Holt Quarry
Metal/Non-Metal, Surface·Dimension Stone NEC·Franklin, Arkansas·Mine ID 0302058
Operator Rainbow Stone Company·Controller not shown·MSHA status Active since Dec 5, 2023
What MSHA has on file for this mine
MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Inspections
Regular Safety and Health InspectionApr 8, 2026Inspectors 1 | Hours on site 3.5Began: Apr 8, 2026Ended: Apr 8, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 8, 2026
- Closed outINSPECTION_END_DT
- Apr 8, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F03A7D4
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Rainbow Stone Company
- Operator IDOPERATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Mine IDMINE_ID
- 0302058
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionDec 8 to Dec 11, 2025Inspectors 1 | Hours on site 5Began: Dec 8, 2025Ended: Dec 11, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 8, 2025
- Closed outINSPECTION_END_DT
- Dec 11, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F022A2A
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Rainbow Stone Company
- Operator IDOPERATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Mine IDMINE_ID
- 0302058
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMay 5, 2025Inspectors 1 | Hours on site 3Began: May 5, 2025Ended: May 5, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 5, 2025
- Closed outINSPECTION_END_DT
- May 5, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F014AFB
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Rainbow Stone Company
- Operator IDOPERATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Mine IDMINE_ID
- 0302058
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJan 29 to Jan 30, 2025Inspectors 1 | Hours on site 8.25Began: Jan 29, 2025Ended: Jan 30, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 8.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 29, 2025
- Closed outINSPECTION_END_DT
- Jan 30, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F003536
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 9.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Rainbow Stone Company
- Operator IDOPERATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Mine IDMINE_ID
- 0302058
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Spot InspectionSep 24 to Sep 26, 2024Inspectors 1 | Hours on site 12.5Began: Sep 24, 2024Ended: Sep 26, 2024Activity: Spot InspectionInspectors: 1Hours on site: 12.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 24, 2024
- Closed outINSPECTION_END_DT
- Sep 26, 2024
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6938780
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 12.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 29
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Rainbow Stone Company
- Operator IDOPERATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Mine IDMINE_ID
- 0302058
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Compliance Follow-up InspectionJul 24, 2024Inspectors 1 | Hours on site 1.25Began: Jul 24, 2024Ended: Jul 24, 2024Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 1.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 24, 2024
- Closed outINSPECTION_END_DT
- Jul 24, 2024
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6938246
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3.75
- Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE
- 1.25
- Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
- 3.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Rainbow Stone Company
- Operator IDOPERATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Mine IDMINE_ID
- 0302058
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (1)
Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJul 8 to Jul 9, 2024Inspectors 1 | Hours on site 5Began: Jul 8, 2024Ended: Jul 9, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 8, 2024
- Closed outINSPECTION_END_DT
- Jul 9, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F00555A
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 14
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Rainbow Stone Company
- Operator IDOPERATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Mine IDMINE_ID
- 0302058
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Special Emphasis ProgramsMay 22, 2024Inspectors 1 | Hours on site 0.5Began: May 22, 2024Ended: May 22, 2024Activity: Special Emphasis ProgramsInspectors: 1Hours on site: 0.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 22, 2024
- Closed outINSPECTION_END_DT
- May 22, 2024
- ActivityACTIVITY
- Special Emphasis Programs
- Activity codeACTIVITY_CODE
- E17
- Program areaPROGRAM_AREA
- M/NM--Special Emphasis Programs
- Event numberEVENT_NO
- 6935792
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Rainbow Stone Company
- Operator IDOPERATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Mine IDMINE_ID
- 0302058
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionFeb 5 to Feb 6, 2024Inspectors 1 | Hours on site 10.5Began: Feb 5, 2024Ended: Feb 6, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 10.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 5, 2024
- Closed outINSPECTION_END_DT
- Feb 6, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6937331
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 10.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Rainbow Stone Company
- Operator IDOPERATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Mine IDMINE_ID
- 0302058
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Spot InspectionDec 4 to Dec 11, 2023Inspectors 1 | Hours on site 0Began: Dec 4, 2023Ended: Dec 11, 2023Activity: Spot InspectionInspectors: 1Hours on site: 0Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 4, 2023
- Closed outINSPECTION_END_DT
- Dec 11, 2023
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6935746
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Holt Farm
- Operator IDOPERATOR_ID
- 0148873
- Controller IDCONTROLLER_ID
- 0130701
- Mine IDMINE_ID
- 0302058
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (14)
Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionDec 4 to Dec 6, 2017Inspectors 1 | Hours on site 5.5Began: Dec 4, 2017Ended: Dec 6, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 4, 2017
- Closed outINSPECTION_END_DT
- Dec 6, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6739049
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Holt Farm
- Operator IDOPERATOR_ID
- 0148873
- Controller IDCONTROLLER_ID
- 0130701
- Mine IDMINE_ID
- 0302058
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionDec 13 to Dec 15, 2016Inspectors 1 | Hours on site 2Began: Dec 13, 2016Ended: Dec 15, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 2Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 13, 2016
- Closed outINSPECTION_END_DT
- Dec 15, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6738610
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M5871
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 5.75
Who and when, as recorded
- Mine IDMINE_ID
- 0302058
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (6)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Operator at the timeOPERATOR_NAME, Operator IDOPERATOR_ID, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID
12 inspections and other MSHA visits since Dec 13, 2016; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Apr 8, 2026Type: CitationStandard: 56.4201(a)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5009164
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 8, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0815
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 8, 2026
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 8, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Apr 8, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Apr 8, 2026
- Terminated, timeTERMINATION_TIME
- 0819
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Bill first printedBILL_PRINT_DT
- Jun 4, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 3, 2026
- Last actionLAST_ACTION_CD
- 1stDemandPrinted
- Last action dateLAST_ACTION_DT
- Sep 18, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- F03A7D4
- Inspection beganINSPECTION_BEGIN_DT
- Apr 8, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 8, 2026
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 8, 2026Type: CitationStandard: 41.12S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5009165
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 8, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 1014
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 8, 2026
- 30 CFR part and sectionPART_SECTION
- 41.12
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 15, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Apr 15, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Apr 16, 2026
- Terminated, timeTERMINATION_TIME
- 1232
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Bill first printedBILL_PRINT_DT
- Jun 4, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 3, 2026
- Last actionLAST_ACTION_CD
- 1stDemandPrinted
- Last action dateLAST_ACTION_DT
- Sep 18, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- F03A7D4
- Inspection beganINSPECTION_BEGIN_DT
- Apr 8, 2026
- Inspection closed outINSPECTION_END_DT
- Apr 8, 2026
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (2)
Persons potentially affectedNO_AFFECTED, Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Dec 9, 2025Type: CitationStandard: 50.30(a)S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5009101
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Dec 9, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0927
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 9, 2025
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Dec 9, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1030
- Latest dueLATEST_TERM_DUE_DT
- Dec 9, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1030
- TerminatedTERMINATION_DT
- Dec 9, 2025
- Terminated, timeTERMINATION_TIME
- 0930
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Bill first printedBILL_PRINT_DT
- Feb 5, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 12, 2026
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Jun 25, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- F022A2A
- Inspection beganINSPECTION_BEGIN_DT
- Dec 8, 2025
- Inspection closed outINSPECTION_END_DT
- Dec 11, 2025
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Persons potentially affectedNO_AFFECTED, Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Dec 9, 2025Type: CitationStandard: 56.12025S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $165.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5009100
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Dec 9, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0801
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 9, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12025
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Dec 11, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 0900
- Latest dueLATEST_TERM_DUE_DT
- Dec 11, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 0900
- TerminatedTERMINATION_DT
- Dec 11, 2025
- Terminated, timeTERMINATION_TIME
- 0733
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 165
- Current proposed assessmentAMOUNT_DUE
- 165
- Bill first printedBILL_PRINT_DT
- Feb 5, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 12, 2026
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Jun 25, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- F022A2A
- Inspection beganINSPECTION_BEGIN_DT
- Dec 8, 2025
- Inspection closed outINSPECTION_END_DT
- Dec 11, 2025
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Dec 8, 2025Type: CitationStandard: 56.14132(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $165.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5009099
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Dec 8, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1540
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 8, 2025
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Dec 9, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Dec 9, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Dec 11, 2025
- Terminated, timeTERMINATION_TIME
- 0732
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 165
- Current proposed assessmentAMOUNT_DUE
- 165
- Bill first printedBILL_PRINT_DT
- Feb 5, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 12, 2026
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Jun 25, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- F022A2A
- Inspection beganINSPECTION_BEGIN_DT
- Dec 8, 2025
- Inspection closed outINSPECTION_END_DT
- Dec 11, 2025
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jan 29, 2025Type: CitationStandard: 56.12018S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $245.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5001010
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 29, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1430
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 29, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12018
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 29, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jan 29, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jan 29, 2025
- Terminated, timeTERMINATION_TIME
- 1530
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 245
- Current proposed assessmentAMOUNT_DUE
- 245
- Bill first printedBILL_PRINT_DT
- Apr 3, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- May 14, 2025
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Aug 28, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 15
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- F003536
- Inspection beganINSPECTION_BEGIN_DT
- Jan 29, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 30, 2025
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Sep 25, 2024Type: CitationStandard: 62.110S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9791350
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 25, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1530
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 25, 2024
- 30 CFR part and sectionPART_SECTION
- 62.110
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 16, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Nov 6, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Nov 18, 2024
- Terminated, timeTERMINATION_TIME
- 0801
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 6, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Mar 20, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- 6938780
- Inspection beganINSPECTION_BEGIN_DT
- Sep 24, 2024
- Inspection closed outINSPECTION_END_DT
- Sep 26, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Sep 25, 2024Type: CitationStandard: 62.120S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9791349
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 25, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1531
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 25, 2024
- 30 CFR part and sectionPART_SECTION
- 62.120
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 9, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Oct 9, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Oct 25, 2024
- Terminated, timeTERMINATION_TIME
- 0900
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 6, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Mar 20, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- 6938780
- Inspection beganINSPECTION_BEGIN_DT
- Sep 24, 2024
- Inspection closed outINSPECTION_END_DT
- Sep 26, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Sep 24, 2024Type: CitationStandard: 56.14207S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9791347
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 24, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1202
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 24, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14207
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 24, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1215
- Latest dueLATEST_TERM_DUE_DT
- Sep 24, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1215
- TerminatedTERMINATION_DT
- Sep 24, 2024
- Terminated, timeTERMINATION_TIME
- 1203
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 6, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Mar 20, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- 6938780
- Inspection beganINSPECTION_BEGIN_DT
- Sep 24, 2024
- Inspection closed outINSPECTION_END_DT
- Sep 26, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Sep 24, 2024Type: CitationStandard: 56.14107(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9791348
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 24, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1306
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 24, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 25, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Sep 25, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- Sep 25, 2024
- Terminated, timeTERMINATION_TIME
- 1458
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 6, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Mar 20, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- 6938780
- Inspection beganINSPECTION_BEGIN_DT
- Sep 24, 2024
- Inspection closed outINSPECTION_END_DT
- Sep 26, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 8, 2024Type: CitationStandard: 56.4101S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795259
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 8, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1334
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 8, 2024
- 30 CFR part and sectionPART_SECTION
- 56.4101
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 8, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 8, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 8, 2024
- Terminated, timeTERMINATION_TIME
- 1334
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 14, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Mar 6, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- F00555A
- Inspection beganINSPECTION_BEGIN_DT
- Jul 8, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 9, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 8, 2024Type: CitationStandard: 56.14132(b)(1)(i)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795255
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 8, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1238
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 8, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14132(b)(1)(i)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 9, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 9, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 24, 2024
- Terminated, timeTERMINATION_TIME
- 0954
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 14, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Mar 6, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- F00555A
- Inspection beganINSPECTION_BEGIN_DT
- Jul 8, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 9, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 8, 2024Type: CitationStandard: 56.14132(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795254
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 8, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1236
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 8, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 9, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 9, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 24, 2024
- Terminated, timeTERMINATION_TIME
- 0950
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 14, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Mar 6, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- F00555A
- Inspection beganINSPECTION_BEGIN_DT
- Jul 8, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 9, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 8, 2024Type: CitationStandard: 56.14132(b)(1)(i)S&S: YNegligence: HighNegligenceIssued to: OperatorProposed penalty: $535.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795257
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 8, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1312
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 8, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14132(b)(1)(i)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 8, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1327
- Latest dueLATEST_TERM_DUE_DT
- Jul 8, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1327
- TerminatedTERMINATION_DT
- Jul 24, 2024
- Terminated, timeTERMINATION_TIME
- 0943
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 535
- Current proposed assessmentAMOUNT_DUE
- 535
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 14, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Mar 6, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- F00555A
- Inspection beganINSPECTION_BEGIN_DT
- Jul 8, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 9, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 8, 2024Type: CitationStandard: 56.14100(b)S&S: YNegligence: HighNegligenceIssued to: OperatorProposed penalty: $535.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795258
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 8, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1322
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 8, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 8, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1337
- Latest dueLATEST_TERM_DUE_DT
- Jul 8, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1337
- TerminatedTERMINATION_DT
- Jul 24, 2024
- Terminated, timeTERMINATION_TIME
- 0942
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 535
- Current proposed assessmentAMOUNT_DUE
- 535
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 14, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Mar 6, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- F00555A
- Inspection beganINSPECTION_BEGIN_DT
- Jul 8, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 9, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 8, 2024Type: CitationStandard: 56.14100(b)S&S: YNegligence: HighNegligenceIssued to: OperatorProposed penalty: $535.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795253
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 8, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1226
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 8, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Mill
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 8, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1241
- Latest dueLATEST_TERM_DUE_DT
- Jul 8, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1241
- TerminatedTERMINATION_DT
- Jul 24, 2024
- Terminated, timeTERMINATION_TIME
- 0947
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 535
- Current proposed assessmentAMOUNT_DUE
- 535
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 14, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Mar 6, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- F00555A
- Inspection beganINSPECTION_BEGIN_DT
- Jul 8, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 9, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 8, 2024Type: CitationStandard: 56.14130(i)S&S: YNegligence: HighNegligenceIssued to: OperatorProposed penalty: $1,188.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9795256
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 8, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1302
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 8, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14130(i)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 8, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1317
- Latest dueLATEST_TERM_DUE_DT
- Jul 8, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1317
- TerminatedTERMINATION_DT
- Jul 24, 2024
- Terminated, timeTERMINATION_TIME
- 0941
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 1188
- Current proposed assessmentAMOUNT_DUE
- 1188
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 14, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Mar 6, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- F00555A
- Inspection beganINSPECTION_BEGIN_DT
- Jul 8, 2024
- Inspection closed outINSPECTION_END_DT
- Jul 9, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Feb 6, 2024Type: CitationStandard: 50.30(a)S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9748069
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 6, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0940
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 6, 2024
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 6, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Feb 6, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Feb 6, 2024
- Terminated, timeTERMINATION_TIME
- 1030
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Bill first printedBILL_PRINT_DT
- Apr 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- May 15, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Aug 29, 2024
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- 6937331
- Inspection beganINSPECTION_BEGIN_DT
- Feb 5, 2024
- Inspection closed outINSPECTION_END_DT
- Feb 6, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (3)
Persons potentially affectedNO_AFFECTED, Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Feb 6, 2024Type: CitationStandard: 56.12028S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9748068
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 6, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0905
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 6, 2024
- 30 CFR part and sectionPART_SECTION
- 56.12028
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 15, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Feb 15, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Feb 16, 2024
- Terminated, timeTERMINATION_TIME
- 0931
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Bill first printedBILL_PRINT_DT
- Apr 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- May 15, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Aug 29, 2024
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- 6937331
- Inspection beganINSPECTION_BEGIN_DT
- Feb 5, 2024
- Inspection closed outINSPECTION_END_DT
- Feb 6, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Feb 5, 2024Type: CitationStandard: 56.14132(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9748067
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 5, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1400
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 5, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 5, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1530
- Latest dueLATEST_TERM_DUE_DT
- Feb 6, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1000
- TerminatedTERMINATION_DT
- Feb 6, 2024
- Terminated, timeTERMINATION_TIME
- 0949
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Bill first printedBILL_PRINT_DT
- Apr 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- May 15, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Aug 29, 2024
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- 6937331
- Inspection beganINSPECTION_BEGIN_DT
- Feb 5, 2024
- Inspection closed outINSPECTION_END_DT
- Feb 6, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (3)
Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Feb 5, 2024Type: CitationStandard: 56.12002S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9748066
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 5, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1350
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 5, 2024
- 30 CFR part and sectionPART_SECTION
- 56.12002
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 5, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1530
- Latest dueLATEST_TERM_DUE_DT
- Feb 5, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1530
- TerminatedTERMINATION_DT
- Feb 5, 2024
- Terminated, timeTERMINATION_TIME
- 1430
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Bill first printedBILL_PRINT_DT
- Apr 4, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- May 15, 2024
- Last actionLAST_ACTION_CD
- Treasury
- Last action dateLAST_ACTION_DT
- Aug 29, 2024
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Rainbow Stone Company
- Operator IDVIOLATOR_ID
- 0119849
- Controller IDCONTROLLER_ID
- 0101845
- Inspection eventEVENT_NO
- 6937331
- Inspection beganINSPECTION_BEGIN_DT
- Feb 5, 2024
- Inspection closed outINSPECTION_END_DT
- Feb 6, 2024
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (3)
Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Dec 4, 2023Type: CitationStandard: 56.1000S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9743732
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Dec 4, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1500
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 4, 2023
- 30 CFR part and sectionPART_SECTION
- 56.1000
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Dec 5, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Dec 5, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Dec 5, 2023
- Terminated, timeTERMINATION_TIME
- 1101
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Feb 7, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 13, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 18, 2024
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Holt Farm
- Operator IDVIOLATOR_ID
- 0148873
- Controller IDCONTROLLER_ID
- 0130701
- Inspection eventEVENT_NO
- 6935746
- Inspection beganINSPECTION_BEGIN_DT
- Dec 4, 2023
- Inspection closed outINSPECTION_END_DT
- Dec 11, 2023
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (3)
Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Dec 4, 2023Type: OrderStandard: 46.5(b)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $397.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9743733
- TypeCIT_ORD_SAFE
- Order
- IssuedVIOLATION_ISSUE_DT
- Dec 4, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1515
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 4, 2023
- 30 CFR part and sectionPART_SECTION
- 46.5(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(g)(1)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- TerminatedTERMINATION_DT
- Dec 5, 2023
- Terminated, timeTERMINATION_TIME
- 1000
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 397
- Current proposed assessmentAMOUNT_DUE
- 397
- Amount paidAMOUNT_PAID
- 397
- Bill first printedBILL_PRINT_DT
- Feb 7, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 13, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 18, 2024
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Holt Farm
- Operator IDVIOLATOR_ID
- 0148873
- Controller IDCONTROLLER_ID
- 0130701
- Inspection eventEVENT_NO
- 6935746
- Inspection beganINSPECTION_BEGIN_DT
- Dec 4, 2023
- Inspection closed outINSPECTION_END_DT
- Dec 11, 2023
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (17)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Dec 4, 2017Type: CitationStandard: 56.15001S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $118.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9354487
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Dec 4, 2017
- Time issuedVIOLATION_ISSUE_TIME
- 1405
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 4, 2017
- 30 CFR part and sectionPART_SECTION
- 56.15001
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Dec 6, 2017
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Dec 6, 2017
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Dec 6, 2017
- Terminated, timeTERMINATION_TIME
- 1550
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 118
- Current proposed assessmentAMOUNT_DUE
- 118
- Amount paidAMOUNT_PAID
- 118
- Bill first printedBILL_PRINT_DT
- Jan 10, 2018
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 24, 2018
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 30, 2018
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Holt Farm
- Operator IDVIOLATOR_ID
- 0148873
- Controller IDCONTROLLER_ID
- 0130701
- Inspection eventEVENT_NO
- 6739049
- Inspection beganINSPECTION_BEGIN_DT
- Dec 4, 2017
- Inspection closed outINSPECTION_END_DT
- Dec 6, 2017
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
24 citations and orders since Dec 4, 2017: 24 issued to the operator, 0 to contractors working at the mine. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Apr 8, 2026Citation number: 5009164Standard: 56.4201(a)(2)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5009164
- Assessment control numberASSESS_CASE_NO
- 000642190
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jul 4, 2026
- Citation issuedISSUE_DT
- Apr 8, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 8, 2026
- Final order dateFINAL_ORDER_DT
- Aug 3, 2026
- Bill first printedBILL_PRINT_DT
- Jun 4, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 3, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 2.12
- Excessive late payment interestEXLATE_INTEREST_AMT
- 1.19
Penalty points
- Violation history pointsPENALTY_POINTS
- 37
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 8139
- Size of mineSIZE_OF_MINE
- 8139
- Controller hours workedCONTROLLER_HRS
- 9603
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9603
- History period startHISTORY_START_DT
- Jan 8, 2025
- History period endHISTORY_END_DT
- Apr 7, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03A7D4
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (12)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 8, 2026Citation number: 5009165Standard: 41.12Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5009165
- Assessment control numberASSESS_CASE_NO
- 000642190
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Jul 4, 2026
- Citation issuedISSUE_DT
- Apr 8, 2026
- Date of occurrenceOCCURRENCE_DT
- Apr 8, 2026
- Final order dateFINAL_ORDER_DT
- Aug 3, 2026
- Bill first printedBILL_PRINT_DT
- Jun 4, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 3, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 41.12
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 2.12
- Excessive late payment interestEXLATE_INTEREST_AMT
- 1.19
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Mine size pointsMINE_SIZE_POINTS
- 1
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 8139
- Size of mineSIZE_OF_MINE
- 8139
- Controller hours workedCONTROLLER_HRS
- 9603
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 9603
- History period startHISTORY_START_DT
- Jan 8, 2025
- History period endHISTORY_END_DT
- Apr 7, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F03A7D4
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (15)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 9, 2025Citation number: 5009101Standard: 50.30(a)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5009101
- Assessment control numberASSESS_CASE_NO
- 000635361
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Feb 10, 2026
- Citation issuedISSUE_DT
- Dec 9, 2025
- Date of occurrenceOCCURRENCE_DT
- Dec 9, 2025
- Final order dateFINAL_ORDER_DT
- Mar 12, 2026
- Bill first printedBILL_PRINT_DT
- Feb 5, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 12, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.79
Penalty points
- Violation history pointsPENALTY_POINTS
- 60
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 2.4
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4488
- Size of mineSIZE_OF_MINE
- 4488
- Controller hours workedCONTROLLER_HRS
- 7793
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7793
- History period startHISTORY_START_DT
- Sep 9, 2024
- History period endHISTORY_END_DT
- Dec 8, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F022A2A
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (16)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 9, 2025Citation number: 5009100Standard: 56.12025Proposed penalty: $165.00Current assessment: $165.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5009100
- Assessment control numberASSESS_CASE_NO
- 000635361
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Feb 10, 2026
- Citation issuedISSUE_DT
- Dec 9, 2025
- Date of occurrenceOCCURRENCE_DT
- Dec 9, 2025
- Final order dateFINAL_ORDER_DT
- Mar 12, 2026
- Bill first printedBILL_PRINT_DT
- Feb 5, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 12, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12025
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 165.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 165.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.96
Penalty points
- Violation history pointsPENALTY_POINTS
- 61
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 2.4
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4488
- Size of mineSIZE_OF_MINE
- 4488
- Controller hours workedCONTROLLER_HRS
- 7793
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7793
- History period startHISTORY_START_DT
- Sep 9, 2024
- History period endHISTORY_END_DT
- Dec 8, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F022A2A
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 8, 2025Citation number: 5009099Standard: 56.14132(a)Proposed penalty: $165.00Current assessment: $165.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5009099
- Assessment control numberASSESS_CASE_NO
- 000635361
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Feb 10, 2026
- Citation issuedISSUE_DT
- Dec 8, 2025
- Date of occurrenceOCCURRENCE_DT
- Dec 8, 2025
- Final order dateFINAL_ORDER_DT
- Mar 12, 2026
- Bill first printedBILL_PRINT_DT
- Feb 5, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 12, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 165.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 165.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.96
Penalty points
- Violation history pointsPENALTY_POINTS
- 61
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 12
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 2.4
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4488
- Size of mineSIZE_OF_MINE
- 4488
- Controller hours workedCONTROLLER_HRS
- 7793
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7793
- History period startHISTORY_START_DT
- Sep 8, 2024
- History period endHISTORY_END_DT
- Dec 7, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F022A2A
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 29, 2025Citation number: 5001010Standard: 56.12018Proposed penalty: $245.00Current assessment: $245.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5001010
- Assessment control numberASSESS_CASE_NO
- 000617495
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Apr 14, 2025
- Citation issuedISSUE_DT
- Jan 29, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 29, 2025
- Final order dateFINAL_ORDER_DT
- May 14, 2025
- Bill first printedBILL_PRINT_DT
- Apr 3, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 14, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12018
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 245.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 245.00
- Mine Act interestMINEACT_INTEREST_AMT
- 2.57
Penalty points
- Violation history pointsPENALTY_POINTS
- 66
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 25
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 15
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 6
- Violations per inspection dayVPID
- 2.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4488
- Size of mineSIZE_OF_MINE
- 4488
- Controller hours workedCONTROLLER_HRS
- 7793
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 7793
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Jan 28, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F003536
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 25, 2024Citation number: 9791350Standard: 62.110Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9791350
- Assessment control numberASSESS_CASE_NO
- 000609227
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Nov 6, 2024
- Citation issuedISSUE_DT
- Sep 25, 2024
- Date of occurrenceOCCURRENCE_DT
- Sep 25, 2024
- Final order dateFINAL_ORDER_DT
- Dec 6, 2024
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 6, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 62.110
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.71
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Sep 24, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6938780
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 25, 2024Citation number: 9791349Standard: 62.120Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9791349
- Assessment control numberASSESS_CASE_NO
- 000609227
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Nov 6, 2024
- Citation issuedISSUE_DT
- Sep 25, 2024
- Date of occurrenceOCCURRENCE_DT
- Sep 25, 2024
- Final order dateFINAL_ORDER_DT
- Dec 6, 2024
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 6, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 62.120
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.71
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Sep 24, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6938780
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 24, 2024Citation number: 9791347Standard: 56.14207Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9791347
- Assessment control numberASSESS_CASE_NO
- 000609227
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Nov 6, 2024
- Citation issuedISSUE_DT
- Sep 24, 2024
- Date of occurrenceOCCURRENCE_DT
- Sep 24, 2024
- Final order dateFINAL_ORDER_DT
- Dec 6, 2024
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 6, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14207
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.71
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Sep 23, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6938780
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 24, 2024Citation number: 9791348Standard: 56.14107(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9791348
- Assessment control numberASSESS_CASE_NO
- 000609227
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Nov 6, 2024
- Citation issuedISSUE_DT
- Sep 24, 2024
- Date of occurrenceOCCURRENCE_DT
- Sep 24, 2024
- Final order dateFINAL_ORDER_DT
- Dec 6, 2024
- Bill first printedBILL_PRINT_DT
- Oct 31, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 6, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.71
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Sep 23, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6938780
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (14)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 8, 2024Citation number: 9795254Standard: 56.14132(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795254
- Assessment control numberASSESS_CASE_NO
- 000604068
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Oct 17, 2024
- Citation issuedISSUE_DT
- Jul 8, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 8, 2024
- Final order dateFINAL_ORDER_DT
- Nov 14, 2024
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 14, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 2.41
- Excessive late payment interestEXLATE_INTEREST_AMT
- 1.43
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1.33
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.333
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Jul 7, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00555A
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (11)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 8, 2024Citation number: 9795253Standard: 56.14100(b)Proposed penalty: $535.00Current assessment: $535.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795253
- Assessment control numberASSESS_CASE_NO
- 000604068
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Oct 17, 2024
- Citation issuedISSUE_DT
- Jul 8, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 8, 2024
- Final order dateFINAL_ORDER_DT
- Nov 14, 2024
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 14, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 535.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 535.00
- Mine Act interestMINEACT_INTEREST_AMT
- 8.79
- Excessive late payment interestEXLATE_INTEREST_AMT
- 5.19
Penalty points
- Violation history pointsPENALTY_POINTS
- 76
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 35
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Jul 7, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00555A
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 8, 2024Citation number: 9795259Standard: 56.4101Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795259
- Assessment control numberASSESS_CASE_NO
- 000604068
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Oct 17, 2024
- Citation issuedISSUE_DT
- Jul 8, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 8, 2024
- Final order dateFINAL_ORDER_DT
- Nov 14, 2024
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 14, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4101
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 2.41
- Excessive late payment interestEXLATE_INTEREST_AMT
- 1.43
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Jul 7, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00555A
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 8, 2024Citation number: 9795257Standard: 56.14132(b)(1)(i)Proposed penalty: $535.00Current assessment: $535.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795257
- Assessment control numberASSESS_CASE_NO
- 000604068
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Oct 17, 2024
- Citation issuedISSUE_DT
- Jul 8, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 8, 2024
- Final order dateFINAL_ORDER_DT
- Nov 14, 2024
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 14, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(b)(1)(i)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 535.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 535.00
- Mine Act interestMINEACT_INTEREST_AMT
- 8.79
- Excessive late payment interestEXLATE_INTEREST_AMT
- 5.19
Penalty points
- Violation history pointsPENALTY_POINTS
- 76
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 35
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Jul 7, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00555A
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 8, 2024Citation number: 9795255Standard: 56.14132(b)(1)(i)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795255
- Assessment control numberASSESS_CASE_NO
- 000604068
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Oct 17, 2024
- Citation issuedISSUE_DT
- Jul 8, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 8, 2024
- Final order dateFINAL_ORDER_DT
- Nov 14, 2024
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 14, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(b)(1)(i)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 2.41
- Excessive late payment interestEXLATE_INTEREST_AMT
- 1.43
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Jul 7, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00555A
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 8, 2024Citation number: 9795258Standard: 56.14100(b)Proposed penalty: $535.00Current assessment: $535.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795258
- Assessment control numberASSESS_CASE_NO
- 000604068
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Oct 17, 2024
- Citation issuedISSUE_DT
- Jul 8, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 8, 2024
- Final order dateFINAL_ORDER_DT
- Nov 14, 2024
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 14, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 535.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 535.00
- Mine Act interestMINEACT_INTEREST_AMT
- 8.79
- Excessive late payment interestEXLATE_INTEREST_AMT
- 5.19
Penalty points
- Violation history pointsPENALTY_POINTS
- 76
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 35
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Jul 7, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00555A
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 8, 2024Citation number: 9795256Standard: 56.14130(i)Proposed penalty: $1,188.00Current assessment: $1,188.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9795256
- Assessment control numberASSESS_CASE_NO
- 000604068
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Oct 17, 2024
- Citation issuedISSUE_DT
- Jul 8, 2024
- Date of occurrenceOCCURRENCE_DT
- Jul 8, 2024
- Final order dateFINAL_ORDER_DT
- Nov 14, 2024
- Bill first printedBILL_PRINT_DT
- Oct 3, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 14, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14130(i)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 1188.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 1188.00
- Mine Act interestMINEACT_INTEREST_AMT
- 19.53
- Excessive late payment interestEXLATE_INTEREST_AMT
- 11.52
Penalty points
- Violation history pointsPENALTY_POINTS
- 86
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 35
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1.33
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Jul 7, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F00555A
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (13)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 6, 2024Citation number: 9748068Standard: 56.12028Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9748068
- Assessment control numberASSESS_CASE_NO
- 000596575
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Apr 15, 2024
- Citation issuedISSUE_DT
- Feb 6, 2024
- Date of occurrenceOCCURRENCE_DT
- Feb 6, 2024
- Final order dateFINAL_ORDER_DT
- May 15, 2024
- Bill first printedBILL_PRINT_DT
- Apr 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 15, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12028
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.54
Penalty points
- Violation history pointsPENALTY_POINTS
- 26
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Feb 5, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6937331
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (16)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 6, 2024Citation number: 9748069Standard: 50.30(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9748069
- Assessment control numberASSESS_CASE_NO
- 000596575
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Apr 15, 2024
- Citation issuedISSUE_DT
- Feb 6, 2024
- Date of occurrenceOCCURRENCE_DT
- Feb 6, 2024
- Final order dateFINAL_ORDER_DT
- May 15, 2024
- Bill first printedBILL_PRINT_DT
- Apr 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 15, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.54
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Negligence pointsNEGLIGENCE_POINTS
- 35
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Feb 5, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6937331
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (19)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 5, 2024Citation number: 9748067Standard: 56.14132(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9748067
- Assessment control numberASSESS_CASE_NO
- 000596575
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Apr 15, 2024
- Citation issuedISSUE_DT
- Feb 5, 2024
- Date of occurrenceOCCURRENCE_DT
- Feb 5, 2024
- Final order dateFINAL_ORDER_DT
- May 15, 2024
- Bill first printedBILL_PRINT_DT
- Apr 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 15, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.54
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Feb 4, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6937331
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (17)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 5, 2024Citation number: 9748066Standard: 56.12002Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $0.00Case status: ReceivedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9748066
- Assessment control numberASSESS_CASE_NO
- 000596575
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Received
- Case status dateASSESS_CASE_STATUS_DT
- Apr 15, 2024
- Citation issuedISSUE_DT
- Feb 5, 2024
- Date of occurrenceOCCURRENCE_DT
- Feb 5, 2024
- Final order dateFINAL_ORDER_DT
- May 15, 2024
- Bill first printedBILL_PRINT_DT
- Apr 4, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- May 15, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.54
Penalty points
- Violation history pointsPENALTY_POINTS
- 36
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 160
- Size of mineSIZE_OF_MINE
- 160
- Controller hours workedCONTROLLER_HRS
- 2318
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2318
- History period startHISTORY_START_DT
- Dec 5, 2023
- History period endHISTORY_END_DT
- Feb 4, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Rainbow Stone Company
- IDVIOLATOR_ID
- 0119849
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 5, 2023
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6937331
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (17)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 4, 2023Citation number: 9743733Standard: 46.5(b)Proposed penalty: $397.00Current assessment: $397.00Paid against proposed penalty: $397.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9743733
- Assessment control numberASSESS_CASE_NO
- 000593710
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 7, 2024
- Citation issuedISSUE_DT
- Dec 4, 2023
- Date of occurrenceOCCURRENCE_DT
- Dec 4, 2023
- Final order dateFINAL_ORDER_DT
- Mar 13, 2024
- Bill first printedBILL_PRINT_DT
- Feb 7, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 13, 2024
- Citation typeCITATION_TYPE_CD
- Order
- 30 CFR standardCFR_STANDARD_CD
- 46.5(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(g)(1)
- Significant and substantialSIG_SUB_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 397.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 397.00
- Mine Act interestMINEACT_INTEREST_AMT
- 4.70
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 397.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 4.70
Penalty points
- Violation history pointsPENALTY_POINTS
- 71
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
Inputs to the penalty calculation
- History period startHISTORY_START_DT
- Sep 4, 2022
- History period endHISTORY_END_DT
- Dec 3, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Holt Farm
- IDVIOLATOR_ID
- 0148873
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 22, 2016
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Dec 4, 2023
- Inspection eventEVENT_NBR
- 6935746
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (19)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 4, 2023Citation number: 9743732Standard: 56.1000Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9743732
- Assessment control numberASSESS_CASE_NO
- 000593710
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 7, 2024
- Citation issuedISSUE_DT
- Dec 4, 2023
- Date of occurrenceOCCURRENCE_DT
- Dec 4, 2023
- Final order dateFINAL_ORDER_DT
- Mar 13, 2024
- Bill first printedBILL_PRINT_DT
- Feb 7, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 13, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.1000
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.74
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 1.74
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Negligence pointsNEGLIGENCE_POINTS
- 35
Inputs to the penalty calculation
- History period startHISTORY_START_DT
- Sep 4, 2022
- History period endHISTORY_END_DT
- Dec 3, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Holt Farm
- IDVIOLATOR_ID
- 0148873
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 22, 2016
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Dec 4, 2023
- Inspection eventEVENT_NBR
- 6935746
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (22)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 4, 2017Citation number: 9354487Standard: 56.15001Proposed penalty: $118.00Current assessment: $118.00Paid against proposed penalty: $118.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9354487
- Assessment control numberASSESS_CASE_NO
- 000456274
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 30, 2018
- Citation issuedISSUE_DT
- Dec 4, 2017
- Date of occurrenceOCCURRENCE_DT
- Dec 4, 2017
- Final order dateFINAL_ORDER_DT
- Feb 24, 2018
- Bill first printedBILL_PRINT_DT
- Jan 10, 2018
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2018
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.15001
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 118.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 118.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 118.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 26
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 60
- Size of mineSIZE_OF_MINE
- 60
- Controller hours workedCONTROLLER_HRS
- 60
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 60
- History period startHISTORY_START_DT
- Dec 22, 2016
- History period endHISTORY_END_DT
- Dec 3, 2017
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Holt Farm
- IDVIOLATOR_ID
- 0148873
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 22, 2016
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6739049
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M5871
Recorded as 0 (17)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
24 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Employment and hours worked
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 1Hours worked: 1,557Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 1557
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1557
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileCURR_MINE_NM
- Holt Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 4Hours worked: 5,080Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 5080
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1270
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileCURR_MINE_NM
- Holt Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 1Hours worked: 3,197Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 3197
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 3197
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileCURR_MINE_NM
- Holt Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 4Hours worked: 8,139Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 8139
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2035
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileCURR_MINE_NM
- Holt Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 1Hours worked: 1,642Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 1642
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1642
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileCURR_MINE_NM
- Holt Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 4Hours worked: 4,488Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 4488
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1122
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileCURR_MINE_NM
- Holt Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 1Hours worked: 20Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 20
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 20
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileCURR_MINE_NM
- Holt Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 2Hours worked: 40Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 40
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 20
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileCURR_MINE_NM
- Holt Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 1Hours worked: 3Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 3
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 3
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileCURR_MINE_NM
- Holt Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 2Hours worked: 60Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 60
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 30
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileCURR_MINE_NM
- Holt Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 1Hours worked: 5Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 5
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 5
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileCURR_MINE_NM
- Holt Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 1Hours worked: 16Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 16
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 16
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileCURR_MINE_NM
- Holt Quarry
- StateSTATE_ABBR
- AR
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 6 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Little Rock AR Field Office
- Nearest town
- Ozark
- Days worked per week
- 5
- Hours per shift
- 8
- Production shifts per day
- 1
- Maintenance shifts per day
- 0
- Employees, current record
- 2
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- Holt Quarry
- Mine IDMINE_ID
- 0302058
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Active
- Status sinceCURRENT_STATUS_DT
- Dec 5, 2023
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- Rainbow Stone Company
- Operator IDCURRENT_OPERATOR_ID
- 0119849
- Controller IDCURRENT_CONTROLLER_ID
- 0101845
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Dec 5, 2023
Location and MSHA office
- StateSTATE
- AR
- Bureau of Mines state codeBOM_STATE_CD
- 03
- FIPS county codeFIPS_CNTY_CD
- 047
- FIPS county nameFIPS_CNTY_NM
- Franklin
- Nearest townNEAREST_TOWN
- Ozark
- MSHA districtDISTRICT
- M5
- MSHA office codeOFFICE_CD
- M5871
- MSHA officeOFFICE_NAME
- Little Rock AR Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 122
- Most recent assessment control numberASSESS_CTRL_NO
- 000642190
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Dimension Stone NEC
- Primary commodity codePRIMARY_SIC_CD
- 141100
- Primary SIC codePRIMARY_SIC_CD_1
- 1411
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 00
- Primary industry groupPRIMARY_CANVASS
- Stone
- Primary industry group codePRIMARY_CANVASS_CD
- 6
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 5
- Hours per shiftHOURS_PER_SHIFT
- 8
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 1
- Workers employedNO_EMPLOYEES
- 2
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (2)
Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS
Recorded as N (5)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND
Not recorded by MSHA (15)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: Rainbow Stone CompanyFrom: Dec 5, 2023To: No end dateController: Not shownFrom : Sep 14, 2011To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Rainbow Stone Company
- Operator IDOPERATOR_ID
- 0119849
- Operator fromOPERATOR_START_DT
- Dec 5, 2023
Controller
- Controller IDCONTROLLER_ID
- 0101845
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Sep 14, 2011
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
Operator: Rainbow Stone CompanyFrom: Dec 5, 2023To: No end dateController: Not shownFrom : Sep 14, 2011To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Rainbow Stone Company
- Operator IDOPERATOR_ID
- 0119849
- Operator fromOPERATOR_START_DT
- Dec 5, 2023
Controller
- Controller IDCONTROLLER_ID
- 0101845
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Sep 14, 2011
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
Operator: Rainbow Stone CompanyFrom: Dec 5, 2023To: No end dateController: Not shownFrom : Sep 14, 2011To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Rainbow Stone Company
- Operator IDOPERATOR_ID
- 0119849
- Operator fromOPERATOR_START_DT
- Dec 5, 2023
Controller
- Controller IDCONTROLLER_ID
- 0101845
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Sep 14, 2011
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
Operator: Rainbow Stone CompanyFrom: Dec 5, 2023To: No end dateController: Not shownFrom : Sep 14, 2011To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Rainbow Stone Company
- Operator IDOPERATOR_ID
- 0119849
- Operator fromOPERATOR_START_DT
- Dec 5, 2023
Controller
- Controller IDCONTROLLER_ID
- 0101845
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Sep 14, 2011
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
Operator: Holt FarmFrom: Dec 22, 2016To: Dec 4, 2023Controller: Not shownFrom : Dec 22, 2016To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Holt Farm
- Operator IDOPERATOR_ID
- 0148873
- Operator fromOPERATOR_START_DT
- Dec 22, 2016
- Operator toOPERATOR_END_DT
- Dec 4, 2023
Controller
- Controller IDCONTROLLER_ID
- 0130701
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Dec 22, 2016
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
As MSHA records it, newest operator first.
Address of record
Rainbow Stone Company·Contact title Owner/Operator·Street not recorded, Subiaco AR 72865
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- Rainbow Stone Company
- Contact titleCONTACT_TITLE
- Owner/Operator
- CityCITY
- Subiaco
- StateSTATE_ABBR
- AR
- State nameSTATE
- Arkansas
- ZIP codeZIP_CD
- 72865
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 05
Mine
- Mine IDMINE_ID
- 0302058
- Mine name in this fileMINE_NAME
- Holt Quarry
- Nearest townNEAREST_TOWN
- Ozark
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Active
- Status sinceMINE_STATUS_DT
- Dec 5, 2023
- Primary commodity (SIC)PRIMARY_SIC_CD
- Dimension Stone NEC
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (4)
StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology