Granite Mountain Qrys-Crystal Hill Plt
Metal/Non-Metal, Surface·Crushed, Broken Sandstone·Pulaski, Arkansas·Mine ID 0301537
Operator McGeorge Contracting·Controller not shown·MSHA status Intermittent since Apr 13, 2026
What MSHA has on file for this mine
MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Inspections
Regular Safety and Health InspectionOct 22 to Oct 23, 2025Inspectors 1 | Hours on site 7.5Began: Oct 22, 2025Ended: Oct 23, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 22, 2025
- Closed outINSPECTION_END_DT
- Oct 23, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6938294
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 13.25
- Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- 7.5
- Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- 13.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (1)
Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionSep 2 to Sep 3, 2025Inspectors 1 | Hours on site 10.5Began: Sep 2, 2025Ended: Sep 3, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 10.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 2, 2025
- Closed outINSPECTION_END_DT
- Sep 3, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F02586B
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 10.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Compliance Follow-up InspectionMar 11, 2025Inspectors 1 | Hours on site 10.5Began: Mar 11, 2025Ended: Mar 11, 2025Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 10.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 11, 2025
- Closed outINSPECTION_END_DT
- Mar 11, 2025
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- F0151E5
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 10.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 13
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJan 28 to Jan 30, 2025Inspectors 1 | Hours on site 19.5Began: Jan 28, 2025Ended: Jan 30, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 19.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 28, 2025
- Closed outINSPECTION_END_DT
- Jan 30, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F0151DB
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 19.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 35
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJul 17 to Jul 18, 2024Inspectors 1 | Hours on site 9.75Began: Jul 17, 2024Ended: Jul 18, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 17, 2024
- Closed outINSPECTION_END_DT
- Jul 18, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F00555E
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 19.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJan 2 to Jan 4, 2024Inspectors 1 | Hours on site 14.75Began: Jan 2, 2024Ended: Jan 4, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 14.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 2, 2024
- Closed outINSPECTION_END_DT
- Jan 4, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6932184
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 20
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJul 10 to Jul 11, 2023Inspectors 1 | Hours on site 14.5Began: Jul 10, 2023Ended: Jul 11, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 14.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 10, 2023
- Closed outINSPECTION_END_DT
- Jul 11, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6934557
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionFeb 21 to Feb 24, 2023Inspectors 1 | Hours on site 26.5Began: Feb 21, 2023Ended: Feb 24, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 26.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 21, 2023
- Closed outINSPECTION_END_DT
- Feb 24, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6810791
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 26.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 32
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMay 23 to May 24, 2022Inspectors 1 | Hours on site 8Began: May 23, 2022Ended: May 24, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 23, 2022
- Closed outINSPECTION_END_DT
- May 24, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6888851
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 12
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionFeb 22 to Feb 23, 2022Inspectors 1 | Hours on site 9Began: Feb 22, 2022Ended: Feb 23, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 22, 2022
- Closed outINSPECTION_END_DT
- Feb 23, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6888825
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 12
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMay 17 to May 19, 2021Inspectors 1 | Hours on site 15.5Began: May 17, 2021Ended: May 19, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 15.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 17, 2021
- Closed outINSPECTION_END_DT
- May 19, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6884974
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 15.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionDec 15, 2020Inspectors 1 | Hours on site 12.5Began: Dec 15, 2020Ended: Dec 15, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 12.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 15, 2020
- Closed outINSPECTION_END_DT
- Dec 15, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6884939
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 12.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 14
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionAug 24 to Aug 27, 2020Inspectors 1 | Hours on site 31.5Began: Aug 24, 2020Ended: Aug 27, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 31.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 24, 2020
- Closed outINSPECTION_END_DT
- Aug 27, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6810789
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 31.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 40
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionFeb 26 to Feb 28, 2020Inspectors 1 | Hours on site 14Began: Feb 26, 2020Ended: Feb 28, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 14Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 26, 2020
- Closed outINSPECTION_END_DT
- Feb 28, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6809673
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJun 26 to Jun 27, 2019Inspectors 1 | Hours on site 9Began: Jun 26, 2019Ended: Jun 27, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 26, 2019
- Closed outINSPECTION_END_DT
- Jun 27, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6810410
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMar 19 to Mar 21, 2019Inspectors 1 | Hours on site 19Began: Mar 19, 2019Ended: Mar 21, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 19Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 19, 2019
- Closed outINSPECTION_END_DT
- Mar 21, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6737881
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 19
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 28
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionSep 12, 2018Inspectors 1 | Hours on site 9Began: Sep 12, 2018Ended: Sep 12, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 12, 2018
- Closed outINSPECTION_END_DT
- Sep 12, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6806001
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMar 12 to Mar 13, 2018Inspectors 2 | Hours on site 14.5Began: Mar 12, 2018Ended: Mar 13, 2018Activity: Regular Safety and Health InspectionInspectors: 2Hours on site: 14.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 12, 2018
- Closed outINSPECTION_END_DT
- Mar 13, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6739070
- InspectorsNBR_INSPECTOR
- 2
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 19
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionSep 13, 2017Inspectors 3 | Hours on site 17.75Began: Sep 13, 2017Ended: Sep 13, 2017Activity: Regular Safety and Health InspectionInspectors: 3Hours on site: 17.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 13, 2017
- Closed outINSPECTION_END_DT
- Sep 13, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6738653
- InspectorsNBR_INSPECTOR
- 3
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 17.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 27
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionFeb 23 to Feb 24, 2017Inspectors 1 | Hours on site 6.5Began: Feb 23, 2017Ended: Feb 24, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 23, 2017
- Closed outINSPECTION_END_DT
- Feb 24, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6738626
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJun 16, 2016Inspectors 1 | Hours on site 8Began: Jun 16, 2016Ended: Jun 16, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 16, 2016
- Closed outINSPECTION_END_DT
- Jun 16, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6660543
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMar 8 to Mar 9, 2016Inspectors 1 | Hours on site 8.5Began: Mar 8, 2016Ended: Mar 9, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 8, 2016
- Closed outINSPECTION_END_DT
- Mar 9, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6660948
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 14
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMay 4 to May 5, 2015Inspectors 1 | Hours on site 10.5Began: May 4, 2015Ended: May 5, 2015Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 10.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 4, 2015
- Closed outINSPECTION_END_DT
- May 5, 2015
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6660407
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 10.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 13.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMar 19 to Mar 20, 2015Inspectors 1 | Hours on site 6Began: Mar 19, 2015Ended: Mar 20, 2015Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 19, 2015
- Closed outINSPECTION_END_DT
- Mar 20, 2015
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6653975
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Part 50 AuditSep 24, 2014Inspectors 1 | Hours on site 5.5Began: Sep 24, 2014Ended: Sep 24, 2014Activity: Part 50 AuditInspectors: 1Hours on site: 5.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 24, 2014
- Closed outINSPECTION_END_DT
- Sep 24, 2014
- ActivityACTIVITY
- Part 50 Audit
- Activity codeACTIVITY_CODE
- E25
- Program areaPROGRAM_AREA
- M/NM--Part 50 Audit
- Event numberEVENT_NO
- 6655930
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 12.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
25 most recent of 68 inspections and other MSHA visits since Jan 5, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Oct 22, 2025Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9792880
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 22, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1358
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 22, 2025
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 23, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0900
- Latest dueLATEST_TERM_DUE_DT
- Oct 23, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0900
- TerminatedTERMINATION_DT
- Oct 23, 2025
- Terminated, timeTERMINATION_TIME
- 0821
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Dec 18, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 28, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 4, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- 6938294
- Inspection beganINSPECTION_BEGIN_DT
- Oct 22, 2025
- Inspection closed outINSPECTION_END_DT
- Oct 23, 2025
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Oct 22, 2025Type: CitationStandard: 56.11012S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9792881
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 22, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1411
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 22, 2025
- 30 CFR part and sectionPART_SECTION
- 56.11012
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 23, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1000
- Latest dueLATEST_TERM_DUE_DT
- Oct 23, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1000
- TerminatedTERMINATION_DT
- Oct 22, 2025
- Terminated, timeTERMINATION_TIME
- 1503
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Dec 18, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 28, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 4, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- 6938294
- Inspection beganINSPECTION_BEGIN_DT
- Oct 22, 2025
- Inspection closed outINSPECTION_END_DT
- Oct 23, 2025
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Sep 3, 2025Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5007646
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 3, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0925
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 3, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 3, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Sep 3, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- Sep 3, 2025
- Terminated, timeTERMINATION_TIME
- 1009
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Nov 14, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 10, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- F02586B
- Inspection beganINSPECTION_BEGIN_DT
- Sep 2, 2025
- Inspection closed outINSPECTION_END_DT
- Sep 3, 2025
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Sep 3, 2025Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5007645
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 3, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0830
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 3, 2025
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 3, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Sep 3, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Sep 3, 2025
- Terminated, timeTERMINATION_TIME
- 0854
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Nov 14, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 25, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 10, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- F02586B
- Inspection beganINSPECTION_BEGIN_DT
- Sep 2, 2025
- Inspection closed outINSPECTION_END_DT
- Sep 3, 2025
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Sep 2, 2025Type: CitationStandard: 56.4201(a)(2)S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5007644
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 2, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1302
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 2, 2025
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 3, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Sep 3, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Sep 2, 2025
- Terminated, timeTERMINATION_TIME
- 1308
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Nov 14, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 29, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 5, 2025
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Stribling Equipment Company I
- Operator IDVIOLATOR_ID
- A256
- Contractor IDCONTRACTOR_ID
- A256
- Inspection eventEVENT_NO
- F02586B
- Inspection beganINSPECTION_BEGIN_DT
- Sep 2, 2025
- Inspection closed outINSPECTION_END_DT
- Sep 3, 2025
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Feb 6, 2025Type: CitationStandard: 56.5001(a)/.5005S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $313.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5000243
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 6, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1154
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 28, 2025
- 30 CFR part and sectionPART_SECTION
- 56.5001(a)/.5005
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 13, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Mar 14, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Mar 24, 2025
- Terminated, timeTERMINATION_TIME
- 0919
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 313
- Current proposed assessmentAMOUNT_DUE
- 313
- Amount paidAMOUNT_PAID
- 313
- Bill first printedBILL_PRINT_DT
- Mar 13, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 23, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 10, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- F0151DB
- Inspection beganINSPECTION_BEGIN_DT
- Jan 28, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jan 28, 2025Type: CitationStandard: 47.41(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5000241
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 28, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1208
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 28, 2025
- 30 CFR part and sectionPART_SECTION
- 47.41(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 28, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jan 28, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jan 28, 2025
- Terminated, timeTERMINATION_TIME
- 1208
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 13, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 23, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 10, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- F0151DB
- Inspection beganINSPECTION_BEGIN_DT
- Jan 28, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jan 28, 2025Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5000240
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 28, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1116
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 28, 2025
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 28, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jan 28, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jan 28, 2025
- Terminated, timeTERMINATION_TIME
- 1459
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 13, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 23, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 10, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- F0151DB
- Inspection beganINSPECTION_BEGIN_DT
- Jan 28, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 17, 2024Type: CitationStandard: 56.12032S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795271
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 17, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1044
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 17, 2024
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 17, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 17, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 17, 2024
- Terminated, timeTERMINATION_TIME
- 1522
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Oct 17, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 21, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 27, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- F00555E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 17, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 18, 2024
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 17, 2024Type: CitationStandard: 56.11012S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795272
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 17, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1109
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 17, 2024
- 30 CFR part and sectionPART_SECTION
- 56.11012
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 17, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 17, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 17, 2024
- Terminated, timeTERMINATION_TIME
- 1133
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Oct 17, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 21, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 27, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- F00555E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 17, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 18, 2024
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 17, 2024Type: CitationStandard: 56.11002S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795268
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 17, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0942
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 17, 2024
- 30 CFR part and sectionPART_SECTION
- 56.11002
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 17, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 17, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 17, 2024
- Terminated, timeTERMINATION_TIME
- 1038
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Oct 17, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 21, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 27, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- F00555E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 17, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 18, 2024
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 17, 2024Type: CitationStandard: 56.11012S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $305.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795267
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 17, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0937
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 17, 2024
- 30 CFR part and sectionPART_SECTION
- 56.11012
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 17, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 17, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 17, 2024
- Terminated, timeTERMINATION_TIME
- 1054
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 305
- Current proposed assessmentAMOUNT_DUE
- 305
- Amount paidAMOUNT_PAID
- 305
- Bill first printedBILL_PRINT_DT
- Oct 17, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 21, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 27, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- F00555E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 17, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 18, 2024
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 17, 2024Type: CitationStandard: 56.11008S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795270
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 17, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1027
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 17, 2024
- 30 CFR part and sectionPART_SECTION
- 56.11008
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 17, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 17, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 17, 2024
- Terminated, timeTERMINATION_TIME
- 1418
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jan 16, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 20, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 11, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- F00555E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 17, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 18, 2024
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 17, 2024Type: CitationStandard: 56.12032S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795269
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 17, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1022
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 17, 2024
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 17, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 17, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 17, 2024
- Terminated, timeTERMINATION_TIME
- 1422
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Oct 17, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 21, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 27, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- F00555E
- Inspection beganINSPECTION_BEGIN_DT
- Jul 17, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 18, 2024
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jan 2, 2024Type: CitationStandard: 56.9300(a)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $204.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9742576
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 2, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1330
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 2, 2024
- 30 CFR part and sectionPART_SECTION
- 56.9300(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 2, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1430
- Latest dueLATEST_TERM_DUE_DT
- Jan 2, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1430
- TerminatedTERMINATION_DT
- Jan 4, 2024
- Terminated, timeTERMINATION_TIME
- 1015
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 204
- Current proposed assessmentAMOUNT_DUE
- 204
- Amount paidAMOUNT_PAID
- 204
- Bill first printedBILL_PRINT_DT
- Feb 15, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 23, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 6, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- 6932184
- Inspection beganINSPECTION_BEGIN_DT
- Jan 2, 2024
- Inspection closed outINSPECTION_END_DT
- Jan 4, 2024
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jan 2, 2024Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9742575
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 2, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1245
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 2, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 2, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jan 2, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jan 2, 2024
- Terminated, timeTERMINATION_TIME
- 1425
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Feb 15, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 23, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Mar 6, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- 6932184
- Inspection beganINSPECTION_BEGIN_DT
- Jan 2, 2024
- Inspection closed outINSPECTION_END_DT
- Jan 4, 2024
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 10, 2023Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9744630
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 10, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1146
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 10, 2023
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 10, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Jul 10, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Jul 10, 2023
- Terminated, timeTERMINATION_TIME
- 1400
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Aug 17, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 22, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 6, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- 6934557
- Inspection beganINSPECTION_BEGIN_DT
- Jul 10, 2023
- Inspection closed outINSPECTION_END_DT
- Jul 11, 2023
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 10, 2023Type: CitationStandard: 56.14206(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9744628
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 10, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0827
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 10, 2023
- 30 CFR part and sectionPART_SECTION
- 56.14206(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 10, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 0900
- Latest dueLATEST_TERM_DUE_DT
- Jul 10, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 0900
- TerminatedTERMINATION_DT
- Jul 10, 2023
- Terminated, timeTERMINATION_TIME
- 0835
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Aug 17, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 22, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 6, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- 6934557
- Inspection beganINSPECTION_BEGIN_DT
- Jul 10, 2023
- Inspection closed outINSPECTION_END_DT
- Jul 11, 2023
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 10, 2023Type: CitationStandard: 56.14107(a)S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $198.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9744629
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 10, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1106
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 10, 2023
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 10, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jul 10, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jul 10, 2023
- Terminated, timeTERMINATION_TIME
- 1200
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 198
- Current proposed assessmentAMOUNT_DUE
- 198
- Amount paidAMOUNT_PAID
- 198
- Bill first printedBILL_PRINT_DT
- Aug 17, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 22, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 6, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- 6934557
- Inspection beganINSPECTION_BEGIN_DT
- Jul 10, 2023
- Inspection closed outINSPECTION_END_DT
- Jul 11, 2023
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Feb 22, 2023Type: CitationStandard: 56.14105S&S: YNegligence: LowNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9678863
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 22, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1455
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 22, 2023
- 30 CFR part and sectionPART_SECTION
- 56.14105
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 22, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Feb 22, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Feb 22, 2023
- Terminated, timeTERMINATION_TIME
- 1500
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Apr 13, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- May 28, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 3, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- 6810791
- Inspection beganINSPECTION_BEGIN_DT
- Feb 21, 2023
- Inspection closed outINSPECTION_END_DT
- Feb 24, 2023
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Feb 21, 2023Type: CitationStandard: 56.12002S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9678858
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 21, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0950
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 21, 2023
- 30 CFR part and sectionPART_SECTION
- 56.12002
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 21, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Feb 21, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Feb 21, 2023
- Terminated, timeTERMINATION_TIME
- 1000
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Apr 13, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- May 28, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 3, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- 6810791
- Inspection beganINSPECTION_BEGIN_DT
- Feb 21, 2023
- Inspection closed outINSPECTION_END_DT
- Feb 24, 2023
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Feb 21, 2023Type: CitationStandard: 56.12032S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9678861
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 21, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1140
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 21, 2023
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 21, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Feb 21, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Feb 21, 2023
- Terminated, timeTERMINATION_TIME
- 1145
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Apr 18, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 2, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 28, 2023
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Industrial Power Inc.
- Operator IDVIOLATOR_ID
- Z310
- Contractor IDCONTRACTOR_ID
- Z310
- Inspection eventEVENT_NO
- 6810791
- Inspection beganINSPECTION_BEGIN_DT
- Feb 21, 2023
- Inspection closed outINSPECTION_END_DT
- Feb 24, 2023
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Feb 21, 2023Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: ContractorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9678862
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 21, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1200
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 21, 2023
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 21, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Feb 21, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Feb 21, 2023
- Terminated, timeTERMINATION_TIME
- 1205
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Apr 18, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 2, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 28, 2023
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Operator at the timeVIOLATOR_NAME
- Industrial Power Inc.
- Operator IDVIOLATOR_ID
- Z310
- Contractor IDCONTRACTOR_ID
- Z310
- Inspection eventEVENT_NO
- 6810791
- Inspection beganINSPECTION_BEGIN_DT
- Feb 21, 2023
- Inspection closed outINSPECTION_END_DT
- Feb 24, 2023
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
Issued: Feb 21, 2023Type: CitationStandard: 56.20011S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9678859
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 21, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1030
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 21, 2023
- 30 CFR part and sectionPART_SECTION
- 56.20011
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 21, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Feb 21, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Feb 21, 2023
- Terminated, timeTERMINATION_TIME
- 1300
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Apr 13, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- May 28, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- May 3, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- 6810791
- Inspection beganINSPECTION_BEGIN_DT
- Feb 21, 2023
- Inspection closed outINSPECTION_END_DT
- Feb 24, 2023
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: May 23, 2022Type: OrderStandard: 46.7(a)S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $148.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9646780
- TypeCIT_ORD_SAFE
- Order
- IssuedVIOLATION_ISSUE_DT
- May 23, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1000
- Date of occurrenceVIOLATION_OCCUR_DT
- May 23, 2022
- 30 CFR part and sectionPART_SECTION
- 46.7(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(g)(1)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- TerminatedTERMINATION_DT
- May 23, 2022
- Terminated, timeTERMINATION_TIME
- 1430
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 148
- Current proposed assessmentAMOUNT_DUE
- 148
- Amount paidAMOUNT_PAID
- 148
- Bill first printedBILL_PRINT_DT
- Jul 14, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 17, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 4, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- McGeorge Contracting
- Operator IDVIOLATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Inspection eventEVENT_NO
- 6888851
- Inspection beganINSPECTION_BEGIN_DT
- May 23, 2022
- Inspection closed outINSPECTION_END_DT
- May 24, 2022
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (17)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
209 citations and orders since Jan 6, 2000: 197 issued to the operator, 12 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Oct 22, 2025Citation number: 9792880Standard: 56.20003(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9792880
- Assessment control numberASSESS_CASE_NO
- 000633240
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 4, 2026
- Citation issuedISSUE_DT
- Oct 22, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 22, 2025
- Final order dateFINAL_ORDER_DT
- Jan 28, 2026
- Bill first printedBILL_PRINT_DT
- Dec 18, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 28, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 44
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32044
- Size of mineSIZE_OF_MINE
- 32044
- Controller hours workedCONTROLLER_HRS
- 428388
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 428388
- History period startHISTORY_START_DT
- Jul 22, 2024
- History period endHISTORY_END_DT
- Oct 21, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6938294
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 22, 2025Citation number: 9792881Standard: 56.11012Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9792881
- Assessment control numberASSESS_CASE_NO
- 000633240
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 4, 2026
- Citation issuedISSUE_DT
- Oct 22, 2025
- Date of occurrenceOCCURRENCE_DT
- Oct 22, 2025
- Final order dateFINAL_ORDER_DT
- Jan 28, 2026
- Bill first printedBILL_PRINT_DT
- Dec 18, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 28, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11012
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 49
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 1
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 2
- Repeat violations per inspection dayRPID
- 0.222
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32044
- Size of mineSIZE_OF_MINE
- 32044
- Controller hours workedCONTROLLER_HRS
- 428388
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 428388
- History period startHISTORY_START_DT
- Jul 22, 2024
- History period endHISTORY_END_DT
- Oct 21, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6938294
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 3, 2025Citation number: 5007646Standard: 56.12004Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007646
- Assessment control numberASSESS_CASE_NO
- 000631222
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 10, 2025
- Citation issuedISSUE_DT
- Sep 3, 2025
- Date of occurrenceOCCURRENCE_DT
- Sep 3, 2025
- Final order dateFINAL_ORDER_DT
- Dec 25, 2025
- Bill first printedBILL_PRINT_DT
- Nov 14, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 44
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32044
- Size of mineSIZE_OF_MINE
- 32044
- Controller hours workedCONTROLLER_HRS
- 428388
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 428388
- History period startHISTORY_START_DT
- Jun 3, 2024
- History period endHISTORY_END_DT
- Sep 2, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F02586B
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 3, 2025Citation number: 5007645Standard: 56.14100(b)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007645
- Assessment control numberASSESS_CASE_NO
- 000631222
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 10, 2025
- Citation issuedISSUE_DT
- Sep 3, 2025
- Date of occurrenceOCCURRENCE_DT
- Sep 3, 2025
- Final order dateFINAL_ORDER_DT
- Dec 25, 2025
- Bill first printedBILL_PRINT_DT
- Nov 14, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 25, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 44
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 1
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.111
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32044
- Size of mineSIZE_OF_MINE
- 32044
- Controller hours workedCONTROLLER_HRS
- 428388
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 428388
- History period startHISTORY_START_DT
- Jun 3, 2024
- History period endHISTORY_END_DT
- Sep 2, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F02586B
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 2, 2025Citation number: 5007644Standard: 56.4201(a)(2)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5007644
- Assessment control numberASSESS_CASE_NO
- 000631562
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 5, 2025
- Citation issuedISSUE_DT
- Sep 2, 2025
- Date of occurrenceOCCURRENCE_DT
- Sep 2, 2025
- Final order dateFINAL_ORDER_DT
- Dec 29, 2025
- Bill first printedBILL_PRINT_DT
- Nov 14, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 38
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Contractor size pointsCONTRACTOR_SIZE_POINTS
- 2
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 5158
- Size of mineSIZE_OF_MINE
- 5158
- History period startHISTORY_START_DT
- Jun 2, 2024
- History period endHISTORY_END_DT
- Sep 1, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Stribling Equipment Company I
- IDVIOLATOR_ID
- A256
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Sep 2, 2025
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F02586B
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Feb 6, 2025Citation number: 5000243Standard: 56.5001(a)/.5005Proposed penalty: $313.00Current assessment: $313.00Paid against proposed penalty: $313.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5000243
- Assessment control numberASSESS_CASE_NO
- 000616550
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 10, 2025
- Citation issuedISSUE_DT
- Feb 6, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 28, 2025
- Final order dateFINAL_ORDER_DT
- Apr 23, 2025
- Bill first printedBILL_PRINT_DT
- Mar 13, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 23, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.5001(a)/.5005
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 313.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 313.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 313.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 69
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 1.4
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32044
- Size of mineSIZE_OF_MINE
- 32044
- Controller hours workedCONTROLLER_HRS
- 428388
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 428388
- History period startHISTORY_START_DT
- Oct 28, 2023
- History period endHISTORY_END_DT
- Jan 27, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F0151DB
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 28, 2025Citation number: 5000240Standard: 56.14100(b)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5000240
- Assessment control numberASSESS_CASE_NO
- 000616550
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 10, 2025
- Citation issuedISSUE_DT
- Jan 28, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 28, 2025
- Final order dateFINAL_ORDER_DT
- Apr 23, 2025
- Bill first printedBILL_PRINT_DT
- Mar 13, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 23, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 44
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 1.4
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32044
- Size of mineSIZE_OF_MINE
- 32044
- Controller hours workedCONTROLLER_HRS
- 428388
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 428388
- History period startHISTORY_START_DT
- Oct 28, 2023
- History period endHISTORY_END_DT
- Jan 27, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F0151DB
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 28, 2025Citation number: 5000241Standard: 47.41(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5000241
- Assessment control numberASSESS_CASE_NO
- 000616550
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 10, 2025
- Citation issuedISSUE_DT
- Jan 28, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 28, 2025
- Final order dateFINAL_ORDER_DT
- Apr 23, 2025
- Bill first printedBILL_PRINT_DT
- Mar 13, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 23, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.41(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 44
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 1.4
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 32044
- Size of mineSIZE_OF_MINE
- 32044
- Controller hours workedCONTROLLER_HRS
- 428388
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 428388
- History period startHISTORY_START_DT
- Oct 28, 2023
- History period endHISTORY_END_DT
- Jan 27, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F0151DB
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 17, 2024Citation number: 9795269Standard: 56.12032Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795269
- Assessment control numberASSESS_CASE_NO
- 000607082
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 23, 2025
- Citation issuedISSUE_DT
- Jul 17, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 17, 2024
- Final order dateFINAL_ORDER_DT
- Nov 21, 2024
- Bill first printedBILL_PRINT_DT
- Oct 17, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 21, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.84
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 59
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35694
- Size of mineSIZE_OF_MINE
- 35694
- Controller hours workedCONTROLLER_HRS
- 427092
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 427092
- History period startHISTORY_START_DT
- Apr 17, 2023
- History period endHISTORY_END_DT
- Jul 16, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00555E
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 17, 2024Citation number: 9795268Standard: 56.11002Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795268
- Assessment control numberASSESS_CASE_NO
- 000607082
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 23, 2025
- Citation issuedISSUE_DT
- Jul 17, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 17, 2024
- Final order dateFINAL_ORDER_DT
- Nov 21, 2024
- Bill first printedBILL_PRINT_DT
- Oct 17, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 21, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.84
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 44
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35694
- Size of mineSIZE_OF_MINE
- 35694
- Controller hours workedCONTROLLER_HRS
- 427092
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 427092
- History period startHISTORY_START_DT
- Apr 17, 2023
- History period endHISTORY_END_DT
- Jul 16, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00555E
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 17, 2024Citation number: 9795267Standard: 56.11012Proposed penalty: $305.00Current assessment: $305.00Paid against proposed penalty: $305.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795267
- Assessment control numberASSESS_CASE_NO
- 000607082
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 23, 2025
- Citation issuedISSUE_DT
- Jul 17, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 17, 2024
- Final order dateFINAL_ORDER_DT
- Nov 21, 2024
- Bill first printedBILL_PRINT_DT
- Oct 17, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 21, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11012
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 305.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 305.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.74
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 305.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 69
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35694
- Size of mineSIZE_OF_MINE
- 35694
- Controller hours workedCONTROLLER_HRS
- 427092
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 427092
- History period startHISTORY_START_DT
- Apr 17, 2023
- History period endHISTORY_END_DT
- Jul 16, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00555E
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 17, 2024Citation number: 9795272Standard: 56.11012Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795272
- Assessment control numberASSESS_CASE_NO
- 000607082
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 23, 2025
- Citation issuedISSUE_DT
- Jul 17, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 17, 2024
- Final order dateFINAL_ORDER_DT
- Nov 21, 2024
- Bill first printedBILL_PRINT_DT
- Oct 17, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 21, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11012
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.84
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 49
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35694
- Size of mineSIZE_OF_MINE
- 35694
- Controller hours workedCONTROLLER_HRS
- 427092
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 427092
- History period startHISTORY_START_DT
- Apr 17, 2023
- History period endHISTORY_END_DT
- Jul 16, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00555E
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 17, 2024Citation number: 9795270Standard: 56.11008Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795270
- Assessment control numberASSESS_CASE_NO
- 000613712
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 10, 2025
- Citation issuedISSUE_DT
- Jul 17, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 17, 2024
- Final order dateFINAL_ORDER_DT
- Feb 20, 2025
- Bill first printedBILL_PRINT_DT
- Jan 16, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 20, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11008
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 44
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35694
- Size of mineSIZE_OF_MINE
- 35694
- Controller hours workedCONTROLLER_HRS
- 427092
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 427092
- History period startHISTORY_START_DT
- Apr 17, 2023
- History period endHISTORY_END_DT
- Jul 16, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00555E
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 17, 2024Citation number: 9795271Standard: 56.12032Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795271
- Assessment control numberASSESS_CASE_NO
- 000607082
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 23, 2025
- Citation issuedISSUE_DT
- Jul 17, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 17, 2024
- Final order dateFINAL_ORDER_DT
- Nov 21, 2024
- Bill first printedBILL_PRINT_DT
- Oct 17, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 21, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.84
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 59
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35694
- Size of mineSIZE_OF_MINE
- 35694
- Controller hours workedCONTROLLER_HRS
- 427092
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 427092
- History period startHISTORY_START_DT
- Apr 17, 2023
- History period endHISTORY_END_DT
- Jul 16, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00555E
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 2, 2024Citation number: 9742575Standard: 56.14100(b)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9742575
- Assessment control numberASSESS_CASE_NO
- 000594196
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 6, 2024
- Citation issuedISSUE_DT
- Jan 2, 2024
- Date of occurrenceOCCURRENCE_DT
- Jan 2, 2024
- Final order dateFINAL_ORDER_DT
- Mar 23, 2024
- Bill first printedBILL_PRINT_DT
- Feb 15, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 23, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 44
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35694
- Size of mineSIZE_OF_MINE
- 35694
- Controller hours workedCONTROLLER_HRS
- 427092
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 427092
- History period startHISTORY_START_DT
- Oct 2, 2022
- History period endHISTORY_END_DT
- Jan 1, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6932184
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 2, 2024Citation number: 9742576Standard: 56.9300(a)Proposed penalty: $204.00Current assessment: $204.00Paid against proposed penalty: $204.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9742576
- Assessment control numberASSESS_CASE_NO
- 000594196
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Mar 6, 2024
- Citation issuedISSUE_DT
- Jan 2, 2024
- Date of occurrenceOCCURRENCE_DT
- Jan 2, 2024
- Final order dateFINAL_ORDER_DT
- Mar 23, 2024
- Bill first printedBILL_PRINT_DT
- Feb 15, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 23, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9300(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 204.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 204.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 204.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 64
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35694
- Size of mineSIZE_OF_MINE
- 35694
- Controller hours workedCONTROLLER_HRS
- 427092
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 427092
- History period startHISTORY_START_DT
- Oct 2, 2022
- History period endHISTORY_END_DT
- Jan 1, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6932184
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 10, 2023Citation number: 9744630Standard: 56.12004Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9744630
- Assessment control numberASSESS_CASE_NO
- 000583135
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 6, 2023
- Citation issuedISSUE_DT
- Jul 10, 2023
- Date of occurrenceOCCURRENCE_DT
- Jul 10, 2023
- Final order dateFINAL_ORDER_DT
- Sep 22, 2023
- Bill first printedBILL_PRINT_DT
- Aug 17, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 22, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 44
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.71
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35903
- Size of mineSIZE_OF_MINE
- 35903
- Controller hours workedCONTROLLER_HRS
- 405831
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 405831
- History period startHISTORY_START_DT
- Apr 10, 2022
- History period endHISTORY_END_DT
- Jul 9, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6934557
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 10, 2023Citation number: 9744628Standard: 56.14206(b)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9744628
- Assessment control numberASSESS_CASE_NO
- 000583135
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 6, 2023
- Citation issuedISSUE_DT
- Jul 10, 2023
- Date of occurrenceOCCURRENCE_DT
- Jul 10, 2023
- Final order dateFINAL_ORDER_DT
- Sep 22, 2023
- Bill first printedBILL_PRINT_DT
- Aug 17, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 22, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14206(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 49
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.71
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35903
- Size of mineSIZE_OF_MINE
- 35903
- Controller hours workedCONTROLLER_HRS
- 405831
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 405831
- History period startHISTORY_START_DT
- Apr 10, 2022
- History period endHISTORY_END_DT
- Jul 9, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6934557
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 10, 2023Citation number: 9744629Standard: 56.14107(a)Proposed penalty: $198.00Current assessment: $198.00Paid against proposed penalty: $198.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9744629
- Assessment control numberASSESS_CASE_NO
- 000583135
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 6, 2023
- Citation issuedISSUE_DT
- Jul 10, 2023
- Date of occurrenceOCCURRENCE_DT
- Jul 10, 2023
- Final order dateFINAL_ORDER_DT
- Sep 22, 2023
- Bill first printedBILL_PRINT_DT
- Aug 17, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 22, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 198.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 198.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 198.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 64
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.71
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35903
- Size of mineSIZE_OF_MINE
- 35903
- Controller hours workedCONTROLLER_HRS
- 405831
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 405831
- History period startHISTORY_START_DT
- Apr 10, 2022
- History period endHISTORY_END_DT
- Jul 9, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6934557
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 22, 2023Citation number: 9678863Standard: 56.14105Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9678863
- Assessment control numberASSESS_CASE_NO
- 000574832
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 3, 2023
- Citation issuedISSUE_DT
- Feb 22, 2023
- Date of occurrenceOCCURRENCE_DT
- Feb 22, 2023
- Final order dateFINAL_ORDER_DT
- May 28, 2023
- Bill first printedBILL_PRINT_DT
- Apr 13, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14105
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 54
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 0.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35903
- Size of mineSIZE_OF_MINE
- 35903
- Controller hours workedCONTROLLER_HRS
- 405831
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 405831
- History period startHISTORY_START_DT
- Nov 22, 2021
- History period endHISTORY_END_DT
- Feb 21, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6810791
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 21, 2023Citation number: 9678859Standard: 56.20011Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9678859
- Assessment control numberASSESS_CASE_NO
- 000574832
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 3, 2023
- Citation issuedISSUE_DT
- Feb 21, 2023
- Date of occurrenceOCCURRENCE_DT
- Feb 21, 2023
- Final order dateFINAL_ORDER_DT
- May 28, 2023
- Bill first printedBILL_PRINT_DT
- Apr 13, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20011
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 59
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35903
- Size of mineSIZE_OF_MINE
- 35903
- Controller hours workedCONTROLLER_HRS
- 405831
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 405831
- History period startHISTORY_START_DT
- Nov 21, 2021
- History period endHISTORY_END_DT
- Feb 20, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6810791
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 21, 2023Citation number: 9678862Standard: 56.12004Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9678862
- Assessment control numberASSESS_CASE_NO
- 000574996
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 26, 2023
- Citation issuedISSUE_DT
- Feb 21, 2023
- Date of occurrenceOCCURRENCE_DT
- Feb 21, 2023
- Final order dateFINAL_ORDER_DT
- Jun 2, 2023
- Bill first printedBILL_PRINT_DT
- Apr 18, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 1214
- Size of mineSIZE_OF_MINE
- 1214
- History period startHISTORY_START_DT
- Nov 21, 2021
- History period endHISTORY_END_DT
- Feb 20, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Industrial Power Inc.
- IDVIOLATOR_ID
- Z310
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 21, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6810791
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (18)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Feb 21, 2023Citation number: 9678858Standard: 56.12002Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9678858
- Assessment control numberASSESS_CASE_NO
- 000574832
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- May 3, 2023
- Citation issuedISSUE_DT
- Feb 21, 2023
- Date of occurrenceOCCURRENCE_DT
- Feb 21, 2023
- Final order dateFINAL_ORDER_DT
- May 28, 2023
- Bill first printedBILL_PRINT_DT
- Apr 13, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 59
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35903
- Size of mineSIZE_OF_MINE
- 35903
- Controller hours workedCONTROLLER_HRS
- 405831
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 405831
- History period startHISTORY_START_DT
- Nov 21, 2021
- History period endHISTORY_END_DT
- Feb 20, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6810791
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 21, 2023Citation number: 9678861Standard: 56.12032Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9678861
- Assessment control numberASSESS_CASE_NO
- 000574996
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 26, 2023
- Citation issuedISSUE_DT
- Feb 21, 2023
- Date of occurrenceOCCURRENCE_DT
- Feb 21, 2023
- Final order dateFINAL_ORDER_DT
- Jun 2, 2023
- Bill first printedBILL_PRINT_DT
- Apr 18, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 1214
- Size of mineSIZE_OF_MINE
- 1214
- History period startHISTORY_START_DT
- Nov 21, 2021
- History period endHISTORY_END_DT
- Feb 20, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Contractor
- Name at the time of the assessmentVIOLATOR_NAME
- Industrial Power Inc.
- IDVIOLATOR_ID
- Z310
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Feb 21, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6810791
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (18)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (3)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: May 23, 2022Citation number: 9646780Standard: 46.7(a)Proposed penalty: $148.00Current assessment: $148.00Paid against proposed penalty: $148.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9646780
- Assessment control numberASSESS_CASE_NO
- 000558914
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 4, 2022
- Citation issuedISSUE_DT
- May 23, 2022
- Date of occurrenceOCCURRENCE_DT
- May 23, 2022
- Final order dateFINAL_ORDER_DT
- Aug 17, 2022
- Bill first printedBILL_PRINT_DT
- Jul 14, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 17, 2022
- Citation typeCITATION_TYPE_CD
- Order
- 30 CFR standardCFR_STANDARD_CD
- 46.7(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(g)(1)
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 148.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 148.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 148.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 59
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Mine size pointsMINE_SIZE_POINTS
- 4
- Controller size pointsCONTROLLER_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 35007
- Size of mineSIZE_OF_MINE
- 35007
- Controller hours workedCONTROLLER_HRS
- 408702
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 408702
- History period startHISTORY_START_DT
- Feb 23, 2021
- History period endHISTORY_END_DT
- May 22, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- McGeorge Contracting
- IDVIOLATOR_ID
- L00751
- Operator start at the mine, as assessedVIOLATOR_START_DT
- May 2, 2005
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6888851
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (3)
Significant and substantialSIG_SUB_IND, Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 208 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Contested citations and decisions
Contested: Mar 8, 2011Citation issued: Dec 20, 2010Docket: CENT 2011-533MStandard: 56.14108Proposed penalty: $100.00Penalty after decision: $0.00Decided: Aug 26, 2011Decision type: WithdrawalDetails
The contest
- Citation or order numberCITATION_NO
- 8616806
- Citation issuedCITATION_ISSUE_DT
- Dec 20, 2010
- Hearing request receivedCONTEST_DT
- Mar 8, 2011
- Docket numberDOCKET_NO
- CENT 2011-533M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Withdrawal
- DecidedDECISION_DT
- Aug 26, 2011
- Petition duePETITION_DUE_DT
- Apr 22, 2011
- Petition filedPETITION_FILED_DT
- Apr 29, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14108
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Recorded as 0 (1)
Penalty after the decisionDECISION_PENALTY_AMT
Recorded as N (1)
S&S when contestedORIGINAL_SIG_SUB_IND
Not recorded by MSHA (9)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE
Contested: Oct 5, 2010Citation issued: Jul 20, 2010Docket: CENT 2011-11MStandard: 56.12002Proposed penalty: $946.00Penalty after decision: $946.00Decided: May 19, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 6568905
- Citation issuedCITATION_ISSUE_DT
- Jul 20, 2010
- Hearing request receivedCONTEST_DT
- Oct 5, 2010
- Docket numberDOCKET_NO
- CENT 2011-11M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- May 19, 2011
- Petition duePETITION_DUE_DT
- Nov 19, 2010
- Petition filedPETITION_FILED_DT
- Oct 3, 2011
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 946.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 946.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.12002
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Fatal
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Fatal
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M5000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M5000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Dallas District
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
Other fields
- ISSUING_FIELD_OFFICE
- M5871
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
2 contested citations and orders; decision types are MSHA's own text.
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- NO DYS AWY FRM WRK,NO RSTR ACT
- 12
- DAYS RESTRICTED ACTIVITY ONLY
- 11
- DYS AWY FRM WRK & RESTRCTD ACT
- 1
- OCCUPATNAL ILLNESS NOT DEG 1-6
- 1
- DAYS AWAY FROM WORK ONLY
- 1
- PERM TOT OR PERM PRTL DISABLTY
- 1
Date: May 31, 2025Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Struck by rolling or sliding objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220251550011
- DateACCIDENT_DT
- May 31, 2025
- TimeACCIDENT_TIME
- 1140
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck by rolling or sliding object
- Accident type codeACCIDENT_TYPE_CD
- 06
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320251990006
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days of restricted workDAYS_RESTRICT
- 44
- Returned to workRETURN_TO_WORK_DT
- Jul 14, 2025
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Aug 3, 2023Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion in lifting objectsDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220232260035
- DateACCIDENT_DT
- Aug 3, 2023
- TimeACCIDENT_TIME
- 1800
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion in lifting objects
- Accident type codeACCIDENT_TYPE_CD
- 27
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320232750015
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days of restricted workDAYS_RESTRICT
- 39
- Returned to workRETURN_TO_WORK_DT
- Sep 27, 2023
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Dec 1, 2022Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: MACHINERYAccident type: Caught in, under or between a moving and a stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220223390028
- DateACCIDENT_DT
- Dec 1, 2022
- TimeACCIDENT_TIME
- 1500
- Shift beganSHIFT_BEGIN_TIME
- 0530
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- Accident type codeACCIDENT_TYPE_CD
- 21
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320223480001
Injury
- Activity at the timeACTIVITY
- Hand tools (powered)
- Activity codeACTIVITY_CD
- 031
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CRUSHING
- Nature of injury codeNATURE_INJURY_CD
- 170
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days of restricted workDAYS_RESTRICT
- 7
- Returned to workRETURN_TO_WORK_DT
- Dec 13, 2022
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (powered)
- Equipment codeMINING_EQUIP_CD
- 29
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Apr 11, 2022Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDTOOLS (NONPOWERED)Accident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220221030022
- DateACCIDENT_DT
- Apr 11, 2022
- TimeACCIDENT_TIME
- 1330
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320221040003
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- AXE,HAMMER,SLEDGE
- Source of injury codeINJURY_SOURCE_CD
- 046
- Nature of injuryNATURE_INJURY
- CONTUSN,BRUISE,INTAC SKIN
- Nature of injury codeNATURE_INJURY_CD
- 160
- Part of bodyINJ_BODY_PART
- HAND (NOT WRIST OR FINGERS)
- Part of body codeINJ_BODY_PART_CD
- 330
- Days of restricted workDAYS_RESTRICT
- 1
- Returned to workRETURN_TO_WORK_DT
- Apr 13, 2022
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Jan 21, 2022Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Caught in, under or between a moving and a stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220220260015
- DateACCIDENT_DT
- Jan 21, 2022
- TimeACCIDENT_TIME
- 1500
- Shift beganSHIFT_BEGIN_TIME
- 0630
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- Accident type codeACCIDENT_TYPE_CD
- 21
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- BROKEN ROCK,COAL,ORE,WSTE
- Source of injury codeINJURY_SOURCE_CD
- 089
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Returned to workRETURN_TO_WORK_DT
- Jan 21, 2022
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Feb 1, 2021Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: MACHINERYAccident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220210330003
- DateACCIDENT_DT
- Feb 1, 2021
- TimeACCIDENT_TIME
- 1130
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320210430003
Injury
- Activity at the timeACTIVITY
- Grinding
- Activity codeACTIVITY_CD
- 024
- Source of injuryINJURY_SOURCE
- ABRAS STONE,WHEEL GRINDER
- Source of injury codeINJURY_SOURCE_CD
- 052
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days of restricted workDAYS_RESTRICT
- 8
- Returned to workRETURN_TO_WORK_DT
- Feb 12, 2021
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (powered)
- Equipment codeMINING_EQUIP_CD
- 29
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Aug 24, 2018Degree of injury: PERM TOT OR PERM PRTL DISABLTYClassification: HANDTOOLS (NONPOWERED)Accident type: Caught in, under or between a moving and a stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220182400005
- DateACCIDENT_DT
- Aug 24, 2018
- TimeACCIDENT_TIME
- 1200
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- PERM TOT OR PERM PRTL DISABLTY
- Degree of injury codeDEGREE_INJURY_CD
- 02
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- Accident type codeACCIDENT_TYPE_CD
- 21
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- BELT CONVEYORS
- Source of injury codeINJURY_SOURCE_CD
- 035
- Nature of injuryNATURE_INJURY
- AMPUTATION OR ENUCLEATION
- Nature of injury codeNATURE_INJURY_CD
- 100
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Schedule charge, daysSCHEDULE_CHARGE
- 300
- Returned to workRETURN_TO_WORK_DT
- Aug 27, 2018
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Sep 25, 2015Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Caught in, under or between a moving and a stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220152730023
- DateACCIDENT_DT
- Sep 25, 2015
- TimeACCIDENT_TIME
- 1505
- Shift beganSHIFT_BEGIN_TIME
- 0630
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- Accident type codeACCIDENT_TYPE_CD
- 21
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320152800004
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- MOVEABLE LADDERS
- Source of injury codeINJURY_SOURCE_CD
- 071
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days of restricted workDAYS_RESTRICT
- 5
- Returned to workRETURN_TO_WORK_DT
- Oct 5, 2015
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Dec 13, 2013Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: SLIP OR FALL OF PERSONAccident type: Fall onto or against objectsDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220133500033
- DateACCIDENT_DT
- Dec 13, 2013
- TimeACCIDENT_TIME
- 1615
- Shift beganSHIFT_BEGIN_TIME
- 0630
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall onto or against objects
- Accident type codeACCIDENT_TYPE_CD
- 18
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Walking, Running
- Activity codeACTIVITY_CD
- 092
- Source of injuryINJURY_SOURCE
- BROKEN ROCK,COAL,ORE,WSTE
- Source of injury codeINJURY_SOURCE_CD
- 089
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- HAND (NOT WRIST OR FINGERS)
- Part of body codeINJ_BODY_PART_CD
- 330
- Returned to workRETURN_TO_WORK_DT
- Dec 14, 2013
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2013
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Jun 25, 2013Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Caught in, under or between a moving and a stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220131790016
- DateACCIDENT_DT
- Jun 25, 2013
- TimeACCIDENT_TIME
- 1120
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- Accident type codeACCIDENT_TYPE_CD
- 21
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- WRENCH
- Source of injury codeINJURY_SOURCE_CD
- 050
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Returned to workRETURN_TO_WORK_DT
- Jun 25, 2013
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2013
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Jun 7, 2013Degree of injury: DYS AWY FRM WRK & RESTRCTD ACTClassification: OTHERAccident type: Bodily reaction, NECDays lost: 34Details
The report
- Document numberDOCUMENT_NO
- 220132410020
- DateACCIDENT_DT
- Jun 7, 2013
- TimeACCIDENT_TIME
- 9999
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DYS AWY FRM WRK & RESTRCTD ACT
- Degree of injury codeDEGREE_INJURY_CD
- 04
- ClassificationCLASSIFICATION
- OTHER
- Classification codeCLASSIFICATION_CD
- 21
- Accident typeACCIDENT_TYPE
- Bodily reaction, NEC
- Accident type codeACCIDENT_TYPE_CD
- 26
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320133440006
Injury
- Activity at the timeACTIVITY
- Other, NEC
- Activity codeACTIVITY_CD
- 098
- Source of injuryINJURY_SOURCE
- BODILY MOTION
- Source of injury codeINJURY_SOURCE_CD
- 002
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days of restricted workDAYS_RESTRICT
- 33
- Days lostDAYS_LOST
- 34
- Returned to workRETURN_TO_WORK_DT
- Dec 2, 2013
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2013
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Schedule charge, daysSCHEDULE_CHARGE
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Feb 27, 2013Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: MACHINERYAccident type: Struck by flying objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220130630034
- DateACCIDENT_DT
- Feb 27, 2013
- TimeACCIDENT_TIME
- 1500
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Struck by flying object
- Accident type codeACCIDENT_TYPE_CD
- 05
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Grinding
- Activity codeACTIVITY_CD
- 024
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- EYE(S) OPTIC NERVE/VISON
- Part of body codeINJ_BODY_PART_CD
- 130
- Days of restricted workDAYS_RESTRICT
- 1
- Returned to workRETURN_TO_WORK_DT
- Mar 4, 2013
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (powered)
- Equipment codeMINING_EQUIP_CD
- 29
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2013
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Feb 11, 2013Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDTOOLS (NONPOWERED)Accident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220130440006
- DateACCIDENT_DT
- Feb 11, 2013
- TimeACCIDENT_TIME
- 1600
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320130530010
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- KNIFE
- Source of injury codeINJURY_SOURCE_CD
- 049
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days of restricted workDAYS_RESTRICT
- 9
- Returned to workRETURN_TO_WORK_DT
- Feb 22, 2013
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2013
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Nov 18, 2009Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Struck by flying objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220093280013
- DateACCIDENT_DT
- Nov 18, 2009
- TimeACCIDENT_TIME
- 1445
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Struck by flying object
- Accident type codeACCIDENT_TYPE_CD
- 05
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- HAND TOOLS,NONPOWERED,NEC
- Source of injury codeINJURY_SOURCE_CD
- 051
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- NOSE/NASAL PASSAGES/SINUS/SMELL
- Part of body codeINJ_BODY_PART_CD
- 143
- Returned to workRETURN_TO_WORK_DT
- Nov 19, 2009
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2009
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2010
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Jul 29, 2009Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion in lifting objectsDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220092300024
- DateACCIDENT_DT
- Jul 29, 2009
- TimeACCIDENT_TIME
- 1500
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion in lifting objects
- Accident type codeACCIDENT_TYPE_CD
- 27
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320092330005
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- METAL COVERS & GUARDS
- Source of injury codeINJURY_SOURCE_CD
- 086
- Nature of injuryNATURE_INJURY
- OTHER INJURY,NEC
- Nature of injury codeNATURE_INJURY_CD
- 390
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days of restricted workDAYS_RESTRICT
- 3
- Returned to workRETURN_TO_WORK_DT
- Aug 20, 2009
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2009
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2009
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Apr 9, 2008Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: HANDLING OF MATERIALSAccident type: Caught in, under or between a moving and a stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220081060007
- DateACCIDENT_DT
- Apr 9, 2008
- TimeACCIDENT_TIME
- 1000
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- Accident type codeACCIDENT_TYPE_CD
- 21
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320081120009
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- BELT CONVEYORS
- Source of injury codeINJURY_SOURCE_CD
- 035
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- WRIST
- Part of body codeINJ_BODY_PART_CD
- 320
- Days of restricted workDAYS_RESTRICT
- 1
- Returned to workRETURN_TO_WORK_DT
- Apr 16, 2008
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2008
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2008
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Jul 18, 2007Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: POWERED HAULAGEAccident type: Struck against a moving objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220072110008
- DateACCIDENT_DT
- Jul 18, 2007
- TimeACCIDENT_TIME
- 1430
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- POWERED HAULAGE
- Classification codeCLASSIFICATION_CD
- 12
- Accident typeACCIDENT_TYPE
- Struck against a moving object
- Accident type codeACCIDENT_TYPE_CD
- 02
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Front-end loader
- Activity codeACTIVITY_CD
- 053
- Source of injuryINJURY_SOURCE
- SURFACE MINING MACHINES
- Source of injury codeINJURY_SOURCE_CD
- 076
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- NECK
- Part of body codeINJ_BODY_PART_CD
- 200
- Days of restricted workDAYS_RESTRICT
- 2
- Returned to workRETURN_TO_WORK_DT
- Jul 23, 2007
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Ore haulage trucks - off highway trucks
- Equipment codeMINING_EQUIP_CD
- 44
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2007
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2007
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Nov 22, 2005Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Struck by flying objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220053360018
- DateACCIDENT_DT
- Nov 22, 2005
- TimeACCIDENT_TIME
- 0815
- Shift beganSHIFT_BEGIN_TIME
- 0630
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck by flying object
- Accident type codeACCIDENT_TYPE_CD
- 05
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- LOWER LEG/TIBIA/FIBULA
- Part of body codeINJ_BODY_PART_CD
- 513
- Returned to workRETURN_TO_WORK_DT
- Nov 22, 2005
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Controller IDCONTROLLER_ID
- M00616
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2005
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2006
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Mar 26, 2004Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: ELECTRICALAccident type: Contact with hot objects or substancesDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220040960067
- DateACCIDENT_DT
- Mar 26, 2004
- TimeACCIDENT_TIME
- 1026
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- ELECTRICAL
- Classification codeCLASSIFICATION_CD
- 01
- Accident typeACCIDENT_TYPE
- Contact with hot objects or substances
- Accident type codeACCIDENT_TYPE_CD
- 33
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- METAL COVERS & GUARDS
- Source of injury codeINJURY_SOURCE_CD
- 086
- Nature of injuryNATURE_INJURY
- BURN OR SCALD (HEAT)
- Nature of injury codeNATURE_INJURY_CD
- 120
- Part of bodyINJ_BODY_PART
- ARM,NEC
- Part of body codeINJ_BODY_PART_CD
- 310
- Returned to workRETURN_TO_WORK_DT
- Mar 26, 2004
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- E C Rowlett Construction Company Inc
- Operator IDOPERATOR_ID
- L03746
- Controller IDCONTROLLER_ID
- M02997
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Oct 2, 2003Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: MACHINERYAccident type: Struck by flying objectDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220032830025
- DateACCIDENT_DT
- Oct 2, 2003
- TimeACCIDENT_TIME
- 1300
- Shift beganSHIFT_BEGIN_TIME
- 600
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Struck by flying object
- Accident type codeACCIDENT_TYPE_CD
- 05
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
- Returned to Duty document numberCLOSED_DOC_NO
- 320032830008
Injury
- Activity at the timeACTIVITY
- Blow gun, Airlance
- Activity codeACTIVITY_CD
- 004
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- EYE(S) OPTIC NERVE/VISON
- Part of body codeINJ_BODY_PART_CD
- 130
- Returned to workRETURN_TO_WORK_DT
- Oct 6, 2003
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Blow pipe, Blow gun, Air lance
- Equipment codeMINING_EQUIP_CD
- 06
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- E C Rowlett Construction Company Inc
- Operator IDOPERATOR_ID
- L03746
- Controller IDCONTROLLER_ID
- M02997
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2003
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (6)
MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Sep 19, 2003Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDTOOLS (NONPOWERED)Accident type: Struck against stationary objectDays lost: 51Details
The report
- Document numberDOCUMENT_NO
- 220032720019
- DateACCIDENT_DT
- Sep 19, 2003
- TimeACCIDENT_TIME
- 1800
- Shift beganSHIFT_BEGIN_TIME
- 700
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Struck against stationary object
- Accident type codeACCIDENT_TYPE_CD
- 01
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
- Returned to Duty document numberCLOSED_DOC_NO
- 320040230017
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- METAL COVERS & GUARDS
- Source of injury codeINJURY_SOURCE_CD
- 086
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Days lostDAYS_LOST
- 51
- Returned to workRETURN_TO_WORK_DT
- Nov 10, 2003
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- E C Rowlett Construction Company Inc
- Operator IDOPERATOR_ID
- L03746
- Controller IDCONTROLLER_ID
- M02997
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2003
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2003
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Aug 8, 2003Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Struck by flying objectDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220032300042
- DateACCIDENT_DT
- Aug 8, 2003
- TimeACCIDENT_TIME
- 1800
- Shift beganSHIFT_BEGIN_TIME
- 700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Struck by flying object
- Accident type codeACCIDENT_TYPE_CD
- 05
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
- Returned to Duty document numberCLOSED_DOC_NO
- 320032300015
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- UNCLASSIFIED,NOT DETERMED
- Nature of injury codeNATURE_INJURY_CD
- 400
- Part of bodyINJ_BODY_PART
- EYE(S) OPTIC NERVE/VISON
- Part of body codeINJ_BODY_PART_CD
- 130
- Returned to workRETURN_TO_WORK_DT
- Aug 11, 2003
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- E C Rowlett Construction Company Inc
- Operator IDOPERATOR_ID
- L03746
- Controller IDCONTROLLER_ID
- M02997
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2003
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2003
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (6)
MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Mar 4, 2003Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: MACHINERYAccident type: Struck by... NECDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220030660010
- DateACCIDENT_DT
- Mar 4, 2003
- TimeACCIDENT_TIME
- 1130
- Shift beganSHIFT_BEGIN_TIME
- 600
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
- Returned to Duty document numberCLOSED_DOC_NO
- 320030660006
Injury
- Activity at the timeACTIVITY
- Surface equipment, NEC
- Activity codeACTIVITY_CD
- 072
- Source of injuryINJURY_SOURCE
- BOILR,PRES VSL,AIR HOS,OX
- Source of injury codeINJURY_SOURCE_CD
- 003
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- HEAD,NEC
- Part of body codeINJ_BODY_PART_CD
- 100
- Returned to workRETURN_TO_WORK_DT
- Mar 4, 2003
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Machine, NEC - Wheelbarrow, Well drilling Rig, Post hole auger
- Equipment codeMINING_EQUIP_CD
- 71
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- E C Rowlett Construction Company Inc
- Operator IDOPERATOR_ID
- L03746
- Controller IDCONTROLLER_ID
- M02997
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2003
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2003
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (6)
MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Feb 26, 2001Degree of injury: OCCUPATNAL ILLNESS NOT DEG 1-6Classification: DUST DISEASE OF LUNGSAccident type: Inhalation of radiations, caustics, toxic and noxious substancesDays lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220011230006
- DateACCIDENT_DT
- Feb 26, 2001
- TimeACCIDENT_TIME
- 9999
- Shift beganSHIFT_BEGIN_TIME
- 700
- Degree of injuryDEGREE_INJURY
- OCCUPATNAL ILLNESS NOT DEG 1-6
- Degree of injury codeDEGREE_INJURY_CD
- 07
- ClassificationCLASSIFICATION
- DUST DISEASE OF LUNGS
- Classification codeCLASSIFICATION_CD
- 27
- Accident typeACCIDENT_TYPE
- Inhalation of radiations, caustics, toxic and noxious substances
- Accident type codeACCIDENT_TYPE_CD
- 36
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
Injury
- Activity at the timeACTIVITY
- Unknown
- Activity codeACTIVITY_CD
- 099
- Source of injuryINJURY_SOURCE
- PULVERIZED MINERAL (DUST)
- Source of injury codeINJURY_SOURCE_CD
- 092
- Nature of injuryNATURE_INJURY
- SILICOSIS
- Nature of injury codeNATURE_INJURY_CD
- 294
- Part of bodyINJ_BODY_PART
- CHEST (RIBS/BREAST BONE/CHEST ORGNS)
- Part of body codeINJ_BODY_PART_CD
- 430
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- E C Rowlett Construction Company Inc
- Operator IDOPERATOR_ID
- L03746
- Controller IDCONTROLLER_ID
- M02997
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2001
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2001
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (8)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Returned to workRETURN_TO_WORK_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: May 16, 2000Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: MACHINERYAccident type: Flash burns (welding)Days lost: Not recordedDetails
The report
- Document numberDOCUMENT_NO
- 220001570077
- DateACCIDENT_DT
- May 16, 2000
- TimeACCIDENT_TIME
- 1500
- Shift beganSHIFT_BEGIN_TIME
- 730
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Flash burns (welding)
- Accident type codeACCIDENT_TYPE_CD
- 40
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
- Returned to Duty document numberCLOSED_DOC_NO
- 320001570024
Injury
- Activity at the timeACTIVITY
- Welding or cutting
- Activity codeACTIVITY_CD
- 093
- Source of injuryINJURY_SOURCE
- MOLTEN METAL
- Source of injury codeINJURY_SOURCE_CD
- 085
- Nature of injuryNATURE_INJURY
- ELECT.ARC BURN-NOT CONTAC
- Nature of injury codeNATURE_INJURY_CD
- 301
- Part of bodyINJ_BODY_PART
- EYE(S) OPTIC NERVE/VISON
- Part of body codeINJ_BODY_PART_CD
- 130
- Returned to workRETURN_TO_WORK_DT
- May 17, 2000
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Welding machine, Torch, Cutting torch, Arc welder, Air arc
- Equipment codeMINING_EQUIP_CD
- 70
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 0000
- Equipment model numberEQUIP_MODEL_NO
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- E C Rowlett Construction Company Inc
- Operator IDOPERATOR_ID
- L03746
- Controller IDCONTROLLER_ID
- M02997
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2000
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2000
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (6)
MSHA investigation beganINVEST_BEGIN_DT, Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
25 most recent of 27 reports filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 4Hours worked: 5,679Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 5679
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1420
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 6Hours worked: 2,427Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 2427
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 405
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 4Hours worked: 5,197Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 5197
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1299
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 6Hours worked: 13,181Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 13181
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2197
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 7Hours worked: 7,029Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 7029
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1004
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 17,164Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 17164
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2452
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 8Hours worked: 17,547Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 8
- Hours workedANNUAL_HRS
- 17547
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2193
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 7Hours worked: 9,141Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 9141
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1306
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 14,497Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 14497
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2416
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 7Hours worked: 17,486Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 17486
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2498
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 5,394Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 5394
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1798
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 18,208Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 18208
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2601
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 6Hours worked: 16,768Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 16768
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2795
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 2Hours worked: 5,281Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 5281
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2641
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 19,135Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 19135
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2734
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 7Hours worked: 17,929Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 17929
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2561
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 7,211Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 7211
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2404
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 17,078Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 17078
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2440
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 8Hours worked: 16,568Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 8
- Hours workedANNUAL_HRS
- 16568
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2071
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 6,693Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 6693
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2231
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 13,015Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 13015
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2169
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 7Hours worked: 17,336Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 17336
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2477
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 6,820Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 6820
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2273
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 11,444Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 11444
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1907
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileCURR_MINE_NM
- Granite Mountain Qrys-Crystal Hill Plt
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Little Rock AR Field Office
- Nearest town
- Little Rock
- Days worked per week
- 5
- Hours per shift
- 8
- Production shifts per day
- 1
- Maintenance shifts per day
- 0
- Employees, current record
- 5
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- Y
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine IDMINE_ID
- 0301537
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Intermittent
- Status sinceCURRENT_STATUS_DT
- Apr 13, 2026
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- McGeorge Contracting
- Operator IDCURRENT_OPERATOR_ID
- L00751
- Controller IDCURRENT_CONTROLLER_ID
- M00616
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- May 2, 2005
Location and MSHA office
- StateSTATE
- AR
- Bureau of Mines state codeBOM_STATE_CD
- 03
- FIPS county codeFIPS_CNTY_CD
- 119
- FIPS county nameFIPS_CNTY_NM
- Pulaski
- Congressional districtCONG_DIST_CD
- 02
- Nearest townNEAREST_TOWN
- Little Rock
- MSHA districtDISTRICT
- M5
- MSHA office codeOFFICE_CD
- M5871
- MSHA officeOFFICE_NAME
- Little Rock AR Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 12
- Most recent assessment control numberASSESS_CTRL_NO
- 000633240
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Crushed, Broken Sandstone
- Primary commodity codePRIMARY_SIC_CD
- 142902
- Primary SIC codePRIMARY_SIC_CD_1
- 1429
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 02
- Primary industry groupPRIMARY_CANVASS
- Stone
- Primary industry group codePRIMARY_CANVASS_CD
- 6
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 5
- Hours per shiftHOURS_PER_SHIFT
- 8
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 1
- Workers employedNO_EMPLOYEES
- 5
- Safety committeeSAFETY_COMMITTEE_IND
- Y
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (2)
Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS
Recorded as N (4)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS
Not recorded by MSHA (14)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: McGeorge ContractingFrom: May 2, 2005To: No end dateController: Not shownFrom : Jan 1, 1950To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- McGeorge Contracting
- Operator IDOPERATOR_ID
- L00751
- Operator fromOPERATOR_START_DT
- May 2, 2005
Controller
- Controller IDCONTROLLER_ID
- M00616
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine status at this pointMINE_STATUS
- Intermittent
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
Operator: E C Rowlett Construction Company IncFrom: Nov 1, 1982To: May 1, 2005Controller: Not shownFrom : Jan 1, 1950To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- E C Rowlett Construction Company Inc
- Operator IDOPERATOR_ID
- L03746
- Operator fromOPERATOR_START_DT
- Nov 1, 1982
- Operator toOPERATOR_END_DT
- May 1, 2005
Controller
- Controller IDCONTROLLER_ID
- M02997
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Mine status at this pointMINE_STATUS
- Intermittent
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
As MSHA records it, newest operator first.
Address of record
McGeorge Contracting·Contact title Sr. Vice President·Street not recorded, White Hall AR 71602
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- McGeorge Contracting
- Contact titleCONTACT_TITLE
- Sr. Vice President
- CityCITY
- White Hall
- StateSTATE_ABBR
- AR
- State nameSTATE
- Arkansas
- ZIP codeZIP_CD
- 71602
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 05
Mine
- Mine IDMINE_ID
- 0301537
- Mine name in this fileMINE_NAME
- Granite Mountain Qrys-Crystal Hill Plt
- Nearest townNEAREST_TOWN
- Little Rock
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Intermittent
- Status sinceMINE_STATUS_DT
- Apr 13, 2026
- Primary commodity (SIC)PRIMARY_SIC_CD
- Crushed, Broken Sandstone
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (4)
StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology