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Mar 20, 2018Degree of injury: DAYS AWAY FROM WORK ONLYClassification: SLIP OR FALL OF PERSONAccident type: Fall from laddersDays lost: 152Details
The report
- Document numberDOCUMENT_NO
- 220180820024
- DateACCIDENT_DT
- Mar 20, 2018
- TimeACCIDENT_TIME
- 1310
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall from ladders
- Accident type codeACCIDENT_TYPE_CD
- 14
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320191120016
Injury
- Activity at the timeACTIVITY
- Climb scaffolds, Ladders
- Activity codeACTIVITY_CD
- 013
- Source of injuryINJURY_SOURCE
- FLOOR,WALKING SURF-NOT UG
- Source of injury codeINJURY_SOURCE_CD
- 010
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- HIPS (PELVIS/ORGANS/KIDNEYS/BUTTOCKS)
- Part of body codeINJ_BODY_PART_CD
- 440
- Days lostDAYS_LOST
- 152
- Returned to workRETURN_TO_WORK_DT
- Oct 24, 2018
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Sep 20, 2017Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Caught in, under or between a moving and a stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220172720007
- DateACCIDENT_DT
- Sep 20, 2017
- TimeACCIDENT_TIME
- 1430
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- Accident type codeACCIDENT_TYPE_CD
- 21
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320181070019
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- BARRELS,KEGS,DRUMS
- Source of injury codeINJURY_SOURCE_CD
- 005
- Nature of injuryNATURE_INJURY
- CRUSHING
- Nature of injury codeNATURE_INJURY_CD
- 170
- Part of bodyINJ_BODY_PART
- HAND (NOT WRIST OR FINGERS)
- Part of body codeINJ_BODY_PART_CD
- 330
- Days of restricted workDAYS_RESTRICT
- 6
- Returned to workRETURN_TO_WORK_DT
- Sep 26, 2017
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Sep 13, 2017Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: POWERED HAULAGEAccident type: Struck against a moving objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220173040028
- DateACCIDENT_DT
- Sep 13, 2017
- TimeACCIDENT_TIME
- 1200
- Shift beganSHIFT_BEGIN_TIME
- 0500
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- POWERED HAULAGE
- Classification codeCLASSIFICATION_CD
- 12
- Accident typeACCIDENT_TYPE
- Struck against a moving object
- Accident type codeACCIDENT_TYPE_CD
- 02
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Front-end loader
- Activity codeACTIVITY_CD
- 053
- Source of injuryINJURY_SOURCE
- SURFACE MINING MACHINES
- Source of injury codeINJURY_SOURCE_CD
- 076
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days of restricted workDAYS_RESTRICT
- 23
- Returned to workRETURN_TO_WORK_DT
- Oct 27, 2017
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
- Equipment codeMINING_EQUIP_CD
- 24
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- Equipment model numberEQUIP_MODEL_NO
- 980H
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID
Date: Aug 18, 2017Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Struck against stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220172330010
- DateACCIDENT_DT
- Aug 18, 2017
- TimeACCIDENT_TIME
- 1030
- Shift beganSHIFT_BEGIN_TIME
- 0800
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck against stationary object
- Accident type codeACCIDENT_TYPE_CD
- 01
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- SERIOUS INJURY
- Immediately reportable codeIMMED_NOTIFY_CD
- 02
- MSHA investigation beganINVEST_BEGIN_DT
- Aug 18, 2017
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- METAL COVERS & GUARDS
- Source of injury codeINJURY_SOURCE_CD
- 086
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- HAND (NOT WRIST OR FINGERS)
- Part of body codeINJ_BODY_PART_CD
- 330
- Returned to workRETURN_TO_WORK_DT
- Aug 18, 2017
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Contractor IDCONTRACTOR_ID
- B6157
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO
Date: May 14, 2017Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: STEPPING OR KNEELING ON OBJECTAccident type: Struck against stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220171440018
- DateACCIDENT_DT
- May 14, 2017
- TimeACCIDENT_TIME
- 1330
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- STEPPING OR KNEELING ON OBJECT
- Classification codeCLASSIFICATION_CD
- 19
- Accident typeACCIDENT_TYPE
- Struck against stationary object
- Accident type codeACCIDENT_TYPE_CD
- 01
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320171510004
Injury
- Activity at the timeACTIVITY
- Walking, Running
- Activity codeACTIVITY_CD
- 092
- Source of injuryINJURY_SOURCE
- BROKEN ROCK,COAL,ORE,WSTE
- Source of injury codeINJURY_SOURCE_CD
- 089
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- ANKLE
- Part of body codeINJ_BODY_PART_CD
- 520
- Days of restricted workDAYS_RESTRICT
- 10
- Returned to workRETURN_TO_WORK_DT
- May 29, 2017
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
Date: Feb 19, 2016Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDLING OF MATERIALSAccident type: Struck by falling objectDays lost: 2Details
The report
- Document numberDOCUMENT_NO
- 220160550013
- DateACCIDENT_DT
- Feb 19, 2016
- TimeACCIDENT_TIME
- 1850
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck by falling object
- Accident type codeACCIDENT_TYPE_CD
- 04
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- BRICK,CERAMIC
- Source of injury codeINJURY_SOURCE_CD
- 020
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days lostDAYS_LOST
- 2
- Returned to workRETURN_TO_WORK_DT
- Feb 24, 2016
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Controller at the timeCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Contractor IDCONTRACTOR_ID
- F223
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO
25 most recent of 90 reports filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 47Hours worked: 83,274Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 47
- Hours workedANNUAL_HRS
- 83274
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1772
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 2Hours worked: 2,974Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 2974
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1487
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 9Hours worked: 16,513Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 9
- Hours workedANNUAL_HRS
- 16513
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1835
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 43Hours worked: 105,100Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 43
- Hours workedANNUAL_HRS
- 105100
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2444
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 5,517Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 5517
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1839
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 10Hours worked: 23,379Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 23379
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2338
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 42Hours worked: 98,927Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 42
- Hours workedANNUAL_HRS
- 98927
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2355
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 6,138Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 6138
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2046
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 10Hours worked: 20,862Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 20862
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2086
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 44Hours worked: 106,604Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 44
- Hours workedANNUAL_HRS
- 106604
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2423
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 6,099Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 6099
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2033
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 10Hours worked: 24,590Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 24590
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2459
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 31Hours worked: 49,470Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 31
- Hours workedANNUAL_HRS
- 49470
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1596
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 6Hours worked: 20,287Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 20287
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 3381
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 11Hours worked: 18,172Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 11
- Hours workedANNUAL_HRS
- 18172
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1652
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 33Hours worked: 48,456Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 33
- Hours workedANNUAL_HRS
- 48456
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1468
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 8Hours worked: 26,316Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 8
- Hours workedANNUAL_HRS
- 26316
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 3290
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 10Hours worked: 14,886Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 14886
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1489
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 24Hours worked: 51,325Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 24
- Hours workedANNUAL_HRS
- 51325
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2139
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 22Hours worked: 48,253Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 22
- Hours workedANNUAL_HRS
- 48253
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2193
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 13Hours worked: 29,798Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 13
- Hours workedANNUAL_HRS
- 29798
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2292
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 19Hours worked: 48,769Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 19
- Hours workedANNUAL_HRS
- 48769
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2567
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 27Hours worked: 38,677Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 27
- Hours workedANNUAL_HRS
- 38677
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1432
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 19Hours worked: 47,770Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 19
- Hours workedANNUAL_HRS
- 47770
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2514
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileCURR_MINE_NM
- LIMEDALE QUARRY
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Little Rock AR Field Office
- Nearest town
- Batesville, AR
- Days worked per week
- 7
- Hours per shift
- 8
- Production shifts per day
- 3
- Maintenance shifts per day
- 0
- Employees, current record
- 50
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- LIMEDALE QUARRY
- Mine IDMINE_ID
- 0300050
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Active
- Status sinceCURRENT_STATUS_DT
- Jul 4, 1976
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- Arkansas Lime Company
- Operator IDCURRENT_OPERATOR_ID
- L11945
- ControllerCURRENT_CONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCURRENT_CONTROLLER_ID
- M08976
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Aug 20, 1989
Location and MSHA office
- StateSTATE
- AR
- Bureau of Mines state codeBOM_STATE_CD
- 03
- FIPS county codeFIPS_CNTY_CD
- 063
- FIPS county nameFIPS_CNTY_NM
- Independence
- Congressional districtCONG_DIST_CD
- 01
- Nearest townNEAREST_TOWN
- Batesville, AR
- MSHA districtDISTRICT
- M5
- MSHA office codeOFFICE_CD
- M5871
- MSHA officeOFFICE_NAME
- Little Rock AR Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 25
- Most recent assessment control numberASSESS_CTRL_NO
- 000641397
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Crushed, Broken Limestone NEC
- Primary commodity codePRIMARY_SIC_CD
- 142200
- Primary SIC codePRIMARY_SIC_CD_1
- 1422
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 00
- Primary industry groupPRIMARY_CANVASS
- Stone
- Primary industry group codePRIMARY_CANVASS_CD
- 6
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 7
- Hours per shiftHOURS_PER_SHIFT
- 8
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 3
- Workers employedNO_EMPLOYEES
- 50
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (2)
Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS
Recorded as N (5)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND
Not recorded by MSHA (13)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: Arkansas Lime CompanyFrom: Aug 20, 1989To: No end dateController: United States Lime & Minerals IncFrom : Aug 20, 1989To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L11945
- Operator fromOPERATOR_START_DT
- Aug 20, 1989
Controller
- ControllerCONTROLLER_NAME
- United States Lime & Minerals Inc
- Controller IDCONTROLLER_ID
- M08976
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Aug 20, 1989
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT
Operator: Arkansas Lime CompanyFrom: Jan 1, 1950To: Aug 19, 1989Controller: Rangaire CorpFrom : Jan 1, 1950To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Arkansas Lime Company
- Operator IDOPERATOR_ID
- L00164
- Operator fromOPERATOR_START_DT
- Jan 1, 1950
- Operator toOPERATOR_END_DT
- Aug 19, 1989
Controller
- ControllerCONTROLLER_NAME
- Rangaire Corp
- Controller IDCONTROLLER_ID
- M00117
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
Controller toCONTROLLER_END_DT
As MSHA records it, newest operator first.
Address of record
Arkansas Lime Company·Contact title VP Plant Manager·600 Limedale Road, Batesville AR 72501
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- Arkansas Lime Company
- Contact titleCONTACT_TITLE
- VP Plant Manager
- StreetSTREET
- 600 Limedale Road
- CityCITY
- Batesville
- StateSTATE_ABBR
- AR
- State nameSTATE
- Arkansas
- ZIP codeZIP_CD
- 72501
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 05
Mine
- Mine IDMINE_ID
- 0300050
- Mine name in this fileMINE_NAME
- LIMEDALE QUARRY
- Nearest townNEAREST_TOWN
- Batesville, AR
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Active
- Status sinceMINE_STATUS_DT
- Jul 4, 1976
- Primary commodity (SIC)PRIMARY_SIC_CD
- Crushed, Broken Limestone NEC
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology