Arkansas Quality Stone Company
Metal/Non-Metal, Surface·Crushed, Broken Limestone NEC·Sharp, Arkansas·Mine ID 0301779
Operator Arkansas Quality Stone Company·Controller not shown·MSHA status Active since Oct 7, 1996
What MSHA has on file for this mine
MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Inspections
Regular Safety and Health InspectionJul 6 to Jul 7, 2026Inspectors 1 | Hours on site 11.25Began: Jul 6, 2026Ended: Jul 7, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 11.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 6, 2026
- Closed outINSPECTION_END_DT
- Jul 7, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F03A52A
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 22
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJan 13 to Jan 15, 2026Inspectors 1 | Hours on site 8Began: Jan 13, 2026Ended: Jan 15, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 13, 2026
- Closed outINSPECTION_END_DT
- Jan 15, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6804575
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJun 30 to Jul 2, 2025Inspectors 1 | Hours on site 18Began: Jun 30, 2025Ended: Jul 2, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 18Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 30, 2025
- Closed outINSPECTION_END_DT
- Jul 2, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F015202
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 18
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 31.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionNov 18 to Nov 21, 2024Inspectors 1 | Hours on site 15.75Began: Nov 18, 2024Ended: Nov 21, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 15.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 18, 2024
- Closed outINSPECTION_END_DT
- Nov 21, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F006902
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 15.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 34.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJul 1 to Jul 3, 2024Inspectors 1 | Hours on site 11.75Began: Jul 1, 2024Ended: Jul 3, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 11.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 1, 2024
- Closed outINSPECTION_END_DT
- Jul 3, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6938755
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 28
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionNov 29 to Dec 1, 2023Inspectors 1 | Hours on site 15Began: Nov 29, 2023Ended: Dec 1, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 15Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 29, 2023
- Closed outINSPECTION_END_DT
- Dec 1, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6934597
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 15
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionAug 28 to Aug 31, 2023Inspectors 1 | Hours on site 10.25Began: Aug 28, 2023Ended: Aug 31, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 10.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 28, 2023
- Closed outINSPECTION_END_DT
- Aug 31, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 7102308
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 10.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 24
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionFeb 14 to Feb 16, 2023Inspectors 1 | Hours on site 17Began: Feb 14, 2023Ended: Feb 16, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 17Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 14, 2023
- Closed outINSPECTION_END_DT
- Feb 16, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6890282
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 17
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 25.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionAug 24 to Aug 26, 2022Inspectors 1 | Hours on site 17.75Began: Aug 24, 2022Ended: Aug 26, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 17.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 24, 2022
- Closed outINSPECTION_END_DT
- Aug 26, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6888870
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 17.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 25.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMar 22 to Mar 25, 2022Inspectors 1 | Hours on site 21Began: Mar 22, 2022Ended: Mar 25, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 21Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 22, 2022
- Closed outINSPECTION_END_DT
- Mar 25, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6890214
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 21
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 28
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJun 1, 2021Inspectors 1 | Hours on site 7.5Began: Jun 1, 2021Ended: Jun 1, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 1, 2021
- Closed outINSPECTION_END_DT
- Jun 1, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6884074
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 12
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionNov 18 to Nov 19, 2020Inspectors 1 | Hours on site 9.25Began: Nov 18, 2020Ended: Nov 19, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 18, 2020
- Closed outINSPECTION_END_DT
- Nov 19, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6884033
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 14.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionAug 26 to Aug 28, 2020Inspectors 1 | Hours on site 16Began: Aug 26, 2020Ended: Aug 28, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 16Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 26, 2020
- Closed outINSPECTION_END_DT
- Aug 28, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6884322
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 16
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 27
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionFeb 20, 2020Inspectors 1 | Hours on site 0.75Began: Feb 20, 2020Ended: Feb 20, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 0.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 20, 2020
- Closed outINSPECTION_END_DT
- Feb 20, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6606400
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionAug 19 to Aug 20, 2019Inspectors 1 | Hours on site 8Began: Aug 19, 2019Ended: Aug 20, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 19, 2019
- Closed outINSPECTION_END_DT
- Aug 20, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6810710
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 13.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionFeb 11 to Feb 13, 2019Inspectors 1 | Hours on site 7.75Began: Feb 11, 2019Ended: Feb 13, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 11, 2019
- Closed outINSPECTION_END_DT
- Feb 13, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6805444
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMay 8, 2018Inspectors 1 | Hours on site 9.5Began: May 8, 2018Ended: May 8, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 8, 2018
- Closed outINSPECTION_END_DT
- May 8, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6804314
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 14
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMar 20 to Mar 21, 2018Inspectors 1 | Hours on site 13Began: Mar 20, 2018Ended: Mar 21, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 13Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 20, 2018
- Closed outINSPECTION_END_DT
- Mar 21, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6739072
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 13
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 28.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJul 11 to Jul 12, 2017Inspectors 1 | Hours on site 9Began: Jul 11, 2017Ended: Jul 12, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 11, 2017
- Closed outINSPECTION_END_DT
- Jul 12, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6737864
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMar 13 to Mar 14, 2017Inspectors 1 | Hours on site 11.25Began: Mar 13, 2017Ended: Mar 14, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 11.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 13, 2017
- Closed outINSPECTION_END_DT
- Mar 14, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6737555
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 19
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Part 50 AuditSep 27, 2016Inspectors 1 | Hours on site 9.5Began: Sep 27, 2016Ended: Sep 27, 2016Activity: Part 50 AuditInspectors: 1Hours on site: 9.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 27, 2016
- Closed outINSPECTION_END_DT
- Sep 27, 2016
- ActivityACTIVITY
- Part 50 Audit
- Activity codeACTIVITY_CODE
- E25
- Program areaPROGRAM_AREA
- M/NM--Part 50 Audit
- Event numberEVENT_NO
- 6735931
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 12
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionSep 6 to Sep 8, 2016Inspectors 1 | Hours on site 20Began: Sep 6, 2016Ended: Sep 8, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 20Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 6, 2016
- Closed outINSPECTION_END_DT
- Sep 8, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6735927
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 20
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 29
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMar 2 to Mar 3, 2016Inspectors 1 | Hours on site 9Began: Mar 2, 2016Ended: Mar 3, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 2, 2016
- Closed outINSPECTION_END_DT
- Mar 3, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6658093
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 12.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJul 15, 2015Inspectors 1 | Hours on site 8.5Began: Jul 15, 2015Ended: Jul 15, 2015Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 15, 2015
- Closed outINSPECTION_END_DT
- Jul 15, 2015
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6658060
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 9.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionNov 5 to Nov 6, 2014Inspectors 1 | Hours on site 9.5Began: Nov 5, 2014Ended: Nov 6, 2014Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 5, 2014
- Closed outINSPECTION_END_DT
- Nov 6, 2014
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6658006
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
25 most recent of 67 inspections and other MSHA visits since Sep 14, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Jul 7, 2026Type: CitationStandard: 47.41(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5170179
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 7, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0740
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 7, 2026
- 30 CFR part and sectionPART_SECTION
- 47.41(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 7, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jul 7, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jul 7, 2026
- Terminated, timeTERMINATION_TIME
- 0741
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 3, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 11, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 5, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- F03A52A
- Inspection beganINSPECTION_BEGIN_DT
- Jul 6, 2026
- Inspection closed outINSPECTION_END_DT
- Jul 7, 2026
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 6, 2026Type: CitationStandard: 56.14112(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5170177
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1352
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 6, 2026
- 30 CFR part and sectionPART_SECTION
- 56.14112(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 6, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 6, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 6, 2026
- Terminated, timeTERMINATION_TIME
- 1358
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 3, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 11, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 5, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- F03A52A
- Inspection beganINSPECTION_BEGIN_DT
- Jul 6, 2026
- Inspection closed outINSPECTION_END_DT
- Jul 7, 2026
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 6, 2026Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5170178
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 6, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1422
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 6, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 6, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 6, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 6, 2026
- Terminated, timeTERMINATION_TIME
- 1433
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 3, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 11, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 5, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- F03A52A
- Inspection beganINSPECTION_BEGIN_DT
- Jul 6, 2026
- Inspection closed outINSPECTION_END_DT
- Jul 7, 2026
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jan 14, 2026Type: CitationStandard: 50.30(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5170444
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 14, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1115
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 14, 2026
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 14, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1116
- Latest dueLATEST_TERM_DUE_DT
- Jan 14, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1116
- TerminatedTERMINATION_DT
- Jan 14, 2026
- Terminated, timeTERMINATION_TIME
- 1116
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 5, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 12, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 11, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 6804575
- Inspection beganINSPECTION_BEGIN_DT
- Jan 13, 2026
- Inspection closed outINSPECTION_END_DT
- Jan 15, 2026
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jan 14, 2026Type: CitationStandard: 50.30(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5170445
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 14, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1120
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 14, 2026
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 14, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1121
- Latest dueLATEST_TERM_DUE_DT
- Jan 14, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1121
- TerminatedTERMINATION_DT
- Jan 14, 2026
- Terminated, timeTERMINATION_TIME
- 1120
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 5, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 12, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 11, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 6804575
- Inspection beganINSPECTION_BEGIN_DT
- Jan 13, 2026
- Inspection closed outINSPECTION_END_DT
- Jan 15, 2026
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jan 13, 2026Type: CitationStandard: 56.9300(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5170442
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 13, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1325
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 13, 2026
- 30 CFR part and sectionPART_SECTION
- 56.9300(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 13, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Jan 13, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Jan 13, 2026
- Terminated, timeTERMINATION_TIME
- 1400
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 5, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 12, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 11, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 6804575
- Inspection beganINSPECTION_BEGIN_DT
- Jan 13, 2026
- Inspection closed outINSPECTION_END_DT
- Jan 15, 2026
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jan 13, 2026Type: CitationStandard: 56.12005S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $398.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5170443
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 13, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1420
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 13, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12005
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 14, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 0700
- Latest dueLATEST_TERM_DUE_DT
- Jan 14, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 0700
- TerminatedTERMINATION_DT
- Jan 14, 2026
- Terminated, timeTERMINATION_TIME
- 1010
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 398
- Current proposed assessmentAMOUNT_DUE
- 398
- Amount paidAMOUNT_PAID
- 398
- Bill first printedBILL_PRINT_DT
- Mar 5, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 12, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 11, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 6804575
- Inspection beganINSPECTION_BEGIN_DT
- Jan 13, 2026
- Inspection closed outINSPECTION_END_DT
- Jan 15, 2026
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 2, 2025Type: CitationStandard: 46.9(g)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5000372
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 2, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0823
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 2, 2025
- 30 CFR part and sectionPART_SECTION
- 46.9(g)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 11, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 11, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 9, 2025
- Terminated, timeTERMINATION_TIME
- 1952
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Sep 4, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 12, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 24, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- F015202
- Inspection beganINSPECTION_BEGIN_DT
- Jun 30, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 2, 2025
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 30, 2025Type: CitationStandard: 56.4201(a)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5000371
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 30, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1221
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 30, 2025
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 30, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jun 30, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 1, 2025
- Terminated, timeTERMINATION_TIME
- 1139
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jul 31, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 4, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 27, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- F015202
- Inspection beganINSPECTION_BEGIN_DT
- Jun 30, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 2, 2025
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 30, 2025Type: CitationStandard: 56.14112(a)(1)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5000370
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 30, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1233
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 30, 2025
- 30 CFR part and sectionPART_SECTION
- 56.14112(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 30, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jun 30, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jun 30, 2025
- Terminated, timeTERMINATION_TIME
- 1440
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jul 31, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 4, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 27, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- F015202
- Inspection beganINSPECTION_BEGIN_DT
- Jun 30, 2025
- Inspection closed outINSPECTION_END_DT
- Jul 2, 2025
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 20, 2024Type: CitationStandard: 50.30(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9793598
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 20, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1020
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 20, 2024
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 20, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Nov 20, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Nov 20, 2024
- Terminated, timeTERMINATION_TIME
- 1036
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jan 2, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 6, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 15, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- F006902
- Inspection beganINSPECTION_BEGIN_DT
- Nov 18, 2024
- Inspection closed outINSPECTION_END_DT
- Nov 21, 2024
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 20, 2024Type: CitationStandard: 50.30(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9793599
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 20, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1042
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 20, 2024
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 20, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Nov 20, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Nov 20, 2024
- Terminated, timeTERMINATION_TIME
- 1047
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jan 2, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 6, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 15, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- F006902
- Inspection beganINSPECTION_BEGIN_DT
- Nov 18, 2024
- Inspection closed outINSPECTION_END_DT
- Nov 21, 2024
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 19, 2024Type: CitationStandard: 47.41(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9793597
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 19, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1407
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 19, 2024
- 30 CFR part and sectionPART_SECTION
- 47.41(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 19, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Nov 19, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Nov 19, 2024
- Terminated, timeTERMINATION_TIME
- 1409
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jan 2, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 6, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 15, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- F006902
- Inspection beganINSPECTION_BEGIN_DT
- Nov 18, 2024
- Inspection closed outINSPECTION_END_DT
- Nov 21, 2024
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 19, 2024Type: CitationStandard: 56.14207S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9793595
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 19, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0950
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 19, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14207
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 19, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Nov 19, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Nov 19, 2024
- Terminated, timeTERMINATION_TIME
- 0951
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jan 2, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 6, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 15, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- F006902
- Inspection beganINSPECTION_BEGIN_DT
- Nov 18, 2024
- Inspection closed outINSPECTION_END_DT
- Nov 21, 2024
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 19, 2024Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9793596
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 19, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1108
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 19, 2024
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 19, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Nov 19, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Nov 19, 2024
- Terminated, timeTERMINATION_TIME
- 1115
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jan 2, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 6, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 15, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- F006902
- Inspection beganINSPECTION_BEGIN_DT
- Nov 18, 2024
- Inspection closed outINSPECTION_END_DT
- Nov 21, 2024
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 1, 2024Type: CitationStandard: 56.14107(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $260.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9791298
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 1, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1445
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 1, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 1, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jul 1, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jul 1, 2024
- Terminated, timeTERMINATION_TIME
- 1530
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 260
- Current proposed assessmentAMOUNT_DUE
- 260
- Amount paidAMOUNT_PAID
- 260
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 11, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 27, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 6938755
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 3, 2024
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 30, 2023Type: CitationStandard: 56.14207S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9744746
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 30, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0820
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 30, 2023
- 30 CFR part and sectionPART_SECTION
- 56.14207
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 30, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 0900
- Latest dueLATEST_TERM_DUE_DT
- Nov 30, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 0900
- TerminatedTERMINATION_DT
- Nov 30, 2023
- Terminated, timeTERMINATION_TIME
- 0825
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 18, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 17, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 6934597
- Inspection beganINSPECTION_BEGIN_DT
- Nov 29, 2023
- Inspection closed outINSPECTION_END_DT
- Dec 1, 2023
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 29, 2023Type: CitationStandard: 56.6130(d)S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $252.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9744743
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 29, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1030
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 29, 2023
- 30 CFR part and sectionPART_SECTION
- 56.6130(d)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 29, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Nov 29, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Nov 29, 2023
- Terminated, timeTERMINATION_TIME
- 1045
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 252
- Current proposed assessmentAMOUNT_DUE
- 252
- Amount paidAMOUNT_PAID
- 252
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 18, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 17, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 6934597
- Inspection beganINSPECTION_BEGIN_DT
- Nov 29, 2023
- Inspection closed outINSPECTION_END_DT
- Dec 1, 2023
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 29, 2023Type: CitationStandard: 56.6101(a)S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $252.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9744744
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 29, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1045
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 29, 2023
- 30 CFR part and sectionPART_SECTION
- 56.6101(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 29, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Nov 29, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Nov 29, 2023
- Terminated, timeTERMINATION_TIME
- 1500
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 252
- Current proposed assessmentAMOUNT_DUE
- 252
- Amount paidAMOUNT_PAID
- 252
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 18, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 17, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 6934597
- Inspection beganINSPECTION_BEGIN_DT
- Nov 29, 2023
- Inspection closed outINSPECTION_END_DT
- Dec 1, 2023
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 29, 2023Type: CitationStandard: 56.4104(a)S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9744739
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 29, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0753
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 29, 2023
- 30 CFR part and sectionPART_SECTION
- 56.4104(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 29, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Nov 29, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Nov 29, 2023
- Terminated, timeTERMINATION_TIME
- 1500
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 18, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 17, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 6934597
- Inspection beganINSPECTION_BEGIN_DT
- Nov 29, 2023
- Inspection closed outINSPECTION_END_DT
- Dec 1, 2023
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 29, 2023Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9744742
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 29, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0953
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 29, 2023
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 29, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Nov 29, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Nov 29, 2023
- Terminated, timeTERMINATION_TIME
- 1500
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 18, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 17, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 6934597
- Inspection beganINSPECTION_BEGIN_DT
- Nov 29, 2023
- Inspection closed outINSPECTION_END_DT
- Dec 1, 2023
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 29, 2023Type: CitationStandard: 47.41(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9744740
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 29, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0757
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 29, 2023
- 30 CFR part and sectionPART_SECTION
- 47.41(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 29, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 0900
- Latest dueLATEST_TERM_DUE_DT
- Nov 29, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 0900
- TerminatedTERMINATION_DT
- Nov 29, 2023
- Terminated, timeTERMINATION_TIME
- 0801
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 18, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 17, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 6934597
- Inspection beganINSPECTION_BEGIN_DT
- Nov 29, 2023
- Inspection closed outINSPECTION_END_DT
- Dec 1, 2023
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 29, 2023Type: CitationStandard: 56.12008S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9744741
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 29, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0827
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 29, 2023
- 30 CFR part and sectionPART_SECTION
- 56.12008
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 29, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Nov 29, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Nov 29, 2023
- Terminated, timeTERMINATION_TIME
- 1200
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 18, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 17, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 6934597
- Inspection beganINSPECTION_BEGIN_DT
- Nov 29, 2023
- Inspection closed outINSPECTION_END_DT
- Dec 1, 2023
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 29, 2023Type: CitationStandard: 50.30(a)S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9744745
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 29, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1120
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 15, 2023
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 29, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Nov 29, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Nov 29, 2023
- Terminated, timeTERMINATION_TIME
- 1125
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 18, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 17, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 6934597
- Inspection beganINSPECTION_BEGIN_DT
- Nov 29, 2023
- Inspection closed outINSPECTION_END_DT
- Dec 1, 2023
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Aug 29, 2023Type: CitationStandard: 56.9300(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9763037
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 29, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0828
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 29, 2023
- 30 CFR part and sectionPART_SECTION
- 56.9300(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 29, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1100
- Latest dueLATEST_TERM_DUE_DT
- Aug 29, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1100
- TerminatedTERMINATION_DT
- Aug 29, 2023
- Terminated, timeTERMINATION_TIME
- 0835
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Oct 5, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 11, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 22, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Arkansas Quality Stone Company
- Operator IDVIOLATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- 0152741
- Inspection eventEVENT_NO
- 7102308
- Inspection beganINSPECTION_BEGIN_DT
- Aug 28, 2023
- Inspection closed outINSPECTION_END_DT
- Aug 31, 2023
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
201 citations and orders since Sep 14, 2000: 201 issued to the operator, 0 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Jul 7, 2026Citation number: 5170179Standard: 47.41(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5170179
- Assessment control numberASSESS_CASE_NO
- 000647619
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 2, 2026
- Citation issuedISSUE_DT
- Jul 7, 2026
- Date of occurrenceOCCURRENCE_DT
- Jul 7, 2026
- Final order dateFINAL_ORDER_DT
- Oct 11, 2026
- Bill first printedBILL_PRINT_DT
- Sep 3, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 11, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.41(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 37
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.17
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6411
- Size of mineSIZE_OF_MINE
- 6411
- Controller hours workedCONTROLLER_HRS
- 6411
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 6411
- History period startHISTORY_START_DT
- Apr 7, 2025
- History period endHISTORY_END_DT
- Jul 6, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03A52A
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 6, 2026Citation number: 5170177Standard: 56.14112(b)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5170177
- Assessment control numberASSESS_CASE_NO
- 000647619
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 2, 2026
- Citation issuedISSUE_DT
- Jul 6, 2026
- Date of occurrenceOCCURRENCE_DT
- Jul 6, 2026
- Final order dateFINAL_ORDER_DT
- Oct 11, 2026
- Bill first printedBILL_PRINT_DT
- Sep 3, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 11, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14112(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.17
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6411
- Size of mineSIZE_OF_MINE
- 6411
- Controller hours workedCONTROLLER_HRS
- 6411
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 6411
- History period startHISTORY_START_DT
- Apr 6, 2025
- History period endHISTORY_END_DT
- Jul 5, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03A52A
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 6, 2026Citation number: 5170178Standard: 56.12004Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5170178
- Assessment control numberASSESS_CASE_NO
- 000647619
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 2, 2026
- Citation issuedISSUE_DT
- Jul 6, 2026
- Date of occurrenceOCCURRENCE_DT
- Jul 6, 2026
- Final order dateFINAL_ORDER_DT
- Oct 11, 2026
- Bill first printedBILL_PRINT_DT
- Sep 3, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 11, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 37
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.17
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6411
- Size of mineSIZE_OF_MINE
- 6411
- Controller hours workedCONTROLLER_HRS
- 6411
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 6411
- History period startHISTORY_START_DT
- Apr 6, 2025
- History period endHISTORY_END_DT
- Jul 5, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03A52A
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 14, 2026Citation number: 5170445Standard: 50.30(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5170445
- Assessment control numberASSESS_CASE_NO
- 000636754
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 11, 2026
- Citation issuedISSUE_DT
- Jan 14, 2026
- Date of occurrenceOCCURRENCE_DT
- Jan 14, 2026
- Final order dateFINAL_ORDER_DT
- Apr 12, 2026
- Bill first printedBILL_PRINT_DT
- Mar 5, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 12, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 21
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
- Violations per inspection dayVPID
- 1.13
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 2
- Repeat violations per inspection dayRPID
- 0.25
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6518
- Size of mineSIZE_OF_MINE
- 6518
- Controller hours workedCONTROLLER_HRS
- 6518
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 6518
- History period startHISTORY_START_DT
- Oct 14, 2024
- History period endHISTORY_END_DT
- Jan 13, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6804575
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 14, 2026Citation number: 5170444Standard: 50.30(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5170444
- Assessment control numberASSESS_CASE_NO
- 000636754
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 11, 2026
- Citation issuedISSUE_DT
- Jan 14, 2026
- Date of occurrenceOCCURRENCE_DT
- Jan 14, 2026
- Final order dateFINAL_ORDER_DT
- Apr 12, 2026
- Bill first printedBILL_PRINT_DT
- Mar 5, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 12, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 21
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
- Violations per inspection dayVPID
- 1.13
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 2
- Repeat violations per inspection dayRPID
- 0.25
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6518
- Size of mineSIZE_OF_MINE
- 6518
- Controller hours workedCONTROLLER_HRS
- 6518
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 6518
- History period startHISTORY_START_DT
- Oct 14, 2024
- History period endHISTORY_END_DT
- Jan 13, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6804575
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 13, 2026Citation number: 5170442Standard: 56.9300(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5170442
- Assessment control numberASSESS_CASE_NO
- 000636754
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 11, 2026
- Citation issuedISSUE_DT
- Jan 13, 2026
- Date of occurrenceOCCURRENCE_DT
- Jan 13, 2026
- Final order dateFINAL_ORDER_DT
- Apr 12, 2026
- Bill first printedBILL_PRINT_DT
- Mar 5, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 12, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9300(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 1.29
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6518
- Size of mineSIZE_OF_MINE
- 6518
- Controller hours workedCONTROLLER_HRS
- 6518
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 6518
- History period startHISTORY_START_DT
- Oct 13, 2024
- History period endHISTORY_END_DT
- Jan 12, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6804575
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 13, 2026Citation number: 5170443Standard: 56.12005Proposed penalty: $398.00Current assessment: $398.00Paid against proposed penalty: $398.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5170443
- Assessment control numberASSESS_CASE_NO
- 000636754
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 11, 2026
- Citation issuedISSUE_DT
- Jan 13, 2026
- Date of occurrenceOCCURRENCE_DT
- Jan 13, 2026
- Final order dateFINAL_ORDER_DT
- Apr 12, 2026
- Bill first printedBILL_PRINT_DT
- Mar 5, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 12, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12005
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 398.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 398.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 398.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 72
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 1.29
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6518
- Size of mineSIZE_OF_MINE
- 6518
- Controller hours workedCONTROLLER_HRS
- 6518
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 6518
- History period startHISTORY_START_DT
- Oct 13, 2024
- History period endHISTORY_END_DT
- Jan 12, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6804575
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 2, 2025Citation number: 5000372Standard: 46.9(g)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5000372
- Assessment control numberASSESS_CASE_NO
- 000627618
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 24, 2025
- Citation issuedISSUE_DT
- Jul 2, 2025
- Date of occurrenceOCCURRENCE_DT
- Jul 2, 2025
- Final order dateFINAL_ORDER_DT
- Oct 12, 2025
- Bill first printedBILL_PRINT_DT
- Sep 4, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 12, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 46.9(g)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 21
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9064
- Size of mineSIZE_OF_MINE
- 9064
- Controller hours workedCONTROLLER_HRS
- 9064
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9064
- History period startHISTORY_START_DT
- Apr 2, 2024
- History period endHISTORY_END_DT
- Jul 1, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F015202
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 30, 2025Citation number: 5000370Standard: 56.14112(a)(1)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5000370
- Assessment control numberASSESS_CASE_NO
- 000625761
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 27, 2025
- Citation issuedISSUE_DT
- Jun 30, 2025
- Date of occurrenceOCCURRENCE_DT
- Jun 30, 2025
- Final order dateFINAL_ORDER_DT
- Sep 4, 2025
- Bill first printedBILL_PRINT_DT
- Jul 31, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 4, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14112(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 37
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9064
- Size of mineSIZE_OF_MINE
- 9064
- Controller hours workedCONTROLLER_HRS
- 9064
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9064
- History period startHISTORY_START_DT
- Mar 30, 2024
- History period endHISTORY_END_DT
- Jun 29, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F015202
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 30, 2025Citation number: 5000371Standard: 56.4201(a)(2)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5000371
- Assessment control numberASSESS_CASE_NO
- 000625761
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 27, 2025
- Citation issuedISSUE_DT
- Jun 30, 2025
- Date of occurrenceOCCURRENCE_DT
- Jun 30, 2025
- Final order dateFINAL_ORDER_DT
- Sep 4, 2025
- Bill first printedBILL_PRINT_DT
- Jul 31, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 4, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9064
- Size of mineSIZE_OF_MINE
- 9064
- Controller hours workedCONTROLLER_HRS
- 9064
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9064
- History period startHISTORY_START_DT
- Mar 30, 2024
- History period endHISTORY_END_DT
- Jun 29, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F015202
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 20, 2024Citation number: 9793599Standard: 50.30(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9793599
- Assessment control numberASSESS_CASE_NO
- 000612873
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 15, 2025
- Citation issuedISSUE_DT
- Nov 20, 2024
- Date of occurrenceOCCURRENCE_DT
- Nov 20, 2024
- Final order dateFINAL_ORDER_DT
- Feb 6, 2025
- Bill first printedBILL_PRINT_DT
- Jan 2, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 6, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 14
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 1.33
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.111
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 8968
- Size of mineSIZE_OF_MINE
- 8968
- Controller hours workedCONTROLLER_HRS
- 8968
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 8968
- History period startHISTORY_START_DT
- Aug 20, 2023
- History period endHISTORY_END_DT
- Nov 19, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F006902
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 20, 2024Citation number: 9793598Standard: 50.30(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9793598
- Assessment control numberASSESS_CASE_NO
- 000612873
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 15, 2025
- Citation issuedISSUE_DT
- Nov 20, 2024
- Date of occurrenceOCCURRENCE_DT
- Nov 20, 2024
- Final order dateFINAL_ORDER_DT
- Feb 6, 2025
- Bill first printedBILL_PRINT_DT
- Jan 2, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 6, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 14
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 1.33
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.111
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 8968
- Size of mineSIZE_OF_MINE
- 8968
- Controller hours workedCONTROLLER_HRS
- 8968
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 8968
- History period startHISTORY_START_DT
- Aug 20, 2023
- History period endHISTORY_END_DT
- Nov 19, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F006902
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 19, 2024Citation number: 9793596Standard: 56.20003(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9793596
- Assessment control numberASSESS_CASE_NO
- 000612873
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 15, 2025
- Citation issuedISSUE_DT
- Nov 19, 2024
- Date of occurrenceOCCURRENCE_DT
- Nov 19, 2024
- Final order dateFINAL_ORDER_DT
- Feb 6, 2025
- Bill first printedBILL_PRINT_DT
- Jan 2, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 6, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 14
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
- Violations per inspection dayVPID
- 1.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 8968
- Size of mineSIZE_OF_MINE
- 8968
- Controller hours workedCONTROLLER_HRS
- 8968
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 8968
- History period startHISTORY_START_DT
- Aug 19, 2023
- History period endHISTORY_END_DT
- Nov 18, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F006902
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 19, 2024Citation number: 9793597Standard: 47.41(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9793597
- Assessment control numberASSESS_CASE_NO
- 000612873
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 15, 2025
- Citation issuedISSUE_DT
- Nov 19, 2024
- Date of occurrenceOCCURRENCE_DT
- Nov 19, 2024
- Final order dateFINAL_ORDER_DT
- Feb 6, 2025
- Bill first printedBILL_PRINT_DT
- Jan 2, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 6, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.41(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 14
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
- Violations per inspection dayVPID
- 1.5
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.125
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 8968
- Size of mineSIZE_OF_MINE
- 8968
- Controller hours workedCONTROLLER_HRS
- 8968
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 8968
- History period startHISTORY_START_DT
- Aug 19, 2023
- History period endHISTORY_END_DT
- Nov 18, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F006902
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 19, 2024Citation number: 9793595Standard: 56.14207Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9793595
- Assessment control numberASSESS_CASE_NO
- 000612873
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 15, 2025
- Citation issuedISSUE_DT
- Nov 19, 2024
- Date of occurrenceOCCURRENCE_DT
- Nov 19, 2024
- Final order dateFINAL_ORDER_DT
- Feb 6, 2025
- Bill first printedBILL_PRINT_DT
- Jan 2, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 6, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14207
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 51
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 14
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
- Violations per inspection dayVPID
- 1.5
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.125
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 8968
- Size of mineSIZE_OF_MINE
- 8968
- Controller hours workedCONTROLLER_HRS
- 8968
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 8968
- History period startHISTORY_START_DT
- Aug 19, 2023
- History period endHISTORY_END_DT
- Nov 18, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F006902
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 1, 2024Citation number: 9791298Standard: 56.14107(a)Proposed penalty: $260.00Current assessment: $260.00Paid against proposed penalty: $260.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9791298
- Assessment control numberASSESS_CASE_NO
- 000604064
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 25, 2024
- Citation issuedISSUE_DT
- Jul 1, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 1, 2024
- Final order dateFINAL_ORDER_DT
- Nov 11, 2024
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 11, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 260.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 260.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 260.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 67
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 13
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 2.17
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 8968
- Size of mineSIZE_OF_MINE
- 8968
- Controller hours workedCONTROLLER_HRS
- 8968
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 8968
- History period startHISTORY_START_DT
- Apr 1, 2023
- History period endHISTORY_END_DT
- Jun 30, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6938755
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 30, 2023Citation number: 9744746Standard: 56.14207Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9744746
- Assessment control numberASSESS_CASE_NO
- 000591677
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 17, 2024
- Citation issuedISSUE_DT
- Nov 30, 2023
- Date of occurrenceOCCURRENCE_DT
- Nov 30, 2023
- Final order dateFINAL_ORDER_DT
- Feb 18, 2024
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14207
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
- Violations per inspection dayVPID
- 0.88
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9161
- Size of mineSIZE_OF_MINE
- 9161
- Controller hours workedCONTROLLER_HRS
- 9161
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9161
- History period startHISTORY_START_DT
- Aug 30, 2022
- History period endHISTORY_END_DT
- Nov 29, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6934597
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 29, 2023Citation number: 9744742Standard: 56.12004Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9744742
- Assessment control numberASSESS_CASE_NO
- 000591677
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 17, 2024
- Citation issuedISSUE_DT
- Nov 29, 2023
- Date of occurrenceOCCURRENCE_DT
- Nov 29, 2023
- Final order dateFINAL_ORDER_DT
- Feb 18, 2024
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 52
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.17
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.167
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9161
- Size of mineSIZE_OF_MINE
- 9161
- Controller hours workedCONTROLLER_HRS
- 9161
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9161
- History period startHISTORY_START_DT
- Aug 29, 2022
- History period endHISTORY_END_DT
- Nov 28, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6934597
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 29, 2023Citation number: 9744740Standard: 47.41(a)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9744740
- Assessment control numberASSESS_CASE_NO
- 000591677
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 17, 2024
- Citation issuedISSUE_DT
- Nov 29, 2023
- Date of occurrenceOCCURRENCE_DT
- Nov 29, 2023
- Final order dateFINAL_ORDER_DT
- Feb 18, 2024
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.41(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 37
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.17
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9161
- Size of mineSIZE_OF_MINE
- 9161
- Controller hours workedCONTROLLER_HRS
- 9161
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9161
- History period startHISTORY_START_DT
- Aug 29, 2022
- History period endHISTORY_END_DT
- Nov 28, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6934597
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 29, 2023Citation number: 9744741Standard: 56.12008Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9744741
- Assessment control numberASSESS_CASE_NO
- 000591677
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 17, 2024
- Citation issuedISSUE_DT
- Nov 29, 2023
- Date of occurrenceOCCURRENCE_DT
- Nov 29, 2023
- Final order dateFINAL_ORDER_DT
- Feb 18, 2024
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12008
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 52
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.17
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9161
- Size of mineSIZE_OF_MINE
- 9161
- Controller hours workedCONTROLLER_HRS
- 9161
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9161
- History period startHISTORY_START_DT
- Aug 29, 2022
- History period endHISTORY_END_DT
- Nov 28, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6934597
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 29, 2023Citation number: 9744739Standard: 56.4104(a)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9744739
- Assessment control numberASSESS_CASE_NO
- 000591677
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 17, 2024
- Citation issuedISSUE_DT
- Nov 29, 2023
- Date of occurrenceOCCURRENCE_DT
- Nov 29, 2023
- Final order dateFINAL_ORDER_DT
- Feb 18, 2024
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4104(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 57
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.17
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9161
- Size of mineSIZE_OF_MINE
- 9161
- Controller hours workedCONTROLLER_HRS
- 9161
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9161
- History period startHISTORY_START_DT
- Aug 29, 2022
- History period endHISTORY_END_DT
- Nov 28, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6934597
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 29, 2023Citation number: 9744743Standard: 56.6130(d)Proposed penalty: $252.00Current assessment: $252.00Paid against proposed penalty: $252.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9744743
- Assessment control numberASSESS_CASE_NO
- 000591677
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 17, 2024
- Citation issuedISSUE_DT
- Nov 29, 2023
- Date of occurrenceOCCURRENCE_DT
- Nov 29, 2023
- Final order dateFINAL_ORDER_DT
- Feb 18, 2024
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.6130(d)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 252.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 252.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 252.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 67
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.17
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9161
- Size of mineSIZE_OF_MINE
- 9161
- Controller hours workedCONTROLLER_HRS
- 9161
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9161
- History period startHISTORY_START_DT
- Aug 29, 2022
- History period endHISTORY_END_DT
- Nov 28, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6934597
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 29, 2023Citation number: 9744744Standard: 56.6101(a)Proposed penalty: $252.00Current assessment: $252.00Paid against proposed penalty: $252.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9744744
- Assessment control numberASSESS_CASE_NO
- 000591677
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 17, 2024
- Citation issuedISSUE_DT
- Nov 29, 2023
- Date of occurrenceOCCURRENCE_DT
- Nov 29, 2023
- Final order dateFINAL_ORDER_DT
- Feb 18, 2024
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.6101(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 252.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 252.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 252.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 67
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 7
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 1.17
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9161
- Size of mineSIZE_OF_MINE
- 9161
- Controller hours workedCONTROLLER_HRS
- 9161
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9161
- History period startHISTORY_START_DT
- Aug 29, 2022
- History period endHISTORY_END_DT
- Nov 28, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6934597
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 29, 2023Citation number: 9744745Standard: 50.30(a)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9744745
- Assessment control numberASSESS_CASE_NO
- 000591677
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 17, 2024
- Citation issuedISSUE_DT
- Nov 29, 2023
- Date of occurrenceOCCURRENCE_DT
- Oct 15, 2023
- Final order dateFINAL_ORDER_DT
- Feb 18, 2024
- Bill first printedBILL_PRINT_DT
- Jan 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 9
- Violations per inspection dayVPID
- 0.44
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9161
- Size of mineSIZE_OF_MINE
- 9161
- Controller hours workedCONTROLLER_HRS
- 9161
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9161
- History period startHISTORY_START_DT
- Jul 15, 2022
- History period endHISTORY_END_DT
- Oct 14, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6934597
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 29, 2023Citation number: 9763037Standard: 56.9300(a)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9763037
- Assessment control numberASSESS_CASE_NO
- 000586272
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 20, 2023
- Citation issuedISSUE_DT
- Aug 29, 2023
- Date of occurrenceOCCURRENCE_DT
- Aug 29, 2023
- Final order dateFINAL_ORDER_DT
- Nov 11, 2023
- Bill first printedBILL_PRINT_DT
- Oct 5, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 11, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9300(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 52
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 8
- Violations per inspection dayVPID
- 1.13
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 9161
- Size of mineSIZE_OF_MINE
- 9161
- Controller hours workedCONTROLLER_HRS
- 9161
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9161
- History period startHISTORY_START_DT
- May 29, 2022
- History period endHISTORY_END_DT
- Aug 28, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Arkansas Quality Stone Company
- IDVIOLATOR_ID
- L17898
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Jan 3, 2000
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 7102308
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 201 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- DAYS AWAY FROM WORK ONLY
- 3
- DYS AWY FRM WRK & RESTRCTD ACT
- 1
Date: Jun 17, 2010Degree of injury: DAYS AWAY FROM WORK ONLYClassification: SLIP OR FALL OF PERSONAccident type: Fall from machineDays lost: 20Details
The report
- Document numberDOCUMENT_NO
- 220101790059
- DateACCIDENT_DT
- Jun 17, 2010
- TimeACCIDENT_TIME
- 1600
- Shift beganSHIFT_BEGIN_TIME
- 0730
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall from machine
- Accident type codeACCIDENT_TYPE_CD
- 12
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- HIPS (PELVIS/ORGANS/KIDNEYS/BUTTOCKS)
- Part of body codeINJ_BODY_PART_CD
- 440
- Days lostDAYS_LOST
- 20
- Permanently transferred or terminatedTRANS_TERM
- Y
- Returned to workRETURN_TO_WORK_DT
- Jul 17, 2010
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
- Equipment codeMINING_EQUIP_CD
- 24
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2010
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2010
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Oct 7, 2008Degree of injury: DYS AWY FRM WRK & RESTRCTD ACTClassification: SLIP OR FALL OF PERSONAccident type: Over-exertion NECDays lost: 15Details
The report
- Document numberDOCUMENT_NO
- 220082830029
- DateACCIDENT_DT
- Oct 7, 2008
- TimeACCIDENT_TIME
- 0800
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DYS AWY FRM WRK & RESTRCTD ACT
- Degree of injury codeDEGREE_INJURY_CD
- 04
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320090640015
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- LOOSE DIRT AND MUD
- Source of injury codeINJURY_SOURCE_CD
- 094
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- ANKLE
- Part of body codeINJ_BODY_PART_CD
- 520
- Days of restricted workDAYS_RESTRICT
- 8
- Days lostDAYS_LOST
- 15
- Returned to workRETURN_TO_WORK_DT
- Nov 3, 2008
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Contractor IDCONTRACTOR_ID
- 1UB
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2008
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2009
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Schedule charge, daysSCHEDULE_CHARGE
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME
Date: Mar 24, 2004Degree of injury: DAYS AWAY FROM WORK ONLYClassification: POWERED HAULAGEAccident type: Struck against a moving objectDays lost: 3Details
The report
- Document numberDOCUMENT_NO
- 220040960072
- DateACCIDENT_DT
- Mar 24, 2004
- TimeACCIDENT_TIME
- 0955
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- POWERED HAULAGE
- Classification codeCLASSIFICATION_CD
- 12
- Accident typeACCIDENT_TYPE
- Struck against a moving object
- Accident type codeACCIDENT_TYPE_CD
- 02
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Front-end loader
- Activity codeACTIVITY_CD
- 053
- Source of injuryINJURY_SOURCE
- SURFACE MINING MACHINES
- Source of injury codeINJURY_SOURCE_CD
- 076
- Nature of injuryNATURE_INJURY
- CONTUSN,BRUISE,INTAC SKIN
- Nature of injury codeNATURE_INJURY_CD
- 160
- Part of bodyINJ_BODY_PART
- MULTIPLE PARTS (MORE THAN ONE MAJOR)
- Part of body codeINJ_BODY_PART_CD
- 700
- Days lostDAYS_LOST
- 3
- Returned to workRETURN_TO_WORK_DT
- Mar 29, 2004
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
- Equipment codeMINING_EQUIP_CD
- 24
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- Equipment model numberEQUIP_MODEL_NO
- 980B
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Jul 22, 2002Degree of injury: DAYS AWAY FROM WORK ONLYClassification: MACHINERYAccident type: Caught in, under or between running or meshing objectsDays lost: 65Details
The report
- Document numberDOCUMENT_NO
- 220022310109
- DateACCIDENT_DT
- Jul 22, 2002
- TimeACCIDENT_TIME
- 1345
- Shift beganSHIFT_BEGIN_TIME
- 630
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Caught in, under or between running or meshing objects
- Accident type codeACCIDENT_TYPE_CD
- 20
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NOT MARKED
- Immediately reportable codeIMMED_NOTIFY_CD
- 13
- MSHA investigation beganINVEST_BEGIN_DT
- Jul 22, 2002
- Returned to Duty document numberCLOSED_DOC_NO
- 320025552446
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- BELTS (NOT CONVEYOR)
- Source of injury codeINJURY_SOURCE_CD
- 078
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- LEG, NEC
- Part of body codeINJ_BODY_PART_CD
- 510
- Days lostDAYS_LOST
- 65
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Crusher, Breaker, Mills (ball and rod), Feeder breaker
- Equipment codeMINING_EQUIP_CD
- 15
- Equipment manufacturerEQUIP_MFR_NAME
- Not listed
- Equipment manufacturer codeEQUIP_MFR_CD
- 3000
- Equipment model numberEQUIP_MODEL_NO
- 350
- FIPS state codeFIPS_STATE_CD
- 05
Who and period
- Operator at the timeOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Controller IDCONTROLLER_ID
- M13657
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2002
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2002
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Returned to workRETURN_TO_WORK_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
4 reports filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 1Hours worked: 1,037Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 1037
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1037
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 4Hours worked: 4,242Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 4242
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1061
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 2Hours worked: 2,169Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 2169
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1085
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 4Hours worked: 6,411Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 6411
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1603
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 1Hours worked: 2,044Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 2044
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2044
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 5Hours worked: 9,064Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 9064
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1813
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 1Hours worked: 1,926Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 1926
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1926
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 5Hours worked: 8,968Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 8968
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1794
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 1Hours worked: 1,965Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 1965
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1965
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 4Hours worked: 9,161Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 9161
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2290
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 1Hours worked: 2,049Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 2049
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2049
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 5Hours worked: 9,507Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 9507
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1901
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 1Hours worked: 2,183Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 2183
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2183
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 4Hours worked: 9,026Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 9026
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2257
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 1Hours worked: 2,187Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 2187
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2187
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 4Hours worked: 10,157Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 10157
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2539
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileCURR_MINE_NM
- Arkansas Quality Stone Company
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Little Rock AR Field Office
- Nearest town
- Sharp
- Days worked per week
- 5
- Hours per shift
- 8
- Production shifts per day
- 1
- Maintenance shifts per day
- 0
- Employees, current record
- 8
- Tailing ponds
- 0
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- Arkansas Quality Stone Company
- Mine IDMINE_ID
- 0301779
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Active
- Status sinceCURRENT_STATUS_DT
- Oct 7, 1996
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDCURRENT_OPERATOR_ID
- L17898
- Controller IDCURRENT_CONTROLLER_ID
- 0152741
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Jan 3, 2000
Location and MSHA office
- StateSTATE
- AR
- Bureau of Mines state codeBOM_STATE_CD
- 03
- FIPS county codeFIPS_CNTY_CD
- 135
- FIPS county nameFIPS_CNTY_NM
- Sharp
- Congressional districtCONG_DIST_CD
- 01
- Nearest townNEAREST_TOWN
- Sharp
- MSHA districtDISTRICT
- M5
- MSHA office codeOFFICE_CD
- M5871
- MSHA officeOFFICE_NAME
- Little Rock AR Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 110
- Most recent assessment control numberASSESS_CTRL_NO
- 000647619
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Crushed, Broken Limestone NEC
- Primary commodity codePRIMARY_SIC_CD
- 142200
- Primary SIC codePRIMARY_SIC_CD_1
- 1422
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 00
- Primary industry groupPRIMARY_CANVASS
- Stone
- Primary industry group codePRIMARY_CANVASS_CD
- 6
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 5
- Hours per shiftHOURS_PER_SHIFT
- 8
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 1
- Workers employedNO_EMPLOYEES
- 8
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
Recorded as 0 (2)
Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS
Recorded as N (5)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND
Not recorded by MSHA (15)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) statusCURRENT_103I, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: Arkansas Quality Stone CompanyFrom: Jan 3, 2000To: No end dateController: Not shownFrom : Jan 3, 2020To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Operator fromOPERATOR_START_DT
- Jan 3, 2000
Controller
- Controller IDCONTROLLER_ID
- 0152741
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Jan 3, 2020
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
Operator: Arkansas Quality Stone CompanyFrom: Jan 3, 2000To: No end dateController: Not shownFrom : Jan 3, 2000To : Jan 2, 2020Details
Operator
- OperatorOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L17898
- Operator fromOPERATOR_START_DT
- Jan 3, 2000
Controller
- Controller IDCONTROLLER_ID
- M13657
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Jan 3, 2000
- Controller toCONTROLLER_END_DT
- Jan 2, 2020
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME
Operator: Arkansas Quality Stone CompanyFrom: Oct 1, 1996To: Jan 2, 2000Controller: Not shownFrom : Oct 1, 1996To : Jan 2, 2000Details
Operator
- OperatorOPERATOR_NAME
- Arkansas Quality Stone Company
- Operator IDOPERATOR_ID
- L14928
- Operator fromOPERATOR_START_DT
- Oct 1, 1996
- Operator toOPERATOR_END_DT
- Jan 2, 2000
Controller
- Controller IDCONTROLLER_ID
- M11359
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Oct 1, 1996
- Controller toCONTROLLER_END_DT
- Jan 2, 2000
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (1)
ControllerCONTROLLER_NAME
As MSHA records it, newest operator first.
Address of record
Arkansas Quality Stone Company·Contact title President·Street not recorded, ASH FLAT AR 72513
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- Arkansas Quality Stone Company
- Contact titleCONTACT_TITLE
- President
- CityCITY
- ASH FLAT
- StateSTATE_ABBR
- AR
- State nameSTATE
- Arkansas
- ZIP codeZIP_CD
- 72513
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 05
Mine
- Mine IDMINE_ID
- 0301779
- Mine name in this fileMINE_NAME
- Arkansas Quality Stone Company
- Nearest townNEAREST_TOWN
- Sharp
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Active
- Status sinceMINE_STATUS_DT
- Oct 7, 1996
- Primary commodity (SIC)PRIMARY_SIC_CD
- Crushed, Broken Limestone NEC
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (4)
StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology