Earth #403

Metal/Non-Metal, SurfaceCrushed, Broken GraniteWood, WisconsinMine ID 4703269

Operator Earth IncController not shownMSHA status Intermittent since Oct 15, 2013

What MSHA has on file for this mine

Citations and orders
49
since May 16, 2001 · 46 to the operator, 3 to contractors · 12 marked S&S
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Accident, injury or illness reports
None on record
MSHA's file starts January 2000
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
Aug 25, 2026Inspectors 1 | Hours on site 3.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 25, 2026
Closed outINSPECTION_END_DT
Aug 25, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F04D57F
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
4.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
0175121
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Mine Idle Activity
Jun 25, 2025Inspectors 1 | Hours on site 0.25

The inspection

BeganINSPECTION_BEGIN_DT
Jun 25, 2025
Closed outINSPECTION_END_DT
Jun 25, 2025
ActivityACTIVITY
Mine Idle Activity
Activity codeACTIVITY_CODE
E28
Program areaPROGRAM_AREA
M/NM--Mine Idle Activity
Event numberEVENT_NO
F02EEE0
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
6

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
0175121
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
May 28, 2024Inspectors 1 | Hours on site 1.5

The inspection

BeganINSPECTION_BEGIN_DT
May 28, 2024
Closed outINSPECTION_END_DT
May 28, 2024
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6952326
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4651
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
0175121
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Apr 29 to May 1, 2024Inspectors 1 | Hours on site 14.75

The inspection

BeganINSPECTION_BEGIN_DT
Apr 29, 2024
Closed outINSPECTION_END_DT
May 1, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6952314
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4651
Hours on siteSUM_TOTAL_ON_SITE_HOURS
14.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
26.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
0175121
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 7 to Aug 9, 2023Inspectors 1 | Hours on site 1.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 7, 2023
Closed outINSPECTION_END_DT
Aug 9, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6906605
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4651
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
0175121
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 9 to Aug 10, 2022Inspectors 1 | Hours on site 5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 9, 2022
Closed outINSPECTION_END_DT
Aug 10, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6906265
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4651
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Dec 28 to Dec 29, 2021Inspectors 1 | Hours on site 0.75

The inspection

BeganINSPECTION_BEGIN_DT
Dec 28, 2021
Closed outINSPECTION_END_DT
Dec 29, 2021
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6901482
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4651
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Sep 13 to Sep 14, 2021Inspectors 1 | Hours on site 6.25

The inspection

BeganINSPECTION_BEGIN_DT
Sep 13, 2021
Closed outINSPECTION_END_DT
Sep 14, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6905038
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
15.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Sep 22, 2020Inspectors 1 | Hours on site 2.25

The inspection

BeganINSPECTION_BEGIN_DT
Sep 22, 2020
Closed outINSPECTION_END_DT
Sep 22, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6839262
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
17

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Mine Idle Activity
Aug 26, 2020Inspectors 1 | Hours on site 0

The inspection

BeganINSPECTION_BEGIN_DT
Aug 26, 2020
Closed outINSPECTION_END_DT
Aug 26, 2020
ActivityACTIVITY
Mine Idle Activity
Activity codeACTIVITY_CODE
E28
Program areaPROGRAM_AREA
M/NM--Mine Idle Activity
Event numberEVENT_NO
6839257
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Total inspection hoursSUM_TOTAL_INSP_HOURS
1.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (14)

Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Jun 4, 2020Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Jun 4, 2020
Closed outINSPECTION_END_DT
Jun 4, 2020
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6839217
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
4.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 4, 2019Inspectors 1 | Hours on site 1.5

The inspection

BeganINSPECTION_BEGIN_DT
Jun 4, 2019
Closed outINSPECTION_END_DT
Jun 4, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6831448
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
4

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Jul 18, 2018Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Jul 18, 2018
Closed outINSPECTION_END_DT
Jul 18, 2018
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6744768
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
4

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 10, 2018Inspectors 1 | Hours on site 5.5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 10, 2018
Closed outINSPECTION_END_DT
Jul 10, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6744763
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Sep 12, 2017Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Sep 12, 2017
Closed outINSPECTION_END_DT
Sep 12, 2017
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6744073
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
4

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Aug 17, 2017Inspectors 1 | Hours on site 0.25

The inspection

BeganINSPECTION_BEGIN_DT
Aug 17, 2017
Closed outINSPECTION_END_DT
Aug 17, 2017
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6744805
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
7.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 25, 2017Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Jul 25, 2017
Closed outINSPECTION_END_DT
Jul 25, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6707993
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
14.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 1, 2016Inspectors 1 | Hours on site 4.25

The inspection

BeganINSPECTION_BEGIN_DT
Jun 1, 2016
Closed outINSPECTION_END_DT
Jun 1, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6707467
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
6

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Jun 3, 2015Inspectors 1 | Hours on site 0.5

The inspection

BeganINSPECTION_BEGIN_DT
Jun 3, 2015
Closed outINSPECTION_END_DT
Jun 3, 2015
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
6638755
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
8.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 28 to May 29, 2015Inspectors 1 | Hours on site 3.25

The inspection

BeganINSPECTION_BEGIN_DT
May 28, 2015
Closed outINSPECTION_END_DT
May 29, 2015
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6638751
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
12.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Oct 21, 2014Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Oct 21, 2014
Closed outINSPECTION_END_DT
Oct 21, 2014
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6638707
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
7

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Sep 2 to Sep 3, 2014Inspectors 1 | Hours on site 5.25

The inspection

BeganINSPECTION_BEGIN_DT
Sep 2, 2014
Closed outINSPECTION_END_DT
Sep 3, 2014
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6637218
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
22.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Mine Idle Activity
Aug 28, 2012Inspectors 1 | Hours on site 0.25

The inspection

BeganINSPECTION_BEGIN_DT
Aug 28, 2012
Closed outINSPECTION_END_DT
Aug 28, 2012
ActivityACTIVITY
Mine Idle Activity
Activity codeACTIVITY_CODE
E28
Program areaPROGRAM_AREA
M/NM--Mine Idle Activity
Event numberEVENT_NO
1062306
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4651
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
1.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
Mar 20, 2012Inspectors 1 | Hours on site 0.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 20, 2012
Closed outINSPECTION_END_DT
Mar 20, 2012
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6578665
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4661
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 15 to Nov 16, 2010Inspectors 1 | Hours on site 12.75

The inspection

BeganINSPECTION_BEGIN_DT
Nov 15, 2010
Closed outINSPECTION_END_DT
Nov 16, 2010
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6511480
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M4661
Hours on siteSUM_TOTAL_ON_SITE_HOURS
12.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
23

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Mine IDMINE_ID
4703269
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

25 most recent of 44 inspections and other MSHA visits since May 14, 2001; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Apr 29, 2024
Type: Citation
Standard: 56.14103(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9487971
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Apr 29, 2024
Time issuedVIOLATION_ISSUE_TIME
1618
Date of occurrenceVIOLATION_OCCUR_DT
Apr 29, 2024
30 CFR part and sectionPART_SECTION
56.14103(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 28, 2024
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 28, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
May 28, 2024
Terminated, timeTERMINATION_TIME
1336
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Jun 6, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Jul 10, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 14, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
0175121
Inspection eventEVENT_NO
6952314
Inspection beganINSPECTION_BEGIN_DT
Apr 29, 2024
Inspection closed outINSPECTION_END_DT
May 1, 2024
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 8, 2023
Type: Citation
Standard: 56.1000
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
8896145
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 8, 2023
Time issuedVIOLATION_ISSUE_TIME
0920
Date of occurrenceVIOLATION_OCCUR_DT
Aug 8, 2023
30 CFR part and sectionPART_SECTION
56.1000
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 8, 2023
Originally due, timeORIG_TERM_DUE_TIME
1105
Latest dueLATEST_TERM_DUE_DT
Aug 8, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1105
TerminatedTERMINATION_DT
Aug 8, 2023
Terminated, timeTERMINATION_TIME
1105
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Oct 12, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Nov 15, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 24, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
0175121
Inspection eventEVENT_NO
6906605
Inspection beganINSPECTION_BEGIN_DT
Aug 7, 2023
Inspection closed outINSPECTION_END_DT
Aug 9, 2023
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 8, 2023
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $143.00
Details

The citation

Citation or order numberVIOLATION_NO
8896146
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 8, 2023
Time issuedVIOLATION_ISSUE_TIME
1020
Date of occurrenceVIOLATION_OCCUR_DT
Aug 8, 2023
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 8, 2023
Originally due, timeORIG_TERM_DUE_TIME
1025
Latest dueLATEST_TERM_DUE_DT
Aug 8, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1025
TerminatedTERMINATION_DT
Aug 8, 2023
Terminated, timeTERMINATION_TIME
1025
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
143
Current proposed assessmentAMOUNT_DUE
143
Amount paidAMOUNT_PAID
143
Bill first printedBILL_PRINT_DT
Oct 12, 2023
Final order dateFINAL_ORDER_ISSUE_DT
Nov 15, 2023
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 24, 2023
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
0175121
Inspection eventEVENT_NO
6906605
Inspection beganINSPECTION_BEGIN_DT
Aug 7, 2023
Inspection closed outINSPECTION_END_DT
Aug 9, 2023
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 10, 2022
Type: Citation
Standard: 56.15001
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9449993
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 10, 2022
Time issuedVIOLATION_ISSUE_TIME
1104
Date of occurrenceVIOLATION_OCCUR_DT
Aug 10, 2022
30 CFR part and sectionPART_SECTION
56.15001
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 15, 2022
Originally due, timeORIG_TERM_DUE_TIME
0800
Latest dueLATEST_TERM_DUE_DT
Aug 15, 2022
Latest due, timeLATEST_TERM_DUE_TIME
0800
TerminatedTERMINATION_DT
Aug 10, 2022
Terminated, timeTERMINATION_TIME
1148
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
Oct 6, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Nov 12, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 17, 2022
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6906265
Inspection beganINSPECTION_BEGIN_DT
Aug 9, 2022
Inspection closed outINSPECTION_END_DT
Aug 10, 2022
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Sep 14, 2021
Type: Citation
Standard: 56.4101
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $125.00
Details

The citation

Citation or order numberVIOLATION_NO
9387739
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 14, 2021
Time issuedVIOLATION_ISSUE_TIME
0949
Date of occurrenceVIOLATION_OCCUR_DT
Sep 14, 2021
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 14, 2021
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Sep 14, 2021
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Sep 14, 2021
Terminated, timeTERMINATION_TIME
1303
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
125
Current proposed assessmentAMOUNT_DUE
125
Amount paidAMOUNT_PAID
125
Bill first printedBILL_PRINT_DT
Nov 12, 2021
Final order dateFINAL_ORDER_ISSUE_DT
Dec 20, 2021
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 19, 2021
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6905038
Inspection beganINSPECTION_BEGIN_DT
Sep 13, 2021
Inspection closed outINSPECTION_END_DT
Sep 14, 2021
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Sep 14, 2021
Type: Citation
Standard: 56.14132(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $125.00
Details

The citation

Citation or order numberVIOLATION_NO
9387740
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 14, 2021
Time issuedVIOLATION_ISSUE_TIME
0959
Date of occurrenceVIOLATION_OCCUR_DT
Sep 14, 2021
30 CFR part and sectionPART_SECTION
56.14132(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 14, 2021
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Sep 14, 2021
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Sep 14, 2021
Terminated, timeTERMINATION_TIME
1305
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
125
Current proposed assessmentAMOUNT_DUE
125
Amount paidAMOUNT_PAID
125
Bill first printedBILL_PRINT_DT
Nov 12, 2021
Final order dateFINAL_ORDER_ISSUE_DT
Dec 20, 2021
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 19, 2021
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6905038
Inspection beganINSPECTION_BEGIN_DT
Sep 13, 2021
Inspection closed outINSPECTION_END_DT
Sep 14, 2021
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 10, 2018
Type: Citation
Standard: 56.20008(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
8949532
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 10, 2018
Time issuedVIOLATION_ISSUE_TIME
1335
Date of occurrenceVIOLATION_OCCUR_DT
Jul 10, 2018
30 CFR part and sectionPART_SECTION
56.20008(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 11, 2018
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 11, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 18, 2018
Terminated, timeTERMINATION_TIME
1434
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Sep 6, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Oct 11, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 2, 2018
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6744763
Inspection beganINSPECTION_BEGIN_DT
Jul 10, 2018
Inspection closed outINSPECTION_END_DT
Jul 10, 2018
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 10, 2018
Type: Citation
Standard: 56.12006
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
8949530
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 10, 2018
Time issuedVIOLATION_ISSUE_TIME
1244
Date of occurrenceVIOLATION_OCCUR_DT
Jul 10, 2018
30 CFR part and sectionPART_SECTION
56.12006
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 11, 2018
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Jul 11, 2018
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Jul 10, 2018
Terminated, timeTERMINATION_TIME
1536
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Sep 6, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Oct 11, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 2, 2018
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6744763
Inspection beganINSPECTION_BEGIN_DT
Jul 10, 2018
Inspection closed outINSPECTION_END_DT
Jul 10, 2018
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 10, 2018
Type: Citation
Standard: 56.14206(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
8949531
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 10, 2018
Time issuedVIOLATION_ISSUE_TIME
1257
Date of occurrenceVIOLATION_OCCUR_DT
Jul 10, 2018
30 CFR part and sectionPART_SECTION
56.14206(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 10, 2018
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Jul 10, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jul 10, 2018
Terminated, timeTERMINATION_TIME
1539
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Sep 6, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Oct 11, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 2, 2018
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6744763
Inspection beganINSPECTION_BEGIN_DT
Jul 10, 2018
Inspection closed outINSPECTION_END_DT
Jul 10, 2018
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 1, 2016
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $114.00
Details

The citation

Citation or order numberVIOLATION_NO
8893824
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 1, 2016
Time issuedVIOLATION_ISSUE_TIME
0938
Date of occurrenceVIOLATION_OCCUR_DT
Jun 1, 2016
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
NoLostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 1, 2016
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Jun 1, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Jun 1, 2016
Terminated, timeTERMINATION_TIME
1010
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
114
Current proposed assessmentAMOUNT_DUE
114
Amount paidAMOUNT_PAID
114
Bill first printedBILL_PRINT_DT
Aug 11, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Sep 25, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 30, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6707467
Inspection beganINSPECTION_BEGIN_DT
Jun 1, 2016
Inspection closed outINSPECTION_END_DT
Jun 1, 2016
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 29, 2015
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8846584
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 29, 2015
Time issuedVIOLATION_ISSUE_TIME
1550
Date of occurrenceVIOLATION_OCCUR_DT
May 29, 2015
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 29, 2015
Originally due, timeORIG_TERM_DUE_TIME
1551
Latest dueLATEST_TERM_DUE_DT
May 29, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1551
TerminatedTERMINATION_DT
May 29, 2015
Terminated, timeTERMINATION_TIME
1551
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 15, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Sep 14, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 19, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6638751
Inspection beganINSPECTION_BEGIN_DT
May 28, 2015
Inspection closed outINSPECTION_END_DT
May 29, 2015
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 28, 2015
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8846583
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 28, 2015
Time issuedVIOLATION_ISSUE_TIME
1750
Date of occurrenceVIOLATION_OCCUR_DT
May 28, 2015
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 1, 2015
Originally due, timeORIG_TERM_DUE_TIME
1800
Latest dueLATEST_TERM_DUE_DT
Jun 1, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1800
TerminatedTERMINATION_DT
Jun 3, 2015
Terminated, timeTERMINATION_TIME
1740
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jul 15, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Sep 14, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 19, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6638751
Inspection beganINSPECTION_BEGIN_DT
May 28, 2015
Inspection closed outINSPECTION_END_DT
May 29, 2015
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 21, 2014
Type: Order
Standard: 46.5(a)
S&S: Y
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $112.00
Details

The citation

Citation or order numberVIOLATION_NO
8845142
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Oct 21, 2014
Time issuedVIOLATION_ISSUE_TIME
1410
Date of occurrenceVIOLATION_OCCUR_DT
Oct 21, 2014
30 CFR part and sectionPART_SECTION
46.5(a)
Section of the Act, primarySECTION_OF_ACT_1
104(g)(1)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

TerminatedTERMINATION_DT
Jan 26, 2015
Terminated, timeTERMINATION_TIME
1130
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
112
Current proposed assessmentAMOUNT_DUE
112
Amount paidAMOUNT_PAID
112
Bill first printedBILL_PRINT_DT
Dec 26, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Feb 4, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 1, 2015

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Iggy's Trucking, LLC
Operator IDVIOLATOR_ID
B0808
Contractor IDCONTRACTOR_ID
B0808
Inspection eventEVENT_NO
6638707
Inspection beganINSPECTION_BEGIN_DT
Oct 21, 2014
Inspection closed outINSPECTION_END_DT
Oct 21, 2014
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (18)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Oct 21, 2014
Type: Citation
Standard: 56.14130(g)
S&S: Y
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $243.00
Details

The citation

Citation or order numberVIOLATION_NO
8845141
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 21, 2014
Time issuedVIOLATION_ISSUE_TIME
1405
Date of occurrenceVIOLATION_OCCUR_DT
Oct 21, 2014
30 CFR part and sectionPART_SECTION
56.14130(g)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 21, 2014
Originally due, timeORIG_TERM_DUE_TIME
1410
Latest dueLATEST_TERM_DUE_DT
Oct 21, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1410
TerminatedTERMINATION_DT
Oct 21, 2014
Terminated, timeTERMINATION_TIME
1410
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
243
Current proposed assessmentAMOUNT_DUE
243
Amount paidAMOUNT_PAID
243
Bill first printedBILL_PRINT_DT
Dec 26, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Feb 4, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 1, 2015

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Iggy's Trucking, LLC
Operator IDVIOLATOR_ID
B0808
Contractor IDCONTRACTOR_ID
B0808
Inspection eventEVENT_NO
6638707
Inspection beganINSPECTION_BEGIN_DT
Oct 21, 2014
Inspection closed outINSPECTION_END_DT
Oct 21, 2014
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (2)

Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Sep 2, 2014
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8847668
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 2, 2014
Time issuedVIOLATION_ISSUE_TIME
1723
Date of occurrenceVIOLATION_OCCUR_DT
Sep 2, 2014
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 2, 2014
Originally due, timeORIG_TERM_DUE_TIME
1900
Latest dueLATEST_TERM_DUE_DT
Sep 2, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1900
TerminatedTERMINATION_DT
Sep 2, 2014
Terminated, timeTERMINATION_TIME
1754
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Oct 15, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Nov 19, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 19, 2014

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6637218
Inspection beganINSPECTION_BEGIN_DT
Sep 2, 2014
Inspection closed outINSPECTION_END_DT
Sep 3, 2014
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Sep 2, 2014
Type: Citation
Standard: 56.11001
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8847671
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 2, 2014
Time issuedVIOLATION_ISSUE_TIME
1923
Date of occurrenceVIOLATION_OCCUR_DT
Sep 2, 2014
30 CFR part and sectionPART_SECTION
56.11001
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 3, 2014
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Sep 3, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Sep 3, 2014
Terminated, timeTERMINATION_TIME
1512
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Oct 15, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Nov 19, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 19, 2014

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6637218
Inspection beganINSPECTION_BEGIN_DT
Sep 2, 2014
Inspection closed outINSPECTION_END_DT
Sep 3, 2014
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Sep 2, 2014
Type: Citation
Standard: 56.4201(b)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8847667
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 2, 2014
Time issuedVIOLATION_ISSUE_TIME
1656
Date of occurrenceVIOLATION_OCCUR_DT
Sep 2, 2014
30 CFR part and sectionPART_SECTION
56.4201(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 2, 2014
Originally due, timeORIG_TERM_DUE_TIME
1900
Latest dueLATEST_TERM_DUE_DT
Sep 2, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1900
TerminatedTERMINATION_DT
Sep 2, 2014
Terminated, timeTERMINATION_TIME
1945
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Oct 15, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Nov 19, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 19, 2014

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6637218
Inspection beganINSPECTION_BEGIN_DT
Sep 2, 2014
Inspection closed outINSPECTION_END_DT
Sep 3, 2014
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Sep 2, 2014
Type: Citation
Standard: 56.18002(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8847669
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 2, 2014
Time issuedVIOLATION_ISSUE_TIME
1836
Date of occurrenceVIOLATION_OCCUR_DT
Sep 2, 2014
30 CFR part and sectionPART_SECTION
56.18002(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 2, 2014
Originally due, timeORIG_TERM_DUE_TIME
1845
Latest dueLATEST_TERM_DUE_DT
Sep 2, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1845
TerminatedTERMINATION_DT
Sep 2, 2014
Terminated, timeTERMINATION_TIME
1838
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Oct 15, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Nov 19, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 19, 2014

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6637218
Inspection beganINSPECTION_BEGIN_DT
Sep 2, 2014
Inspection closed outINSPECTION_END_DT
Sep 3, 2014
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Sep 2, 2014
Type: Citation
Standard: 56.3200
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8847670
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 2, 2014
Time issuedVIOLATION_ISSUE_TIME
1920
Date of occurrenceVIOLATION_OCCUR_DT
Sep 2, 2014
30 CFR part and sectionPART_SECTION
56.3200
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 3, 2014
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Sep 3, 2014
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Sep 3, 2014
Terminated, timeTERMINATION_TIME
1504
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Oct 15, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Nov 19, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 19, 2014

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6637218
Inspection beganINSPECTION_BEGIN_DT
Sep 2, 2014
Inspection closed outINSPECTION_END_DT
Sep 3, 2014
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Nov 15, 2010
Type: Citation
Standard: 56.9300(b)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $117.00
Details

The citation

Citation or order numberVIOLATION_NO
6491917
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Nov 15, 2010
Time issuedVIOLATION_ISSUE_TIME
1535
Date of occurrenceVIOLATION_OCCUR_DT
Nov 15, 2010
30 CFR part and sectionPART_SECTION
56.9300(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 15, 2010
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Nov 15, 2010
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Nov 15, 2010
Terminated, timeTERMINATION_TIME
1610
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
117
Current proposed assessmentAMOUNT_DUE
117
Amount paidAMOUNT_PAID
117
Bill first printedBILL_PRINT_DT
Jan 6, 2011
Final order dateFINAL_ORDER_ISSUE_DT
Feb 11, 2011
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 7, 2011
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
6511480
Inspection beganINSPECTION_BEGIN_DT
Nov 15, 2010
Inspection closed outINSPECTION_END_DT
Nov 16, 2010
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 9, 2009
Type: Citation
Standard: 56.9300(b)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6189773
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 9, 2009
Time issuedVIOLATION_ISSUE_TIME
0840
Date of occurrenceVIOLATION_OCCUR_DT
Jun 9, 2009
30 CFR part and sectionPART_SECTION
56.9300(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 9, 2009
Originally due, timeORIG_TERM_DUE_TIME
1040
Latest dueLATEST_TERM_DUE_DT
Jun 9, 2009
Latest due, timeLATEST_TERM_DUE_TIME
1040
TerminatedTERMINATION_DT
Jun 9, 2009
Terminated, timeTERMINATION_TIME
1010
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Aug 6, 2009
Final order dateFINAL_ORDER_ISSUE_DT
Sep 12, 2009
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 2, 2009
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
1012091
Inspection beganINSPECTION_BEGIN_DT
Jun 9, 2009
Inspection closed outINSPECTION_END_DT
Jun 9, 2009
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2009
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 9, 2009
Type: Citation
Standard: 56.14101(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6189774
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 9, 2009
Time issuedVIOLATION_ISSUE_TIME
0855
Date of occurrenceVIOLATION_OCCUR_DT
Jun 9, 2009
30 CFR part and sectionPART_SECTION
56.14101(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 9, 2009
Originally due, timeORIG_TERM_DUE_TIME
1800
Latest dueLATEST_TERM_DUE_DT
Jun 9, 2009
Latest due, timeLATEST_TERM_DUE_TIME
1800
TerminatedTERMINATION_DT
Jun 9, 2009
Terminated, timeTERMINATION_TIME
1335
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Aug 6, 2009
Final order dateFINAL_ORDER_ISSUE_DT
Sep 12, 2009
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 2, 2009
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
1012091
Inspection beganINSPECTION_BEGIN_DT
Jun 9, 2009
Inspection closed outINSPECTION_END_DT
Jun 9, 2009
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2009
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 9, 2009
Type: Citation
Standard: 56.11004
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6189775
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 9, 2009
Time issuedVIOLATION_ISSUE_TIME
0920
Date of occurrenceVIOLATION_OCCUR_DT
Jun 9, 2009
30 CFR part and sectionPART_SECTION
56.11004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 9, 2009
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 9, 2009
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 9, 2009
Terminated, timeTERMINATION_TIME
1020
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Aug 6, 2009
Final order dateFINAL_ORDER_ISSUE_DT
Sep 12, 2009
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 2, 2009
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
1012091
Inspection beganINSPECTION_BEGIN_DT
Jun 9, 2009
Inspection closed outINSPECTION_END_DT
Jun 9, 2009
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2009
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 9, 2009
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6189776
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 9, 2009
Time issuedVIOLATION_ISSUE_TIME
0930
Date of occurrenceVIOLATION_OCCUR_DT
Jun 9, 2009
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 9, 2009
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 9, 2009
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 9, 2009
Terminated, timeTERMINATION_TIME
1130
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Aug 6, 2009
Final order dateFINAL_ORDER_ISSUE_DT
Sep 12, 2009
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 2, 2009
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
1012091
Inspection beganINSPECTION_BEGIN_DT
Jun 9, 2009
Inspection closed outINSPECTION_END_DT
Jun 9, 2009
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2009
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 4, 2007
Type: Citation
Standard: 56.12028
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6189554
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 4, 2007
Time issuedVIOLATION_ISSUE_TIME
1045
Date of occurrenceVIOLATION_OCCUR_DT
Oct 4, 2007
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 5, 2007
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Oct 5, 2007
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Oct 16, 2007
Terminated, timeTERMINATION_TIME
1000
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Mar 6, 2008
Final order dateFINAL_ORDER_ISSUE_DT
Apr 12, 2008
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 14, 2008
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Earth Inc
Operator IDVIOLATOR_ID
L18235
Controller IDCONTROLLER_ID
M14020
Inspection eventEVENT_NO
1002591
Inspection beganINSPECTION_BEGIN_DT
Oct 4, 2007
Inspection closed outINSPECTION_END_DT
Oct 4, 2007
Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2007
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

49 citations and orders since May 16, 2001: 46 issued to the operator, 3 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Apr 29, 2024
Citation number: 9487971
Standard: 56.14103(b)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9487971
Assessment control numberASSESS_CASE_NO
000601061
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jun 14, 2024
Citation issuedISSUE_DT
Apr 29, 2024
Date of occurrenceOCCURRENCE_DT
Apr 29, 2024
Final order dateFINAL_ORDER_DT
Jul 10, 2024
Bill first printedBILL_PRINT_DT
Jun 6, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Jul 10, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14103(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
2346
Size of mineSIZE_OF_MINE
2346
Controller hours workedCONTROLLER_HRS
9269
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9269
History period startHISTORY_START_DT
Jan 29, 2023
History period endHISTORY_END_DT
Apr 28, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6952314
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 8, 2023
Citation number: 8896146
Standard: 50.30(a)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8896146
Assessment control numberASSESS_CASE_NO
000587189
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 24, 2023
Citation issuedISSUE_DT
Aug 8, 2023
Date of occurrenceOCCURRENCE_DT
Aug 8, 2023
Final order dateFINAL_ORDER_DT
Nov 15, 2023
Bill first printedBILL_PRINT_DT
Oct 12, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 15, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
2706
Size of mineSIZE_OF_MINE
2706
Controller hours workedCONTROLLER_HRS
7176
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7176
History period startHISTORY_START_DT
May 8, 2022
History period endHISTORY_END_DT
Aug 7, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6906605
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 8, 2023
Citation number: 8896145
Standard: 56.1000
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8896145
Assessment control numberASSESS_CASE_NO
000587189
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 24, 2023
Citation issuedISSUE_DT
Aug 8, 2023
Date of occurrenceOCCURRENCE_DT
Aug 8, 2023
Final order dateFINAL_ORDER_DT
Nov 15, 2023
Bill first printedBILL_PRINT_DT
Oct 12, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 15, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.1000
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
2706
Size of mineSIZE_OF_MINE
2706
Controller hours workedCONTROLLER_HRS
7176
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7176
History period startHISTORY_START_DT
May 8, 2022
History period endHISTORY_END_DT
Aug 7, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6906605
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 10, 2022
Citation number: 9449993
Standard: 56.15001
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9449993
Assessment control numberASSESS_CASE_NO
000564682
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 17, 2022
Citation issuedISSUE_DT
Aug 10, 2022
Date of occurrenceOCCURRENCE_DT
Aug 10, 2022
Final order dateFINAL_ORDER_DT
Nov 12, 2022
Bill first printedBILL_PRINT_DT
Oct 6, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 12, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.15001
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
31
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
1067
Size of mineSIZE_OF_MINE
1067
Controller hours workedCONTROLLER_HRS
5236
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5236
History period startHISTORY_START_DT
May 10, 2021
History period endHISTORY_END_DT
Aug 9, 2022

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6906265
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 14, 2021
Citation number: 9387739
Standard: 56.4101
Proposed penalty: $125.00
Current assessment: $125.00
Paid against proposed penalty: $125.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9387739
Assessment control numberASSESS_CASE_NO
000545329
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 17, 2021
Citation issuedISSUE_DT
Sep 14, 2021
Date of occurrenceOCCURRENCE_DT
Sep 14, 2021
Final order dateFINAL_ORDER_DT
Dec 20, 2021
Bill first printedBILL_PRINT_DT
Nov 12, 2021
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 20, 2021
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
125.00
Current assessmentCURRENT_ASSESSMENT_AMT
125.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
125.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
263
Size of mineSIZE_OF_MINE
263
Controller hours workedCONTROLLER_HRS
10246
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
10246
History period startHISTORY_START_DT
Jun 14, 2020
History period endHISTORY_END_DT
Sep 13, 2021

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6905038
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 14, 2021
Citation number: 9387740
Standard: 56.14132(a)
Proposed penalty: $125.00
Current assessment: $125.00
Paid against proposed penalty: $125.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9387740
Assessment control numberASSESS_CASE_NO
000545329
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 17, 2021
Citation issuedISSUE_DT
Sep 14, 2021
Date of occurrenceOCCURRENCE_DT
Sep 14, 2021
Final order dateFINAL_ORDER_DT
Dec 20, 2021
Bill first printedBILL_PRINT_DT
Nov 12, 2021
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2022
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 20, 2021
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
125.00
Current assessmentCURRENT_ASSESSMENT_AMT
125.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
125.00

Penalty points

Violation history pointsPENALTY_POINTS
26
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
263
Size of mineSIZE_OF_MINE
263
Controller hours workedCONTROLLER_HRS
10246
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
10246
History period startHISTORY_START_DT
Jun 14, 2020
History period endHISTORY_END_DT
Sep 13, 2021

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6905038
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 10, 2018
Citation number: 8949532
Standard: 56.20008(a)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8949532
Assessment control numberASSESS_CASE_NO
000472972
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 2, 2018
Citation issuedISSUE_DT
Jul 10, 2018
Date of occurrenceOCCURRENCE_DT
Jul 10, 2018
Final order dateFINAL_ORDER_DT
Oct 11, 2018
Bill first printedBILL_PRINT_DT
Sep 6, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 11, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.20008(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
39
Size of mineSIZE_OF_MINE
39
Controller hours workedCONTROLLER_HRS
8838
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
8838
History period startHISTORY_START_DT
Apr 10, 2017
History period endHISTORY_END_DT
Jul 9, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6744763
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 10, 2018
Citation number: 8949530
Standard: 56.12006
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8949530
Assessment control numberASSESS_CASE_NO
000472972
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 2, 2018
Citation issuedISSUE_DT
Jul 10, 2018
Date of occurrenceOCCURRENCE_DT
Jul 10, 2018
Final order dateFINAL_ORDER_DT
Oct 11, 2018
Bill first printedBILL_PRINT_DT
Sep 6, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 11, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12006
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
39
Size of mineSIZE_OF_MINE
39
Controller hours workedCONTROLLER_HRS
8838
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
8838
History period startHISTORY_START_DT
Apr 10, 2017
History period endHISTORY_END_DT
Jul 9, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6744763
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 10, 2018
Citation number: 8949531
Standard: 56.14206(b)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8949531
Assessment control numberASSESS_CASE_NO
000472972
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 2, 2018
Citation issuedISSUE_DT
Jul 10, 2018
Date of occurrenceOCCURRENCE_DT
Jul 10, 2018
Final order dateFINAL_ORDER_DT
Oct 11, 2018
Bill first printedBILL_PRINT_DT
Sep 6, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 11, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14206(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
39
Size of mineSIZE_OF_MINE
39
Controller hours workedCONTROLLER_HRS
8838
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
8838
History period startHISTORY_START_DT
Apr 10, 2017
History period endHISTORY_END_DT
Jul 9, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6744763
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 1, 2016
Citation number: 8893824
Standard: 56.14100(b)
Proposed penalty: $114.00
Current assessment: $114.00
Paid against proposed penalty: $114.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8893824
Assessment control numberASSESS_CASE_NO
000417337
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 30, 2016
Citation issuedISSUE_DT
Jun 1, 2016
Date of occurrenceOCCURRENCE_DT
Jun 1, 2016
Final order dateFINAL_ORDER_DT
Sep 25, 2016
Bill first printedBILL_PRINT_DT
Aug 11, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
114.00
Current assessmentCURRENT_ASSESSMENT_AMT
114.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
114.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
3148
Size of mineSIZE_OF_MINE
3148
Controller hours workedCONTROLLER_HRS
10802
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
10802
History period startHISTORY_START_DT
Mar 1, 2015
History period endHISTORY_END_DT
May 31, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6707467
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 29, 2015
Citation number: 8846584
Standard: 50.30(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8846584
Assessment control numberASSESS_CASE_NO
000387022
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 18, 2015
Citation issuedISSUE_DT
May 29, 2015
Date of occurrenceOCCURRENCE_DT
May 29, 2015
Final order dateFINAL_ORDER_DT
Sep 14, 2015
Bill first printedBILL_PRINT_DT
Jul 15, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 14, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
2.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
3255
Size of mineSIZE_OF_MINE
3255
Controller hours workedCONTROLLER_HRS
6869
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6869
History period startHISTORY_START_DT
Feb 28, 2014
History period endHISTORY_END_DT
May 28, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6638751
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 28, 2015
Citation number: 8846583
Standard: 56.14107(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8846583
Assessment control numberASSESS_CASE_NO
000387022
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 18, 2015
Citation issuedISSUE_DT
May 28, 2015
Date of occurrenceOCCURRENCE_DT
May 28, 2015
Final order dateFINAL_ORDER_DT
Sep 14, 2015
Bill first printedBILL_PRINT_DT
Jul 15, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 14, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
5
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
2.5
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
3255
Size of mineSIZE_OF_MINE
3255
Controller hours workedCONTROLLER_HRS
6869
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6869
History period startHISTORY_START_DT
Feb 28, 2014
History period endHISTORY_END_DT
May 27, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6638751
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 21, 2014
Citation number: 8845142
Standard: 46.5(a)
Proposed penalty: $112.00
Current assessment: $112.00
Paid against proposed penalty: $112.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8845142
Assessment control numberASSESS_CASE_NO
000370598
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 30, 2015
Citation issuedISSUE_DT
Oct 21, 2014
Date of occurrenceOCCURRENCE_DT
Oct 21, 2014
Final order dateFINAL_ORDER_DT
Feb 4, 2015
Bill first printedBILL_PRINT_DT
Dec 26, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 4, 2015
Citation typeCITATION_TYPE_CD
Order
30 CFR standardCFR_STANDARD_CD
46.5(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(g)(1)
Significant and substantialSIG_SUB_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
112.00
Current assessmentCURRENT_ASSESSMENT_AMT
112.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
112.00

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

History period startHISTORY_START_DT
Jul 21, 2013
History period endHISTORY_END_DT
Oct 20, 2014

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Iggy's Trucking, LLC
IDVIOLATOR_ID
B0808
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 21, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6638707
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (20)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Oct 21, 2014
Citation number: 8845141
Standard: 56.14130(g)
Proposed penalty: $243.00
Current assessment: $243.00
Paid against proposed penalty: $243.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8845141
Assessment control numberASSESS_CASE_NO
000370598
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 30, 2015
Citation issuedISSUE_DT
Oct 21, 2014
Date of occurrenceOCCURRENCE_DT
Oct 21, 2014
Final order dateFINAL_ORDER_DT
Feb 4, 2015
Bill first printedBILL_PRINT_DT
Dec 26, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 4, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14130(g)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
243.00
Current assessmentCURRENT_ASSESSMENT_AMT
243.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
243.00

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

History period startHISTORY_START_DT
Jul 21, 2013
History period endHISTORY_END_DT
Oct 20, 2014

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
Iggy's Trucking, LLC
IDVIOLATOR_ID
B0808
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 21, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6638707
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (20)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Sep 2, 2014
Citation number: 8847668
Standard: 56.14107(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8847668
Assessment control numberASSESS_CASE_NO
000364750
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 18, 2014
Citation issuedISSUE_DT
Sep 2, 2014
Date of occurrenceOCCURRENCE_DT
Sep 2, 2014
Final order dateFINAL_ORDER_DT
Nov 19, 2014
Bill first printedBILL_PRINT_DT
Oct 15, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 19, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
857
Size of mineSIZE_OF_MINE
857
Controller hours workedCONTROLLER_HRS
7952
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7952
History period startHISTORY_START_DT
Jun 2, 2013
History period endHISTORY_END_DT
Sep 1, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6637218
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 2, 2014
Citation number: 8847671
Standard: 56.11001
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8847671
Assessment control numberASSESS_CASE_NO
000364750
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 18, 2014
Citation issuedISSUE_DT
Sep 2, 2014
Date of occurrenceOCCURRENCE_DT
Sep 2, 2014
Final order dateFINAL_ORDER_DT
Nov 19, 2014
Bill first printedBILL_PRINT_DT
Oct 15, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 19, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11001
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
857
Size of mineSIZE_OF_MINE
857
Controller hours workedCONTROLLER_HRS
7952
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7952
History period startHISTORY_START_DT
Jun 2, 2013
History period endHISTORY_END_DT
Sep 1, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6637218
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 2, 2014
Citation number: 8847669
Standard: 56.18002(b)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8847669
Assessment control numberASSESS_CASE_NO
000364750
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 18, 2014
Citation issuedISSUE_DT
Sep 2, 2014
Date of occurrenceOCCURRENCE_DT
Sep 2, 2014
Final order dateFINAL_ORDER_DT
Nov 19, 2014
Bill first printedBILL_PRINT_DT
Oct 15, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 19, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.18002(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
21
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
857
Size of mineSIZE_OF_MINE
857
Controller hours workedCONTROLLER_HRS
7952
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7952
History period startHISTORY_START_DT
Jun 2, 2013
History period endHISTORY_END_DT
Sep 1, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6637218
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (19)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 2, 2014
Citation number: 8847667
Standard: 56.4201(b)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8847667
Assessment control numberASSESS_CASE_NO
000364750
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 18, 2014
Citation issuedISSUE_DT
Sep 2, 2014
Date of occurrenceOCCURRENCE_DT
Sep 2, 2014
Final order dateFINAL_ORDER_DT
Nov 19, 2014
Bill first printedBILL_PRINT_DT
Oct 15, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 19, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
11
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
857
Size of mineSIZE_OF_MINE
857
Controller hours workedCONTROLLER_HRS
7952
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7952
History period startHISTORY_START_DT
Jun 2, 2013
History period endHISTORY_END_DT
Sep 1, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6637218
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (19)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 2, 2014
Citation number: 8847670
Standard: 56.3200
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8847670
Assessment control numberASSESS_CASE_NO
000364750
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 18, 2014
Citation issuedISSUE_DT
Sep 2, 2014
Date of occurrenceOCCURRENCE_DT
Sep 2, 2014
Final order dateFINAL_ORDER_DT
Nov 19, 2014
Bill first printedBILL_PRINT_DT
Oct 15, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 19, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.3200
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
857
Size of mineSIZE_OF_MINE
857
Controller hours workedCONTROLLER_HRS
7952
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
7952
History period startHISTORY_START_DT
Jun 2, 2013
History period endHISTORY_END_DT
Sep 1, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6637218
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Nov 15, 2010
Citation number: 6491917
Standard: 56.9300(b)
Proposed penalty: $117.00
Current assessment: $117.00
Paid against proposed penalty: $117.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6491917
Assessment control numberASSESS_CASE_NO
000243621
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 4, 2011
Citation issuedISSUE_DT
Nov 15, 2010
Date of occurrenceOCCURRENCE_DT
Nov 15, 2010
Final order dateFINAL_ORDER_DT
Feb 11, 2011
Bill first printedBILL_PRINT_DT
Jan 6, 2011
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2011
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 11, 2011
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
117.00
Current assessmentCURRENT_ASSESSMENT_AMT
117.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
117.00

Penalty points

Violation history pointsPENALTY_POINTS
62
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
4
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
5979
Size of mineSIZE_OF_MINE
5979
Controller hours workedCONTROLLER_HRS
5979
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5979
History period startHISTORY_START_DT
Aug 15, 2009
History period endHISTORY_END_DT
Nov 14, 2010

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6511480
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 9, 2009
Citation number: 6189773
Standard: 56.9300(b)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6189773
Assessment control numberASSESS_CASE_NO
000193763
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 1, 2009
Citation issuedISSUE_DT
Jun 9, 2009
Date of occurrenceOCCURRENCE_DT
Jun 9, 2009
Final order dateFINAL_ORDER_DT
Sep 12, 2009
Bill first printedBILL_PRINT_DT
Aug 6, 2009
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2009
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 12, 2009
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
57
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
6189
Size of mineSIZE_OF_MINE
6189
Controller hours workedCONTROLLER_HRS
6189
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6189
History period startHISTORY_START_DT
Mar 9, 2008
History period endHISTORY_END_DT
Jun 8, 2009

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1012091
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 9, 2009
Citation number: 6189774
Standard: 56.14101(a)(2)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6189774
Assessment control numberASSESS_CASE_NO
000193763
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 1, 2009
Citation issuedISSUE_DT
Jun 9, 2009
Date of occurrenceOCCURRENCE_DT
Jun 9, 2009
Final order dateFINAL_ORDER_DT
Sep 12, 2009
Bill first printedBILL_PRINT_DT
Aug 6, 2009
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2009
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 12, 2009
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14101(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
52
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
6189
Size of mineSIZE_OF_MINE
6189
Controller hours workedCONTROLLER_HRS
6189
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6189
History period startHISTORY_START_DT
Mar 9, 2008
History period endHISTORY_END_DT
Jun 8, 2009

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1012091
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 9, 2009
Citation number: 6189776
Standard: 56.12004
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6189776
Assessment control numberASSESS_CASE_NO
000193763
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 1, 2009
Citation issuedISSUE_DT
Jun 9, 2009
Date of occurrenceOCCURRENCE_DT
Jun 9, 2009
Final order dateFINAL_ORDER_DT
Sep 12, 2009
Bill first printedBILL_PRINT_DT
Aug 6, 2009
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2009
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 12, 2009
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
52
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
6189
Size of mineSIZE_OF_MINE
6189
Controller hours workedCONTROLLER_HRS
6189
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6189
History period startHISTORY_START_DT
Mar 9, 2008
History period endHISTORY_END_DT
Jun 8, 2009

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1012091
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 9, 2009
Citation number: 6189775
Standard: 56.11004
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6189775
Assessment control numberASSESS_CASE_NO
000193763
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 1, 2009
Citation issuedISSUE_DT
Jun 9, 2009
Date of occurrenceOCCURRENCE_DT
Jun 9, 2009
Final order dateFINAL_ORDER_DT
Sep 12, 2009
Bill first printedBILL_PRINT_DT
Aug 6, 2009
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2009
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 12, 2009
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
57
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
6189
Size of mineSIZE_OF_MINE
6189
Controller hours workedCONTROLLER_HRS
6189
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6189
History period startHISTORY_START_DT
Mar 9, 2008
History period endHISTORY_END_DT
Jun 8, 2009

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1012091
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Oct 4, 2007
Citation number: 6189554
Standard: 56.12028
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6189554
Assessment control numberASSESS_CASE_NO
000143218
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 10, 2008
Citation issuedISSUE_DT
Oct 4, 2007
Date of occurrenceOCCURRENCE_DT
Oct 4, 2007
Final order dateFINAL_ORDER_DT
Apr 12, 2008
Bill first printedBILL_PRINT_DT
Mar 6, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 12, 2008
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
52
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
8855
Size of mineSIZE_OF_MINE
8855
Controller hours workedCONTROLLER_HRS
8855
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
8855
History period startHISTORY_START_DT
Jul 4, 2006
History period endHISTORY_END_DT
Oct 3, 2007

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Earth Inc
IDVIOLATOR_ID
L18235
Operator start at the mine, as assessedVIOLATOR_START_DT
May 1, 2001
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1002591
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M4641

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 49 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Contested citations and decisions

Contested: Nov 14, 2017
Citation issued: Jul 25, 2017
Docket: LAKE 2018-0046
Standard: 56.12004
Proposed penalty: $116.00
Penalty after decision: $0.00
Decided: Apr 18, 2018
Decision type: Withdrawal
Details

The contest

Citation or order numberCITATION_NO
8949065
Citation issuedCITATION_ISSUE_DT
Jul 25, 2017
Hearing request receivedCONTEST_DT
Nov 14, 2017
Docket numberDOCKET_NO
LAKE 2018-0046
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
L.Zane
Judge, last nameJUDGE_LAST_NAME
Gill
Decision typeDOCKET_DECISION_TYPE_CODE
Withdrawal
DecidedDECISION_DT
Apr 18, 2018
Petition duePETITION_DUE_DT
Dec 29, 2017
Petition filedPETITION_FILED_DT
Jan 3, 2018

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
116.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.12004
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
LowNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M4000
MSHA representative officeMSHA_REP_OFFICE_NAME
Duluth District

Mine

Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403

Other fields

ISSUING_FIELD_OFFICE
M4641

Recorded as 0 (1)

Penalty after the decisionDECISION_PENALTY_AMT

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Mar 6, 2008
Citation issued: Oct 4, 2007
Docket: LAKE 2008-222M
Standard: 56.14130(g)
Proposed penalty: $100.00
Penalty after decision: $100.00
Decided: Aug 8, 2008
Decision type: Dismissal
Details

The contest

Citation or order numberCITATION_NO
6189557
Citation issuedCITATION_ISSUE_DT
Oct 4, 2007
Hearing request receivedCONTEST_DT
Mar 6, 2008
Docket numberDOCKET_NO
LAKE 2008-222M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Dismissal
DecidedDECISION_DT
Aug 8, 2008
Petition filedPETITION_FILED_DT
Apr 16, 2008

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14130(g)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M4000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M4000
MSHA representative officeMSHA_REP_OFFICE_NAME
Duluth District

Mine

Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403

Other fields

ISSUING_FIELD_OFFICE
M4641

Not recorded by MSHA (10)

Petition duePETITION_DUE_DT, Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

2 contested citations and orders; decision types are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 2,770
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
2770
Average hours per employeeAVG_EMPLOYEE_HOURS
1385

Mine

Mine IDMINE_ID
4703269
Mine name in this fileCURR_MINE_NM
Earth #403
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 4,617
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
4617
Average hours per employeeAVG_EMPLOYEE_HOURS
1539

Mine

Mine IDMINE_ID
4703269
Mine name in this fileCURR_MINE_NM
Earth #403
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 3,508
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
3508
Average hours per employeeAVG_EMPLOYEE_HOURS
1754

Mine

Mine IDMINE_ID
4703269
Mine name in this fileCURR_MINE_NM
Earth #403
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 2,346
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
2346
Average hours per employeeAVG_EMPLOYEE_HOURS
1173

Mine

Mine IDMINE_ID
4703269
Mine name in this fileCURR_MINE_NM
Earth #403
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 2,706
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
2706
Average hours per employeeAVG_EMPLOYEE_HOURS
1353

Mine

Mine IDMINE_ID
4703269
Mine name in this fileCURR_MINE_NM
Earth #403
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 1,067
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
1067
Average hours per employeeAVG_EMPLOYEE_HOURS
1067

Mine

Mine IDMINE_ID
4703269
Mine name in this fileCURR_MINE_NM
Earth #403
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 263
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
263
Average hours per employeeAVG_EMPLOYEE_HOURS
263

Mine

Mine IDMINE_ID
4703269
Mine name in this fileCURR_MINE_NM
Earth #403
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 895
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
895
Average hours per employeeAVG_EMPLOYEE_HOURS
895

Mine

Mine IDMINE_ID
4703269
Mine name in this fileCURR_MINE_NM
Earth #403
StateSTATE_ABBR
WI
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Marquette MI Field Office
Nearest town
Arpin
Days worked per week
0
Hours per shift
0
Production shifts per day
0
Maintenance shifts per day
0
Employees, current record
1
Tailing ponds
1
Safety committee
N
Portable operation
Y
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Earth #403
Mine IDMINE_ID
4703269
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Intermittent
Status sinceCURRENT_STATUS_DT
Oct 15, 2013
Legal entity typeCOMPANY_TYPE
Corporation
Portable minePORTABLE_OPERATION
Y
Portable mine FIPS state codePORTABLE_FIPS_ST_CD
55

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Earth Inc
Operator IDCURRENT_OPERATOR_ID
L18235
Controller IDCURRENT_CONTROLLER_ID
0175121
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
May 1, 2001

Location and MSHA office

StateSTATE
WI
Bureau of Mines state codeBOM_STATE_CD
47
FIPS county codeFIPS_CNTY_CD
141
FIPS county nameFIPS_CNTY_NM
Wood
Congressional districtCONG_DIST_CD
07
Nearest townNEAREST_TOWN
Arpin
MSHA districtDISTRICT
M4
MSHA office codeOFFICE_CD
M4641
MSHA officeOFFICE_NAME
Marquette MI Field Office
Driving miles from the MSHA officeMILES_FROM_OFFICE
260
Most recent assessment control numberASSESS_CTRL_NO
000601061

Commodity

Primary commodity (SIC)PRIMARY_SIC
Crushed, Broken Granite
Primary commodity codePRIMARY_SIC_CD
142300
Primary SIC codePRIMARY_SIC_CD_1
1423
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
Stone
Primary industry group codePRIMARY_CANVASS_CD
6

Operations, from the Mine Information Form

Workers employedNO_EMPLOYEES
1
Tailing pondsNO_TAILING_PONDS
1
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y

Recorded as 0 (4)

Days operating per weekDAYS_PER_WEEK, Hours per shiftHOURS_PER_SHIFT, Production shifts per dayPROD_SHIFTS_PER_DAY, Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY

Recorded as N (4)

Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (14)

ControllerCURRENT_CONTROLLER_NAME, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) statusCURRENT_103I, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: Earth Inc
From: May 1, 2001
To: No end date
Controller: Not shown
From : Mar 1, 2023
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Operator fromOPERATOR_START_DT
May 1, 2001

Controller

Controller IDCONTROLLER_ID
0175121
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Mar 1, 2023

Mine

Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Earth Inc
From: May 1, 2001
To: No end date
Controller: Not shown
From : Mar 1, 2023
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Operator fromOPERATOR_START_DT
May 1, 2001

Controller

Controller IDCONTROLLER_ID
0175121
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Mar 1, 2023

Mine

Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Earth Inc
From: May 1, 2001
To: No end date
Controller: Not shown
From : May 1, 2001
To : Feb 28, 2023
Details

Operator

OperatorOPERATOR_NAME
Earth Inc
Operator IDOPERATOR_ID
L18235
Operator fromOPERATOR_START_DT
May 1, 2001

Controller

Controller IDCONTROLLER_ID
M14020
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
May 1, 2001
Controller toCONTROLLER_END_DT
Feb 28, 2023

Mine

Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME

As MSHA records it, newest operator first.

Address of record

Earth Inc·Contact title President·Street not recorded, ARPIN WI 54410

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Earth Inc
Contact titleCONTACT_TITLE
President
CityCITY
ARPIN
StateSTATE_ABBR
WI
State nameSTATE
Wisconsin
ZIP codeZIP_CD
54410
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
55

Mine

Mine IDMINE_ID
4703269
Mine name in this fileMINE_NAME
Earth #403
Nearest townNEAREST_TOWN
Arpin
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Intermittent
Status sinceMINE_STATUS_DT
Oct 15, 2013
Primary commodity (SIC)PRIMARY_SIC_CD
Crushed, Broken Granite
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology