Skip to content
SafetyRecord logoSafetyRecord

Granite Mountain Qrys-Crystal Hill Plt

Metal/Non-Metal, SurfaceCrushed, Broken SandstonePulaski, ArkansasMine ID 0301537

Operator McGeorge ContractingController not shownMSHA status Intermittent since Apr 13, 2026

What MSHA has on file for this mine

Citations and orders
209
since Jan 6, 2000 · 197 to the operator, 12 to contractors · 41 marked S&S
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
Oct 22 to Oct 23, 2025Inspectors 1 | Hours on site 7.5

The inspection

BeganINSPECTION_BEGIN_DT
Oct 22, 2025
Closed outINSPECTION_END_DT
Oct 23, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6938294
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
7.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
13.25
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
7.5
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
13.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (1)

Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Sep 2 to Sep 3, 2025Inspectors 1 | Hours on site 10.5

The inspection

BeganINSPECTION_BEGIN_DT
Sep 2, 2025
Closed outINSPECTION_END_DT
Sep 3, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F02586B
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
17.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Mar 11, 2025Inspectors 1 | Hours on site 10.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 11, 2025
Closed outINSPECTION_END_DT
Mar 11, 2025
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
F0151E5
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
13

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 28 to Jan 30, 2025Inspectors 1 | Hours on site 19.5

The inspection

BeganINSPECTION_BEGIN_DT
Jan 28, 2025
Closed outINSPECTION_END_DT
Jan 30, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F0151DB
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
19.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
35

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 17 to Jul 18, 2024Inspectors 1 | Hours on site 9.75

The inspection

BeganINSPECTION_BEGIN_DT
Jul 17, 2024
Closed outINSPECTION_END_DT
Jul 18, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F00555E
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
19.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 2 to Jan 4, 2024Inspectors 1 | Hours on site 14.75

The inspection

BeganINSPECTION_BEGIN_DT
Jan 2, 2024
Closed outINSPECTION_END_DT
Jan 4, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6932184
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
14.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
20

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 10 to Jul 11, 2023Inspectors 1 | Hours on site 14.5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 10, 2023
Closed outINSPECTION_END_DT
Jul 11, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6934557
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
14.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
16.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 21 to Feb 24, 2023Inspectors 1 | Hours on site 26.5

The inspection

BeganINSPECTION_BEGIN_DT
Feb 21, 2023
Closed outINSPECTION_END_DT
Feb 24, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6810791
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
26.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
32

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 23 to May 24, 2022Inspectors 1 | Hours on site 8

The inspection

BeganINSPECTION_BEGIN_DT
May 23, 2022
Closed outINSPECTION_END_DT
May 24, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6888851
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8
Total inspection hoursSUM_TOTAL_INSP_HOURS
12

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 22 to Feb 23, 2022Inspectors 1 | Hours on site 9

The inspection

BeganINSPECTION_BEGIN_DT
Feb 22, 2022
Closed outINSPECTION_END_DT
Feb 23, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6888825
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9
Total inspection hoursSUM_TOTAL_INSP_HOURS
12

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 17 to May 19, 2021Inspectors 1 | Hours on site 15.5

The inspection

BeganINSPECTION_BEGIN_DT
May 17, 2021
Closed outINSPECTION_END_DT
May 19, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6884974
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
15.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
18

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Dec 15, 2020Inspectors 1 | Hours on site 12.5

The inspection

BeganINSPECTION_BEGIN_DT
Dec 15, 2020
Closed outINSPECTION_END_DT
Dec 15, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6884939
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
12.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
14

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 24 to Aug 27, 2020Inspectors 1 | Hours on site 31.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 24, 2020
Closed outINSPECTION_END_DT
Aug 27, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6810789
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
31.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
40

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 26 to Feb 28, 2020Inspectors 1 | Hours on site 14

The inspection

BeganINSPECTION_BEGIN_DT
Feb 26, 2020
Closed outINSPECTION_END_DT
Feb 28, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6809673
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
14
Total inspection hoursSUM_TOTAL_INSP_HOURS
16.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 26 to Jun 27, 2019Inspectors 1 | Hours on site 9

The inspection

BeganINSPECTION_BEGIN_DT
Jun 26, 2019
Closed outINSPECTION_END_DT
Jun 27, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6810410
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9
Total inspection hoursSUM_TOTAL_INSP_HOURS
18

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 19 to Mar 21, 2019Inspectors 1 | Hours on site 19

The inspection

BeganINSPECTION_BEGIN_DT
Mar 19, 2019
Closed outINSPECTION_END_DT
Mar 21, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6737881
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
19
Total inspection hoursSUM_TOTAL_INSP_HOURS
28

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Sep 12, 2018Inspectors 1 | Hours on site 9

The inspection

BeganINSPECTION_BEGIN_DT
Sep 12, 2018
Closed outINSPECTION_END_DT
Sep 12, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6806001
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 12 to Mar 13, 2018Inspectors 2 | Hours on site 14.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 12, 2018
Closed outINSPECTION_END_DT
Mar 13, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6739070
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
14.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
19

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Sep 13, 2017Inspectors 3 | Hours on site 17.75

The inspection

BeganINSPECTION_BEGIN_DT
Sep 13, 2017
Closed outINSPECTION_END_DT
Sep 13, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6738653
InspectorsNBR_INSPECTOR
3
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
17.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
27

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 23 to Feb 24, 2017Inspectors 1 | Hours on site 6.5

The inspection

BeganINSPECTION_BEGIN_DT
Feb 23, 2017
Closed outINSPECTION_END_DT
Feb 24, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6738626
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
11.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 16, 2016Inspectors 1 | Hours on site 8

The inspection

BeganINSPECTION_BEGIN_DT
Jun 16, 2016
Closed outINSPECTION_END_DT
Jun 16, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6660543
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8
Total inspection hoursSUM_TOTAL_INSP_HOURS
10

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 8 to Mar 9, 2016Inspectors 1 | Hours on site 8.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 8, 2016
Closed outINSPECTION_END_DT
Mar 9, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6660948
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
14

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 4 to May 5, 2015Inspectors 1 | Hours on site 10.5

The inspection

BeganINSPECTION_BEGIN_DT
May 4, 2015
Closed outINSPECTION_END_DT
May 5, 2015
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6660407
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
13.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 19 to Mar 20, 2015Inspectors 1 | Hours on site 6

The inspection

BeganINSPECTION_BEGIN_DT
Mar 19, 2015
Closed outINSPECTION_END_DT
Mar 20, 2015
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6653975
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6
Total inspection hoursSUM_TOTAL_INSP_HOURS
10

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Part 50 Audit
Sep 24, 2014Inspectors 1 | Hours on site 5.5

The inspection

BeganINSPECTION_BEGIN_DT
Sep 24, 2014
Closed outINSPECTION_END_DT
Sep 24, 2014
ActivityACTIVITY
Part 50 Audit
Activity codeACTIVITY_CODE
E25
Program areaPROGRAM_AREA
M/NM--Part 50 Audit
Event numberEVENT_NO
6655930
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M5871
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
12.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

25 most recent of 68 inspections and other MSHA visits since Jan 5, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Oct 22, 2025
Type: Citation
Standard: 56.20003(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9792880
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 22, 2025
Time issuedVIOLATION_ISSUE_TIME
1358
Date of occurrenceVIOLATION_OCCUR_DT
Oct 22, 2025
30 CFR part and sectionPART_SECTION
56.20003(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 23, 2025
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Oct 23, 2025
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Oct 23, 2025
Terminated, timeTERMINATION_TIME
0821
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Dec 18, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Jan 28, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 4, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
6938294
Inspection beganINSPECTION_BEGIN_DT
Oct 22, 2025
Inspection closed outINSPECTION_END_DT
Oct 23, 2025
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 22, 2025
Type: Citation
Standard: 56.11012
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9792881
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 22, 2025
Time issuedVIOLATION_ISSUE_TIME
1411
Date of occurrenceVIOLATION_OCCUR_DT
Oct 22, 2025
30 CFR part and sectionPART_SECTION
56.11012
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 23, 2025
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Oct 23, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Oct 22, 2025
Terminated, timeTERMINATION_TIME
1503
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Dec 18, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Jan 28, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 4, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
6938294
Inspection beganINSPECTION_BEGIN_DT
Oct 22, 2025
Inspection closed outINSPECTION_END_DT
Oct 23, 2025
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Sep 3, 2025
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5007646
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 3, 2025
Time issuedVIOLATION_ISSUE_TIME
0925
Date of occurrenceVIOLATION_OCCUR_DT
Sep 3, 2025
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 3, 2025
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Sep 3, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Sep 3, 2025
Terminated, timeTERMINATION_TIME
1009
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Dec 25, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 10, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
F02586B
Inspection beganINSPECTION_BEGIN_DT
Sep 2, 2025
Inspection closed outINSPECTION_END_DT
Sep 3, 2025
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Sep 3, 2025
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5007645
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 3, 2025
Time issuedVIOLATION_ISSUE_TIME
0830
Date of occurrenceVIOLATION_OCCUR_DT
Sep 3, 2025
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 3, 2025
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Sep 3, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Sep 3, 2025
Terminated, timeTERMINATION_TIME
0854
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Dec 25, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 10, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
F02586B
Inspection beganINSPECTION_BEGIN_DT
Sep 2, 2025
Inspection closed outINSPECTION_END_DT
Sep 3, 2025
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Sep 2, 2025
Type: Citation
Standard: 56.4201(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5007644
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 2, 2025
Time issuedVIOLATION_ISSUE_TIME
1302
Date of occurrenceVIOLATION_OCCUR_DT
Sep 2, 2025
30 CFR part and sectionPART_SECTION
56.4201(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 3, 2025
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Sep 3, 2025
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Sep 2, 2025
Terminated, timeTERMINATION_TIME
1308
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Dec 29, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 5, 2025

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Stribling Equipment Company I
Operator IDVIOLATOR_ID
A256
Contractor IDCONTRACTOR_ID
A256
Inspection eventEVENT_NO
F02586B
Inspection beganINSPECTION_BEGIN_DT
Sep 2, 2025
Inspection closed outINSPECTION_END_DT
Sep 3, 2025
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Feb 6, 2025
Type: Citation
Standard: 56.5001(a)/.5005
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $313.00
Details

The citation

Citation or order numberVIOLATION_NO
5000243
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 6, 2025
Time issuedVIOLATION_ISSUE_TIME
1154
Date of occurrenceVIOLATION_OCCUR_DT
Jan 28, 2025
30 CFR part and sectionPART_SECTION
56.5001(a)/.5005
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 13, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Mar 14, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Mar 24, 2025
Terminated, timeTERMINATION_TIME
0919
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
313
Current proposed assessmentAMOUNT_DUE
313
Amount paidAMOUNT_PAID
313
Bill first printedBILL_PRINT_DT
Mar 13, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Apr 23, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 10, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
F0151DB
Inspection beganINSPECTION_BEGIN_DT
Jan 28, 2025
Inspection closed outINSPECTION_END_DT
Jan 30, 2025
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 28, 2025
Type: Citation
Standard: 47.41(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5000241
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 28, 2025
Time issuedVIOLATION_ISSUE_TIME
1208
Date of occurrenceVIOLATION_OCCUR_DT
Jan 28, 2025
30 CFR part and sectionPART_SECTION
47.41(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 28, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jan 28, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jan 28, 2025
Terminated, timeTERMINATION_TIME
1208
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Mar 13, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Apr 23, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 10, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
F0151DB
Inspection beganINSPECTION_BEGIN_DT
Jan 28, 2025
Inspection closed outINSPECTION_END_DT
Jan 30, 2025
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 28, 2025
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5000240
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 28, 2025
Time issuedVIOLATION_ISSUE_TIME
1116
Date of occurrenceVIOLATION_OCCUR_DT
Jan 28, 2025
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 28, 2025
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jan 28, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jan 28, 2025
Terminated, timeTERMINATION_TIME
1459
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Mar 13, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Apr 23, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 10, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
F0151DB
Inspection beganINSPECTION_BEGIN_DT
Jan 28, 2025
Inspection closed outINSPECTION_END_DT
Jan 30, 2025
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 17, 2024
Type: Citation
Standard: 56.12032
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9795271
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 17, 2024
Time issuedVIOLATION_ISSUE_TIME
1044
Date of occurrenceVIOLATION_OCCUR_DT
Jul 17, 2024
30 CFR part and sectionPART_SECTION
56.12032
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 17, 2024
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 17, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 17, 2024
Terminated, timeTERMINATION_TIME
1522
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 17, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 21, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 27, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
F00555E
Inspection beganINSPECTION_BEGIN_DT
Jul 17, 2024
Inspection closed outINSPECTION_END_DT
Jul 18, 2024
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 17, 2024
Type: Citation
Standard: 56.11012
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9795272
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 17, 2024
Time issuedVIOLATION_ISSUE_TIME
1109
Date of occurrenceVIOLATION_OCCUR_DT
Jul 17, 2024
30 CFR part and sectionPART_SECTION
56.11012
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 17, 2024
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 17, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 17, 2024
Terminated, timeTERMINATION_TIME
1133
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 17, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 21, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 27, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
F00555E
Inspection beganINSPECTION_BEGIN_DT
Jul 17, 2024
Inspection closed outINSPECTION_END_DT
Jul 18, 2024
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 17, 2024
Type: Citation
Standard: 56.11002
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9795268
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 17, 2024
Time issuedVIOLATION_ISSUE_TIME
0942
Date of occurrenceVIOLATION_OCCUR_DT
Jul 17, 2024
30 CFR part and sectionPART_SECTION
56.11002
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 17, 2024
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 17, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 17, 2024
Terminated, timeTERMINATION_TIME
1038
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 17, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 21, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 27, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
F00555E
Inspection beganINSPECTION_BEGIN_DT
Jul 17, 2024
Inspection closed outINSPECTION_END_DT
Jul 18, 2024
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 17, 2024
Type: Citation
Standard: 56.11012
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $305.00
Details

The citation

Citation or order numberVIOLATION_NO
9795267
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 17, 2024
Time issuedVIOLATION_ISSUE_TIME
0937
Date of occurrenceVIOLATION_OCCUR_DT
Jul 17, 2024
30 CFR part and sectionPART_SECTION
56.11012
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 17, 2024
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 17, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 17, 2024
Terminated, timeTERMINATION_TIME
1054
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
305
Current proposed assessmentAMOUNT_DUE
305
Amount paidAMOUNT_PAID
305
Bill first printedBILL_PRINT_DT
Oct 17, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 21, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 27, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
F00555E
Inspection beganINSPECTION_BEGIN_DT
Jul 17, 2024
Inspection closed outINSPECTION_END_DT
Jul 18, 2024
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 17, 2024
Type: Citation
Standard: 56.11008
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9795270
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 17, 2024
Time issuedVIOLATION_ISSUE_TIME
1027
Date of occurrenceVIOLATION_OCCUR_DT
Jul 17, 2024
30 CFR part and sectionPART_SECTION
56.11008
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 17, 2024
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 17, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 17, 2024
Terminated, timeTERMINATION_TIME
1418
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jan 16, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Feb 20, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 11, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
F00555E
Inspection beganINSPECTION_BEGIN_DT
Jul 17, 2024
Inspection closed outINSPECTION_END_DT
Jul 18, 2024
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 17, 2024
Type: Citation
Standard: 56.12032
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9795269
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 17, 2024
Time issuedVIOLATION_ISSUE_TIME
1022
Date of occurrenceVIOLATION_OCCUR_DT
Jul 17, 2024
30 CFR part and sectionPART_SECTION
56.12032
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Mill

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 17, 2024
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 17, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 17, 2024
Terminated, timeTERMINATION_TIME
1422
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 17, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 21, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 27, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
F00555E
Inspection beganINSPECTION_BEGIN_DT
Jul 17, 2024
Inspection closed outINSPECTION_END_DT
Jul 18, 2024
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 2, 2024
Type: Citation
Standard: 56.9300(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $204.00
Details

The citation

Citation or order numberVIOLATION_NO
9742576
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 2, 2024
Time issuedVIOLATION_ISSUE_TIME
1330
Date of occurrenceVIOLATION_OCCUR_DT
Jan 2, 2024
30 CFR part and sectionPART_SECTION
56.9300(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 2, 2024
Originally due, timeORIG_TERM_DUE_TIME
1430
Latest dueLATEST_TERM_DUE_DT
Jan 2, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1430
TerminatedTERMINATION_DT
Jan 4, 2024
Terminated, timeTERMINATION_TIME
1015
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
204
Current proposed assessmentAMOUNT_DUE
204
Amount paidAMOUNT_PAID
204
Bill first printedBILL_PRINT_DT
Feb 15, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Mar 23, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 6, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
6932184
Inspection beganINSPECTION_BEGIN_DT
Jan 2, 2024
Inspection closed outINSPECTION_END_DT
Jan 4, 2024
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 2, 2024
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9742575
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 2, 2024
Time issuedVIOLATION_ISSUE_TIME
1245
Date of occurrenceVIOLATION_OCCUR_DT
Jan 2, 2024
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 2, 2024
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Jan 2, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jan 2, 2024
Terminated, timeTERMINATION_TIME
1425
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Feb 15, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Mar 23, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 6, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
6932184
Inspection beganINSPECTION_BEGIN_DT
Jan 2, 2024
Inspection closed outINSPECTION_END_DT
Jan 4, 2024
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 10, 2023
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9744630
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 10, 2023
Time issuedVIOLATION_ISSUE_TIME
1146
Date of occurrenceVIOLATION_OCCUR_DT
Jul 10, 2023
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 10, 2023
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jul 10, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jul 10, 2023
Terminated, timeTERMINATION_TIME
1400
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Aug 17, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Sep 22, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 6, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
6934557
Inspection beganINSPECTION_BEGIN_DT
Jul 10, 2023
Inspection closed outINSPECTION_END_DT
Jul 11, 2023
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 10, 2023
Type: Citation
Standard: 56.14206(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9744628
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 10, 2023
Time issuedVIOLATION_ISSUE_TIME
0827
Date of occurrenceVIOLATION_OCCUR_DT
Jul 10, 2023
30 CFR part and sectionPART_SECTION
56.14206(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 10, 2023
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Jul 10, 2023
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Jul 10, 2023
Terminated, timeTERMINATION_TIME
0835
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Aug 17, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Sep 22, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 6, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
6934557
Inspection beganINSPECTION_BEGIN_DT
Jul 10, 2023
Inspection closed outINSPECTION_END_DT
Jul 11, 2023
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 10, 2023
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $198.00
Details

The citation

Citation or order numberVIOLATION_NO
9744629
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 10, 2023
Time issuedVIOLATION_ISSUE_TIME
1106
Date of occurrenceVIOLATION_OCCUR_DT
Jul 10, 2023
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 10, 2023
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jul 10, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jul 10, 2023
Terminated, timeTERMINATION_TIME
1200
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
198
Current proposed assessmentAMOUNT_DUE
198
Amount paidAMOUNT_PAID
198
Bill first printedBILL_PRINT_DT
Aug 17, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Sep 22, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 6, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
6934557
Inspection beganINSPECTION_BEGIN_DT
Jul 10, 2023
Inspection closed outINSPECTION_END_DT
Jul 11, 2023
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 22, 2023
Type: Citation
Standard: 56.14105
S&S: Y
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9678863
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 22, 2023
Time issuedVIOLATION_ISSUE_TIME
1455
Date of occurrenceVIOLATION_OCCUR_DT
Feb 22, 2023
30 CFR part and sectionPART_SECTION
56.14105
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 22, 2023
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Feb 22, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Feb 22, 2023
Terminated, timeTERMINATION_TIME
1500
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Apr 13, 2023
Final order dateFINAL_ORDER_ISSUE_DT
May 28, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 3, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
6810791
Inspection beganINSPECTION_BEGIN_DT
Feb 21, 2023
Inspection closed outINSPECTION_END_DT
Feb 24, 2023
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 21, 2023
Type: Citation
Standard: 56.12002
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9678858
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 21, 2023
Time issuedVIOLATION_ISSUE_TIME
0950
Date of occurrenceVIOLATION_OCCUR_DT
Feb 21, 2023
30 CFR part and sectionPART_SECTION
56.12002
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 21, 2023
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Feb 21, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Feb 21, 2023
Terminated, timeTERMINATION_TIME
1000
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Apr 13, 2023
Final order dateFINAL_ORDER_ISSUE_DT
May 28, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 3, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
6810791
Inspection beganINSPECTION_BEGIN_DT
Feb 21, 2023
Inspection closed outINSPECTION_END_DT
Feb 24, 2023
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 21, 2023
Type: Citation
Standard: 56.12032
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9678861
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 21, 2023
Time issuedVIOLATION_ISSUE_TIME
1140
Date of occurrenceVIOLATION_OCCUR_DT
Feb 21, 2023
30 CFR part and sectionPART_SECTION
56.12032
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 21, 2023
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Feb 21, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Feb 21, 2023
Terminated, timeTERMINATION_TIME
1145
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Apr 18, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Jun 2, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 28, 2023

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Industrial Power Inc.
Operator IDVIOLATOR_ID
Z310
Contractor IDCONTRACTOR_ID
Z310
Inspection eventEVENT_NO
6810791
Inspection beganINSPECTION_BEGIN_DT
Feb 21, 2023
Inspection closed outINSPECTION_END_DT
Feb 24, 2023
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Feb 21, 2023
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9678862
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 21, 2023
Time issuedVIOLATION_ISSUE_TIME
1200
Date of occurrenceVIOLATION_OCCUR_DT
Feb 21, 2023
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 21, 2023
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Feb 21, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Feb 21, 2023
Terminated, timeTERMINATION_TIME
1205
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Apr 18, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Jun 2, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 28, 2023

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Industrial Power Inc.
Operator IDVIOLATOR_ID
Z310
Contractor IDCONTRACTOR_ID
Z310
Inspection eventEVENT_NO
6810791
Inspection beganINSPECTION_BEGIN_DT
Feb 21, 2023
Inspection closed outINSPECTION_END_DT
Feb 24, 2023
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Feb 21, 2023
Type: Citation
Standard: 56.20011
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
9678859
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 21, 2023
Time issuedVIOLATION_ISSUE_TIME
1030
Date of occurrenceVIOLATION_OCCUR_DT
Feb 21, 2023
30 CFR part and sectionPART_SECTION
56.20011
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 21, 2023
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Feb 21, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Feb 21, 2023
Terminated, timeTERMINATION_TIME
1300
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Apr 13, 2023
Final order dateFINAL_ORDER_ISSUE_DT
May 28, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 3, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
6810791
Inspection beganINSPECTION_BEGIN_DT
Feb 21, 2023
Inspection closed outINSPECTION_END_DT
Feb 24, 2023
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 23, 2022
Type: Order
Standard: 46.7(a)
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $148.00
Details

The citation

Citation or order numberVIOLATION_NO
9646780
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
May 23, 2022
Time issuedVIOLATION_ISSUE_TIME
1000
Date of occurrenceVIOLATION_OCCUR_DT
May 23, 2022
30 CFR part and sectionPART_SECTION
46.7(a)
Section of the Act, primarySECTION_OF_ACT_1
104(g)(1)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

TerminatedTERMINATION_DT
May 23, 2022
Terminated, timeTERMINATION_TIME
1430
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
148
Current proposed assessmentAMOUNT_DUE
148
Amount paidAMOUNT_PAID
148
Bill first printedBILL_PRINT_DT
Jul 14, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Aug 17, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 4, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
McGeorge Contracting
Operator IDVIOLATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Inspection eventEVENT_NO
6888851
Inspection beganINSPECTION_BEGIN_DT
May 23, 2022
Inspection closed outINSPECTION_END_DT
May 24, 2022
Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (17)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

209 citations and orders since Jan 6, 2000: 197 issued to the operator, 12 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Oct 22, 2025
Citation number: 9792880
Standard: 56.20003(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9792880
Assessment control numberASSESS_CASE_NO
000633240
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 4, 2026
Citation issuedISSUE_DT
Oct 22, 2025
Date of occurrenceOCCURRENCE_DT
Oct 22, 2025
Final order dateFINAL_ORDER_DT
Jan 28, 2026
Bill first printedBILL_PRINT_DT
Dec 18, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 28, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20003(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
44
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
32044
Size of mineSIZE_OF_MINE
32044
Controller hours workedCONTROLLER_HRS
428388
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
428388
History period startHISTORY_START_DT
Jul 22, 2024
History period endHISTORY_END_DT
Oct 21, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6938294
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 22, 2025
Citation number: 9792881
Standard: 56.11012
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9792881
Assessment control numberASSESS_CASE_NO
000633240
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 4, 2026
Citation issuedISSUE_DT
Oct 22, 2025
Date of occurrenceOCCURRENCE_DT
Oct 22, 2025
Final order dateFINAL_ORDER_DT
Jan 28, 2026
Bill first printedBILL_PRINT_DT
Dec 18, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jan 28, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11012
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
49
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9
Violations per inspection dayVPID
1
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
2
Repeat violations per inspection dayRPID
0.222
Operator hours worked at the mineVIOLATOR_MINE_HRS
32044
Size of mineSIZE_OF_MINE
32044
Controller hours workedCONTROLLER_HRS
428388
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
428388
History period startHISTORY_START_DT
Jul 22, 2024
History period endHISTORY_END_DT
Oct 21, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6938294
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (10)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 3, 2025
Citation number: 5007646
Standard: 56.12004
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5007646
Assessment control numberASSESS_CASE_NO
000631222
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 10, 2025
Citation issuedISSUE_DT
Sep 3, 2025
Date of occurrenceOCCURRENCE_DT
Sep 3, 2025
Final order dateFINAL_ORDER_DT
Dec 25, 2025
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 25, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
44
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
32044
Size of mineSIZE_OF_MINE
32044
Controller hours workedCONTROLLER_HRS
428388
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
428388
History period startHISTORY_START_DT
Jun 3, 2024
History period endHISTORY_END_DT
Sep 2, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F02586B
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 3, 2025
Citation number: 5007645
Standard: 56.14100(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5007645
Assessment control numberASSESS_CASE_NO
000631222
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 10, 2025
Citation issuedISSUE_DT
Sep 3, 2025
Date of occurrenceOCCURRENCE_DT
Sep 3, 2025
Final order dateFINAL_ORDER_DT
Dec 25, 2025
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 25, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
44
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9
Violations per inspection dayVPID
1
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.111
Operator hours worked at the mineVIOLATOR_MINE_HRS
32044
Size of mineSIZE_OF_MINE
32044
Controller hours workedCONTROLLER_HRS
428388
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
428388
History period startHISTORY_START_DT
Jun 3, 2024
History period endHISTORY_END_DT
Sep 2, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F02586B
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (10)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 2, 2025
Citation number: 5007644
Standard: 56.4201(a)(2)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5007644
Assessment control numberASSESS_CASE_NO
000631562
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 5, 2025
Citation issuedISSUE_DT
Sep 2, 2025
Date of occurrenceOCCURRENCE_DT
Sep 2, 2025
Final order dateFINAL_ORDER_DT
Dec 29, 2025
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
38
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Contractor size pointsCONTRACTOR_SIZE_POINTS
2

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
5158
Size of mineSIZE_OF_MINE
5158
History period startHISTORY_START_DT
Jun 2, 2024
History period endHISTORY_END_DT
Sep 1, 2025

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Stribling Equipment Company I
IDVIOLATOR_ID
A256
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 2, 2025
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F02586B
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (3)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Feb 6, 2025
Citation number: 5000243
Standard: 56.5001(a)/.5005
Proposed penalty: $313.00
Current assessment: $313.00
Paid against proposed penalty: $313.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5000243
Assessment control numberASSESS_CASE_NO
000616550
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 10, 2025
Citation issuedISSUE_DT
Feb 6, 2025
Date of occurrenceOCCURRENCE_DT
Jan 28, 2025
Final order dateFINAL_ORDER_DT
Apr 23, 2025
Bill first printedBILL_PRINT_DT
Mar 13, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 23, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.5001(a)/.5005
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
313.00
Current assessmentCURRENT_ASSESSMENT_AMT
313.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
313.00

Penalty points

Violation history pointsPENALTY_POINTS
69
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
1.4
Operator hours worked at the mineVIOLATOR_MINE_HRS
32044
Size of mineSIZE_OF_MINE
32044
Controller hours workedCONTROLLER_HRS
428388
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
428388
History period startHISTORY_START_DT
Oct 28, 2023
History period endHISTORY_END_DT
Jan 27, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0151DB
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 28, 2025
Citation number: 5000240
Standard: 56.14100(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5000240
Assessment control numberASSESS_CASE_NO
000616550
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 10, 2025
Citation issuedISSUE_DT
Jan 28, 2025
Date of occurrenceOCCURRENCE_DT
Jan 28, 2025
Final order dateFINAL_ORDER_DT
Apr 23, 2025
Bill first printedBILL_PRINT_DT
Mar 13, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 23, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
44
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
1.4
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.2
Operator hours worked at the mineVIOLATOR_MINE_HRS
32044
Size of mineSIZE_OF_MINE
32044
Controller hours workedCONTROLLER_HRS
428388
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
428388
History period startHISTORY_START_DT
Oct 28, 2023
History period endHISTORY_END_DT
Jan 27, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0151DB
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (10)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 28, 2025
Citation number: 5000241
Standard: 47.41(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5000241
Assessment control numberASSESS_CASE_NO
000616550
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 10, 2025
Citation issuedISSUE_DT
Jan 28, 2025
Date of occurrenceOCCURRENCE_DT
Jan 28, 2025
Final order dateFINAL_ORDER_DT
Apr 23, 2025
Bill first printedBILL_PRINT_DT
Mar 13, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 23, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
47.41(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
44
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
1.4
Operator hours worked at the mineVIOLATOR_MINE_HRS
32044
Size of mineSIZE_OF_MINE
32044
Controller hours workedCONTROLLER_HRS
428388
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
428388
History period startHISTORY_START_DT
Oct 28, 2023
History period endHISTORY_END_DT
Jan 27, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F0151DB
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 17, 2024
Citation number: 9795269
Standard: 56.12032
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9795269
Assessment control numberASSESS_CASE_NO
000607082
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 23, 2025
Citation issuedISSUE_DT
Jul 17, 2024
Date of occurrenceOCCURRENCE_DT
Jul 17, 2024
Final order dateFINAL_ORDER_DT
Nov 21, 2024
Bill first printedBILL_PRINT_DT
Oct 17, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 21, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12032
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Mine Act interestMINEACT_INTEREST_AMT
0.84
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
59
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
35694
Size of mineSIZE_OF_MINE
35694
Controller hours workedCONTROLLER_HRS
427092
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
427092
History period startHISTORY_START_DT
Apr 17, 2023
History period endHISTORY_END_DT
Jul 16, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00555E
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (11)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 17, 2024
Citation number: 9795268
Standard: 56.11002
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9795268
Assessment control numberASSESS_CASE_NO
000607082
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 23, 2025
Citation issuedISSUE_DT
Jul 17, 2024
Date of occurrenceOCCURRENCE_DT
Jul 17, 2024
Final order dateFINAL_ORDER_DT
Nov 21, 2024
Bill first printedBILL_PRINT_DT
Oct 17, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 21, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11002
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Mine Act interestMINEACT_INTEREST_AMT
0.84
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
44
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
35694
Size of mineSIZE_OF_MINE
35694
Controller hours workedCONTROLLER_HRS
427092
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
427092
History period startHISTORY_START_DT
Apr 17, 2023
History period endHISTORY_END_DT
Jul 16, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00555E
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (11)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 17, 2024
Citation number: 9795267
Standard: 56.11012
Proposed penalty: $305.00
Current assessment: $305.00
Paid against proposed penalty: $305.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9795267
Assessment control numberASSESS_CASE_NO
000607082
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 23, 2025
Citation issuedISSUE_DT
Jul 17, 2024
Date of occurrenceOCCURRENCE_DT
Jul 17, 2024
Final order dateFINAL_ORDER_DT
Nov 21, 2024
Bill first printedBILL_PRINT_DT
Oct 17, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 21, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11012
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
305.00
Current assessmentCURRENT_ASSESSMENT_AMT
305.00
Mine Act interestMINEACT_INTEREST_AMT
1.74
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
305.00

Penalty points

Violation history pointsPENALTY_POINTS
69
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
35694
Size of mineSIZE_OF_MINE
35694
Controller hours workedCONTROLLER_HRS
427092
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
427092
History period startHISTORY_START_DT
Apr 17, 2023
History period endHISTORY_END_DT
Jul 16, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00555E
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (11)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 17, 2024
Citation number: 9795272
Standard: 56.11012
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9795272
Assessment control numberASSESS_CASE_NO
000607082
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 23, 2025
Citation issuedISSUE_DT
Jul 17, 2024
Date of occurrenceOCCURRENCE_DT
Jul 17, 2024
Final order dateFINAL_ORDER_DT
Nov 21, 2024
Bill first printedBILL_PRINT_DT
Oct 17, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 21, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11012
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Mine Act interestMINEACT_INTEREST_AMT
0.84
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
49
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
35694
Size of mineSIZE_OF_MINE
35694
Controller hours workedCONTROLLER_HRS
427092
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
427092
History period startHISTORY_START_DT
Apr 17, 2023
History period endHISTORY_END_DT
Jul 16, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00555E
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (11)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 17, 2024
Citation number: 9795270
Standard: 56.11008
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9795270
Assessment control numberASSESS_CASE_NO
000613712
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 10, 2025
Citation issuedISSUE_DT
Jul 17, 2024
Date of occurrenceOCCURRENCE_DT
Jul 17, 2024
Final order dateFINAL_ORDER_DT
Feb 20, 2025
Bill first printedBILL_PRINT_DT
Jan 16, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 20, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11008
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
44
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
35694
Size of mineSIZE_OF_MINE
35694
Controller hours workedCONTROLLER_HRS
427092
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
427092
History period startHISTORY_START_DT
Apr 17, 2023
History period endHISTORY_END_DT
Jul 16, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00555E
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 17, 2024
Citation number: 9795271
Standard: 56.12032
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9795271
Assessment control numberASSESS_CASE_NO
000607082
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 23, 2025
Citation issuedISSUE_DT
Jul 17, 2024
Date of occurrenceOCCURRENCE_DT
Jul 17, 2024
Final order dateFINAL_ORDER_DT
Nov 21, 2024
Bill first printedBILL_PRINT_DT
Oct 17, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 21, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12032
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Mine Act interestMINEACT_INTEREST_AMT
0.84
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
59
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
1.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
35694
Size of mineSIZE_OF_MINE
35694
Controller hours workedCONTROLLER_HRS
427092
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
427092
History period startHISTORY_START_DT
Apr 17, 2023
History period endHISTORY_END_DT
Jul 16, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F00555E
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (11)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 2, 2024
Citation number: 9742575
Standard: 56.14100(b)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9742575
Assessment control numberASSESS_CASE_NO
000594196
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 6, 2024
Citation issuedISSUE_DT
Jan 2, 2024
Date of occurrenceOCCURRENCE_DT
Jan 2, 2024
Final order dateFINAL_ORDER_DT
Mar 23, 2024
Bill first printedBILL_PRINT_DT
Feb 15, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Mar 23, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
44
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9
Violations per inspection dayVPID
0.67
Operator hours worked at the mineVIOLATOR_MINE_HRS
35694
Size of mineSIZE_OF_MINE
35694
Controller hours workedCONTROLLER_HRS
427092
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
427092
History period startHISTORY_START_DT
Oct 2, 2022
History period endHISTORY_END_DT
Jan 1, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6932184
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 2, 2024
Citation number: 9742576
Standard: 56.9300(a)
Proposed penalty: $204.00
Current assessment: $204.00
Paid against proposed penalty: $204.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9742576
Assessment control numberASSESS_CASE_NO
000594196
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 6, 2024
Citation issuedISSUE_DT
Jan 2, 2024
Date of occurrenceOCCURRENCE_DT
Jan 2, 2024
Final order dateFINAL_ORDER_DT
Mar 23, 2024
Bill first printedBILL_PRINT_DT
Feb 15, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Mar 23, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
204.00
Current assessmentCURRENT_ASSESSMENT_AMT
204.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
204.00

Penalty points

Violation history pointsPENALTY_POINTS
64
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
9
Violations per inspection dayVPID
0.67
Operator hours worked at the mineVIOLATOR_MINE_HRS
35694
Size of mineSIZE_OF_MINE
35694
Controller hours workedCONTROLLER_HRS
427092
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
427092
History period startHISTORY_START_DT
Oct 2, 2022
History period endHISTORY_END_DT
Jan 1, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6932184
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 10, 2023
Citation number: 9744630
Standard: 56.12004
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9744630
Assessment control numberASSESS_CASE_NO
000583135
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 6, 2023
Citation issuedISSUE_DT
Jul 10, 2023
Date of occurrenceOCCURRENCE_DT
Jul 10, 2023
Final order dateFINAL_ORDER_DT
Sep 22, 2023
Bill first printedBILL_PRINT_DT
Aug 17, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 22, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
44
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
0.71
Operator hours worked at the mineVIOLATOR_MINE_HRS
35903
Size of mineSIZE_OF_MINE
35903
Controller hours workedCONTROLLER_HRS
405831
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
405831
History period startHISTORY_START_DT
Apr 10, 2022
History period endHISTORY_END_DT
Jul 9, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6934557
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 10, 2023
Citation number: 9744628
Standard: 56.14206(b)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9744628
Assessment control numberASSESS_CASE_NO
000583135
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 6, 2023
Citation issuedISSUE_DT
Jul 10, 2023
Date of occurrenceOCCURRENCE_DT
Jul 10, 2023
Final order dateFINAL_ORDER_DT
Sep 22, 2023
Bill first printedBILL_PRINT_DT
Aug 17, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 22, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14206(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
49
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
0.71
Operator hours worked at the mineVIOLATOR_MINE_HRS
35903
Size of mineSIZE_OF_MINE
35903
Controller hours workedCONTROLLER_HRS
405831
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
405831
History period startHISTORY_START_DT
Apr 10, 2022
History period endHISTORY_END_DT
Jul 9, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6934557
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 10, 2023
Citation number: 9744629
Standard: 56.14107(a)
Proposed penalty: $198.00
Current assessment: $198.00
Paid against proposed penalty: $198.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9744629
Assessment control numberASSESS_CASE_NO
000583135
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 6, 2023
Citation issuedISSUE_DT
Jul 10, 2023
Date of occurrenceOCCURRENCE_DT
Jul 10, 2023
Final order dateFINAL_ORDER_DT
Sep 22, 2023
Bill first printedBILL_PRINT_DT
Aug 17, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 22, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
198.00
Current assessmentCURRENT_ASSESSMENT_AMT
198.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
198.00

Penalty points

Violation history pointsPENALTY_POINTS
64
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
7
Violations per inspection dayVPID
0.71
Operator hours worked at the mineVIOLATOR_MINE_HRS
35903
Size of mineSIZE_OF_MINE
35903
Controller hours workedCONTROLLER_HRS
405831
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
405831
History period startHISTORY_START_DT
Apr 10, 2022
History period endHISTORY_END_DT
Jul 9, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6934557
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 22, 2023
Citation number: 9678863
Standard: 56.14105
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9678863
Assessment control numberASSESS_CASE_NO
000574832
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 3, 2023
Citation issuedISSUE_DT
Feb 22, 2023
Date of occurrenceOCCURRENCE_DT
Feb 22, 2023
Final order dateFINAL_ORDER_DT
May 28, 2023
Bill first printedBILL_PRINT_DT
Apr 13, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14105
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
54
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
6
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
35903
Size of mineSIZE_OF_MINE
35903
Controller hours workedCONTROLLER_HRS
405831
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
405831
History period startHISTORY_START_DT
Nov 22, 2021
History period endHISTORY_END_DT
Feb 21, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6810791
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 21, 2023
Citation number: 9678859
Standard: 56.20011
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9678859
Assessment control numberASSESS_CASE_NO
000574832
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 3, 2023
Citation issuedISSUE_DT
Feb 21, 2023
Date of occurrenceOCCURRENCE_DT
Feb 21, 2023
Final order dateFINAL_ORDER_DT
May 28, 2023
Bill first printedBILL_PRINT_DT
Apr 13, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20011
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
59
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
35903
Size of mineSIZE_OF_MINE
35903
Controller hours workedCONTROLLER_HRS
405831
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
405831
History period startHISTORY_START_DT
Nov 21, 2021
History period endHISTORY_END_DT
Feb 20, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6810791
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 21, 2023
Citation number: 9678862
Standard: 56.12004
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9678862
Assessment control numberASSESS_CASE_NO
000574996
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 26, 2023
Citation issuedISSUE_DT
Feb 21, 2023
Date of occurrenceOCCURRENCE_DT
Feb 21, 2023
Final order dateFINAL_ORDER_DT
Jun 2, 2023
Bill first printedBILL_PRINT_DT
Apr 18, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
1214
Size of mineSIZE_OF_MINE
1214
History period startHISTORY_START_DT
Nov 21, 2021
History period endHISTORY_END_DT
Feb 20, 2023

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Industrial Power Inc.
IDVIOLATOR_ID
Z310
Operator start at the mine, as assessedVIOLATOR_START_DT
Feb 21, 2023
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6810791
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (18)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (3)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Feb 21, 2023
Citation number: 9678858
Standard: 56.12002
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9678858
Assessment control numberASSESS_CASE_NO
000574832
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 3, 2023
Citation issuedISSUE_DT
Feb 21, 2023
Date of occurrenceOCCURRENCE_DT
Feb 21, 2023
Final order dateFINAL_ORDER_DT
May 28, 2023
Bill first printedBILL_PRINT_DT
Apr 13, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12002
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
59
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
35903
Size of mineSIZE_OF_MINE
35903
Controller hours workedCONTROLLER_HRS
405831
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
405831
History period startHISTORY_START_DT
Nov 21, 2021
History period endHISTORY_END_DT
Feb 20, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6810791
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 21, 2023
Citation number: 9678861
Standard: 56.12032
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9678861
Assessment control numberASSESS_CASE_NO
000574996
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 26, 2023
Citation issuedISSUE_DT
Feb 21, 2023
Date of occurrenceOCCURRENCE_DT
Feb 21, 2023
Final order dateFINAL_ORDER_DT
Jun 2, 2023
Bill first printedBILL_PRINT_DT
Apr 18, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12032
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
1214
Size of mineSIZE_OF_MINE
1214
History period startHISTORY_START_DT
Nov 21, 2021
History period endHISTORY_END_DT
Feb 20, 2023

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Industrial Power Inc.
IDVIOLATOR_ID
Z310
Operator start at the mine, as assessedVIOLATOR_START_DT
Feb 21, 2023
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6810791
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (18)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (3)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: May 23, 2022
Citation number: 9646780
Standard: 46.7(a)
Proposed penalty: $148.00
Current assessment: $148.00
Paid against proposed penalty: $148.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9646780
Assessment control numberASSESS_CASE_NO
000558914
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 4, 2022
Citation issuedISSUE_DT
May 23, 2022
Date of occurrenceOCCURRENCE_DT
May 23, 2022
Final order dateFINAL_ORDER_DT
Aug 17, 2022
Bill first printedBILL_PRINT_DT
Jul 14, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 17, 2022
Citation typeCITATION_TYPE_CD
Order
30 CFR standardCFR_STANDARD_CD
46.7(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(g)(1)

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
148.00
Current assessmentCURRENT_ASSESSMENT_AMT
148.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
148.00

Penalty points

Violation history pointsPENALTY_POINTS
59
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
4
Controller size pointsCONTROLLER_SIZE_POINTS
4

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
0.2
Operator hours worked at the mineVIOLATOR_MINE_HRS
35007
Size of mineSIZE_OF_MINE
35007
Controller hours workedCONTROLLER_HRS
408702
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
408702
History period startHISTORY_START_DT
Feb 23, 2021
History period endHISTORY_END_DT
May 22, 2022

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
McGeorge Contracting
IDVIOLATOR_ID
L00751
Operator start at the mine, as assessedVIOLATOR_START_DT
May 2, 2005
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6888851
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M5871

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (3)

Significant and substantialSIG_SUB_IND, Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 208 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Contested citations and decisions

Contested: Mar 8, 2011
Citation issued: Dec 20, 2010
Docket: CENT 2011-533M
Standard: 56.14108
Proposed penalty: $100.00
Penalty after decision: $0.00
Decided: Aug 26, 2011
Decision type: Withdrawal
Details

The contest

Citation or order numberCITATION_NO
8616806
Citation issuedCITATION_ISSUE_DT
Dec 20, 2010
Hearing request receivedCONTEST_DT
Mar 8, 2011
Docket numberDOCKET_NO
CENT 2011-533M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Withdrawal
DecidedDECISION_DT
Aug 26, 2011
Petition duePETITION_DUE_DT
Apr 22, 2011
Petition filedPETITION_FILED_DT
Apr 29, 2011

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14108
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt

Other fields

ISSUING_FIELD_OFFICE
M5871

Recorded as 0 (1)

Penalty after the decisionDECISION_PENALTY_AMT

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Oct 5, 2010
Citation issued: Jul 20, 2010
Docket: CENT 2011-11M
Standard: 56.12002
Proposed penalty: $946.00
Penalty after decision: $946.00
Decided: May 19, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
6568905
Citation issuedCITATION_ISSUE_DT
Jul 20, 2010
Hearing request receivedCONTEST_DT
Oct 5, 2010
Docket numberDOCKET_NO
CENT 2011-11M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
May 19, 2011
Petition duePETITION_DUE_DT
Nov 19, 2010
Petition filedPETITION_FILED_DT
Oct 3, 2011

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
946.00
Penalty after the decisionDECISION_PENALTY_AMT
946.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.12002
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M5000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M5000
MSHA representative officeMSHA_REP_OFFICE_NAME
Dallas District

Mine

Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt

Other fields

ISSUING_FIELD_OFFICE
M5871

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

2 contested citations and orders; decision types are MSHA's own text.

Reported injuries, illnesses and accidents

Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.

NO DYS AWY FRM WRK,NO RSTR ACT
12
DAYS RESTRICTED ACTIVITY ONLY
11
DYS AWY FRM WRK & RESTRCTD ACT
1
OCCUPATNAL ILLNESS NOT DEG 1-6
1
DAYS AWAY FROM WORK ONLY
1
PERM TOT OR PERM PRTL DISABLTY
1
Date: May 31, 2025
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Struck by rolling or sliding object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220251550011
DateACCIDENT_DT
May 31, 2025
TimeACCIDENT_TIME
1140
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by rolling or sliding object
Accident type codeACCIDENT_TYPE_CD
06
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320251990006

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Days of restricted workDAYS_RESTRICT
44
Returned to workRETURN_TO_WORK_DT
Jul 14, 2025

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Aug 3, 2023
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220232260035
DateACCIDENT_DT
Aug 3, 2023
TimeACCIDENT_TIME
1800
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320232750015

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
39
Returned to workRETURN_TO_WORK_DT
Sep 27, 2023

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Dec 1, 2022
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: MACHINERY
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220223390028
DateACCIDENT_DT
Dec 1, 2022
TimeACCIDENT_TIME
1500
Shift beganSHIFT_BEGIN_TIME
0530
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320223480001

Injury

Activity at the timeACTIVITY
Hand tools (powered)
Activity codeACTIVITY_CD
031
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CRUSHING
Nature of injury codeNATURE_INJURY_CD
170
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Days of restricted workDAYS_RESTRICT
7
Returned to workRETURN_TO_WORK_DT
Dec 13, 2022

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (powered)
Equipment codeMINING_EQUIP_CD
29
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Apr 11, 2022
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220221030022
DateACCIDENT_DT
Apr 11, 2022
TimeACCIDENT_TIME
1330
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320221040003

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
AXE,HAMMER,SLEDGE
Source of injury codeINJURY_SOURCE_CD
046
Nature of injuryNATURE_INJURY
CONTUSN,BRUISE,INTAC SKIN
Nature of injury codeNATURE_INJURY_CD
160
Part of bodyINJ_BODY_PART
HAND (NOT WRIST OR FINGERS)
Part of body codeINJ_BODY_PART_CD
330
Days of restricted workDAYS_RESTRICT
1
Returned to workRETURN_TO_WORK_DT
Apr 13, 2022

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 21, 2022
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220220260015
DateACCIDENT_DT
Jan 21, 2022
TimeACCIDENT_TIME
1500
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
BROKEN ROCK,COAL,ORE,WSTE
Source of injury codeINJURY_SOURCE_CD
089
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Jan 21, 2022

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 1, 2021
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: MACHINERY
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220210330003
DateACCIDENT_DT
Feb 1, 2021
TimeACCIDENT_TIME
1130
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320210430003

Injury

Activity at the timeACTIVITY
Grinding
Activity codeACTIVITY_CD
024
Source of injuryINJURY_SOURCE
ABRAS STONE,WHEEL GRINDER
Source of injury codeINJURY_SOURCE_CD
052
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Days of restricted workDAYS_RESTRICT
8
Returned to workRETURN_TO_WORK_DT
Feb 12, 2021

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (powered)
Equipment codeMINING_EQUIP_CD
29
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Aug 24, 2018
Degree of injury: PERM TOT OR PERM PRTL DISABLTY
Classification: HANDTOOLS (NONPOWERED)
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220182400005
DateACCIDENT_DT
Aug 24, 2018
TimeACCIDENT_TIME
1200
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
PERM TOT OR PERM PRTL DISABLTY
Degree of injury codeDEGREE_INJURY_CD
02
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
BELT CONVEYORS
Source of injury codeINJURY_SOURCE_CD
035
Nature of injuryNATURE_INJURY
AMPUTATION OR ENUCLEATION
Nature of injury codeNATURE_INJURY_CD
100
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Schedule charge, daysSCHEDULE_CHARGE
300
Returned to workRETURN_TO_WORK_DT
Aug 27, 2018

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Sep 25, 2015
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220152730023
DateACCIDENT_DT
Sep 25, 2015
TimeACCIDENT_TIME
1505
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320152800004

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
MOVEABLE LADDERS
Source of injury codeINJURY_SOURCE_CD
071
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Days of restricted workDAYS_RESTRICT
5
Returned to workRETURN_TO_WORK_DT
Oct 5, 2015

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Dec 13, 2013
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: SLIP OR FALL OF PERSON
Accident type: Fall onto or against objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220133500033
DateACCIDENT_DT
Dec 13, 2013
TimeACCIDENT_TIME
1615
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Fall onto or against objects
Accident type codeACCIDENT_TYPE_CD
18
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
BROKEN ROCK,COAL,ORE,WSTE
Source of injury codeINJURY_SOURCE_CD
089
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
HAND (NOT WRIST OR FINGERS)
Part of body codeINJ_BODY_PART_CD
330
Returned to workRETURN_TO_WORK_DT
Dec 14, 2013

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jun 25, 2013
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220131790016
DateACCIDENT_DT
Jun 25, 2013
TimeACCIDENT_TIME
1120
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
WRENCH
Source of injury codeINJURY_SOURCE_CD
050
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Jun 25, 2013

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jun 7, 2013
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: OTHER
Accident type: Bodily reaction, NEC
Days lost: 34
Details

The report

Document numberDOCUMENT_NO
220132410020
DateACCIDENT_DT
Jun 7, 2013
TimeACCIDENT_TIME
9999
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
OTHER
Classification codeCLASSIFICATION_CD
21
Accident typeACCIDENT_TYPE
Bodily reaction, NEC
Accident type codeACCIDENT_TYPE_CD
26
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320133440006

Injury

Activity at the timeACTIVITY
Other, NEC
Activity codeACTIVITY_CD
098
Source of injuryINJURY_SOURCE
BODILY MOTION
Source of injury codeINJURY_SOURCE_CD
002
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
33
Days lostDAYS_LOST
34
Returned to workRETURN_TO_WORK_DT
Dec 2, 2013

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 27, 2013
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: MACHINERY
Accident type: Struck by flying object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220130630034
DateACCIDENT_DT
Feb 27, 2013
TimeACCIDENT_TIME
1500
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Grinding
Activity codeACTIVITY_CD
024
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
EYE(S) OPTIC NERVE/VISON
Part of body codeINJ_BODY_PART_CD
130
Days of restricted workDAYS_RESTRICT
1
Returned to workRETURN_TO_WORK_DT
Mar 4, 2013

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (powered)
Equipment codeMINING_EQUIP_CD
29
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 11, 2013
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220130440006
DateACCIDENT_DT
Feb 11, 2013
TimeACCIDENT_TIME
1600
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320130530010

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
KNIFE
Source of injury codeINJURY_SOURCE_CD
049
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Days of restricted workDAYS_RESTRICT
9
Returned to workRETURN_TO_WORK_DT
Feb 22, 2013

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Nov 18, 2009
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck by flying object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220093280013
DateACCIDENT_DT
Nov 18, 2009
TimeACCIDENT_TIME
1445
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
HAND TOOLS,NONPOWERED,NEC
Source of injury codeINJURY_SOURCE_CD
051
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
NOSE/NASAL PASSAGES/SINUS/SMELL
Part of body codeINJ_BODY_PART_CD
143
Returned to workRETURN_TO_WORK_DT
Nov 19, 2009

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2009
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jul 29, 2009
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220092300024
DateACCIDENT_DT
Jul 29, 2009
TimeACCIDENT_TIME
1500
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320092330005

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
OTHER INJURY,NEC
Nature of injury codeNATURE_INJURY_CD
390
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days of restricted workDAYS_RESTRICT
3
Returned to workRETURN_TO_WORK_DT
Aug 20, 2009

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2009
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Apr 9, 2008
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220081060007
DateACCIDENT_DT
Apr 9, 2008
TimeACCIDENT_TIME
1000
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320081120009

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
BELT CONVEYORS
Source of injury codeINJURY_SOURCE_CD
035
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
WRIST
Part of body codeINJ_BODY_PART_CD
320
Days of restricted workDAYS_RESTRICT
1
Returned to workRETURN_TO_WORK_DT
Apr 16, 2008

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jul 18, 2007
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: POWERED HAULAGE
Accident type: Struck against a moving object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220072110008
DateACCIDENT_DT
Jul 18, 2007
TimeACCIDENT_TIME
1430
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
POWERED HAULAGE
Classification codeCLASSIFICATION_CD
12
Accident typeACCIDENT_TYPE
Struck against a moving object
Accident type codeACCIDENT_TYPE_CD
02
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Front-end loader
Activity codeACTIVITY_CD
053
Source of injuryINJURY_SOURCE
SURFACE MINING MACHINES
Source of injury codeINJURY_SOURCE_CD
076
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
NECK
Part of body codeINJ_BODY_PART_CD
200
Days of restricted workDAYS_RESTRICT
2
Returned to workRETURN_TO_WORK_DT
Jul 23, 2007

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Ore haulage trucks - off highway trucks
Equipment codeMINING_EQUIP_CD
44
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2007
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2007
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Nov 22, 2005
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck by flying object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220053360018
DateACCIDENT_DT
Nov 22, 2005
TimeACCIDENT_TIME
0815
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
LOWER LEG/TIBIA/FIBULA
Part of body codeINJ_BODY_PART_CD
513
Returned to workRETURN_TO_WORK_DT
Nov 22, 2005

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Controller IDCONTROLLER_ID
M00616
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2005
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2006
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Mar 26, 2004
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: ELECTRICAL
Accident type: Contact with hot objects or substances
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220040960067
DateACCIDENT_DT
Mar 26, 2004
TimeACCIDENT_TIME
1026
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
ELECTRICAL
Classification codeCLASSIFICATION_CD
01
Accident typeACCIDENT_TYPE
Contact with hot objects or substances
Accident type codeACCIDENT_TYPE_CD
33
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
BURN OR SCALD (HEAT)
Nature of injury codeNATURE_INJURY_CD
120
Part of bodyINJ_BODY_PART
ARM,NEC
Part of body codeINJ_BODY_PART_CD
310
Returned to workRETURN_TO_WORK_DT
Mar 26, 2004

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
E C Rowlett Construction Company Inc
Operator IDOPERATOR_ID
L03746
Controller IDCONTROLLER_ID
M02997
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2004
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2004
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Oct 2, 2003
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: MACHINERY
Accident type: Struck by flying object
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220032830025
DateACCIDENT_DT
Oct 2, 2003
TimeACCIDENT_TIME
1300
Shift beganSHIFT_BEGIN_TIME
600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NOT MARKED
Immediately reportable codeIMMED_NOTIFY_CD
13
Returned to Duty document numberCLOSED_DOC_NO
320032830008

Injury

Activity at the timeACTIVITY
Blow gun, Airlance
Activity codeACTIVITY_CD
004
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
EYE(S) OPTIC NERVE/VISON
Part of body codeINJ_BODY_PART_CD
130
Returned to workRETURN_TO_WORK_DT
Oct 6, 2003

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Blow pipe, Blow gun, Air lance
Equipment codeMINING_EQUIP_CD
06
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
0000
Equipment model numberEQUIP_MODEL_NO
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
E C Rowlett Construction Company Inc
Operator IDOPERATOR_ID
L03746
Controller IDCONTROLLER_ID
M02997
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2003
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2004
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (6)

MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Sep 19, 2003
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck against stationary object
Days lost: 51
Details

The report

Document numberDOCUMENT_NO
220032720019
DateACCIDENT_DT
Sep 19, 2003
TimeACCIDENT_TIME
1800
Shift beganSHIFT_BEGIN_TIME
700
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck against stationary object
Accident type codeACCIDENT_TYPE_CD
01
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NOT MARKED
Immediately reportable codeIMMED_NOTIFY_CD
13
Returned to Duty document numberCLOSED_DOC_NO
320040230017

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Days lostDAYS_LOST
51
Returned to workRETURN_TO_WORK_DT
Nov 10, 2003

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
0000
Equipment model numberEQUIP_MODEL_NO
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
E C Rowlett Construction Company Inc
Operator IDOPERATOR_ID
L03746
Controller IDCONTROLLER_ID
M02997
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2003
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2003
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Aug 8, 2003
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck by flying object
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220032300042
DateACCIDENT_DT
Aug 8, 2003
TimeACCIDENT_TIME
1800
Shift beganSHIFT_BEGIN_TIME
700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NOT MARKED
Immediately reportable codeIMMED_NOTIFY_CD
13
Returned to Duty document numberCLOSED_DOC_NO
320032300015

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
UNCLASSIFIED,NOT DETERMED
Nature of injury codeNATURE_INJURY_CD
400
Part of bodyINJ_BODY_PART
EYE(S) OPTIC NERVE/VISON
Part of body codeINJ_BODY_PART_CD
130
Returned to workRETURN_TO_WORK_DT
Aug 11, 2003

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
0000
Equipment model numberEQUIP_MODEL_NO
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
E C Rowlett Construction Company Inc
Operator IDOPERATOR_ID
L03746
Controller IDCONTROLLER_ID
M02997
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2003
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2003
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (6)

MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Mar 4, 2003
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: MACHINERY
Accident type: Struck by... NEC
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220030660010
DateACCIDENT_DT
Mar 4, 2003
TimeACCIDENT_TIME
1130
Shift beganSHIFT_BEGIN_TIME
600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NOT MARKED
Immediately reportable codeIMMED_NOTIFY_CD
13
Returned to Duty document numberCLOSED_DOC_NO
320030660006

Injury

Activity at the timeACTIVITY
Surface equipment, NEC
Activity codeACTIVITY_CD
072
Source of injuryINJURY_SOURCE
BOILR,PRES VSL,AIR HOS,OX
Source of injury codeINJURY_SOURCE_CD
003
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
HEAD,NEC
Part of body codeINJ_BODY_PART_CD
100
Returned to workRETURN_TO_WORK_DT
Mar 4, 2003

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Machine, NEC - Wheelbarrow, Well drilling Rig, Post hole auger
Equipment codeMINING_EQUIP_CD
71
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
0000
Equipment model numberEQUIP_MODEL_NO
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
E C Rowlett Construction Company Inc
Operator IDOPERATOR_ID
L03746
Controller IDCONTROLLER_ID
M02997
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2003
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2003
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (6)

MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 26, 2001
Degree of injury: OCCUPATNAL ILLNESS NOT DEG 1-6
Classification: DUST DISEASE OF LUNGS
Accident type: Inhalation of radiations, caustics, toxic and noxious substances
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220011230006
DateACCIDENT_DT
Feb 26, 2001
TimeACCIDENT_TIME
9999
Shift beganSHIFT_BEGIN_TIME
700
Degree of injuryDEGREE_INJURY
OCCUPATNAL ILLNESS NOT DEG 1-6
Degree of injury codeDEGREE_INJURY_CD
07
ClassificationCLASSIFICATION
DUST DISEASE OF LUNGS
Classification codeCLASSIFICATION_CD
27
Accident typeACCIDENT_TYPE
Inhalation of radiations, caustics, toxic and noxious substances
Accident type codeACCIDENT_TYPE_CD
36
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NOT MARKED
Immediately reportable codeIMMED_NOTIFY_CD
13

Injury

Activity at the timeACTIVITY
Unknown
Activity codeACTIVITY_CD
099
Source of injuryINJURY_SOURCE
PULVERIZED MINERAL (DUST)
Source of injury codeINJURY_SOURCE_CD
092
Nature of injuryNATURE_INJURY
SILICOSIS
Nature of injury codeNATURE_INJURY_CD
294
Part of bodyINJ_BODY_PART
CHEST (RIBS/BREAST BONE/CHEST ORGNS)
Part of body codeINJ_BODY_PART_CD
430

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
Equipment model numberEQUIP_MODEL_NO
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
E C Rowlett Construction Company Inc
Operator IDOPERATOR_ID
L03746
Controller IDCONTROLLER_ID
M02997
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2001
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2001
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (8)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Returned to workRETURN_TO_WORK_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: May 16, 2000
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: MACHINERY
Accident type: Flash burns (welding)
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220001570077
DateACCIDENT_DT
May 16, 2000
TimeACCIDENT_TIME
1500
Shift beganSHIFT_BEGIN_TIME
730
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Flash burns (welding)
Accident type codeACCIDENT_TYPE_CD
40
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NOT MARKED
Immediately reportable codeIMMED_NOTIFY_CD
13
Returned to Duty document numberCLOSED_DOC_NO
320001570024

Injury

Activity at the timeACTIVITY
Welding or cutting
Activity codeACTIVITY_CD
093
Source of injuryINJURY_SOURCE
MOLTEN METAL
Source of injury codeINJURY_SOURCE_CD
085
Nature of injuryNATURE_INJURY
ELECT.ARC BURN-NOT CONTAC
Nature of injury codeNATURE_INJURY_CD
301
Part of bodyINJ_BODY_PART
EYE(S) OPTIC NERVE/VISON
Part of body codeINJ_BODY_PART_CD
130
Returned to workRETURN_TO_WORK_DT
May 17, 2000

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Welding machine, Torch, Cutting torch, Arc welder, Air arc
Equipment codeMINING_EQUIP_CD
70
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
0000
Equipment model numberEQUIP_MODEL_NO
?
FIPS state codeFIPS_STATE_CD
05

Who and period

Operator at the timeOPERATOR_NAME
E C Rowlett Construction Company Inc
Operator IDOPERATOR_ID
L03746
Controller IDCONTROLLER_ID
M02997
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2000
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2000
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (6)

MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

25 most recent of 27 reports filed on MSHA Form 7000-1; categories are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 4
Hours worked: 5,679
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
5679
Average hours per employeeAVG_EMPLOYEE_HOURS
1420

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 6
Hours worked: 2,427
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
6
Hours workedANNUAL_HRS
2427
Average hours per employeeAVG_EMPLOYEE_HOURS
405

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 5,197
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
5197
Average hours per employeeAVG_EMPLOYEE_HOURS
1299

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 6
Hours worked: 13,181
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
6
Hours workedANNUAL_HRS
13181
Average hours per employeeAVG_EMPLOYEE_HOURS
2197

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 7
Hours worked: 7,029
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
7029
Average hours per employeeAVG_EMPLOYEE_HOURS
1004

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 7
Hours worked: 17,164
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
17164
Average hours per employeeAVG_EMPLOYEE_HOURS
2452

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 8
Hours worked: 17,547
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
8
Hours workedANNUAL_HRS
17547
Average hours per employeeAVG_EMPLOYEE_HOURS
2193

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 7
Hours worked: 9,141
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
9141
Average hours per employeeAVG_EMPLOYEE_HOURS
1306

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 6
Hours worked: 14,497
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
6
Hours workedANNUAL_HRS
14497
Average hours per employeeAVG_EMPLOYEE_HOURS
2416

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 7
Hours worked: 17,486
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
17486
Average hours per employeeAVG_EMPLOYEE_HOURS
2498

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 3
Hours worked: 5,394
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
5394
Average hours per employeeAVG_EMPLOYEE_HOURS
1798

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 7
Hours worked: 18,208
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
18208
Average hours per employeeAVG_EMPLOYEE_HOURS
2601

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 6
Hours worked: 16,768
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
6
Hours workedANNUAL_HRS
16768
Average hours per employeeAVG_EMPLOYEE_HOURS
2795

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 5,281
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
5281
Average hours per employeeAVG_EMPLOYEE_HOURS
2641

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 7
Hours worked: 19,135
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
19135
Average hours per employeeAVG_EMPLOYEE_HOURS
2734

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 7
Hours worked: 17,929
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
17929
Average hours per employeeAVG_EMPLOYEE_HOURS
2561

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 3
Hours worked: 7,211
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
7211
Average hours per employeeAVG_EMPLOYEE_HOURS
2404

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 7
Hours worked: 17,078
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
17078
Average hours per employeeAVG_EMPLOYEE_HOURS
2440

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 8
Hours worked: 16,568
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
8
Hours workedANNUAL_HRS
16568
Average hours per employeeAVG_EMPLOYEE_HOURS
2071

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 3
Hours worked: 6,693
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
6693
Average hours per employeeAVG_EMPLOYEE_HOURS
2231

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 6
Hours worked: 13,015
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
6
Hours workedANNUAL_HRS
13015
Average hours per employeeAVG_EMPLOYEE_HOURS
2169

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 7
Hours worked: 17,336
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
7
Hours workedANNUAL_HRS
17336
Average hours per employeeAVG_EMPLOYEE_HOURS
2477

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 3
Hours worked: 6,820
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
6820
Average hours per employeeAVG_EMPLOYEE_HOURS
2273

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 6
Hours worked: 11,444
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
6
Hours workedANNUAL_HRS
11444
Average hours per employeeAVG_EMPLOYEE_HOURS
1907

Mine

Mine IDMINE_ID
0301537
Mine name in this fileCURR_MINE_NM
Granite Mountain Qrys-Crystal Hill Plt
StateSTATE_ABBR
AR
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Little Rock AR Field Office
Nearest town
Little Rock
Days worked per week
5
Hours per shift
8
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
5
Tailing ponds
0
103(i) spot inspection status
Never Had 103I Status
Safety committee
Y
Portable operation
N
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine IDMINE_ID
0301537
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Intermittent
Status sinceCURRENT_STATUS_DT
Apr 13, 2026
Legal entity typeCOMPANY_TYPE
Corporation

Operator and controller

OperatorCURRENT_OPERATOR_NAME
McGeorge Contracting
Operator IDCURRENT_OPERATOR_ID
L00751
Controller IDCURRENT_CONTROLLER_ID
M00616
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
May 2, 2005

Location and MSHA office

StateSTATE
AR
Bureau of Mines state codeBOM_STATE_CD
03
FIPS county codeFIPS_CNTY_CD
119
FIPS county nameFIPS_CNTY_NM
Pulaski
Congressional districtCONG_DIST_CD
02
Nearest townNEAREST_TOWN
Little Rock
MSHA districtDISTRICT
M5
MSHA office codeOFFICE_CD
M5871
MSHA officeOFFICE_NAME
Little Rock AR Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
12
Most recent assessment control numberASSESS_CTRL_NO
000633240

Commodity

Primary commodity (SIC)PRIMARY_SIC
Crushed, Broken Sandstone
Primary commodity codePRIMARY_SIC_CD
142902
Primary SIC codePRIMARY_SIC_CD_1
1429
Primary SIC suffixPRIMARY_SIC_CD_SFX
02
Primary industry groupPRIMARY_CANVASS
Stone
Primary industry group codePRIMARY_CANVASS_CD
6

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
5
Hours per shiftHOURS_PER_SHIFT
8
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
5
Safety committeeSAFETY_COMMITTEE_IND
Y
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y
103(i) statusCURRENT_103I
Never Had 103I Status

Recorded as 0 (2)

Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (4)

Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS

Not recorded by MSHA (14)

Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: McGeorge Contracting
From: May 2, 2005
To: No end date
Controller: Not shown
From : Jan 1, 1950
To : No end date
Details

Operator

OperatorOPERATOR_NAME
McGeorge Contracting
Operator IDOPERATOR_ID
L00751
Operator fromOPERATOR_START_DT
May 2, 2005

Controller

Controller IDCONTROLLER_ID
M00616
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jan 1, 1950

Mine

Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: E C Rowlett Construction Company Inc
From: Nov 1, 1982
To: May 1, 2005
Controller: Not shown
From : Jan 1, 1950
To : No end date
Details

Operator

OperatorOPERATOR_NAME
E C Rowlett Construction Company Inc
Operator IDOPERATOR_ID
L03746
Operator fromOPERATOR_START_DT
Nov 1, 1982
Operator toOPERATOR_END_DT
May 1, 2005

Controller

Controller IDCONTROLLER_ID
M02997
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jan 1, 1950

Mine

Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

As MSHA records it, newest operator first.

Address of record

McGeorge Contracting·Contact title Sr. Vice President·Street not recorded, White Hall AR 71602

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
McGeorge Contracting
Contact titleCONTACT_TITLE
Sr. Vice President
CityCITY
White Hall
StateSTATE_ABBR
AR
State nameSTATE
Arkansas
ZIP codeZIP_CD
71602
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
05

Mine

Mine IDMINE_ID
0301537
Mine name in this fileMINE_NAME
Granite Mountain Qrys-Crystal Hill Plt
Nearest townNEAREST_TOWN
Little Rock
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Intermittent
Status sinceMINE_STATUS_DT
Apr 13, 2026
Primary commodity (SIC)PRIMARY_SIC_CD
Crushed, Broken Sandstone
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology