Dresser Trap Rock Incorporated
Metal/Non-Metal, Surface·Crushed, Broken Traprock·Polk, Wisconsin·Mine ID 4700040
Operator Dresser Trap Rock Inc.·Controller not shown·MSHA status Active since Jul 6, 2006
What MSHA has on file for this mine
MSHA records as of Nov 13, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Inspections
Regular Safety and Health InspectionMar 25, 2026Inspectors 1 | Hours on site 10.75Began: Mar 25, 2026Ended: Mar 25, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 10.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 25, 2026
- Closed outINSPECTION_END_DT
- Mar 25, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F0381DE
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 10.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionDec 2 to Dec 3, 2025Inspectors 1 | Hours on site 22Began: Dec 2, 2025Ended: Dec 3, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 22Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 2, 2025
- Closed outINSPECTION_END_DT
- Dec 3, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F0381C6
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 22
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 27.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJun 3 to Jun 4, 2025Inspectors 1 | Hours on site 10.75Began: Jun 3, 2025Ended: Jun 4, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 10.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 3, 2025
- Closed outINSPECTION_END_DT
- Jun 4, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F016D32
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 10.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJan 21 to Jan 23, 2025Inspectors 1 | Hours on site 13.5Began: Jan 21, 2025Ended: Jan 23, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 13.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Closed outINSPECTION_END_DT
- Jan 23, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F016C93
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 13.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 21.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Compliance Follow-up InspectionApr 22, 2024Inspectors 1 | Hours on site 0.75Began: Apr 22, 2024Ended: Apr 22, 2024Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 0.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 22, 2024
- Closed outINSPECTION_END_DT
- Apr 22, 2024
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- F007A4B
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionApr 8 to Apr 10, 2024Inspectors 1 | Hours on site 11.75Began: Apr 8, 2024Ended: Apr 10, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 11.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 8, 2024
- Closed outINSPECTION_END_DT
- Apr 10, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6952195
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 20.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
103 (g) Written Notification Hazard Complaint InspectioNov 13 to Nov 15, 2023Inspectors 1 | Hours on site 4Began: Nov 13, 2023Ended: Nov 15, 2023Activity: 103 (g) Written Notification Hazard Complaint InspectioInspectors: 1Hours on site: 4Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 13, 2023
- Closed outINSPECTION_END_DT
- Nov 15, 2023
- ActivityACTIVITY
- 103 (g) Written Notification Hazard Complaint Inspectio
- Activity codeACTIVITY_CODE
- E03
- Program areaPROGRAM_AREA
- M/NM--103 (g) Written Notification Hazard Complaint Inspecti
- Event numberEVENT_NO
- 6952156
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionNov 13 to Nov 15, 2023Inspectors 1 | Hours on site 14.25Began: Nov 13, 2023Ended: Nov 15, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 14.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 13, 2023
- Closed outINSPECTION_END_DT
- Nov 15, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6952157
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 19.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionFeb 22 to Feb 23, 2023Inspectors 1 | Hours on site 14.75Began: Feb 22, 2023Ended: Feb 23, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 14.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 22, 2023
- Closed outINSPECTION_END_DT
- Feb 23, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6901879
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 19.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionSep 26 to Oct 5, 2022Inspectors 1 | Hours on site 33.75Began: Sep 26, 2022Ended: Oct 5, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 33.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 26, 2022
- Closed outINSPECTION_END_DT
- Oct 5, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6901854
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 33.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 47.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionJun 13 to Jun 24, 2022Inspectors 1 | Hours on site 36.25Began: Jun 13, 2022Ended: Jun 24, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 36.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 13, 2022
- Closed outINSPECTION_END_DT
- Jun 24, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6901637
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 36.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 63
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Verbal Hazard Complaint InspectionsNov 8 to Nov 9, 2021Inspectors 1 | Hours on site 3Began: Nov 8, 2021Ended: Nov 9, 2021Activity: Verbal Hazard Complaint InspectionsInspectors: 1Hours on site: 3Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 8, 2021
- Closed outINSPECTION_END_DT
- Nov 9, 2021
- ActivityACTIVITY
- Verbal Hazard Complaint Inspections
- Activity codeACTIVITY_CODE
- E04
- Program areaPROGRAM_AREA
- M/NM--Verbal Hazard Complaint Inspections
- Event numberEVENT_NO
- 6901624
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 7.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Spot InspectionNov 8 to Nov 9, 2021Inspectors 1 | Hours on site 7.25Began: Nov 8, 2021Ended: Nov 9, 2021Activity: Spot InspectionInspectors: 1Hours on site: 7.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Nov 8, 2021
- Closed outINSPECTION_END_DT
- Nov 9, 2021
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6901625
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionSep 28 to Oct 6, 2021Inspectors 1 | Hours on site 25Began: Sep 28, 2021Ended: Oct 6, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 28, 2021
- Closed outINSPECTION_END_DT
- Oct 6, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6901611
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 40.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMay 17 to May 25, 2021Inspectors 1 | Hours on site 33.75Began: May 17, 2021Ended: May 25, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 33.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 17, 2021
- Closed outINSPECTION_END_DT
- May 25, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6837876
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 33.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 52.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionMar 25 to Mar 31, 2021Inspectors 1 | Hours on site 22Began: Mar 25, 2021Ended: Mar 31, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 22Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 25, 2021
- Closed outINSPECTION_END_DT
- Mar 31, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6837866
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 22
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 33.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Compliance Follow-up InspectionMay 18, 2020Inspectors 1 | Hours on site 1Began: May 18, 2020Ended: May 18, 2020Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 1Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 18, 2020
- Closed outINSPECTION_END_DT
- May 18, 2020
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6837718
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 2.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionApr 16 to Apr 24, 2020Inspectors 1 | Hours on site 10.25Began: Apr 16, 2020Ended: Apr 24, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 10.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 16, 2020
- Closed outINSPECTION_END_DT
- Apr 24, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6837291
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 10.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Compliance Follow-up InspectionMar 4, 2020Inspectors 1 | Hours on site 12.25Began: Mar 4, 2020Ended: Mar 4, 2020Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 12.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Mar 4, 2020
- Closed outINSPECTION_END_DT
- Mar 4, 2020
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6837280
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 12.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Compliance Follow-up InspectionDec 3, 2019Inspectors 1 | Hours on site 9.75Began: Dec 3, 2019Ended: Dec 3, 2019Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 9.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Dec 3, 2019
- Closed outINSPECTION_END_DT
- Dec 3, 2019
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6837276
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionOct 29 to Oct 30, 2019Inspectors 1 | Hours on site 26Began: Oct 29, 2019Ended: Oct 30, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 26Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 29, 2019
- Closed outINSPECTION_END_DT
- Oct 30, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6837266
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 26
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 35.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Special Emphasis ProgramsSep 23, 2019Inspectors 1 | Hours on site 0.5Began: Sep 23, 2019Ended: Sep 23, 2019Activity: Special Emphasis ProgramsInspectors: 1Hours on site: 0.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 23, 2019
- Closed outINSPECTION_END_DT
- Sep 23, 2019
- ActivityACTIVITY
- Special Emphasis Programs
- Activity codeACTIVITY_CODE
- E17
- Program areaPROGRAM_AREA
- M/NM--Special Emphasis Programs
- Event numberEVENT_NO
- 6837151
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Compliance Follow-up InspectionApr 29, 2019Inspectors 1 | Hours on site 1.5Began: Apr 29, 2019Ended: Apr 29, 2019Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 1.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 29, 2019
- Closed outINSPECTION_END_DT
- Apr 29, 2019
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6750806
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 4
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionApr 15 to Apr 16, 2019Inspectors 1 | Hours on site 14.5Began: Apr 15, 2019Ended: Apr 16, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 14.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 15, 2019
- Closed outINSPECTION_END_DT
- Apr 16, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6750802
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 21.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- M04194
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Compliance Follow-up InspectionFeb 25, 2019Inspectors 1 | Hours on site 1.25Began: Feb 25, 2019Ended: Feb 25, 2019Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 1.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Feb 25, 2019
- Closed outINSPECTION_END_DT
- Feb 25, 2019
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6750165
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M4651
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- M04194
- Mine IDMINE_ID
- 4700040
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 2
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
25 most recent of 70 inspections and other MSHA visits since Mar 29, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Mar 25, 2026Type: CitationStandard: 56.12004S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 5112001
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Mar 25, 2026
- Time issuedVIOLATION_ISSUE_TIME
- 0854
- Date of occurrenceVIOLATION_OCCUR_DT
- Mar 25, 2026
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Mar 25, 2026
- Originally due, timeORIG_TERM_DUE_TIME
- 1000
- Latest dueLATEST_TERM_DUE_DT
- Mar 25, 2026
- Latest due, timeLATEST_TERM_DUE_TIME
- 1000
- TerminatedTERMINATION_DT
- Mar 25, 2026
- Terminated, timeTERMINATION_TIME
- 0922
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- May 12, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 18, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 17, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- F0381DE
- Inspection beganINSPECTION_BEGIN_DT
- Mar 25, 2026
- Inspection closed outINSPECTION_END_DT
- Mar 25, 2026
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Dec 3, 2025Type: CitationStandard: 56.14112(b)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9998938
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Dec 3, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0814
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 3, 2025
- 30 CFR part and sectionPART_SECTION
- 56.14112(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Dec 3, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1030
- Latest dueLATEST_TERM_DUE_DT
- Dec 3, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1030
- TerminatedTERMINATION_DT
- Dec 3, 2025
- Terminated, timeTERMINATION_TIME
- 0847
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jan 13, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 19, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 20, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- F0381C6
- Inspection beganINSPECTION_BEGIN_DT
- Dec 2, 2025
- Inspection closed outINSPECTION_END_DT
- Dec 3, 2025
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Dec 2, 2025Type: CitationStandard: 56.12018S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9998936
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Dec 2, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1040
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 2, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12018
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Dec 2, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Dec 2, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Dec 2, 2025
- Terminated, timeTERMINATION_TIME
- 1501
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jan 13, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 19, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 18, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- F0381C6
- Inspection beganINSPECTION_BEGIN_DT
- Dec 2, 2025
- Inspection closed outINSPECTION_END_DT
- Dec 3, 2025
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Dec 2, 2025Type: CitationStandard: 56.4602S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9998937
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Dec 2, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1221
- Date of occurrenceVIOLATION_OCCUR_DT
- Dec 2, 2025
- 30 CFR part and sectionPART_SECTION
- 56.4602
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Dec 2, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Dec 2, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Dec 2, 2025
- Terminated, timeTERMINATION_TIME
- 1455
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Jan 13, 2026
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 19, 2026
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 18, 2026
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- F0381C6
- Inspection beganINSPECTION_BEGIN_DT
- Dec 2, 2025
- Inspection closed outINSPECTION_END_DT
- Dec 3, 2025
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jan 22, 2025Type: CitationStandard: 56.11002S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $165.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9697045
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 22, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0909
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 22, 2025
- 30 CFR part and sectionPART_SECTION
- 56.11002
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 22, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jan 22, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jan 22, 2025
- Terminated, timeTERMINATION_TIME
- 1428
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 165
- Current proposed assessmentAMOUNT_DUE
- 165
- Amount paidAMOUNT_PAID
- 165
- Bill first printedBILL_PRINT_DT
- Mar 11, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 16, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 1, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 11
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- F016C93
- Inspection beganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 23, 2025
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jan 22, 2025Type: CitationStandard: 56.12023S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $165.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9697046
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 22, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 0946
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 22, 2025
- 30 CFR part and sectionPART_SECTION
- 56.12023
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 22, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1030
- Latest dueLATEST_TERM_DUE_DT
- Jan 22, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1030
- TerminatedTERMINATION_DT
- Jan 22, 2025
- Terminated, timeTERMINATION_TIME
- 1008
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 165
- Current proposed assessmentAMOUNT_DUE
- 165
- Amount paidAMOUNT_PAID
- 165
- Bill first printedBILL_PRINT_DT
- Mar 11, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 16, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 1, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 11
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- F016C93
- Inspection beganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 23, 2025
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jan 22, 2025Type: CitationStandard: 56.4203S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $151.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9697047
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jan 22, 2025
- Time issuedVIOLATION_ISSUE_TIME
- 1306
- Date of occurrenceVIOLATION_OCCUR_DT
- Jan 22, 2025
- 30 CFR part and sectionPART_SECTION
- 56.4203
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jan 22, 2025
- Originally due, timeORIG_TERM_DUE_TIME
- 1330
- Latest dueLATEST_TERM_DUE_DT
- Jan 22, 2025
- Latest due, timeLATEST_TERM_DUE_TIME
- 1330
- TerminatedTERMINATION_DT
- Jan 22, 2025
- Terminated, timeTERMINATION_TIME
- 1329
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 151
- Current proposed assessmentAMOUNT_DUE
- 151
- Amount paidAMOUNT_PAID
- 151
- Bill first printedBILL_PRINT_DT
- Mar 11, 2025
- Final order dateFINAL_ORDER_ISSUE_DT
- Apr 16, 2025
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 1, 2025
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 11
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- F016C93
- Inspection beganINSPECTION_BEGIN_DT
- Jan 21, 2025
- Inspection closed outINSPECTION_END_DT
- Jan 23, 2025
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 9, 2024Type: CitationStandard: 56.20011S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9696961
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 9, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0918
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 9, 2024
- 30 CFR part and sectionPART_SECTION
- 56.20011
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 9, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1000
- Latest dueLATEST_TERM_DUE_DT
- Apr 9, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1000
- TerminatedTERMINATION_DT
- Apr 9, 2024
- Terminated, timeTERMINATION_TIME
- 1522
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 19, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 3, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6952195
- Inspection beganINSPECTION_BEGIN_DT
- Apr 8, 2024
- Inspection closed outINSPECTION_END_DT
- Apr 10, 2024
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 9, 2024Type: CitationStandard: 56.14107(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9696959
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 9, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0800
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 9, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 9, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Apr 9, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Apr 9, 2024
- Terminated, timeTERMINATION_TIME
- 1235
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 19, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 3, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6952195
- Inspection beganINSPECTION_BEGIN_DT
- Apr 8, 2024
- Inspection closed outINSPECTION_END_DT
- Apr 10, 2024
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 9, 2024Type: CitationStandard: 56.14112(a)(1)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9696963
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 9, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1503
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 9, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14112(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 9, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Apr 9, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Apr 9, 2024
- Terminated, timeTERMINATION_TIME
- 1700
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 19, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 3, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6952195
- Inspection beganINSPECTION_BEGIN_DT
- Apr 8, 2024
- Inspection closed outINSPECTION_END_DT
- Apr 10, 2024
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 9, 2024Type: CitationStandard: 56.14105S&S: YNegligence: LowNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9696958
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 9, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0744
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 9, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14105
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 9, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 0815
- Latest dueLATEST_TERM_DUE_DT
- Apr 9, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 0815
- TerminatedTERMINATION_DT
- Apr 9, 2024
- Terminated, timeTERMINATION_TIME
- 0746
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 19, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 3, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6952195
- Inspection beganINSPECTION_BEGIN_DT
- Apr 8, 2024
- Inspection closed outINSPECTION_END_DT
- Apr 10, 2024
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 9, 2024Type: CitationStandard: 56.12032S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9696957
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 9, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0726
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 9, 2024
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 9, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1000
- Latest dueLATEST_TERM_DUE_DT
- Apr 9, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1000
- TerminatedTERMINATION_DT
- Apr 9, 2024
- Terminated, timeTERMINATION_TIME
- 1237
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 19, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 3, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6952195
- Inspection beganINSPECTION_BEGIN_DT
- Apr 8, 2024
- Inspection closed outINSPECTION_END_DT
- Apr 10, 2024
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 9, 2024Type: CitationStandard: 56.14112(b)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9696960
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 9, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 0813
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 9, 2024
- 30 CFR part and sectionPART_SECTION
- 56.14112(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 9, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1000
- Latest dueLATEST_TERM_DUE_DT
- Apr 9, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1000
- TerminatedTERMINATION_DT
- Apr 9, 2024
- Terminated, timeTERMINATION_TIME
- 1232
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 19, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 3, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6952195
- Inspection beganINSPECTION_BEGIN_DT
- Apr 8, 2024
- Inspection closed outINSPECTION_END_DT
- Apr 10, 2024
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Apr 9, 2024Type: CitationStandard: 56.4201(a)(5)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9696962
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 9, 2024
- Time issuedVIOLATION_ISSUE_TIME
- 1300
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 9, 2024
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(5)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 19, 2024
- Originally due, timeORIG_TERM_DUE_TIME
- 1630
- Latest dueLATEST_TERM_DUE_DT
- Apr 19, 2024
- Latest due, timeLATEST_TERM_DUE_TIME
- 1630
- TerminatedTERMINATION_DT
- Apr 22, 2024
- Terminated, timeTERMINATION_TIME
- 1238
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 19, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 3, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6952195
- Inspection beganINSPECTION_BEGIN_DT
- Apr 8, 2024
- Inspection closed outINSPECTION_END_DT
- Apr 10, 2024
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 14, 2023Type: CitationStandard: 56.11002S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9696867
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 14, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1532
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 14, 2023
- 30 CFR part and sectionPART_SECTION
- 56.11002
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 15, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Nov 15, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Nov 15, 2023
- Terminated, timeTERMINATION_TIME
- 1009
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jan 16, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 21, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 11, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6952157
- Inspection beganINSPECTION_BEGIN_DT
- Nov 13, 2023
- Inspection closed outINSPECTION_END_DT
- Nov 15, 2023
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 14, 2023Type: CitationStandard: 56.11002S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9696866
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 14, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1502
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 14, 2023
- 30 CFR part and sectionPART_SECTION
- 56.11002
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 15, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Nov 15, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Nov 15, 2023
- Terminated, timeTERMINATION_TIME
- 1006
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jan 16, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 21, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 11, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6952157
- Inspection beganINSPECTION_BEGIN_DT
- Nov 13, 2023
- Inspection closed outINSPECTION_END_DT
- Nov 15, 2023
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 14, 2023Type: CitationStandard: 56.11002S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9696865
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 14, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1454
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 14, 2023
- 30 CFR part and sectionPART_SECTION
- 56.11002
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 15, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Nov 15, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Nov 15, 2023
- Terminated, timeTERMINATION_TIME
- 1003
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jan 16, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 21, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 11, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6952157
- Inspection beganINSPECTION_BEGIN_DT
- Nov 13, 2023
- Inspection closed outINSPECTION_END_DT
- Nov 15, 2023
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Nov 13, 2023Type: CitationStandard: 56.14100(b)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $147.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9696864
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Nov 13, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1712
- Date of occurrenceVIOLATION_OCCUR_DT
- Nov 13, 2023
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Nov 13, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1800
- Latest dueLATEST_TERM_DUE_DT
- Nov 13, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1800
- TerminatedTERMINATION_DT
- Nov 13, 2023
- Terminated, timeTERMINATION_TIME
- 1720
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 147
- Current proposed assessmentAMOUNT_DUE
- 147
- Amount paidAMOUNT_PAID
- 147
- Bill first printedBILL_PRINT_DT
- Jan 16, 2024
- Final order dateFINAL_ORDER_ISSUE_DT
- Feb 21, 2024
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Feb 11, 2024
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6952157
- Inspection beganINSPECTION_BEGIN_DT
- Nov 13, 2023
- Inspection closed outINSPECTION_END_DT
- Nov 15, 2023
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Feb 23, 2023Type: CitationStandard: 56.14115(b)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9486723
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Feb 23, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 0915
- Date of occurrenceVIOLATION_OCCUR_DT
- Feb 23, 2023
- 30 CFR part and sectionPART_SECTION
- 56.14115(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Feb 23, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 0928
- Latest dueLATEST_TERM_DUE_DT
- Feb 23, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 0928
- TerminatedTERMINATION_DT
- Feb 23, 2023
- Terminated, timeTERMINATION_TIME
- 0928
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Apr 11, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- May 26, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Apr 30, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6901879
- Inspection beganINSPECTION_BEGIN_DT
- Feb 22, 2023
- Inspection closed outINSPECTION_END_DT
- Feb 23, 2023
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Oct 3, 2022Type: CitationStandard: 56.12032S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $169.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9486650
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 3, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1647
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 3, 2022
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 4, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Oct 4, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- Oct 5, 2022
- Terminated, timeTERMINATION_TIME
- 1205
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 169
- Current proposed assessmentAMOUNT_DUE
- 169
- Amount paidAMOUNT_PAID
- 169
- Bill first printedBILL_PRINT_DT
- Nov 15, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 30, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 5, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 18
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 20
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6901854
- Inspection beganINSPECTION_BEGIN_DT
- Sep 26, 2022
- Inspection closed outINSPECTION_END_DT
- Oct 5, 2022
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Sep 28, 2022Type: CitationStandard: 56.11001S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $296.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9486649
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 28, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1004
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 28, 2022
- 30 CFR part and sectionPART_SECTION
- 56.11001
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 28, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1349
- Latest dueLATEST_TERM_DUE_DT
- Sep 28, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1349
- TerminatedTERMINATION_DT
- Sep 28, 2022
- Terminated, timeTERMINATION_TIME
- 1349
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 296
- Current proposed assessmentAMOUNT_DUE
- 296
- Amount paidAMOUNT_PAID
- 296
- Bill first printedBILL_PRINT_DT
- Nov 15, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 30, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 5, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 18
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 18
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6901854
- Inspection beganINSPECTION_BEGIN_DT
- Sep 26, 2022
- Inspection closed outINSPECTION_END_DT
- Oct 5, 2022
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Sep 27, 2022Type: CitationStandard: 56.16005S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9486648
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 27, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1046
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 27, 2022
- 30 CFR part and sectionPART_SECTION
- 56.16005
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 27, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1052
- Latest dueLATEST_TERM_DUE_DT
- Sep 27, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1052
- TerminatedTERMINATION_DT
- Sep 27, 2022
- Terminated, timeTERMINATION_TIME
- 1052
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Nov 15, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 30, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 5, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 18
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 16
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6901854
- Inspection beganINSPECTION_BEGIN_DT
- Sep 26, 2022
- Inspection closed outINSPECTION_END_DT
- Oct 5, 2022
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Sep 26, 2022Type: CitationStandard: 56.9300(b)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9486638
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 26, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1528
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 26, 2022
- 30 CFR part and sectionPART_SECTION
- 56.9300(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 26, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1545
- Latest dueLATEST_TERM_DUE_DT
- Sep 26, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1545
- TerminatedTERMINATION_DT
- Sep 26, 2022
- Terminated, timeTERMINATION_TIME
- 1545
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Nov 15, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 30, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 5, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 18
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6901854
- Inspection beganINSPECTION_BEGIN_DT
- Sep 26, 2022
- Inspection closed outINSPECTION_END_DT
- Oct 5, 2022
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 14, 2022Type: CitationStandard: 56.14132(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9486474
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 14, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1454
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 14, 2022
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 15, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 0700
- Latest dueLATEST_TERM_DUE_DT
- Jun 15, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 0700
- TerminatedTERMINATION_DT
- Jun 14, 2022
- Terminated, timeTERMINATION_TIME
- 1645
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Aug 16, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 21, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 6, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 14
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 19
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6901637
- Inspection beganINSPECTION_BEGIN_DT
- Jun 13, 2022
- Inspection closed outINSPECTION_END_DT
- Jun 24, 2022
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jun 13, 2022Type: CitationStandard: 56.11001S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9486473
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 13, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1622
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 13, 2022
- 30 CFR part and sectionPART_SECTION
- 56.11001
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 14, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jun 14, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jun 14, 2022
- Terminated, timeTERMINATION_TIME
- 1500
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Aug 16, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 21, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 6, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 14
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 19
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDVIOLATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Inspection eventEVENT_NO
- 6901637
- Inspection beganINSPECTION_BEGIN_DT
- Jun 13, 2022
- Inspection closed outINSPECTION_END_DT
- Jun 24, 2022
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
149 citations and orders since Mar 29, 2000: 145 issued to the operator, 4 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Mar 25, 2026Citation number: 5112001Standard: 56.12004Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 5112001
- Assessment control numberASSESS_CASE_NO
- 000641217
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 13, 2026
- Citation issuedISSUE_DT
- Mar 25, 2026
- Date of occurrenceOCCURRENCE_DT
- Mar 25, 2026
- Final order dateFINAL_ORDER_DT
- Jun 18, 2026
- Bill first printedBILL_PRINT_DT
- May 12, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 18, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.79
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 45
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
- Violations per inspection dayVPID
- 0.6
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 48044
- Size of mineSIZE_OF_MINE
- 48044
- Controller hours workedCONTROLLER_HRS
- 48044
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 48044
- History period startHISTORY_START_DT
- Dec 25, 2024
- History period endHISTORY_END_DT
- Mar 24, 2026
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F0381DE
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (12)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 3, 2025Citation number: 9998938Standard: 56.14112(b)Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9998938
- Assessment control numberASSESS_CASE_NO
- 000634588
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 13, 2026
- Citation issuedISSUE_DT
- Dec 3, 2025
- Date of occurrenceOCCURRENCE_DT
- Dec 3, 2025
- Final order dateFINAL_ORDER_DT
- Feb 19, 2026
- Bill first printedBILL_PRINT_DT
- Jan 13, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 19, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14112(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.72
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 1.72
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.43
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 46986
- Size of mineSIZE_OF_MINE
- 46986
- Controller hours workedCONTROLLER_HRS
- 46986
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 46986
- History period startHISTORY_START_DT
- Sep 3, 2024
- History period endHISTORY_END_DT
- Dec 2, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F0381C6
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (11)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 2, 2025Citation number: 9998937Standard: 56.4602Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9998937
- Assessment control numberASSESS_CASE_NO
- 000634588
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 13, 2026
- Citation issuedISSUE_DT
- Dec 2, 2025
- Date of occurrenceOCCURRENCE_DT
- Dec 2, 2025
- Final order dateFINAL_ORDER_DT
- Feb 19, 2026
- Bill first printedBILL_PRINT_DT
- Jan 13, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 19, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4602
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.72
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 1.72
Penalty points
- Violation history pointsPENALTY_POINTS
- 40
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.6
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 46986
- Size of mineSIZE_OF_MINE
- 46986
- Controller hours workedCONTROLLER_HRS
- 46986
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 46986
- History period startHISTORY_START_DT
- Sep 2, 2024
- History period endHISTORY_END_DT
- Dec 1, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F0381C6
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (11)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Dec 2, 2025Citation number: 9998936Standard: 56.12018Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9998936
- Assessment control numberASSESS_CASE_NO
- 000634588
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 13, 2026
- Citation issuedISSUE_DT
- Dec 2, 2025
- Date of occurrenceOCCURRENCE_DT
- Dec 2, 2025
- Final order dateFINAL_ORDER_DT
- Feb 19, 2026
- Bill first printedBILL_PRINT_DT
- Jan 13, 2026
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2026
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 19, 2026
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12018
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.72
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 1.72
Penalty points
- Violation history pointsPENALTY_POINTS
- 45
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 3
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 0.6
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 46986
- Size of mineSIZE_OF_MINE
- 46986
- Controller hours workedCONTROLLER_HRS
- 46986
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 46986
- History period startHISTORY_START_DT
- Sep 2, 2024
- History period endHISTORY_END_DT
- Dec 1, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F0381C6
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (11)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 22, 2025Citation number: 9697047Standard: 56.4203Proposed penalty: $151.00Current assessment: $151.00Paid against proposed penalty: $151.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9697047
- Assessment control numberASSESS_CASE_NO
- 000616364
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 1, 2025
- Citation issuedISSUE_DT
- Jan 22, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 22, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 11, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4203
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 151.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 151.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 151.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 46
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 16
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 11
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 1.57
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 46986
- Size of mineSIZE_OF_MINE
- 46986
- Controller hours workedCONTROLLER_HRS
- 46986
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 46986
- History period startHISTORY_START_DT
- Oct 22, 2023
- History period endHISTORY_END_DT
- Jan 21, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F016C93
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 22, 2025Citation number: 9697045Standard: 56.11002Proposed penalty: $165.00Current assessment: $165.00Paid against proposed penalty: $165.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9697045
- Assessment control numberASSESS_CASE_NO
- 000616364
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 1, 2025
- Citation issuedISSUE_DT
- Jan 22, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 22, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 11, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 165.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 165.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 165.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 61
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 16
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 11
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 1.57
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 3
- Repeat violations per inspection dayRPID
- 0.429
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 46986
- Size of mineSIZE_OF_MINE
- 46986
- Controller hours workedCONTROLLER_HRS
- 46986
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 46986
- History period startHISTORY_START_DT
- Oct 22, 2023
- History period endHISTORY_END_DT
- Jan 21, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F016C93
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jan 22, 2025Citation number: 9697046Standard: 56.12023Proposed penalty: $165.00Current assessment: $165.00Paid against proposed penalty: $165.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9697046
- Assessment control numberASSESS_CASE_NO
- 000616364
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 1, 2025
- Citation issuedISSUE_DT
- Jan 22, 2025
- Date of occurrenceOCCURRENCE_DT
- Jan 22, 2025
- Final order dateFINAL_ORDER_DT
- Apr 16, 2025
- Bill first printedBILL_PRINT_DT
- Mar 11, 2025
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2025
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Apr 16, 2025
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12023
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 165.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 165.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 165.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 61
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 16
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 11
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 1.57
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 46986
- Size of mineSIZE_OF_MINE
- 46986
- Controller hours workedCONTROLLER_HRS
- 46986
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 46986
- History period startHISTORY_START_DT
- Oct 22, 2023
- History period endHISTORY_END_DT
- Jan 21, 2025
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- F016C93
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 9, 2024Citation number: 9696961Standard: 56.20011Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9696961
- Assessment control numberASSESS_CASE_NO
- 000599510
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 3, 2024
- Citation issuedISSUE_DT
- Apr 9, 2024
- Date of occurrenceOCCURRENCE_DT
- Apr 9, 2024
- Final order dateFINAL_ORDER_DT
- Jun 19, 2024
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 19, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20011
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 55
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.71
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 43332
- Size of mineSIZE_OF_MINE
- 43332
- Controller hours workedCONTROLLER_HRS
- 43332
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 43332
- History period startHISTORY_START_DT
- Jan 9, 2023
- History period endHISTORY_END_DT
- Apr 8, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6952195
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 9, 2024Citation number: 9696957Standard: 56.12032Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9696957
- Assessment control numberASSESS_CASE_NO
- 000599510
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 3, 2024
- Citation issuedISSUE_DT
- Apr 9, 2024
- Date of occurrenceOCCURRENCE_DT
- Apr 9, 2024
- Final order dateFINAL_ORDER_DT
- Jun 19, 2024
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 19, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 45
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.71
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 43332
- Size of mineSIZE_OF_MINE
- 43332
- Controller hours workedCONTROLLER_HRS
- 43332
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 43332
- History period startHISTORY_START_DT
- Jan 9, 2023
- History period endHISTORY_END_DT
- Apr 8, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6952195
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 9, 2024Citation number: 9696958Standard: 56.14105Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9696958
- Assessment control numberASSESS_CASE_NO
- 000599510
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 3, 2024
- Citation issuedISSUE_DT
- Apr 9, 2024
- Date of occurrenceOCCURRENCE_DT
- Apr 9, 2024
- Final order dateFINAL_ORDER_DT
- Jun 19, 2024
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 19, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14105
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 55
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.71
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 43332
- Size of mineSIZE_OF_MINE
- 43332
- Controller hours workedCONTROLLER_HRS
- 43332
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 43332
- History period startHISTORY_START_DT
- Jan 9, 2023
- History period endHISTORY_END_DT
- Apr 8, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6952195
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 9, 2024Citation number: 9696960Standard: 56.14112(b)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9696960
- Assessment control numberASSESS_CASE_NO
- 000599510
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 3, 2024
- Citation issuedISSUE_DT
- Apr 9, 2024
- Date of occurrenceOCCURRENCE_DT
- Apr 9, 2024
- Final order dateFINAL_ORDER_DT
- Jun 19, 2024
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 19, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14112(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 45
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.71
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 43332
- Size of mineSIZE_OF_MINE
- 43332
- Controller hours workedCONTROLLER_HRS
- 43332
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 43332
- History period startHISTORY_START_DT
- Jan 9, 2023
- History period endHISTORY_END_DT
- Apr 8, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6952195
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 9, 2024Citation number: 9696963Standard: 56.14112(a)(1)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9696963
- Assessment control numberASSESS_CASE_NO
- 000599510
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 3, 2024
- Citation issuedISSUE_DT
- Apr 9, 2024
- Date of occurrenceOCCURRENCE_DT
- Apr 9, 2024
- Final order dateFINAL_ORDER_DT
- Jun 19, 2024
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 19, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14112(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.71
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 43332
- Size of mineSIZE_OF_MINE
- 43332
- Controller hours workedCONTROLLER_HRS
- 43332
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 43332
- History period startHISTORY_START_DT
- Jan 9, 2023
- History period endHISTORY_END_DT
- Apr 8, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6952195
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 9, 2024Citation number: 9696959Standard: 56.14107(a)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9696959
- Assessment control numberASSESS_CASE_NO
- 000599510
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 3, 2024
- Citation issuedISSUE_DT
- Apr 9, 2024
- Date of occurrenceOCCURRENCE_DT
- Apr 9, 2024
- Final order dateFINAL_ORDER_DT
- Jun 19, 2024
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 19, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 35
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.71
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 43332
- Size of mineSIZE_OF_MINE
- 43332
- Controller hours workedCONTROLLER_HRS
- 43332
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 43332
- History period startHISTORY_START_DT
- Jan 9, 2023
- History period endHISTORY_END_DT
- Apr 8, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6952195
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 9, 2024Citation number: 9696962Standard: 56.4201(a)(5)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9696962
- Assessment control numberASSESS_CASE_NO
- 000599510
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jun 3, 2024
- Citation issuedISSUE_DT
- Apr 9, 2024
- Date of occurrenceOCCURRENCE_DT
- Apr 9, 2024
- Final order dateFINAL_ORDER_DT
- Jun 19, 2024
- Bill first printedBILL_PRINT_DT
- May 14, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 19, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(5)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 40
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.71
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 43332
- Size of mineSIZE_OF_MINE
- 43332
- Controller hours workedCONTROLLER_HRS
- 43332
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 43332
- History period startHISTORY_START_DT
- Jan 9, 2023
- History period endHISTORY_END_DT
- Apr 8, 2024
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6952195
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 14, 2023Citation number: 9696866Standard: 56.11002Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9696866
- Assessment control numberASSESS_CASE_NO
- 000592531
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 8, 2024
- Citation issuedISSUE_DT
- Nov 14, 2023
- Date of occurrenceOCCURRENCE_DT
- Nov 14, 2023
- Final order dateFINAL_ORDER_DT
- Feb 21, 2024
- Bill first printedBILL_PRINT_DT
- Jan 16, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 21, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 55
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.82
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 45628
- Size of mineSIZE_OF_MINE
- 45628
- Controller hours workedCONTROLLER_HRS
- 45628
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 45628
- History period startHISTORY_START_DT
- Aug 14, 2022
- History period endHISTORY_END_DT
- Nov 13, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6952157
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 14, 2023Citation number: 9696867Standard: 56.11002Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9696867
- Assessment control numberASSESS_CASE_NO
- 000592531
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 8, 2024
- Citation issuedISSUE_DT
- Nov 14, 2023
- Date of occurrenceOCCURRENCE_DT
- Nov 14, 2023
- Final order dateFINAL_ORDER_DT
- Feb 21, 2024
- Bill first printedBILL_PRINT_DT
- Jan 16, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 21, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 40
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.82
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 45628
- Size of mineSIZE_OF_MINE
- 45628
- Controller hours workedCONTROLLER_HRS
- 45628
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 45628
- History period startHISTORY_START_DT
- Aug 14, 2022
- History period endHISTORY_END_DT
- Nov 13, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6952157
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 14, 2023Citation number: 9696865Standard: 56.11002Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9696865
- Assessment control numberASSESS_CASE_NO
- 000592531
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 8, 2024
- Citation issuedISSUE_DT
- Nov 14, 2023
- Date of occurrenceOCCURRENCE_DT
- Nov 14, 2023
- Final order dateFINAL_ORDER_DT
- Feb 21, 2024
- Bill first printedBILL_PRINT_DT
- Jan 16, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 21, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 40
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 11
- Violations per inspection dayVPID
- 0.82
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 45628
- Size of mineSIZE_OF_MINE
- 45628
- Controller hours workedCONTROLLER_HRS
- 45628
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 45628
- History period startHISTORY_START_DT
- Aug 14, 2022
- History period endHISTORY_END_DT
- Nov 13, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6952157
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Nov 13, 2023Citation number: 9696864Standard: 56.14100(b)Proposed penalty: $147.00Current assessment: $147.00Paid against proposed penalty: $147.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9696864
- Assessment control numberASSESS_CASE_NO
- 000592531
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Feb 8, 2024
- Citation issuedISSUE_DT
- Nov 13, 2023
- Date of occurrenceOCCURRENCE_DT
- Nov 13, 2023
- Final order dateFINAL_ORDER_DT
- Feb 21, 2024
- Bill first printedBILL_PRINT_DT
- Jan 16, 2024
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2024
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Feb 21, 2024
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 147.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 147.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 147.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 45
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 9
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 10
- Violations per inspection dayVPID
- 0.9
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 45628
- Size of mineSIZE_OF_MINE
- 45628
- Controller hours workedCONTROLLER_HRS
- 45628
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 45628
- History period startHISTORY_START_DT
- Aug 13, 2022
- History period endHISTORY_END_DT
- Nov 12, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6952157
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Feb 23, 2023Citation number: 9486723Standard: 56.14115(b)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9486723
- Assessment control numberASSESS_CASE_NO
- 000574568
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 28, 2023
- Citation issuedISSUE_DT
- Feb 23, 2023
- Date of occurrenceOCCURRENCE_DT
- Feb 23, 2023
- Final order dateFINAL_ORDER_DT
- May 26, 2023
- Bill first printedBILL_PRINT_DT
- Apr 11, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14115(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 40
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 16
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 1.07
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 45628
- Size of mineSIZE_OF_MINE
- 45628
- Controller hours workedCONTROLLER_HRS
- 45628
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 45628
- History period startHISTORY_START_DT
- Nov 23, 2021
- History period endHISTORY_END_DT
- Feb 22, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6901879
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 3, 2022Citation number: 9486650Standard: 56.12032Proposed penalty: $169.00Current assessment: $169.00Paid against proposed penalty: $169.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9486650
- Assessment control numberASSESS_CASE_NO
- 000566602
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 5, 2022
- Citation issuedISSUE_DT
- Oct 3, 2022
- Date of occurrenceOCCURRENCE_DT
- Oct 3, 2022
- Final order dateFINAL_ORDER_DT
- Dec 30, 2022
- Bill first printedBILL_PRINT_DT
- Nov 15, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 169.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 169.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 169.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 63
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 8
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 18
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 20
- Violations per inspection dayVPID
- 0.9
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.05
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 45155
- Size of mineSIZE_OF_MINE
- 45155
- Controller hours workedCONTROLLER_HRS
- 45155
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 45155
- History period startHISTORY_START_DT
- Jul 3, 2021
- History period endHISTORY_END_DT
- Oct 2, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6901854
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 28, 2022Citation number: 9486649Standard: 56.11001Proposed penalty: $296.00Current assessment: $296.00Paid against proposed penalty: $296.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9486649
- Assessment control numberASSESS_CASE_NO
- 000566602
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 5, 2022
- Citation issuedISSUE_DT
- Sep 28, 2022
- Date of occurrenceOCCURRENCE_DT
- Sep 28, 2022
- Final order dateFINAL_ORDER_DT
- Dec 30, 2022
- Bill first printedBILL_PRINT_DT
- Nov 15, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11001
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 296.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 296.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 296.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 70
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 18
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 18
- Violations per inspection dayVPID
- 1
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.056
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 45155
- Size of mineSIZE_OF_MINE
- 45155
- Controller hours workedCONTROLLER_HRS
- 45155
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 45155
- History period startHISTORY_START_DT
- Jun 28, 2021
- History period endHISTORY_END_DT
- Sep 27, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6901854
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 27, 2022Citation number: 9486648Standard: 56.16005Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9486648
- Assessment control numberASSESS_CASE_NO
- 000566602
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 5, 2022
- Citation issuedISSUE_DT
- Sep 27, 2022
- Date of occurrenceOCCURRENCE_DT
- Sep 27, 2022
- Final order dateFINAL_ORDER_DT
- Dec 30, 2022
- Bill first printedBILL_PRINT_DT
- Nov 15, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.16005
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 52
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 18
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 16
- Violations per inspection dayVPID
- 1.13
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 45155
- Size of mineSIZE_OF_MINE
- 45155
- Controller hours workedCONTROLLER_HRS
- 45155
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 45155
- History period startHISTORY_START_DT
- Jun 27, 2021
- History period endHISTORY_END_DT
- Sep 26, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6901854
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 26, 2022Citation number: 9486638Standard: 56.9300(b)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9486638
- Assessment control numberASSESS_CASE_NO
- 000566602
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 5, 2022
- Citation issuedISSUE_DT
- Sep 26, 2022
- Date of occurrenceOCCURRENCE_DT
- Sep 26, 2022
- Final order dateFINAL_ORDER_DT
- Dec 30, 2022
- Bill first printedBILL_PRINT_DT
- Nov 15, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9300(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 12
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 18
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 15
- Violations per inspection dayVPID
- 1.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 45155
- Size of mineSIZE_OF_MINE
- 45155
- Controller hours workedCONTROLLER_HRS
- 45155
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 45155
- History period startHISTORY_START_DT
- Jun 26, 2021
- History period endHISTORY_END_DT
- Sep 25, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6901854
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 14, 2022Citation number: 9486474Standard: 56.14132(a)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9486474
- Assessment control numberASSESS_CASE_NO
- 000560790
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 6, 2022
- Citation issuedISSUE_DT
- Jun 14, 2022
- Date of occurrenceOCCURRENCE_DT
- Jun 14, 2022
- Final order dateFINAL_ORDER_DT
- Sep 21, 2022
- Bill first printedBILL_PRINT_DT
- Aug 16, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 21, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 53
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 8
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 14
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 19
- Violations per inspection dayVPID
- 0.74
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 45155
- Size of mineSIZE_OF_MINE
- 45155
- Controller hours workedCONTROLLER_HRS
- 45155
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 45155
- History period startHISTORY_START_DT
- Mar 14, 2021
- History period endHISTORY_END_DT
- Jun 13, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6901637
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 13, 2022Citation number: 9486471Standard: 56.14112(b)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9486471
- Assessment control numberASSESS_CASE_NO
- 000560790
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 6, 2022
- Citation issuedISSUE_DT
- Jun 13, 2022
- Date of occurrenceOCCURRENCE_DT
- Jun 13, 2022
- Final order dateFINAL_ORDER_DT
- Sep 21, 2022
- Bill first printedBILL_PRINT_DT
- Aug 16, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 21, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14112(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 8
- Mine size pointsMINE_SIZE_POINTS
- 4
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 14
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 19
- Violations per inspection dayVPID
- 0.74
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.053
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 45155
- Size of mineSIZE_OF_MINE
- 45155
- Controller hours workedCONTROLLER_HRS
- 45155
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 45155
- History period startHISTORY_START_DT
- Mar 13, 2021
- History period endHISTORY_END_DT
- Jun 12, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Dresser Trap Rock Inc.
- IDVIOLATOR_ID
- L05192
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Dec 1, 1979
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6901637
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M4651
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 149 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- DAYS AWAY FROM WORK ONLY
- 5
- NO DYS AWY FRM WRK,NO RSTR ACT
- 2
Date: Dec 23, 2024Degree of injury: DAYS AWAY FROM WORK ONLYClassification: STEPPING OR KNEELING ON OBJECTAccident type: Struck against stationary objectDays lost: 126Details
The report
- Document numberDOCUMENT_NO
- 220250130001
- DateACCIDENT_DT
- Dec 23, 2024
- TimeACCIDENT_TIME
- 9999
- Shift beganSHIFT_BEGIN_TIME
- 9999
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- STEPPING OR KNEELING ON OBJECT
- Classification codeCLASSIFICATION_CD
- 19
- Accident typeACCIDENT_TYPE
- Struck against stationary object
- Accident type codeACCIDENT_TYPE_CD
- 01
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Getting on or off equipment
- Activity codeACTIVITY_CD
- 023
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- FOOT(NOT ANKLE/TOE)/TARSUS/METATARSUS
- Part of body codeINJ_BODY_PART_CD
- 530
- Days lostDAYS_LOST
- 126
- Returned to workRETURN_TO_WORK_DT
- Jun 25, 2025
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (1)
Schedule charge, daysSCHEDULE_CHARGE
Not recorded by MSHA (7)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Days of restricted workDAYS_RESTRICT, Permanently transferred or terminatedTRANS_TERM, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Jan 25, 2023Degree of injury: DAYS AWAY FROM WORK ONLYClassification: SLIP OR FALL OF PERSONAccident type: Fall onto or against objectsDays lost: 2Details
The report
- Document numberDOCUMENT_NO
- 220230440005
- DateACCIDENT_DT
- Jan 25, 2023
- TimeACCIDENT_TIME
- 9999
- Shift beganSHIFT_BEGIN_TIME
- 9999
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Fall onto or against objects
- Accident type codeACCIDENT_TYPE_CD
- 18
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Climb scaffolds, Ladders
- Activity codeACTIVITY_CD
- 013
- Source of injuryINJURY_SOURCE
- CONTAINERS,NEC
- Source of injury codeINJURY_SOURCE_CD
- 008
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- MOUTH/LIP/TEETH/TONGUE/THROAT/TASTE
- Part of body codeINJ_BODY_PART_CD
- 142
- Days lostDAYS_LOST
- 2
- Returned to workRETURN_TO_WORK_DT
- Feb 1, 2023
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- 0147781
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Jan 14, 2016Degree of injury: DAYS AWAY FROM WORK ONLYClassification: SLIP OR FALL OF PERSONAccident type: Over-exertion NECDays lost: 295Details
The report
- Document numberDOCUMENT_NO
- 220160280008
- DateACCIDENT_DT
- Jan 14, 2016
- TimeACCIDENT_TIME
- 1400
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- SLIP OR FALL OF PERSON
- Classification codeCLASSIFICATION_CD
- 18
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320170750002
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- GROUND
- Source of injury codeINJURY_SOURCE_CD
- 117
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days lostDAYS_LOST
- 295
- Permanently transferred or terminatedTRANS_TERM
- Y
- Returned to workRETURN_TO_WORK_DT
- Mar 13, 2017
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Ore haulage trucks - off highway trucks
- Equipment codeMINING_EQUIP_CD
- 44
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- Equipment model numberEQUIP_MODEL_NO
- 773 E
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- M04194
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 1
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 2
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Nov 28, 2011Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Caught in, under or between a moving and a stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220113400009
- DateACCIDENT_DT
- Nov 28, 2011
- TimeACCIDENT_TIME
- 0930
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Caught in, under or between a moving and a stationary object
- Accident type codeACCIDENT_TYPE_CD
- 21
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Returned to workRETURN_TO_WORK_DT
- Nov 28, 2011
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Crusher, Breaker, Mills (ball and rod), Feeder breaker
- Equipment codeMINING_EQUIP_CD
- 15
- Equipment manufacturerEQUIP_MFR_NAME
- Nordberb&Rexnord
- Equipment manufacturer codeEQUIP_MFR_CD
- 082
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- M04194
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2011
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2012
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Oct 21, 2011Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion NECDays lost: 1Details
The report
- Document numberDOCUMENT_NO
- 220113000037
- DateACCIDENT_DT
- Oct 21, 2011
- TimeACCIDENT_TIME
- 0900
- Shift beganSHIFT_BEGIN_TIME
- 0400
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion NEC
- Accident type codeACCIDENT_TYPE_CD
- 30
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- CONDCTR,ELCT,CBL,TROL POL
- Source of injury codeINJURY_SOURCE_CD
- 042
- Nature of injuryNATURE_INJURY
- UNCLASSIFIED,NOT DETERMED
- Nature of injury codeNATURE_INJURY_CD
- 400
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days lostDAYS_LOST
- 1
- Returned to workRETURN_TO_WORK_DT
- Oct 25, 2011
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- M04194
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2011
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2012
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Sep 12, 2011Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDTOOLS (NONPOWERED)Accident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220112640035
- DateACCIDENT_DT
- Sep 12, 2011
- TimeACCIDENT_TIME
- 0500
- Shift beganSHIFT_BEGIN_TIME
- 0400
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDTOOLS (NONPOWERED)
- Classification codeCLASSIFICATION_CD
- 10
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Hand tools (not powered)
- Activity codeACTIVITY_CD
- 030
- Source of injuryINJURY_SOURCE
- AXE,HAMMER,SLEDGE
- Source of injury codeINJURY_SOURCE_CD
- 046
- Nature of injuryNATURE_INJURY
- FRACTURE,CHIP
- Nature of injury codeNATURE_INJURY_CD
- 220
- Part of bodyINJ_BODY_PART
- FINGER(S)/THUMB
- Part of body codeINJ_BODY_PART_CD
- 340
- Returned to workRETURN_TO_WORK_DT
- Sep 13, 2011
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Hand tools (not powered)
- Equipment codeMINING_EQUIP_CD
- 28
- Equipment manufacturerEQUIP_MFR_NAME
- Not Reported
- Equipment manufacturer codeEQUIP_MFR_CD
- 121
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- M04194
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2011
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2011
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (5)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
Date: Aug 18, 2009Degree of injury: DAYS AWAY FROM WORK ONLYClassification: HANDLING OF MATERIALSAccident type: Over-exertion in lifting objectsDays lost: 16Details
The report
- Document numberDOCUMENT_NO
- 220092430040
- DateACCIDENT_DT
- Aug 18, 2009
- TimeACCIDENT_TIME
- 0730
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS AWAY FROM WORK ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 03
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Over-exertion in lifting objects
- Accident type codeACCIDENT_TYPE_CD
- 27
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320092590012
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- BOILR,PRES VSL,AIR HOS,OX
- Source of injury codeINJURY_SOURCE_CD
- 003
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
- Part of body codeINJ_BODY_PART_CD
- 420
- Days lostDAYS_LOST
- 16
- Returned to workRETURN_TO_WORK_DT
- Sep 14, 2009
Where, and equipment
- Location in the mineSUBUNIT
- MILL OPERATION/PREPARATION PLANT
- Location codeSUBUNIT_CD
- 30
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 55
Who and period
- Operator at the timeOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Controller IDCONTROLLER_ID
- M04194
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2009
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2009
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (4)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID
7 reports filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 10Hours worked: 18,785Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 18785
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1879
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 5Hours worked: 8,235Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 8235
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1647
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 9Hours worked: 18,289Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 9
- Hours workedANNUAL_HRS
- 18289
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2032
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 9Hours worked: 23,536Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 9
- Hours workedANNUAL_HRS
- 23536
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2615
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 5Hours worked: 10,980Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 10980
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2196
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 9Hours worked: 24,508Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 9
- Hours workedANNUAL_HRS
- 24508
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2723
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 10Hours worked: 25,259Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 25259
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2526
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 5Hours worked: 11,020Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 11020
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2204
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 8Hours worked: 21,727Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 8
- Hours workedANNUAL_HRS
- 21727
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2716
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 10Hours worked: 25,175Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 25175
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2518
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 9,180Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 9180
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2295
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 18,157Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 18157
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2594
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 9Hours worked: 25,216Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 9
- Hours workedANNUAL_HRS
- 25216
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2802
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 4Hours worked: 9,143Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 9143
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2286
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 9Hours worked: 20,412Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 9
- Hours workedANNUAL_HRS
- 20412
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2268
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 9Hours worked: 23,912Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 9
- Hours workedANNUAL_HRS
- 23912
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2657
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 7,122Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 7122
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2374
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 8Hours worked: 21,243Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 8
- Hours workedANNUAL_HRS
- 21243
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2655
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 10Hours worked: 26,907Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 26907
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2691
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 7,159Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 7159
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2386
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 15,650Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 15650
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2608
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: MILL OPERATION/PREPARATION PLANTAverage employees: 10Hours worked: 26,533Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- MILL OPERATION/PREPARATION PLANT
- Part of the mine codeSUBUNIT_CD
- 30
- Average employeesAVG_ANNUAL_EMPL
- 10
- Hours workedANNUAL_HRS
- 26533
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2653
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 3Hours worked: 7,024Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 7024
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2341
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 15,252Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 15252
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 2542
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileCURR_MINE_NM
- Dresser Trap Rock Incorporated
- StateSTATE_ABBR
- WI
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Duluth MN Field Office
- Nearest town
- Dresser
- Days worked per week
- 5
- Hours per shift
- 12
- Production shifts per day
- 2
- Maintenance shifts per day
- 1
- Employees, current record
- 12
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- Dresser Trap Rock Incorporated
- Mine IDMINE_ID
- 4700040
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Active
- Status sinceCURRENT_STATUS_DT
- Jul 6, 2006
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDCURRENT_OPERATOR_ID
- L05192
- Controller IDCURRENT_CONTROLLER_ID
- 0147781
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Dec 1, 1979
Location and MSHA office
- StateSTATE
- WI
- Bureau of Mines state codeBOM_STATE_CD
- 47
- FIPS county codeFIPS_CNTY_CD
- 095
- FIPS county nameFIPS_CNTY_NM
- Polk
- Congressional districtCONG_DIST_CD
- 03
- Nearest townNEAREST_TOWN
- Dresser
- MSHA districtDISTRICT
- M4
- MSHA office codeOFFICE_CD
- M4651
- MSHA officeOFFICE_NAME
- Duluth MN Field Office
- Driving miles from the MSHA officeMILES_FROM_OFFICE
- 175
- Most recent assessment control numberASSESS_CTRL_NO
- 000641217
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Crushed, Broken Traprock
- Primary commodity codePRIMARY_SIC_CD
- 142904
- Primary SIC codePRIMARY_SIC_CD_1
- 1429
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 04
- Primary industry groupPRIMARY_CANVASS
- Stone
- Primary industry group codePRIMARY_CANVASS_CD
- 6
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 5
- Hours per shiftHOURS_PER_SHIFT
- 12
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 2
- Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY
- 1
- Workers employedNO_EMPLOYEES
- 12
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (1)
Tailing pondsNO_TAILING_PONDS
Recorded as N (5)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND
Not recorded by MSHA (14)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: Dresser Trap Rock Inc.From: Dec 1, 1979To: No end dateController: Not shownFrom : Apr 22, 2019To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Operator fromOPERATOR_START_DT
- Dec 1, 1979
Controller
- Controller IDCONTROLLER_ID
- 0147781
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Apr 22, 2019
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
Operator: Dresser Trap Rock Inc.From: Dec 1, 1979To: No end dateController: Not shownFrom : Apr 22, 2019To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Operator fromOPERATOR_START_DT
- Dec 1, 1979
Controller
- Controller IDCONTROLLER_ID
- 0147781
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Apr 22, 2019
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
Operator: Dresser Trap Rock Inc.From: Dec 1, 1979To: No end dateController: Not shownFrom : Dec 1, 1979To : Apr 21, 2019Details
Operator
- OperatorOPERATOR_NAME
- Dresser Trap Rock Inc.
- Operator IDOPERATOR_ID
- L05192
- Operator fromOPERATOR_START_DT
- Dec 1, 1979
Controller
- Controller IDCONTROLLER_ID
- M04194
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Dec 1, 1979
- Controller toCONTROLLER_END_DT
- Apr 21, 2019
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME
Operator: Bryan Dresser Trap Rock IncFrom: Jan 1, 1950To: Nov 30, 1979Controller: Dresser Trap Rock IncFrom : Jan 1, 1950To : Nov 30, 1979Details
Operator
- OperatorOPERATOR_NAME
- Bryan Dresser Trap Rock Inc
- Operator IDOPERATOR_ID
- L05191
- Operator fromOPERATOR_START_DT
- Jan 1, 1950
- Operator toOPERATOR_END_DT
- Nov 30, 1979
Controller
- ControllerCONTROLLER_NAME
- Dresser Trap Rock Inc
- Controller IDCONTROLLER_ID
- M04193
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
- Controller toCONTROLLER_END_DT
- Nov 30, 1979
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Mine status at this pointMINE_STATUS
- Active
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
As MSHA records it, newest operator first.
Address of record
Dresser Trap Rock Inc.·Contact title VP-Operations·Street not recorded, DRESSER WI 54009
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- Dresser Trap Rock Inc.
- Contact titleCONTACT_TITLE
- VP-Operations
- CityCITY
- DRESSER
- StateSTATE_ABBR
- WI
- State nameSTATE
- Wisconsin
- ZIP codeZIP_CD
- 54009
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 55
Mine
- Mine IDMINE_ID
- 4700040
- Mine name in this fileMINE_NAME
- Dresser Trap Rock Incorporated
- Nearest townNEAREST_TOWN
- Dresser
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Active
- Status sinceMINE_STATUS_DT
- Jul 6, 2006
- Primary commodity (SIC)PRIMARY_SIC_CD
- Crushed, Broken Traprock
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (4)
StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 13, 2026. Data and methodology