Skip to content
SafetyRecord logoSafetyRecord

Usibelli

Coal, SurfaceCoal (Bituminous)Denali, AlaskaMine ID 5000030

Operator Usibelli Coal Mine IncController not shownMSHA status Active since Nov 30, 1980

What MSHA has on file for this mine

Citations and orders
626
since May 23, 2000 · 620 to the operator, 6 to contractors · 124 marked S&S
Imminent danger orders, section 107(a)
1
MSHA's list starts July 1, 2010
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
Oct 25 to Oct 29, 2026Inspectors 1 | Hours on site 28.25

The inspection

BeganINSPECTION_BEGIN_DT
Oct 25, 2026
Closed outINSPECTION_END_DT
Oct 29, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
F048EDD
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
28.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
53.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2027
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 18 to Jun 23, 2026Inspectors 1 | Hours on site 46

The inspection

BeganINSPECTION_BEGIN_DT
Jun 18, 2026
Closed outINSPECTION_END_DT
Jun 23, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
F018862
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
46
Total inspection hoursSUM_TOTAL_INSP_HOURS
75.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Impoundment Spot Inspection
Jan 14, 2026Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Jan 14, 2026
Closed outINSPECTION_END_DT
Jan 14, 2026
ActivityACTIVITY
Impoundment Spot Inspection
Activity codeACTIVITY_CODE
E23
Program areaPROGRAM_AREA
Coal--Impoundment Spot Inspection
Event numberEVENT_NO
F01884E
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
2

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jan 11 to Jan 16, 2026Inspectors 1 | Hours on site 30

The inspection

BeganINSPECTION_BEGIN_DT
Jan 11, 2026
Closed outINSPECTION_END_DT
Jan 16, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
F01884D
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
30
Total inspection hoursSUM_TOTAL_INSP_HOURS
51

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Impoundment Spot Inspection
Jun 6 to Jun 7, 2025Inspectors 1 | Hours on site 0.5

The inspection

BeganINSPECTION_BEGIN_DT
Jun 6, 2025
Closed outINSPECTION_END_DT
Jun 7, 2025
ActivityACTIVITY
Impoundment Spot Inspection
Activity codeACTIVITY_CODE
E23
Program areaPROGRAM_AREA
Coal--Impoundment Spot Inspection
Event numberEVENT_NO
F01A043
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
2.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 3 to Jun 7, 2025Inspectors 1 | Hours on site 31.25

The inspection

BeganINSPECTION_BEGIN_DT
Jun 3, 2025
Closed outINSPECTION_END_DT
Jun 7, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
F01A042
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
31.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
49.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Impoundment Spot Inspection
Feb 27, 2025Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Feb 27, 2025
Closed outINSPECTION_END_DT
Feb 27, 2025
ActivityACTIVITY
Impoundment Spot Inspection
Activity codeACTIVITY_CODE
E23
Program areaPROGRAM_AREA
Coal--Impoundment Spot Inspection
Event numberEVENT_NO
F014606
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
1

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 25 to Mar 8, 2025Inspectors 1 | Hours on site 27.5

The inspection

BeganINSPECTION_BEGIN_DT
Feb 25, 2025
Closed outINSPECTION_END_DT
Mar 8, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
F014605
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
27.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
67.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Impoundment Spot Inspection
May 8 to May 12, 2024Inspectors 1 | Hours on site 2.5

The inspection

BeganINSPECTION_BEGIN_DT
May 8, 2024
Closed outINSPECTION_END_DT
May 12, 2024
ActivityACTIVITY
Impoundment Spot Inspection
Activity codeACTIVITY_CODE
E23
Program areaPROGRAM_AREA
Coal--Impoundment Spot Inspection
Event numberEVENT_NO
6876167
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
2.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 7 to May 14, 2024Inspectors 1 | Hours on site 39.25

The inspection

BeganINSPECTION_BEGIN_DT
May 7, 2024
Closed outINSPECTION_END_DT
May 14, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
6876166
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
39.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
87

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Non-Injury Accident Investigation
Feb 7 to Feb 9, 2024Inspectors 1 | Hours on site 8.75

The inspection

BeganINSPECTION_BEGIN_DT
Feb 7, 2024
Closed outINSPECTION_END_DT
Feb 9, 2024
ActivityACTIVITY
Non-Injury Accident Investigation
Activity codeACTIVITY_CODE
E08
Program areaPROGRAM_AREA
Coal--Non-Injury Accident Investigation
Event numberEVENT_NO
6876153
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
40

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Impoundment Spot Inspection
Dec 1 to Dec 3, 2023Inspectors 1 | Hours on site 2.5

The inspection

BeganINSPECTION_BEGIN_DT
Dec 1, 2023
Closed outINSPECTION_END_DT
Dec 3, 2023
ActivityACTIVITY
Impoundment Spot Inspection
Activity codeACTIVITY_CODE
E23
Program areaPROGRAM_AREA
Coal--Impoundment Spot Inspection
Event numberEVENT_NO
6876137
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
3.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Nov 29 to Dec 14, 2023Inspectors 1 | Hours on site 66

The inspection

BeganINSPECTION_BEGIN_DT
Nov 29, 2023
Closed outINSPECTION_END_DT
Dec 14, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
6876136
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
66
Total inspection hoursSUM_TOTAL_INSP_HOURS
112

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Impoundment Spot Inspection
May 23 to May 24, 2023Inspectors 1 | Hours on site 0.75

The inspection

BeganINSPECTION_BEGIN_DT
May 23, 2023
Closed outINSPECTION_END_DT
May 24, 2023
ActivityACTIVITY
Impoundment Spot Inspection
Activity codeACTIVITY_CODE
E23
Program areaPROGRAM_AREA
Coal--Impoundment Spot Inspection
Event numberEVENT_NO
6876449
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
2.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 22 to Jun 7, 2023Inspectors 1 | Hours on site 38.75

The inspection

BeganINSPECTION_BEGIN_DT
May 22, 2023
Closed outINSPECTION_END_DT
Jun 7, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
6876448
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
38.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
69.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Impoundment Spot Inspection
Oct 15 to Oct 17, 2022Inspectors 1 | Hours on site 0.5

The inspection

BeganINSPECTION_BEGIN_DT
Oct 15, 2022
Closed outINSPECTION_END_DT
Oct 17, 2022
ActivityACTIVITY
Impoundment Spot Inspection
Activity codeACTIVITY_CODE
E23
Program areaPROGRAM_AREA
Coal--Impoundment Spot Inspection
Event numberEVENT_NO
1124196
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
4.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Oct 12 to Oct 19, 2022Inspectors 1 | Hours on site 47

The inspection

BeganINSPECTION_BEGIN_DT
Oct 12, 2022
Closed outINSPECTION_END_DT
Oct 19, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
1124195
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
47
Total inspection hoursSUM_TOTAL_INSP_HOURS
80.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Impoundment Spot Inspection
Jul 16, 2022Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Jul 16, 2022
Closed outINSPECTION_END_DT
Jul 16, 2022
ActivityACTIVITY
Impoundment Spot Inspection
Activity codeACTIVITY_CODE
E23
Program areaPROGRAM_AREA
Coal--Impoundment Spot Inspection
Event numberEVENT_NO
6876212
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
3

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 13 to Jul 22, 2022Inspectors 1 | Hours on site 48.5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 13, 2022
Closed outINSPECTION_END_DT
Jul 22, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
6876211
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
48.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
82

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Impoundment Spot Inspection
Jan 6, 2022Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Jan 6, 2022
Closed outINSPECTION_END_DT
Jan 6, 2022
ActivityACTIVITY
Impoundment Spot Inspection
Activity codeACTIVITY_CODE
E23
Program areaPROGRAM_AREA
Coal--Impoundment Spot Inspection
Event numberEVENT_NO
1146875
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
1.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Dec 12, 2021 to Jan 13, 2022Inspectors 1 | Hours on site 42

The inspection

BeganINSPECTION_BEGIN_DT
Dec 12, 2021
Closed outINSPECTION_END_DT
Jan 13, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
1146874
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
42
Total inspection hoursSUM_TOTAL_INSP_HOURS
155

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 11 to Aug 19, 2021Inspectors 1 | Hours on site 37.25

The inspection

BeganINSPECTION_BEGIN_DT
Aug 11, 2021
Closed outINSPECTION_END_DT
Aug 19, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
1146555
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
37.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
55.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Feb 21 to Mar 20, 2021Inspectors 1 | Hours on site 60.75

The inspection

BeganINSPECTION_BEGIN_DT
Feb 21, 2021
Closed outINSPECTION_END_DT
Mar 20, 2021
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
1146516
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
60.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
142.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Apr 15 to Jun 23, 2020Inspectors 1 | Hours on site 34

The inspection

BeganINSPECTION_BEGIN_DT
Apr 15, 2020
Closed outINSPECTION_END_DT
Jun 23, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
1146656
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
34
Total inspection hoursSUM_TOTAL_INSP_HOURS
63.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Dec 8, 2019 to Jan 10, 2020Inspectors 1 | Hours on site 50.25

The inspection

BeganINSPECTION_BEGIN_DT
Dec 8, 2019
Closed outINSPECTION_END_DT
Jan 10, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
Coal--Regular Safety and Health Inspection
Event numberEVENT_NO
1146640
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
50.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
103

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Areas inspected

Company recordsCO_RECORDS
Y
Surface area or underground mineSURF_UG_MINE
Y
Surface mine or facilitySURF_FACILITY_MINE
Y
Explosives storageEXPLOSIVE_STORAGE
Y
ImpoundmentsIMPOUNDMENTS
Y

Sections, construction areas and samples

Active working sectionsACTIVE_SECTIONS
2
Dragline or shovel constructionDRAGLINES
1
Respiratory dust samplesSAMPLE_CNT_RESPDUST
5
Noise samplesSAMPLE_CNT_NOISE
5

Recorded as 0 (9)

Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Other samplesSAMPLE_CNT_OTHER

Recorded as N (5)

Refuse pilesREFUSE_PILES, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

25 most recent of 94 inspections and other MSHA visits since May 22, 2000; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Oct 28, 2026
Type: Citation
Standard: 77.502
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
9687797
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 28, 2026
Time issuedVIOLATION_ISSUE_TIME
0947
Date of occurrenceVIOLATION_OCCUR_DT
Oct 28, 2026
30 CFR part and sectionPART_SECTION
77.502
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 28, 2026
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Oct 28, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Oct 28, 2026
Terminated, timeTERMINATION_TIME
0950
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
Jaffa Construction Inc.
Operator IDVIOLATOR_ID
E368
Contractor IDCONTRACTOR_ID
E368
Inspection eventEVENT_NO
F048EDD
Inspection beganINSPECTION_BEGIN_DT
Oct 25, 2026
Inspection closed outINSPECTION_END_DT
Oct 29, 2026
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2027
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (22)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

Issued: Oct 26, 2026
Type: Citation
Standard: 77.1104
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
9687795
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 26, 2026
Time issuedVIOLATION_ISSUE_TIME
1342
Date of occurrenceVIOLATION_OCCUR_DT
Oct 26, 2026
30 CFR part and sectionPART_SECTION
77.1104
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 2, 2026
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Nov 2, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Oct 27, 2026
Terminated, timeTERMINATION_TIME
1000
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F048EDD
Inspection beganINSPECTION_BEGIN_DT
Oct 25, 2026
Inspection closed outINSPECTION_END_DT
Oct 29, 2026
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2027
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (22)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 26, 2026
Type: Citation
Standard: 77.1605(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
9687794
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 26, 2026
Time issuedVIOLATION_ISSUE_TIME
1133
Date of occurrenceVIOLATION_OCCUR_DT
Oct 26, 2026
30 CFR part and sectionPART_SECTION
77.1605(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Nov 2, 2026
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Nov 2, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Oct 27, 2026
Terminated, timeTERMINATION_TIME
1248
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F048EDD
Inspection beganINSPECTION_BEGIN_DT
Oct 25, 2026
Inspection closed outINSPECTION_END_DT
Oct 29, 2026
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2027
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (22)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Oct 26, 2026
Type: Citation
Standard: 77.205(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
9687796
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 26, 2026
Time issuedVIOLATION_ISSUE_TIME
1353
Date of occurrenceVIOLATION_OCCUR_DT
Oct 26, 2026
30 CFR part and sectionPART_SECTION
77.205(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 28, 2026
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Oct 28, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Oct 27, 2026
Terminated, timeTERMINATION_TIME
1001
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F048EDD
Inspection beganINSPECTION_BEGIN_DT
Oct 25, 2026
Inspection closed outINSPECTION_END_DT
Oct 29, 2026
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2027
MSHA fiscal quarterFISCAL_QTR
1

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (22)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 20, 2026
Type: Citation
Standard: 77.1104
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5101816
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 20, 2026
Time issuedVIOLATION_ISSUE_TIME
1405
Date of occurrenceVIOLATION_OCCUR_DT
Jun 20, 2026
30 CFR part and sectionPART_SECTION
77.1104
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 22, 2026
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 22, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 22, 2026
Terminated, timeTERMINATION_TIME
1038
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 26, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F018862
Inspection beganINSPECTION_BEGIN_DT
Jun 18, 2026
Inspection closed outINSPECTION_END_DT
Jun 23, 2026
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 20, 2026
Type: Citation
Standard: 77.904
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5101813
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 20, 2026
Time issuedVIOLATION_ISSUE_TIME
0920
Date of occurrenceVIOLATION_OCCUR_DT
Jun 20, 2026
30 CFR part and sectionPART_SECTION
77.904
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 22, 2026
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 22, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 22, 2026
Terminated, timeTERMINATION_TIME
0834
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 26, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F018862
Inspection beganINSPECTION_BEGIN_DT
Jun 18, 2026
Inspection closed outINSPECTION_END_DT
Jun 23, 2026
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 20, 2026
Type: Citation
Standard: 77.404(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $193.00
Details

The citation

Citation or order numberVIOLATION_NO
5101817
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 20, 2026
Time issuedVIOLATION_ISSUE_TIME
1415
Date of occurrenceVIOLATION_OCCUR_DT
Jun 20, 2026
30 CFR part and sectionPART_SECTION
77.404(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 22, 2026
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 22, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 20, 2026
Terminated, timeTERMINATION_TIME
1500
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
193
Current proposed assessmentAMOUNT_DUE
193
Amount paidAMOUNT_PAID
193
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 26, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F018862
Inspection beganINSPECTION_BEGIN_DT
Jun 18, 2026
Inspection closed outINSPECTION_END_DT
Jun 23, 2026
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 20, 2026
Type: Citation
Standard: 77.205(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5101814
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 20, 2026
Time issuedVIOLATION_ISSUE_TIME
0945
Date of occurrenceVIOLATION_OCCUR_DT
Jun 20, 2026
30 CFR part and sectionPART_SECTION
77.205(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 22, 2026
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 22, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 22, 2026
Terminated, timeTERMINATION_TIME
0836
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 26, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F018862
Inspection beganINSPECTION_BEGIN_DT
Jun 18, 2026
Inspection closed outINSPECTION_END_DT
Jun 23, 2026
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 20, 2026
Type: Citation
Standard: 77.404(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5101815
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 20, 2026
Time issuedVIOLATION_ISSUE_TIME
1350
Date of occurrenceVIOLATION_OCCUR_DT
Jun 20, 2026
30 CFR part and sectionPART_SECTION
77.404(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 22, 2026
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Jun 22, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Jun 22, 2026
Terminated, timeTERMINATION_TIME
0839
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 26, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F018862
Inspection beganINSPECTION_BEGIN_DT
Jun 18, 2026
Inspection closed outINSPECTION_END_DT
Jun 23, 2026
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 20, 2026
Type: Citation
Standard: 77.1102
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5101818
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 20, 2026
Time issuedVIOLATION_ISSUE_TIME
1422
Date of occurrenceVIOLATION_OCCUR_DT
Jun 20, 2026
30 CFR part and sectionPART_SECTION
77.1102
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 22, 2026
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 22, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jun 22, 2026
Terminated, timeTERMINATION_TIME
0846
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 26, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F018862
Inspection beganINSPECTION_BEGIN_DT
Jun 18, 2026
Inspection closed outINSPECTION_END_DT
Jun 23, 2026
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 16, 2026
Type: Citation
Standard: 77.514
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $193.00
Details

The citation

Citation or order numberVIOLATION_NO
9687595
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 16, 2026
Time issuedVIOLATION_ISSUE_TIME
1330
Date of occurrenceVIOLATION_OCCUR_DT
Jan 16, 2026
30 CFR part and sectionPART_SECTION
77.514
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 17, 2026
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jan 17, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jan 17, 2026
Terminated, timeTERMINATION_TIME
1000
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
193
Current proposed assessmentAMOUNT_DUE
193
Amount paidAMOUNT_PAID
193
Bill first printedBILL_PRINT_DT
Mar 10, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Apr 18, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 28, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
10
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
19

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F01884D
Inspection beganINSPECTION_BEGIN_DT
Jan 11, 2026
Inspection closed outINSPECTION_END_DT
Jan 16, 2026
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jan 16, 2026
Type: Citation
Standard: 77.205(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $193.00
Details

The citation

Citation or order numberVIOLATION_NO
9687596
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jan 16, 2026
Time issuedVIOLATION_ISSUE_TIME
1335
Date of occurrenceVIOLATION_OCCUR_DT
Jan 16, 2026
30 CFR part and sectionPART_SECTION
77.205(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jan 17, 2026
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jan 17, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jan 17, 2026
Terminated, timeTERMINATION_TIME
1000
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
193
Current proposed assessmentAMOUNT_DUE
193
Amount paidAMOUNT_PAID
193
Bill first printedBILL_PRINT_DT
Mar 10, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Apr 18, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Mar 28, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
10
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
19

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F01884D
Inspection beganINSPECTION_BEGIN_DT
Jan 11, 2026
Inspection closed outINSPECTION_END_DT
Jan 16, 2026
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 5, 2025
Type: Citation
Standard: 77.1710(i)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5101502
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 5, 2025
Time issuedVIOLATION_ISSUE_TIME
0955
Date of occurrenceVIOLATION_OCCUR_DT
Jun 5, 2025
30 CFR part and sectionPART_SECTION
77.1710(i)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 5, 2025
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Jun 5, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Jun 5, 2025
Terminated, timeTERMINATION_TIME
1015
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jul 8, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Aug 13, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 20, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
16

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F01A042
Inspection beganINSPECTION_BEGIN_DT
Jun 3, 2025
Inspection closed outINSPECTION_END_DT
Jun 7, 2025
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 5, 2025
Type: Citation
Standard: 77.502
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5101503
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 5, 2025
Time issuedVIOLATION_ISSUE_TIME
0850
Date of occurrenceVIOLATION_OCCUR_DT
Jun 5, 2025
30 CFR part and sectionPART_SECTION
77.502
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 5, 2025
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jun 5, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jun 5, 2025
Terminated, timeTERMINATION_TIME
1335
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jul 8, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Aug 13, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 20, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
16

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F01A042
Inspection beganINSPECTION_BEGIN_DT
Jun 3, 2025
Inspection closed outINSPECTION_END_DT
Jun 7, 2025
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 4, 2025
Type: Citation
Standard: 77.1007(b)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5101501
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 4, 2025
Time issuedVIOLATION_ISSUE_TIME
1220
Date of occurrenceVIOLATION_OCCUR_DT
Jun 4, 2025
30 CFR part and sectionPART_SECTION
77.1007(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 4, 2025
Originally due, timeORIG_TERM_DUE_TIME
2300
Latest dueLATEST_TERM_DUE_DT
Jun 4, 2025
Latest due, timeLATEST_TERM_DUE_TIME
2300
TerminatedTERMINATION_DT
Jun 4, 2025
Terminated, timeTERMINATION_TIME
2230
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Jul 8, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Aug 13, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 20, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F01A042
Inspection beganINSPECTION_BEGIN_DT
Jun 3, 2025
Inspection closed outINSPECTION_END_DT
Jun 7, 2025
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 6, 2025
Type: Citation
Standard: 77.208(e)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9687971
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 6, 2025
Time issuedVIOLATION_ISSUE_TIME
1430
Date of occurrenceVIOLATION_OCCUR_DT
Mar 6, 2025
30 CFR part and sectionPART_SECTION
77.208(e)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 6, 2025
Originally due, timeORIG_TERM_DUE_TIME
1450
Latest dueLATEST_TERM_DUE_DT
Mar 6, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1450
TerminatedTERMINATION_DT
Mar 6, 2025
Terminated, timeTERMINATION_TIME
1445
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Apr 8, 2025
Final order dateFINAL_ORDER_ISSUE_DT
May 17, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 27, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
17

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F014605
Inspection beganINSPECTION_BEGIN_DT
Feb 25, 2025
Inspection closed outINSPECTION_END_DT
Mar 8, 2025
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 27, 2025
Type: Citation
Standard: 77.1608(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9687970
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 27, 2025
Time issuedVIOLATION_ISSUE_TIME
1050
Date of occurrenceVIOLATION_OCCUR_DT
Feb 27, 2025
30 CFR part and sectionPART_SECTION
77.1608(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 28, 2025
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Feb 28, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Feb 28, 2025
Terminated, timeTERMINATION_TIME
1615
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Apr 8, 2025
Final order dateFINAL_ORDER_ISSUE_DT
May 17, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 27, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
26

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F014605
Inspection beganINSPECTION_BEGIN_DT
Feb 25, 2025
Inspection closed outINSPECTION_END_DT
Mar 8, 2025
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 26, 2025
Type: Citation
Standard: 77.210(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $432.00
Details

The citation

Citation or order numberVIOLATION_NO
9687969
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 26, 2025
Time issuedVIOLATION_ISSUE_TIME
1405
Date of occurrenceVIOLATION_OCCUR_DT
Feb 26, 2025
30 CFR part and sectionPART_SECTION
77.210(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 26, 2025
Originally due, timeORIG_TERM_DUE_TIME
1415
Latest dueLATEST_TERM_DUE_DT
Feb 26, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1415
TerminatedTERMINATION_DT
Feb 26, 2025
Terminated, timeTERMINATION_TIME
1410
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
432
Current proposed assessmentAMOUNT_DUE
432
Amount paidAMOUNT_PAID
432
Bill first printedBILL_PRINT_DT
Apr 8, 2025
Final order dateFINAL_ORDER_ISSUE_DT
May 17, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 27, 2025
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
24

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
F014605
Inspection beganINSPECTION_BEGIN_DT
Feb 25, 2025
Inspection closed outINSPECTION_END_DT
Mar 8, 2025
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 8, 2024
Type: Citation
Standard: 77.410(b)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $189.00
Details

The citation

Citation or order numberVIOLATION_NO
9687441
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1310
Date of occurrenceVIOLATION_OCCUR_DT
May 8, 2024
30 CFR part and sectionPART_SECTION
77.410(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 8, 2024
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
May 8, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
May 8, 2024
Terminated, timeTERMINATION_TIME
1458
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
189
Current proposed assessmentAMOUNT_DUE
189
Amount paidAMOUNT_PAID
189
Bill first printedBILL_PRINT_DT
Jul 9, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 27, 2024
Last actionLAST_ACTION_CD
Final Order Date
Last action dateLAST_ACTION_DT
Nov 27, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
24

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
6876166
Inspection beganINSPECTION_BEGIN_DT
May 7, 2024
Inspection closed outINSPECTION_END_DT
May 14, 2024
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 8, 2024
Type: Citation
Standard: 77.1606(c)
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $1,395.00
Details

The citation

Citation or order numberVIOLATION_NO
9687451
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1129
Date of occurrenceVIOLATION_OCCUR_DT
May 8, 2024
30 CFR part and sectionPART_SECTION
77.1606(c)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 8, 2024
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 8, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
May 8, 2024
Terminated, timeTERMINATION_TIME
1145
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
1395
Current proposed assessmentAMOUNT_DUE
1395
Amount paidAMOUNT_PAID
1395
Bill first printedBILL_PRINT_DT
Jul 9, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 27, 2024
Last actionLAST_ACTION_CD
Final Order Date
Last action dateLAST_ACTION_DT
Nov 27, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
24

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
6876166
Inspection beganINSPECTION_BEGIN_DT
May 7, 2024
Inspection closed outINSPECTION_END_DT
May 14, 2024
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 8, 2024
Type: Citation
Standard: 77.205(b)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $626.00
Details

The citation

Citation or order numberVIOLATION_NO
9687453
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1404
Date of occurrenceVIOLATION_OCCUR_DT
May 8, 2024
30 CFR part and sectionPART_SECTION
77.205(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 9, 2024
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 9, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
May 9, 2024
Terminated, timeTERMINATION_TIME
1130
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
626
Current proposed assessmentAMOUNT_DUE
626
Amount paidAMOUNT_PAID
626
Bill first printedBILL_PRINT_DT
Jul 9, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 27, 2024
Last actionLAST_ACTION_CD
Final Order Date
Last action dateLAST_ACTION_DT
Nov 27, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
24

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
6876166
Inspection beganINSPECTION_BEGIN_DT
May 7, 2024
Inspection closed outINSPECTION_END_DT
May 14, 2024
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 8, 2024
Type: Citation
Standard: 71.402(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9687452
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1355
Date of occurrenceVIOLATION_OCCUR_DT
May 8, 2024
30 CFR part and sectionPART_SECTION
71.402(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 9, 2024
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
May 9, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
May 9, 2024
Terminated, timeTERMINATION_TIME
1030
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Jul 9, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 27, 2024
Last actionLAST_ACTION_CD
Final Order Date
Last action dateLAST_ACTION_DT
Nov 27, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
24

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
6876166
Inspection beganINSPECTION_BEGIN_DT
May 7, 2024
Inspection closed outINSPECTION_END_DT
May 14, 2024
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 8, 2024
Type: Citation
Standard: 77.1606(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
8745596
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Feb 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1055
Date of occurrenceVIOLATION_OCCUR_DT
Feb 6, 2024
30 CFR part and sectionPART_SECTION
77.1606(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Feb 8, 2024
Originally due, timeORIG_TERM_DUE_TIME
1056
Latest dueLATEST_TERM_DUE_DT
Feb 8, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1056
TerminatedTERMINATION_DT
Feb 8, 2024
Terminated, timeTERMINATION_TIME
1058
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Apr 9, 2024
Final order dateFINAL_ORDER_ISSUE_DT
May 15, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 21, 2024
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
22

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
6876153
Inspection beganINSPECTION_BEGIN_DT
Feb 7, 2024
Inspection closed outINSPECTION_END_DT
Feb 9, 2024
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Feb 7, 2024
Type: Order
Standard: Not recorded
S&S: Not recorded
Negligence: Not recorded
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
8745594
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Feb 7, 2024
Time issuedVIOLATION_ISSUE_TIME
1535
Date of occurrenceVIOLATION_OCCUR_DT
Feb 7, 2024
Section of the Act, primarySECTION_OF_ACT_1
103(k)

Abatement

TerminatedTERMINATION_DT
Mar 1, 2024
Terminated, timeTERMINATION_TIME
1221
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Usibelli Coal Mine Inc
Operator IDVIOLATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Inspection eventEVENT_NO
6876153
Inspection beganINSPECTION_BEGIN_DT
Feb 7, 2024
Inspection closed outINSPECTION_END_DT
Feb 9, 2024
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (32)

30 CFR part and sectionPART_SECTION, Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Dec 2, 2023
Type: Citation
Standard: 77.1605(a)
S&S: N
Negligence: ModNegligence
Issued to: Contractor
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
8745556
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Dec 2, 2023
Time issuedVIOLATION_ISSUE_TIME
1127
Date of occurrenceVIOLATION_OCCUR_DT
Dec 2, 2023
30 CFR part and sectionPART_SECTION
77.1605(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Enforcement areaENFORCEMENT_AREA
Safety

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Dec 15, 2023
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Dec 15, 2023
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Dec 13, 2023
Terminated, timeTERMINATION_TIME
0558
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Jan 24, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Feb 29, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Feb 4, 2024

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Contractor
Operator at the timeVIOLATOR_NAME
North Pole Coal
Operator IDVIOLATOR_ID
T492
Contractor IDCONTRACTOR_ID
T492
Inspection eventEVENT_NO
6876136
Inspection beganINSPECTION_BEGIN_DT
Nov 29, 2023
Inspection closed outINSPECTION_END_DT
Dec 14, 2023
Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Primary mine or millPRIMARY_OR_MILL, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Controller at the timeCONTROLLER_NAME, Controller IDCONTROLLER_ID

626 citations and orders since May 23, 2000: 620 issued to the operator, 6 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Jun 20, 2026
Citation number: 5101815
Standard: 77.404(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5101815
Assessment control numberASSESS_CASE_NO
000646140
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 26, 2026
Citation issuedISSUE_DT
Jun 20, 2026
Date of occurrenceOCCURRENCE_DT
Jun 20, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.404(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15
Violations per inspection dayVPID
0.53
Operator tonnageVIOLATOR_PRODUCTION_AMT
1107417
Size of mineSIZE_OF_MINE
1107417
Controller tonnageCONTROLLER_PRODUCTION_AMT
1107417
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1107417
History period startHISTORY_START_DT
Mar 20, 2025
History period endHISTORY_END_DT
Jun 19, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F018862
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 20, 2026
Citation number: 5101818
Standard: 77.1102
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5101818
Assessment control numberASSESS_CASE_NO
000646140
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 26, 2026
Citation issuedISSUE_DT
Jun 20, 2026
Date of occurrenceOCCURRENCE_DT
Jun 20, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.1102
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15
Violations per inspection dayVPID
0.53
Operator tonnageVIOLATOR_PRODUCTION_AMT
1107417
Size of mineSIZE_OF_MINE
1107417
Controller tonnageCONTROLLER_PRODUCTION_AMT
1107417
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1107417
History period startHISTORY_START_DT
Mar 20, 2025
History period endHISTORY_END_DT
Jun 19, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F018862
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 20, 2026
Citation number: 5101813
Standard: 77.904
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5101813
Assessment control numberASSESS_CASE_NO
000646140
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 26, 2026
Citation issuedISSUE_DT
Jun 20, 2026
Date of occurrenceOCCURRENCE_DT
Jun 20, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.904
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15
Violations per inspection dayVPID
0.53
Operator tonnageVIOLATOR_PRODUCTION_AMT
1107417
Size of mineSIZE_OF_MINE
1107417
Controller tonnageCONTROLLER_PRODUCTION_AMT
1107417
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1107417
History period startHISTORY_START_DT
Mar 20, 2025
History period endHISTORY_END_DT
Jun 19, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F018862
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 20, 2026
Citation number: 5101817
Standard: 77.404(a)
Proposed penalty: $193.00
Current assessment: $193.00
Paid against proposed penalty: $193.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5101817
Assessment control numberASSESS_CASE_NO
000646140
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 26, 2026
Citation issuedISSUE_DT
Jun 20, 2026
Date of occurrenceOCCURRENCE_DT
Jun 20, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.404(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
193.00
Current assessmentCURRENT_ASSESSMENT_AMT
193.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
193.00

Penalty points

Violation history pointsPENALTY_POINTS
63
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15
Violations per inspection dayVPID
0.53
Operator tonnageVIOLATOR_PRODUCTION_AMT
1107417
Size of mineSIZE_OF_MINE
1107417
Controller tonnageCONTROLLER_PRODUCTION_AMT
1107417
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1107417
History period startHISTORY_START_DT
Mar 20, 2025
History period endHISTORY_END_DT
Jun 19, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F018862
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 20, 2026
Citation number: 5101816
Standard: 77.1104
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5101816
Assessment control numberASSESS_CASE_NO
000646140
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 26, 2026
Citation issuedISSUE_DT
Jun 20, 2026
Date of occurrenceOCCURRENCE_DT
Jun 20, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.1104
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15
Violations per inspection dayVPID
0.53
Operator tonnageVIOLATOR_PRODUCTION_AMT
1107417
Size of mineSIZE_OF_MINE
1107417
Controller tonnageCONTROLLER_PRODUCTION_AMT
1107417
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1107417
History period startHISTORY_START_DT
Mar 20, 2025
History period endHISTORY_END_DT
Jun 19, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F018862
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 20, 2026
Citation number: 5101814
Standard: 77.205(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5101814
Assessment control numberASSESS_CASE_NO
000646140
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 26, 2026
Citation issuedISSUE_DT
Jun 20, 2026
Date of occurrenceOCCURRENCE_DT
Jun 20, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.205(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15
Violations per inspection dayVPID
0.53
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.067
Operator tonnageVIOLATOR_PRODUCTION_AMT
1107417
Size of mineSIZE_OF_MINE
1107417
Controller tonnageCONTROLLER_PRODUCTION_AMT
1107417
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1107417
History period startHISTORY_START_DT
Mar 20, 2025
History period endHISTORY_END_DT
Jun 19, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F018862
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (10)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 16, 2026
Citation number: 9687596
Standard: 77.205(b)
Proposed penalty: $193.00
Current assessment: $193.00
Paid against proposed penalty: $193.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9687596
Assessment control numberASSESS_CASE_NO
000637004
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 28, 2026
Citation issuedISSUE_DT
Jan 16, 2026
Date of occurrenceOCCURRENCE_DT
Jan 16, 2026
Final order dateFINAL_ORDER_DT
Apr 18, 2026
Bill first printedBILL_PRINT_DT
Mar 10, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 18, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.205(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
193.00
Current assessmentCURRENT_ASSESSMENT_AMT
193.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
193.00

Penalty points

Violation history pointsPENALTY_POINTS
63
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
5
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
10
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
19
Violations per inspection dayVPID
0.53
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.053
Operator tonnageVIOLATOR_PRODUCTION_AMT
1107417
Size of mineSIZE_OF_MINE
1107417
Controller tonnageCONTROLLER_PRODUCTION_AMT
1107417
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1107417
History period startHISTORY_START_DT
Oct 16, 2024
History period endHISTORY_END_DT
Jan 15, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F01884D
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jan 16, 2026
Citation number: 9687595
Standard: 77.514
Proposed penalty: $193.00
Current assessment: $193.00
Paid against proposed penalty: $193.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9687595
Assessment control numberASSESS_CASE_NO
000637004
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 28, 2026
Citation issuedISSUE_DT
Jan 16, 2026
Date of occurrenceOCCURRENCE_DT
Jan 16, 2026
Final order dateFINAL_ORDER_DT
Apr 18, 2026
Bill first printedBILL_PRINT_DT
Mar 10, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 18, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.514
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
193.00
Current assessmentCURRENT_ASSESSMENT_AMT
193.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
193.00

Penalty points

Violation history pointsPENALTY_POINTS
63
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
5
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
10
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
19
Violations per inspection dayVPID
0.53
Operator tonnageVIOLATOR_PRODUCTION_AMT
1107417
Size of mineSIZE_OF_MINE
1107417
Controller tonnageCONTROLLER_PRODUCTION_AMT
1107417
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1107417
History period startHISTORY_START_DT
Oct 16, 2024
History period endHISTORY_END_DT
Jan 15, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F01884D
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 5, 2025
Citation number: 5101503
Standard: 77.502
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5101503
Assessment control numberASSESS_CASE_NO
000624059
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 20, 2025
Citation issuedISSUE_DT
Jun 5, 2025
Date of occurrenceOCCURRENCE_DT
Jun 5, 2025
Final order dateFINAL_ORDER_DT
Aug 13, 2025
Bill first printedBILL_PRINT_DT
Jul 8, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 13, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.502
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
16
Violations per inspection dayVPID
0.5
Operator tonnageVIOLATOR_PRODUCTION_AMT
1003565
Size of mineSIZE_OF_MINE
1003565
Controller tonnageCONTROLLER_PRODUCTION_AMT
1003565
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1003565
History period startHISTORY_START_DT
Mar 5, 2024
History period endHISTORY_END_DT
Jun 4, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F01A042
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 5, 2025
Citation number: 5101502
Standard: 77.1710(i)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5101502
Assessment control numberASSESS_CASE_NO
000624059
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 20, 2025
Citation issuedISSUE_DT
Jun 5, 2025
Date of occurrenceOCCURRENCE_DT
Jun 5, 2025
Final order dateFINAL_ORDER_DT
Aug 13, 2025
Bill first printedBILL_PRINT_DT
Jul 8, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 13, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.1710(i)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
16
Violations per inspection dayVPID
0.5
Operator tonnageVIOLATOR_PRODUCTION_AMT
1003565
Size of mineSIZE_OF_MINE
1003565
Controller tonnageCONTROLLER_PRODUCTION_AMT
1003565
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1003565
History period startHISTORY_START_DT
Mar 5, 2024
History period endHISTORY_END_DT
Jun 4, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F01A042
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 4, 2025
Citation number: 5101501
Standard: 77.1007(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5101501
Assessment control numberASSESS_CASE_NO
000624059
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 20, 2025
Citation issuedISSUE_DT
Jun 4, 2025
Date of occurrenceOCCURRENCE_DT
Jun 4, 2025
Final order dateFINAL_ORDER_DT
Aug 13, 2025
Bill first printedBILL_PRINT_DT
Jul 8, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 13, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.1007(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
53
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
15
Violations per inspection dayVPID
0.53
Operator tonnageVIOLATOR_PRODUCTION_AMT
1003565
Size of mineSIZE_OF_MINE
1003565
Controller tonnageCONTROLLER_PRODUCTION_AMT
1003565
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1003565
History period startHISTORY_START_DT
Mar 4, 2024
History period endHISTORY_END_DT
Jun 3, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F01A042
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 6, 2025
Citation number: 9687971
Standard: 77.208(e)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9687971
Assessment control numberASSESS_CASE_NO
000617876
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 27, 2025
Citation issuedISSUE_DT
Mar 6, 2025
Date of occurrenceOCCURRENCE_DT
Mar 6, 2025
Final order dateFINAL_ORDER_DT
May 17, 2025
Bill first printedBILL_PRINT_DT
Apr 8, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 17, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.208(e)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
17
Violations per inspection dayVPID
0.41
Operator tonnageVIOLATOR_PRODUCTION_AMT
1003565
Size of mineSIZE_OF_MINE
1003565
Controller tonnageCONTROLLER_PRODUCTION_AMT
1003565
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1003565
History period startHISTORY_START_DT
Dec 6, 2023
History period endHISTORY_END_DT
Mar 5, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F014605
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 27, 2025
Citation number: 9687970
Standard: 77.1608(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9687970
Assessment control numberASSESS_CASE_NO
000617876
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 27, 2025
Citation issuedISSUE_DT
Feb 27, 2025
Date of occurrenceOCCURRENCE_DT
Feb 27, 2025
Final order dateFINAL_ORDER_DT
May 17, 2025
Bill first printedBILL_PRINT_DT
Apr 8, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 17, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.1608(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
26
Violations per inspection dayVPID
0.27
Operator tonnageVIOLATOR_PRODUCTION_AMT
1003565
Size of mineSIZE_OF_MINE
1003565
Controller tonnageCONTROLLER_PRODUCTION_AMT
1003565
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1003565
History period startHISTORY_START_DT
Nov 27, 2023
History period endHISTORY_END_DT
Feb 26, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F014605
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 26, 2025
Citation number: 9687969
Standard: 77.210(a)
Proposed penalty: $432.00
Current assessment: $432.00
Paid against proposed penalty: $432.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9687969
Assessment control numberASSESS_CASE_NO
000617876
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 27, 2025
Citation issuedISSUE_DT
Feb 26, 2025
Date of occurrenceOCCURRENCE_DT
Feb 26, 2025
Final order dateFINAL_ORDER_DT
May 17, 2025
Bill first printedBILL_PRINT_DT
Apr 8, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 17, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.210(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
432.00
Current assessmentCURRENT_ASSESSMENT_AMT
432.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
432.00

Penalty points

Violation history pointsPENALTY_POINTS
73
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
24
Violations per inspection dayVPID
0.29
Operator tonnageVIOLATOR_PRODUCTION_AMT
1003565
Size of mineSIZE_OF_MINE
1003565
Controller tonnageCONTROLLER_PRODUCTION_AMT
1003565
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1003565
History period startHISTORY_START_DT
Nov 26, 2023
History period endHISTORY_END_DT
Feb 25, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F014605
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 8, 2024
Citation number: 9687441
Standard: 77.410(b)
Proposed penalty: $189.00
Current assessment: $189.00
Paid against proposed penalty: $189.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9687441
Assessment control numberASSESS_CASE_NO
000602561
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 20, 2024
Citation issuedISSUE_DT
May 8, 2024
Date of occurrenceOCCURRENCE_DT
May 8, 2024
Final order dateFINAL_ORDER_DT
Nov 27, 2024
Bill first printedBILL_PRINT_DT
Jul 9, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 27, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.410(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
189.00
Current assessmentCURRENT_ASSESSMENT_AMT
189.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
189.00

Penalty points

Violation history pointsPENALTY_POINTS
63
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
24
Violations per inspection dayVPID
0.25
Operator tonnageVIOLATOR_PRODUCTION_AMT
1008994
Size of mineSIZE_OF_MINE
1008994
Controller tonnageCONTROLLER_PRODUCTION_AMT
1008994
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1008994
History period startHISTORY_START_DT
Feb 8, 2023
History period endHISTORY_END_DT
May 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6876166
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 8, 2024
Citation number: 9687451
Standard: 77.1606(c)
Proposed penalty: $1,395.00
Current assessment: $1,395.00
Paid against proposed penalty: $1,395.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9687451
Assessment control numberASSESS_CASE_NO
000602561
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 20, 2024
Citation issuedISSUE_DT
May 8, 2024
Date of occurrenceOCCURRENCE_DT
May 8, 2024
Final order dateFINAL_ORDER_DT
Nov 27, 2024
Bill first printedBILL_PRINT_DT
Jul 9, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 27, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.1606(c)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
1395.00
Current assessmentCURRENT_ASSESSMENT_AMT
1395.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
1395.00

Penalty points

Violation history pointsPENALTY_POINTS
88
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
24
Violations per inspection dayVPID
0.25
Operator tonnageVIOLATOR_PRODUCTION_AMT
1008994
Size of mineSIZE_OF_MINE
1008994
Controller tonnageCONTROLLER_PRODUCTION_AMT
1008994
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1008994
History period startHISTORY_START_DT
Feb 8, 2023
History period endHISTORY_END_DT
May 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6876166
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 8, 2024
Citation number: 9687453
Standard: 77.205(b)
Proposed penalty: $626.00
Current assessment: $626.00
Paid against proposed penalty: $626.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9687453
Assessment control numberASSESS_CASE_NO
000602561
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 20, 2024
Citation issuedISSUE_DT
May 8, 2024
Date of occurrenceOCCURRENCE_DT
May 8, 2024
Final order dateFINAL_ORDER_DT
Nov 27, 2024
Bill first printedBILL_PRINT_DT
Jul 9, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 27, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.205(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
626.00
Current assessmentCURRENT_ASSESSMENT_AMT
626.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
626.00

Penalty points

Violation history pointsPENALTY_POINTS
78
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
24
Violations per inspection dayVPID
0.25
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.042
Operator tonnageVIOLATOR_PRODUCTION_AMT
1008994
Size of mineSIZE_OF_MINE
1008994
Controller tonnageCONTROLLER_PRODUCTION_AMT
1008994
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1008994
History period startHISTORY_START_DT
Feb 8, 2023
History period endHISTORY_END_DT
May 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6876166
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (10)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 8, 2024
Citation number: 9687452
Standard: 71.402(a)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9687452
Assessment control numberASSESS_CASE_NO
000602561
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 20, 2024
Citation issuedISSUE_DT
May 8, 2024
Date of occurrenceOCCURRENCE_DT
May 8, 2024
Final order dateFINAL_ORDER_DT
Nov 27, 2024
Bill first printedBILL_PRINT_DT
Jul 9, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 27, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
71.402(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
58
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
24
Violations per inspection dayVPID
0.25
Operator tonnageVIOLATOR_PRODUCTION_AMT
1008994
Size of mineSIZE_OF_MINE
1008994
Controller tonnageCONTROLLER_PRODUCTION_AMT
1008994
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1008994
History period startHISTORY_START_DT
Feb 8, 2023
History period endHISTORY_END_DT
May 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6876166
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Feb 8, 2024
Citation number: 8745596
Standard: 77.1606(a)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8745596
Assessment control numberASSESS_CASE_NO
000596950
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 21, 2024
Citation issuedISSUE_DT
Feb 8, 2024
Date of occurrenceOCCURRENCE_DT
Feb 6, 2024
Final order dateFINAL_ORDER_DT
May 15, 2024
Bill first printedBILL_PRINT_DT
Apr 9, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 15, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.1606(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
48
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
9
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
22
Violations per inspection dayVPID
0.41
Operator tonnageVIOLATOR_PRODUCTION_AMT
1008994
Size of mineSIZE_OF_MINE
1008994
Controller tonnageCONTROLLER_PRODUCTION_AMT
1008994
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1008994
History period startHISTORY_START_DT
Nov 6, 2022
History period endHISTORY_END_DT
Feb 5, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6876153
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Dec 2, 2023
Citation number: 8745556
Standard: 77.1605(a)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8745556
Assessment control numberASSESS_CASE_NO
000593088
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 4, 2024
Citation issuedISSUE_DT
Dec 2, 2023
Date of occurrenceOCCURRENCE_DT
Dec 2, 2023
Final order dateFINAL_ORDER_DT
Feb 29, 2024
Bill first printedBILL_PRINT_DT
Jan 24, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 29, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.1605(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
1250
History period startHISTORY_START_DT
Sep 2, 2022
History period endHISTORY_END_DT
Dec 1, 2023

Who

Issued toVIOLATOR_TYPE_CD
Contractor
Name at the time of the assessmentVIOLATOR_NAME
North Pole Coal
IDVIOLATOR_ID
T492
Operator start at the mine, as assessedVIOLATOR_START_DT
Feb 11, 2008
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6876136
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (19)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Mine Act sectionMINE_ACT_SECTION_CD, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Dec 1, 2023
Citation number: 8745555
Standard: 77.205(e)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8745555
Assessment control numberASSESS_CASE_NO
000592028
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 25, 2024
Citation issuedISSUE_DT
Dec 1, 2023
Date of occurrenceOCCURRENCE_DT
Dec 1, 2023
Final order dateFINAL_ORDER_DT
Feb 15, 2024
Bill first printedBILL_PRINT_DT
Jan 9, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 15, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.205(e)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
53
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
5
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
19
Violations per inspection dayVPID
0.68
Operator tonnageVIOLATOR_PRODUCTION_AMT
1014307
Size of mineSIZE_OF_MINE
1014307
Controller tonnageCONTROLLER_PRODUCTION_AMT
1014307
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1014307
History period startHISTORY_START_DT
Sep 1, 2022
History period endHISTORY_END_DT
Nov 30, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6876136
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Dec 1, 2023
Citation number: 8745553
Standard: 77.1103(a)
Proposed penalty: $182.00
Current assessment: $182.00
Paid against proposed penalty: $182.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8745553
Assessment control numberASSESS_CASE_NO
000592028
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 25, 2024
Citation issuedISSUE_DT
Dec 1, 2023
Date of occurrenceOCCURRENCE_DT
Dec 1, 2023
Final order dateFINAL_ORDER_DT
Feb 15, 2024
Bill first printedBILL_PRINT_DT
Jan 9, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2024
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 15, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.1103(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
182.00
Current assessmentCURRENT_ASSESSMENT_AMT
182.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
182.00

Penalty points

Violation history pointsPENALTY_POINTS
63
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
5
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
19
Violations per inspection dayVPID
0.68
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.053
Operator tonnageVIOLATOR_PRODUCTION_AMT
1014307
Size of mineSIZE_OF_MINE
1014307
Controller tonnageCONTROLLER_PRODUCTION_AMT
1014307
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1014307
History period startHISTORY_START_DT
Sep 1, 2022
History period endHISTORY_END_DT
Nov 30, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6876136
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (9)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 6, 2023
Citation number: 6563298
Standard: 77.205(b)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6563298
Assessment control numberASSESS_CASE_NO
000582260
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 26, 2023
Citation issuedISSUE_DT
Jun 6, 2023
Date of occurrenceOCCURRENCE_DT
Jun 6, 2023
Final order dateFINAL_ORDER_DT
Sep 20, 2023
Bill first printedBILL_PRINT_DT
Aug 8, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 20, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.205(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
53
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
5
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
14
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
26
Violations per inspection dayVPID
0.54
Operator tonnageVIOLATOR_PRODUCTION_AMT
1014307
Size of mineSIZE_OF_MINE
1014307
Controller tonnageCONTROLLER_PRODUCTION_AMT
1014307
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1014307
History period startHISTORY_START_DT
Mar 6, 2022
History period endHISTORY_END_DT
Jun 5, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6876448
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 5, 2023
Citation number: 6563297
Standard: 77.1104
Proposed penalty: $182.00
Current assessment: $182.00
Paid against proposed penalty: $182.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6563297
Assessment control numberASSESS_CASE_NO
000582260
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 26, 2023
Citation issuedISSUE_DT
Jun 5, 2023
Date of occurrenceOCCURRENCE_DT
Jun 5, 2023
Final order dateFINAL_ORDER_DT
Sep 20, 2023
Bill first printedBILL_PRINT_DT
Aug 8, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 20, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
77.1104
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
182.00
Current assessmentCURRENT_ASSESSMENT_AMT
182.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
182.00

Penalty points

Violation history pointsPENALTY_POINTS
63
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
5
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
14
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
24
Violations per inspection dayVPID
0.58
Operator tonnageVIOLATOR_PRODUCTION_AMT
1014307
Size of mineSIZE_OF_MINE
1014307
Controller tonnageCONTROLLER_PRODUCTION_AMT
1014307
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1014307
History period startHISTORY_START_DT
Mar 5, 2022
History period endHISTORY_END_DT
Jun 4, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6876448
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 5, 2023
Citation number: 6563296
Standard: 47.44(b)
Proposed penalty: $143.00
Current assessment: $143.00
Paid against proposed penalty: $143.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6563296
Assessment control numberASSESS_CASE_NO
000582260
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 26, 2023
Citation issuedISSUE_DT
Jun 5, 2023
Date of occurrenceOCCURRENCE_DT
Jun 5, 2023
Final order dateFINAL_ORDER_DT
Sep 20, 2023
Bill first printedBILL_PRINT_DT
Aug 8, 2023
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 20, 2023
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
47.44(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
143.00
Current assessmentCURRENT_ASSESSMENT_AMT
143.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
143.00

Penalty points

Violation history pointsPENALTY_POINTS
53
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
5
Mine size pointsMINE_SIZE_POINTS
14
Controller size pointsCONTROLLER_SIZE_POINTS
8

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
14
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
24
Violations per inspection dayVPID
0.58
Operator tonnageVIOLATOR_PRODUCTION_AMT
1014307
Size of mineSIZE_OF_MINE
1014307
Controller tonnageCONTROLLER_PRODUCTION_AMT
1014307
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
1014307
History period startHISTORY_START_DT
Mar 5, 2022
History period endHISTORY_END_DT
Jun 4, 2023

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Usibelli Coal Mine Inc
IDVIOLATOR_ID
P04002
Operator start at the mine, as assessedVIOLATOR_START_DT
Jan 1, 1950
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6876448
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Controller hours workedCONTROLLER_HRS

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 611 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Contested citations and decisions

Contested: Mar 24, 2020
Citation issued: Jan 9, 2020
Docket: WEST 2020-0222
Standard: 77.201-1
Proposed penalty: $448.00
Penalty after decision: $0.00
Decided: Jul 2, 2020
Decision type: Withdrawal
Details

The contest

Citation or order numberCITATION_NO
9435355
Citation issuedCITATION_ISSUE_DT
Jan 9, 2020
Hearing request receivedCONTEST_DT
Mar 24, 2020
Docket numberDOCKET_NO
WEST 2020-0222
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Margaret
Judge, last nameJUDGE_LAST_NAME
Miller
Decision typeDOCKET_DECISION_TYPE_CODE
Withdrawal
DecidedDECISION_DT
Jul 2, 2020
Petition duePETITION_DUE_DT
May 8, 2020
Petition filedPETITION_FILED_DT
Apr 23, 2020

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
448.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.201-1
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as 0 (1)

Penalty after the decisionDECISION_PENALTY_AMT

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Mar 3, 2020
Citation issued: Dec 11, 2019
Docket: WEST 2020-0204
Standard: 77.502
Proposed penalty: $567.00
Penalty after decision: $454.00
Decided: May 20, 2020
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9435354
Citation issuedCITATION_ISSUE_DT
Dec 11, 2019
Hearing request receivedCONTEST_DT
Mar 3, 2020
Docket numberDOCKET_NO
WEST 2020-0204
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Margaret
Judge, last nameJUDGE_LAST_NAME
Miller
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
May 20, 2020
Petition duePETITION_DUE_DT
Apr 17, 2020
Petition filedPETITION_FILED_DT
Mar 17, 2020

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
567.00
Penalty after the decisionDECISION_PENALTY_AMT
454.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.502
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Mar 3, 2020
Citation issued: Dec 11, 2019
Docket: WEST 2020-0204
Standard: 77.211-1
Proposed penalty: $567.00
Penalty after decision: $567.00
Decided: May 20, 2020
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9435353
Citation issuedCITATION_ISSUE_DT
Dec 11, 2019
Hearing request receivedCONTEST_DT
Mar 3, 2020
Docket numberDOCKET_NO
WEST 2020-0204
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Margaret
Judge, last nameJUDGE_LAST_NAME
Miller
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
May 20, 2020
Petition duePETITION_DUE_DT
Apr 17, 2020
Petition filedPETITION_FILED_DT
Mar 17, 2020

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
567.00
Penalty after the decisionDECISION_PENALTY_AMT
567.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.211-1
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Mar 3, 2020
Citation issued: Dec 10, 2019
Docket: WEST 2020-0204
Standard: 47.41(a)
Proposed penalty: $171.00
Penalty after decision: $137.00
Decided: May 20, 2020
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9435350
Citation issuedCITATION_ISSUE_DT
Dec 10, 2019
Hearing request receivedCONTEST_DT
Mar 3, 2020
Docket numberDOCKET_NO
WEST 2020-0204
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Margaret
Judge, last nameJUDGE_LAST_NAME
Miller
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
May 20, 2020
Petition duePETITION_DUE_DT
Apr 17, 2020
Petition filedPETITION_FILED_DT
Mar 17, 2020

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
171.00
Penalty after the decisionDECISION_PENALTY_AMT
137.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
47.41(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
LowNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Mar 24, 2020
Citation issued: Dec 10, 2019
Docket: WEST 2020-0222
Standard: 77.205(a)
Proposed penalty: $846.00
Penalty after decision: $846.00
Decided: Jul 2, 2020
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9435352
Citation issuedCITATION_ISSUE_DT
Dec 10, 2019
Hearing request receivedCONTEST_DT
Mar 24, 2020
Docket numberDOCKET_NO
WEST 2020-0222
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Margaret
Judge, last nameJUDGE_LAST_NAME
Miller
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 2, 2020
Petition duePETITION_DUE_DT
May 8, 2020
Petition filedPETITION_FILED_DT
Apr 23, 2020

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
846.00
Penalty after the decisionDECISION_PENALTY_AMT
846.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.205(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
M7861

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Mar 3, 2020
Citation issued: Dec 10, 2019
Docket: WEST 2020-0204
Standard: 77.401(b)
Proposed penalty: $254.00
Penalty after decision: $171.00
Decided: May 20, 2020
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9435351
Citation issuedCITATION_ISSUE_DT
Dec 10, 2019
Hearing request receivedCONTEST_DT
Mar 3, 2020
Docket numberDOCKET_NO
WEST 2020-0204
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Margaret
Judge, last nameJUDGE_LAST_NAME
Miller
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
May 20, 2020
Petition duePETITION_DUE_DT
Apr 17, 2020
Petition filedPETITION_FILED_DT
Mar 17, 2020

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
254.00
Penalty after the decisionDECISION_PENALTY_AMT
171.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.401(b)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Nov 19, 2019
Citation issued: Sep 17, 2019
Docket: WEST 2020-0097
Standard: 77.1000
Proposed penalty: $28,114.00
Penalty after decision: $0.00
Decided: Apr 14, 2020
Decision type: Withdrawal
Details

The contest

Citation or order numberCITATION_NO
9435326
Citation issuedCITATION_ISSUE_DT
Sep 17, 2019
Hearing request receivedCONTEST_DT
Nov 19, 2019
Docket numberDOCKET_NO
WEST 2020-0097
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Richard
Judge, last nameJUDGE_LAST_NAME
Manning
Decision typeDOCKET_DECISION_TYPE_CODE
Withdrawal
DecidedDECISION_DT
Apr 14, 2020
Petition duePETITION_DUE_DT
Jan 3, 2020
Petition filedPETITION_FILED_DT
Dec 18, 2019

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
28114.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.1000
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Highly
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as 0 (1)

Penalty after the decisionDECISION_PENALTY_AMT

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Nov 19, 2019
Citation issued: Sep 16, 2019
Docket: WEST 2020-0097
Standard: 77.1608(b)
Proposed penalty: $9,936.00
Penalty after decision: $5,049.00
Decided: Apr 14, 2020
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9435325
Citation issuedCITATION_ISSUE_DT
Sep 16, 2019
Hearing request receivedCONTEST_DT
Nov 19, 2019
Docket numberDOCKET_NO
WEST 2020-0097
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Richard
Judge, last nameJUDGE_LAST_NAME
Manning
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Apr 14, 2020
Petition duePETITION_DUE_DT
Jan 3, 2020
Petition filedPETITION_FILED_DT
Dec 18, 2019

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
9936.00
Penalty after the decisionDECISION_PENALTY_AMT
5049.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.1608(b)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Highly
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
M7861

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: May 8, 2019
Citation issued: Dec 17, 2018
Docket: WEST 2019-0306
Standard: 77.1605(k)
Proposed penalty: $1,577.00
Penalty after decision: $0.00
Decided: Oct 17, 2019
Decision type: Withdrawal
Details

The contest

Citation or order numberCITATION_NO
6367584
Citation issuedCITATION_ISSUE_DT
Dec 17, 2018
Hearing request receivedCONTEST_DT
May 8, 2019
Docket numberDOCKET_NO
WEST 2019-0306
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
L.Zane
Judge, last nameJUDGE_LAST_NAME
Gill
Decision typeDOCKET_DECISION_TYPE_CODE
Withdrawal
DecidedDECISION_DT
Oct 17, 2019
Petition duePETITION_DUE_DT
Jun 24, 2019
Petition filedPETITION_FILED_DT
Jun 6, 2019

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
1577.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.1605(k)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as 0 (1)

Penalty after the decisionDECISION_PENALTY_AMT

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Oct 10, 2018
Citation issued: Jul 18, 2018
Docket: WEST 2019-0021
Standard: 77.1605(k)
Proposed penalty: $638.00
Penalty after decision: $447.00
Decided: Nov 29, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8534052
Citation issuedCITATION_ISSUE_DT
Jul 18, 2018
Hearing request receivedCONTEST_DT
Oct 10, 2018
Docket numberDOCKET_NO
WEST 2019-0021
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Jacqueline
Judge, last nameJUDGE_LAST_NAME
Bulluck
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Nov 29, 2018
Petition duePETITION_DUE_DT
Nov 26, 2018
Petition filedPETITION_FILED_DT
Oct 23, 2018

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
638.00
Penalty after the decisionDECISION_PENALTY_AMT
447.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.1605(k)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
COAL
MSHA representative office codeMSHA_REP_OFFICE_CODE
C0900
MSHA representative officeMSHA_REP_OFFICE_NAME
Lakewood District

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (1)

S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 15, 2017
Docket: WEST 2018-0038
Standard: 77.1104
Proposed penalty: $126.00
Penalty after decision: $126.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9026203
Citation issuedCITATION_ISSUE_DT
Aug 15, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
126.00
Penalty after the decisionDECISION_PENALTY_AMT
126.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.1104
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 15, 2017
Docket: WEST 2018-0038
Standard: 77.516
Proposed penalty: $126.00
Penalty after decision: $126.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8476898
Citation issuedCITATION_ISSUE_DT
Aug 15, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
126.00
Penalty after the decisionDECISION_PENALTY_AMT
126.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.516
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 14, 2017
Docket: WEST 2018-0038
Standard: 77.516
Proposed penalty: $160.00
Penalty after decision: $160.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9026202
Citation issuedCITATION_ISSUE_DT
Aug 14, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
160.00
Penalty after the decisionDECISION_PENALTY_AMT
160.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.516
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 14, 2017
Docket: WEST 2018-0038
Standard: 77.404(a)
Proposed penalty: $160.00
Penalty after decision: $160.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9026201
Citation issuedCITATION_ISSUE_DT
Aug 14, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
160.00
Penalty after the decisionDECISION_PENALTY_AMT
160.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.404(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 14, 2017
Docket: WEST 2018-0038
Standard: 77.205(b)
Proposed penalty: $160.00
Penalty after decision: $160.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9026200
Citation issuedCITATION_ISSUE_DT
Aug 14, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
160.00
Penalty after the decisionDECISION_PENALTY_AMT
160.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.205(b)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 13, 2017
Docket: WEST 2018-0038
Standard: 77.205(b)
Proposed penalty: $160.00
Penalty after decision: $160.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9026198
Citation issuedCITATION_ISSUE_DT
Aug 13, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
160.00
Penalty after the decisionDECISION_PENALTY_AMT
160.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.205(b)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 11, 2017
Docket: WEST 2018-0038
Standard: 77.404(a)
Proposed penalty: $160.00
Penalty after decision: $160.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9026196
Citation issuedCITATION_ISSUE_DT
Aug 11, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
160.00
Penalty after the decisionDECISION_PENALTY_AMT
160.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.404(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 11, 2017
Docket: WEST 2018-0038
Standard: 77.400(a)
Proposed penalty: $116.00
Penalty after decision: $116.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8476896
Citation issuedCITATION_ISSUE_DT
Aug 11, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
116.00
Penalty after the decisionDECISION_PENALTY_AMT
116.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.400(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
LowNegligence
Negligence when decidedDECISION_NEGLIGENCE
LowNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 11, 2017
Docket: WEST 2018-0038
Standard: 77.205(e)
Proposed penalty: $116.00
Penalty after decision: $116.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8476894
Citation issuedCITATION_ISSUE_DT
Aug 11, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
116.00
Penalty after the decisionDECISION_PENALTY_AMT
116.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.205(e)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
LowNegligence
Negligence when decidedDECISION_NEGLIGENCE
LowNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 11, 2017
Docket: WEST 2018-0038
Standard: 77.516
Proposed penalty: $160.00
Penalty after decision: $160.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9026197
Citation issuedCITATION_ISSUE_DT
Aug 11, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
160.00
Penalty after the decisionDECISION_PENALTY_AMT
160.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.516
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 11, 2017
Docket: WEST 2018-0038
Standard: 77.516
Proposed penalty: $160.00
Penalty after decision: $160.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9026195
Citation issuedCITATION_ISSUE_DT
Aug 11, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
160.00
Penalty after the decisionDECISION_PENALTY_AMT
160.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.516
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 11, 2017
Docket: WEST 2018-0038
Standard: 77.516
Proposed penalty: $160.00
Penalty after decision: $160.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8476895
Citation issuedCITATION_ISSUE_DT
Aug 11, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
160.00
Penalty after the decisionDECISION_PENALTY_AMT
160.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.516
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 10, 2017
Docket: WEST 2018-0038
Standard: 77.1605(d)
Proposed penalty: $160.00
Penalty after decision: $160.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
9026194
Citation issuedCITATION_ISSUE_DT
Aug 10, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
160.00
Penalty after the decisionDECISION_PENALTY_AMT
160.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.1605(d)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 25, 2017
Citation issued: Aug 10, 2017
Docket: WEST 2018-0038
Standard: 77.404(a)
Proposed penalty: $160.00
Penalty after decision: $0.00
Decided: Jul 13, 2018
Decision type: Withdrawal
Details

The contest

Citation or order numberCITATION_NO
8476892
Citation issuedCITATION_ISSUE_DT
Aug 10, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Withdrawal
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
160.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.404(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as 0 (1)

Penalty after the decisionDECISION_PENALTY_AMT

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Oct 25, 2017
Citation issued: Aug 10, 2017
Docket: WEST 2018-0038
Standard: 77.1104
Proposed penalty: $160.00
Penalty after decision: $160.00
Decided: Jul 13, 2018
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8476893
Citation issuedCITATION_ISSUE_DT
Aug 10, 2017
Hearing request receivedCONTEST_DT
Oct 25, 2017
Docket numberDOCKET_NO
WEST 2018-0038
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Priscilla
Judge, last nameJUDGE_LAST_NAME
Rae
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 13, 2018
Petition duePETITION_DUE_DT
Dec 11, 2017
Petition filedPETITION_FILED_DT
Nov 29, 2017

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
160.00
Penalty after the decisionDECISION_PENALTY_AMT
160.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
77.1104
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
COAL
Issuing districtISSUING_DISTRICT
C0900
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR902
MSHA representative officeMSHA_REP_OFFICE_NAME
Seattle

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli

Other fields

ISSUING_FIELD_OFFICE
C0904

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

25 most recent of 193 contested citations and orders; decision types are MSHA's own text.

Imminent danger orders, section 107(a)

Issued: Jul 28, 2011
Order number: 8475544
Terminated: Jul 28, 2011
Issued to: Operator
Details

The order

Order numberVIOLATION_NO
8475544
IssuedVIOLATION_DATE_ISSUED
Jul 28, 2011
TerminatedTERMINATION_DATE
Jul 28, 2011
Issued toVIOLATOR_TYPE
Operator

Who

Operator at the timeOPERATOR_NAME_VIOLATIONS
Usibelli Coal Mine Inc
Controller IDCONTROLLER_ID_VIOLATIONS
C03295

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
StateSTATE_ABBREVIATION
AK
Coal or Metal/Non-MetalCOAL_OR_METAL
C

Not recorded by MSHA (3)

Controller at the timeCONTROLLER_NAME_VIOLATIONS, ContractorCONTRACTOR_NAME, Contractor IDCONTRACTOR_ID

1 imminent danger order in MSHA's list, which starts July 1, 2010.

Reported injuries, illnesses and accidents

Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.

DAYS AWAY FROM WORK ONLY
33
NO DYS AWY FRM WRK,NO RSTR ACT
23
DYS AWY FRM WRK & RESTRCTD ACT
5
DAYS RESTRICTED ACTIVITY ONLY
4
NO VALUE FOUND
1
OCCUPATNAL ILLNESS NOT DEG 1-6
1
Date: Sep 30, 2025
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220253170021
DateACCIDENT_DT
Sep 30, 2025
TimeACCIDENT_TIME
1305
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
CRUSHING
Nature of injury codeNATURE_INJURY_CD
170
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Oct 1, 2025

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 14, 2025
Degree of injury: DYS AWY FRM WRK & RESTRCTD ACT
Classification: SLIP OR FALL OF PERSON
Accident type: Fall to the walkway or working surface
Days lost: 22
Details

The report

Document numberDOCUMENT_NO
220260540015
DateACCIDENT_DT
Jan 14, 2025
TimeACCIDENT_TIME
1045
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
DYS AWY FRM WRK & RESTRCTD ACT
Degree of injury codeDEGREE_INJURY_CD
04
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Fall to the walkway or working surface
Accident type codeACCIDENT_TYPE_CD
17
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320261050005

Injury

Activity at the timeACTIVITY
Walking, Running
Activity codeACTIVITY_CD
092
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
SHOULDERS (COLLARBONE/CLAVICLE/SCAPULA)
Part of body codeINJ_BODY_PART_CD
450
Days of restricted workDAYS_RESTRICT
4
Days lostDAYS_LOST
22
Returned to workRETURN_TO_WORK_DT
Apr 13, 2026

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Schedule charge, daysSCHEDULE_CHARGE

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Sep 5, 2024
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: SLIP OR FALL OF PERSON
Accident type: Over-exertion NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220242980003
DateACCIDENT_DT
Sep 5, 2024
TimeACCIDENT_TIME
0505
Shift beganSHIFT_BEGIN_TIME
1800
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
SURFACE MINING MACHINES
Source of injury codeINJURY_SOURCE_CD
076
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
KNEE/PATELLA
Part of body codeINJ_BODY_PART_CD
512
Returned to workRETURN_TO_WORK_DT
Oct 21, 2024

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Bulldozer, Dozer, Crawler tractor, Push cat
Equipment codeMINING_EQUIP_CD
08
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
D10T2
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Apr 9, 2024
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: MACHINERY
Accident type: Struck by... NEC
Days lost: 60
Details

The report

Document numberDOCUMENT_NO
220241030030
DateACCIDENT_DT
Apr 9, 2024
TimeACCIDENT_TIME
0100
Shift beganSHIFT_BEGIN_TIME
1630
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320242150019

Injury

Activity at the timeACTIVITY
Observe operations
Activity codeACTIVITY_CD
042
Source of injuryINJURY_SOURCE
CHAIN,ROPE,CABLE-NT CONVY
Source of injury codeINJURY_SOURCE_CD
079
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
LOWER LEG/TIBIA/FIBULA
Part of body codeINJ_BODY_PART_CD
513
Days lostDAYS_LOST
60
Returned to workRETURN_TO_WORK_DT
Jul 29, 2024

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Bulldozer, Dozer, Crawler tractor, Push cat
Equipment codeMINING_EQUIP_CD
08
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
D11R
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Feb 13, 2024
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Over-exertion NEC
Days lost: 37
Details

The report

Document numberDOCUMENT_NO
220241010006
DateACCIDENT_DT
Feb 13, 2024
TimeACCIDENT_TIME
2340
Shift beganSHIFT_BEGIN_TIME
1630
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320241720004

Injury

Activity at the timeACTIVITY
Climb scaffolds, Ladders
Activity codeACTIVITY_CD
013
Source of injuryINJURY_SOURCE
SURFACE MINING MACHINES
Source of injury codeINJURY_SOURCE_CD
076
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
KNEE/PATELLA
Part of body codeINJ_BODY_PART_CD
512
Days lostDAYS_LOST
37
Returned to workRETURN_TO_WORK_DT
Jun 17, 2024

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Shovel, Power shovel, Backhoe, Trackhoe, Dragline - Big Muskie
Equipment codeMINING_EQUIP_CD
60
Equipment manufacturerEQUIP_MFR_NAME
Bucyrus-Erie
Equipment manufacturer codeEQUIP_MFR_CD
015
Equipment model numberEQUIP_MODEL_NO
1300W
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 18, 2024
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: MACHINERY
Accident type: Struck by flying object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220240220011
DateACCIDENT_DT
Jan 18, 2024
TimeACCIDENT_TIME
0800
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Bulldozer
Activity codeACTIVITY_CD
047
Source of injuryINJURY_SOURCE
BROKEN ROCK,COAL,ORE,WSTE
Source of injury codeINJURY_SOURCE_CD
089
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
HEAD,NEC
Part of body codeINJ_BODY_PART_CD
100
Returned to workRETURN_TO_WORK_DT
Jan 19, 2024

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Bulldozer, Dozer, Crawler tractor, Push cat
Equipment codeMINING_EQUIP_CD
08
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
D10T
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jul 7, 2023
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220231930010
DateACCIDENT_DT
Jul 7, 2023
TimeACCIDENT_TIME
0230
Shift beganSHIFT_BEGIN_TIME
1800
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CRUSHING
Nature of injury codeNATURE_INJURY_CD
170
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Jul 10, 2023

Where, and equipment

Location in the mineSUBUNIT
MILL OPERATION/PREPARATION PLANT
Location codeSUBUNIT_CD
30
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Apr 13, 2023
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: MACHINERY
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220231070011
DateACCIDENT_DT
Apr 13, 2023
TimeACCIDENT_TIME
0945
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Grinding
Activity codeACTIVITY_CD
024
Source of injuryINJURY_SOURCE
ABRAS STONE,WHEEL GRINDER
Source of injury codeINJURY_SOURCE_CD
052
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
JAW INCLUDE CHIN
Part of body codeINJ_BODY_PART_CD
141
Returned to workRETURN_TO_WORK_DT
Apr 14, 2023

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (powered)
Equipment codeMINING_EQUIP_CD
29
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Dec 10, 2020
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: POWERED HAULAGE
Accident type: Struck against a moving object
Days lost: 5
Details

The report

Document numberDOCUMENT_NO
220203560023
DateACCIDENT_DT
Dec 10, 2020
TimeACCIDENT_TIME
2030
Shift beganSHIFT_BEGIN_TIME
1730
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
POWERED HAULAGE
Classification codeCLASSIFICATION_CD
12
Accident typeACCIDENT_TYPE
Struck against a moving object
Accident type codeACCIDENT_TYPE_CD
02
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Idle
Activity codeACTIVITY_CD
034
Source of injuryINJURY_SOURCE
HGHWY ORE CARIER,LRGE TRK
Source of injury codeINJURY_SOURCE_CD
104
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
BACK (MUSCLES/SPINE/S-CORD/TAILBONE)
Part of body codeINJ_BODY_PART_CD
420
Days lostDAYS_LOST
5
Returned to workRETURN_TO_WORK_DT
Dec 21, 2020

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Ore haulage trucks - off highway trucks
Equipment codeMINING_EQUIP_CD
44
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
777
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 20, 2020
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: SLIP OR FALL OF PERSON
Accident type: Over-exertion NEC
Days lost: 359
Details

The report

Document numberDOCUMENT_NO
220200300023
DateACCIDENT_DT
Jan 20, 2020
TimeACCIDENT_TIME
1830
Shift beganSHIFT_BEGIN_TIME
1730
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
HIPS (PELVIS/ORGANS/KIDNEYS/BUTTOCKS)
Part of body codeINJ_BODY_PART_CD
440
Days lostDAYS_LOST
359

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Shovel, Power shovel, Backhoe, Trackhoe, Dragline - Big Muskie
Equipment codeMINING_EQUIP_CD
60
Equipment manufacturerEQUIP_MFR_NAME
Bucyrus-Erie
Equipment manufacturer codeEQUIP_MFR_CD
015
Equipment model numberEQUIP_MODEL_NO
1300W
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Returned to workRETURN_TO_WORK_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jun 10, 2019
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck by falling object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220191780006
DateACCIDENT_DT
Jun 10, 2019
TimeACCIDENT_TIME
1630
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by falling object
Accident type codeACCIDENT_TYPE_CD
04
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
FOOT(NOT ANKLE/TOE)/TARSUS/METATARSUS
Part of body codeINJ_BODY_PART_CD
530
Returned to workRETURN_TO_WORK_DT
Jun 26, 2019

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Auger machine, Highwall miner, Auger highwall drill, Auger drill
Equipment codeMINING_EQUIP_CD
04
Equipment manufacturerEQUIP_MFR_NAME
Terex
Equipment manufacturer codeEQUIP_MFR_CD
105
Equipment model numberEQUIP_MODEL_NO
DR-8
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 30, 2017
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: SLIP OR FALL OF PERSON
Accident type: Fall to the walkway or working surface
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220170400005
DateACCIDENT_DT
Jan 30, 2017
TimeACCIDENT_TIME
0900
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Fall to the walkway or working surface
Accident type codeACCIDENT_TYPE_CD
17
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
KNEE/PATELLA
Part of body codeINJ_BODY_PART_CD
512
Returned to workRETURN_TO_WORK_DT
Jan 31, 2017

Where, and equipment

Location in the mineSUBUNIT
OFFICE WORKERS AT MINE SITE
Location codeSUBUNIT_CD
99
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: May 24, 2016
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in lifting objects
Days lost: 20
Details

The report

Document numberDOCUMENT_NO
220161460016
DateACCIDENT_DT
May 24, 2016
TimeACCIDENT_TIME
1030
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in lifting objects
Accident type codeACCIDENT_TYPE_CD
27
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320161750008

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
UPPER ARM/HUMERUS
Part of body codeINJ_BODY_PART_CD
311
Days lostDAYS_LOST
20
Returned to workRETURN_TO_WORK_DT
Jun 22, 2016

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jul 8, 2014
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: HANDLING OF MATERIALS
Accident type: Contact with hot objects or substances
Days lost: 28
Details

The report

Document numberDOCUMENT_NO
220141910009
DateACCIDENT_DT
Jul 8, 2014
TimeACCIDENT_TIME
1730
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Contact with hot objects or substances
Accident type codeACCIDENT_TYPE_CD
33
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320142330004

Injury

Activity at the timeACTIVITY
Machine maintenance
Activity codeACTIVITY_CD
039
Source of injuryINJURY_SOURCE
STEAM
Source of injury codeINJURY_SOURCE_CD
102
Nature of injuryNATURE_INJURY
BURN OR SCALD (HEAT)
Nature of injury codeNATURE_INJURY_CD
120
Part of bodyINJ_BODY_PART
MULTIPLE PARTS (MORE THAN ONE MAJOR)
Part of body codeINJ_BODY_PART_CD
700
Days lostDAYS_LOST
28
Returned to workRETURN_TO_WORK_DT
Aug 18, 2014

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Apr 30, 2014
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: MACHINERY
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220141270030
DateACCIDENT_DT
Apr 30, 2014
TimeACCIDENT_TIME
0800
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (powered)
Activity codeACTIVITY_CD
031
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
HEAD,NEC
Part of body codeINJ_BODY_PART_CD
100
Returned to workRETURN_TO_WORK_DT
Apr 30, 2014

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Shovel, Power shovel, Backhoe, Trackhoe, Dragline - Big Muskie
Equipment codeMINING_EQUIP_CD
60
Equipment manufacturerEQUIP_MFR_NAME
Orenstein
Equipment manufacturer codeEQUIP_MFR_CD
084
Equipment model numberEQUIP_MODEL_NO
RH170C
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 19, 2014
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: POWERED HAULAGE
Accident type: Struck against a moving object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220140220004
DateACCIDENT_DT
Jan 19, 2014
TimeACCIDENT_TIME
0630
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
POWERED HAULAGE
Classification codeCLASSIFICATION_CD
12
Accident typeACCIDENT_TYPE
Struck against a moving object
Accident type codeACCIDENT_TYPE_CD
02
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Utility truck, Water trucks
Activity codeACTIVITY_CD
071
Source of injuryINJURY_SOURCE
PASS CARS,PICKUP TRUCKS
Source of injury codeINJURY_SOURCE_CD
103
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
NECK
Part of body codeINJ_BODY_PART_CD
200
Returned to workRETURN_TO_WORK_DT
Jan 21, 2014

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Trucks, Service truck, Utility truck, Pickup, Water truck, Fuel truck
Equipment codeMINING_EQUIP_CD
67
Equipment manufacturerEQUIP_MFR_NAME
Ford
Equipment manufacturer codeEQUIP_MFR_CD
041
Equipment model numberEQUIP_MODEL_NO
F350
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Aug 9, 2013
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: MACHINERY
Accident type: Struck by flying object
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220132310031
DateACCIDENT_DT
Aug 9, 2013
TimeACCIDENT_TIME
1030
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Struck by flying object
Accident type codeACCIDENT_TYPE_CD
05
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Grinding
Activity codeACTIVITY_CD
024
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
DUST IN EYES
Nature of injury codeNATURE_INJURY_CD
320
Part of bodyINJ_BODY_PART
EYE(S) OPTIC NERVE/VISON
Part of body codeINJ_BODY_PART_CD
130
Returned to workRETURN_TO_WORK_DT
Aug 9, 2013

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (powered)
Equipment codeMINING_EQUIP_CD
29
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jul 29, 2013
Degree of injury: DAYS RESTRICTED ACTIVITY ONLY
Classification: HANDLING OF MATERIALS
Accident type: Over-exertion in pulling or pushing objects
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220132240021
DateACCIDENT_DT
Jul 29, 2013
TimeACCIDENT_TIME
1400
Shift beganSHIFT_BEGIN_TIME
0830
Degree of injuryDEGREE_INJURY
DAYS RESTRICTED ACTIVITY ONLY
Degree of injury codeDEGREE_INJURY_CD
05
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Over-exertion in pulling or pushing objects
Accident type codeACCIDENT_TYPE_CD
28
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320140770028

Injury

Activity at the timeACTIVITY
Handling supplies or material
Activity codeACTIVITY_CD
028
Source of injuryINJURY_SOURCE
BOILR,PRES VSL,AIR HOS,OX
Source of injury codeINJURY_SOURCE_CD
003
Nature of injuryNATURE_INJURY
HERNIA;RUPTURE
Nature of injury codeNATURE_INJURY_CD
260
Part of bodyINJ_BODY_PART
HIPS (PELVIS/ORGANS/KIDNEYS/BUTTOCKS)
Part of body codeINJ_BODY_PART_CD
440
Days of restricted workDAYS_RESTRICT
10
Returned to workRETURN_TO_WORK_DT
Sep 10, 2013

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: May 31, 2013
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDTOOLS (NONPOWERED)
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220131630040
DateACCIDENT_DT
May 31, 2013
TimeACCIDENT_TIME
0745
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDTOOLS (NONPOWERED)
Classification codeCLASSIFICATION_CD
10
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Hand tools (not powered)
Activity codeACTIVITY_CD
030
Source of injuryINJURY_SOURCE
HAND TOOLS,NONPOWERED,NEC
Source of injury codeINJURY_SOURCE_CD
051
Nature of injuryNATURE_INJURY
FRACTURE,CHIP
Nature of injury codeNATURE_INJURY_CD
220
Part of bodyINJ_BODY_PART
FINGER(S)/THUMB
Part of body codeINJ_BODY_PART_CD
340
Returned to workRETURN_TO_WORK_DT
Jun 3, 2013

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Hand tools (not powered)
Equipment codeMINING_EQUIP_CD
28
Equipment manufacturerEQUIP_MFR_NAME
Not Reported
Equipment manufacturer codeEQUIP_MFR_CD
121
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Apr 19, 2013
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220131130018
DateACCIDENT_DT
Apr 19, 2013
TimeACCIDENT_TIME
9999
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Welding or cutting
Activity codeACTIVITY_CD
093
Source of injuryINJURY_SOURCE
PULVERIZED MINERAL (DUST)
Source of injury codeINJURY_SOURCE_CD
092
Nature of injuryNATURE_INJURY
DUST IN EYES
Nature of injury codeNATURE_INJURY_CD
320
Part of bodyINJ_BODY_PART
EYE(S) OPTIC NERVE/VISON
Part of body codeINJ_BODY_PART_CD
130
Returned to workRETURN_TO_WORK_DT
Apr 22, 2013

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jan 21, 2013
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: SLIP OR FALL OF PERSON
Accident type: Over-exertion NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220130280030
DateACCIDENT_DT
Jan 21, 2013
TimeACCIDENT_TIME
1900
Shift beganSHIFT_BEGIN_TIME
1730
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Over-exertion NEC
Accident type codeACCIDENT_TYPE_CD
30
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
METAL,NEC(PIPE,WIRE,NAIL)
Source of injury codeINJURY_SOURCE_CD
088
Nature of injuryNATURE_INJURY
SPRAIN,STRAIN RUPT DISC
Nature of injury codeNATURE_INJURY_CD
330
Part of bodyINJ_BODY_PART
MULTIPLE PARTS (MORE THAN ONE MAJOR)
Part of body codeINJ_BODY_PART_CD
700
Returned to workRETURN_TO_WORK_DT
Jan 25, 2013

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
Equipment codeMINING_EQUIP_CD
24
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
994
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2013
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Dec 5, 2012
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: HANDLING OF MATERIALS
Accident type: Struck by... NEC
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220123420019
DateACCIDENT_DT
Dec 5, 2012
TimeACCIDENT_TIME
0130
Shift beganSHIFT_BEGIN_TIME
1830
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
HANDLING OF MATERIALS
Classification codeCLASSIFICATION_CD
09
Accident typeACCIDENT_TYPE
Struck by... NEC
Accident type codeACCIDENT_TYPE_CD
08
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Inspect equipment or mine
Activity codeACTIVITY_CD
036
Source of injuryINJURY_SOURCE
METAL COVERS & GUARDS
Source of injury codeINJURY_SOURCE_CD
086
Nature of injuryNATURE_INJURY
CUT,LACER,PUNCT-OPN WOUND
Nature of injury codeNATURE_INJURY_CD
180
Part of bodyINJ_BODY_PART
FACE,NEC
Part of body codeINJ_BODY_PART_CD
140
Returned to workRETURN_TO_WORK_DT
Dec 5, 2012

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Nov 30, 2012
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: SLIP OR FALL OF PERSON
Accident type: Fall to the walkway or working surface
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220123390020
DateACCIDENT_DT
Nov 30, 2012
TimeACCIDENT_TIME
0800
Shift beganSHIFT_BEGIN_TIME
0600
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
SLIP OR FALL OF PERSON
Classification codeCLASSIFICATION_CD
18
Accident typeACCIDENT_TYPE
Fall to the walkway or working surface
Accident type codeACCIDENT_TYPE_CD
17
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Getting on or off equipment
Activity codeACTIVITY_CD
023
Source of injuryINJURY_SOURCE
GROUND
Source of injury codeINJURY_SOURCE_CD
117
Nature of injuryNATURE_INJURY
CONTUSN,BRUISE,INTAC SKIN
Nature of injury codeNATURE_INJURY_CD
160
Part of bodyINJ_BODY_PART
CHEST (RIBS/BREAST BONE/CHEST ORGNS)
Part of body codeINJ_BODY_PART_CD
430
Returned to workRETURN_TO_WORK_DT
Nov 30, 2012

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Aug 4, 2012
Degree of injury: DAYS AWAY FROM WORK ONLY
Classification: MACHINERY
Accident type: Caught in, under or between a moving and a stationary object
Days lost: 2
Details

The report

Document numberDOCUMENT_NO
220122210014
DateACCIDENT_DT
Aug 4, 2012
TimeACCIDENT_TIME
1530
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
DAYS AWAY FROM WORK ONLY
Degree of injury codeDEGREE_INJURY_CD
03
ClassificationCLASSIFICATION
MACHINERY
Classification codeCLASSIFICATION_CD
17
Accident typeACCIDENT_TYPE
Caught in, under or between a moving and a stationary object
Accident type codeACCIDENT_TYPE_CD
21
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
Returned to Duty document numberCLOSED_DOC_NO
320122280011

Injury

Activity at the timeACTIVITY
Hand tools (powered)
Activity codeACTIVITY_CD
031
Source of injuryINJURY_SOURCE
HAND TOOLS,POWERED,NEC
Source of injury codeINJURY_SOURCE_CD
057
Nature of injuryNATURE_INJURY
CRUSHING
Nature of injury codeNATURE_INJURY_CD
170
Part of bodyINJ_BODY_PART
UPPER EXTREMITIES, MULTIPLE
Part of body codeINJ_BODY_PART_CD
350
Days lostDAYS_LOST
2
Returned to workRETURN_TO_WORK_DT
Aug 10, 2012

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
Equipment codeMINING_EQUIP_CD
24
Equipment manufacturerEQUIP_MFR_NAME
Caterpillar
Equipment manufacturer codeEQUIP_MFR_CD
018
Equipment model numberEQUIP_MODEL_NO
994
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (3)

MSHA investigation beganINVEST_BEGIN_DT, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

Date: Jun 22, 2012
Degree of injury: OCCUPATNAL ILLNESS NOT DEG 1-6
Classification: OCCUPATIONAL SKIN DISEASES
Accident type: Absorption of radiations, caustics, toxic and noxious substances
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220121950019
DateACCIDENT_DT
Jun 22, 2012
TimeACCIDENT_TIME
1630
Shift beganSHIFT_BEGIN_TIME
0630
Degree of injuryDEGREE_INJURY
OCCUPATNAL ILLNESS NOT DEG 1-6
Degree of injury codeDEGREE_INJURY_CD
07
ClassificationCLASSIFICATION
OCCUPATIONAL SKIN DISEASES
Classification codeCLASSIFICATION_CD
26
Accident typeACCIDENT_TYPE
Absorption of radiations, caustics, toxic and noxious substances
Accident type codeACCIDENT_TYPE_CD
38
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Electrical maintenance
Activity codeACTIVITY_CD
020
Source of injuryINJURY_SOURCE
MISCELLANEOUS,NEC
Source of injury codeINJURY_SOURCE_CD
127
Nature of injuryNATURE_INJURY
DERMATITIS,RASH,SKIN INFL
Nature of injury codeNATURE_INJURY_CD
190
Part of bodyINJ_BODY_PART
CHEST (RIBS/BREAST BONE/CHEST ORGNS)
Part of body codeINJ_BODY_PART_CD
430
Permanently transferred or terminatedTRANS_TERM
Y
Returned to workRETURN_TO_WORK_DT
Jun 26, 2012

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Controller IDCONTROLLER_ID
C03295
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Not recorded by MSHA (5)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Controller at the timeCONTROLLER_NAME, Contractor IDCONTRACTOR_ID

25 most recent of 67 reports filed on MSHA Form 7000-1; categories are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 3
Hours worked: 5,409
Coal production: 0
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
5409
Average hours per employeeAVG_EMPLOYEE_HOURS
1803

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 16
Hours worked: 21,608
Coal production: 0
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
16
Hours workedANNUAL_HRS
21608
Average hours per employeeAVG_EMPLOYEE_HOURS
1351

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 87
Hours worked: 128,681
Coal production: 757,906
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
87
Hours workedANNUAL_HRS
128681
Average hours per employeeAVG_EMPLOYEE_HOURS
1479
Coal productionANNUAL_COAL_PROD
757906

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C
Year: 2025
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 3
Hours worked: 7,084
Coal production: 0
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
7084
Average hours per employeeAVG_EMPLOYEE_HOURS
2361

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 17
Hours worked: 30,302
Coal production: 0
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
17
Hours workedANNUAL_HRS
30302
Average hours per employeeAVG_EMPLOYEE_HOURS
1782

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 85
Hours worked: 172,775
Coal production: 1,107,417
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
85
Hours workedANNUAL_HRS
172775
Average hours per employeeAVG_EMPLOYEE_HOURS
2033
Coal productionANNUAL_COAL_PROD
1107417

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C
Year: 2024
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 3
Hours worked: 5,550
Coal production: 0
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
5550
Average hours per employeeAVG_EMPLOYEE_HOURS
1850

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 18
Hours worked: 32,769
Coal production: 0
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
18
Hours workedANNUAL_HRS
32769
Average hours per employeeAVG_EMPLOYEE_HOURS
1821

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 85
Hours worked: 164,494
Coal production: 1,003,565
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
85
Hours workedANNUAL_HRS
164494
Average hours per employeeAVG_EMPLOYEE_HOURS
1935
Coal productionANNUAL_COAL_PROD
1003565

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C
Year: 2023
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 3
Hours worked: 4,473
Coal production: 0
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
4473
Average hours per employeeAVG_EMPLOYEE_HOURS
1491

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 18
Hours worked: 33,909
Coal production: 0
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
18
Hours workedANNUAL_HRS
33909
Average hours per employeeAVG_EMPLOYEE_HOURS
1884

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 84
Hours worked: 169,795
Coal production: 1,008,994
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
84
Hours workedANNUAL_HRS
169795
Average hours per employeeAVG_EMPLOYEE_HOURS
2021
Coal productionANNUAL_COAL_PROD
1008994

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C
Year: 2022
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 2
Hours worked: 4,233
Coal production: 0
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
4233
Average hours per employeeAVG_EMPLOYEE_HOURS
2117

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 17
Hours worked: 30,833
Coal production: 0
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
17
Hours workedANNUAL_HRS
30833
Average hours per employeeAVG_EMPLOYEE_HOURS
1814

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 79
Hours worked: 155,090
Coal production: 1,014,307
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
79
Hours workedANNUAL_HRS
155090
Average hours per employeeAVG_EMPLOYEE_HOURS
1963
Coal productionANNUAL_COAL_PROD
1014307

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C
Year: 2021
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 3
Hours worked: 4,661
Coal production: 0
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
4661
Average hours per employeeAVG_EMPLOYEE_HOURS
1554

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 17
Hours worked: 31,233
Coal production: 0
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
17
Hours workedANNUAL_HRS
31233
Average hours per employeeAVG_EMPLOYEE_HOURS
1837

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 82
Hours worked: 159,593
Coal production: 1,042,288
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
82
Hours workedANNUAL_HRS
159593
Average hours per employeeAVG_EMPLOYEE_HOURS
1946
Coal productionANNUAL_COAL_PROD
1042288

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C
Year: 2020
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 3
Hours worked: 5,335
Coal production: 0
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
5335
Average hours per employeeAVG_EMPLOYEE_HOURS
1778

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 17
Hours worked: 29,954
Coal production: 0
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
17
Hours workedANNUAL_HRS
29954
Average hours per employeeAVG_EMPLOYEE_HOURS
1762

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 82
Hours worked: 164,660
Coal production: 1,020,870
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
82
Hours workedANNUAL_HRS
164660
Average hours per employeeAVG_EMPLOYEE_HOURS
2008
Coal productionANNUAL_COAL_PROD
1020870

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C
Year: 2019
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 3
Hours worked: 6,003
Coal production: 0
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
6003
Average hours per employeeAVG_EMPLOYEE_HOURS
2001

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 15
Hours worked: 27,141
Coal production: 0
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
15
Hours workedANNUAL_HRS
27141
Average hours per employeeAVG_EMPLOYEE_HOURS
1809

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 82
Hours worked: 156,670
Coal production: 974,702
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
82
Hours workedANNUAL_HRS
156670
Average hours per employeeAVG_EMPLOYEE_HOURS
1911
Coal productionANNUAL_COAL_PROD
974702

Mine

Mine IDMINE_ID
5000030
Mine name in this fileCURR_MINE_NM
Usibelli
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
C

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together. MSHA's definition file gives no unit for coal production.

Mine details

MSHA field office
Anchorage AK Field Office
Nearest town
Healy
Days worked per week
4
Hours per shift
9
Production shifts per day
2
Maintenance shifts per day
2
Employees, current record
80
Average mine height, inches
360
103(i) spot inspection status
Removed From 103I Status
103(i) status since
Sep 30, 1981
Safety committee
Y
Portable operation
N
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Usibelli
Mine IDMINE_ID
5000030
Coal or Metal/Non-MetalCOAL_METAL_IND
C
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Active
Status sinceCURRENT_STATUS_DT
Nov 30, 1980
Legal entity typeCOMPANY_TYPE
Corporation

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDCURRENT_OPERATOR_ID
P04002
Controller IDCURRENT_CONTROLLER_ID
C03295
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Jan 1, 1950

Location and MSHA office

StateSTATE
AK
Bureau of Mines state codeBOM_STATE_CD
50
FIPS county codeFIPS_CNTY_CD
068
FIPS county nameFIPS_CNTY_NM
Denali
Congressional districtCONG_DIST_CD
01
Nearest townNEAREST_TOWN
Healy
MSHA districtDISTRICT
M7
MSHA office codeOFFICE_CD
M7861
MSHA officeOFFICE_NAME
Anchorage AK Field Office
Most recent assessment control numberASSESS_CTRL_NO
000646140

Commodity

Primary commodity (SIC)PRIMARY_SIC
Coal (Bituminous)
Primary commodity codePRIMARY_SIC_CD
122200
Primary SIC codePRIMARY_SIC_CD_1
1222
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
Coal
Primary industry group codePRIMARY_CANVASS_CD
2

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
4
Hours per shiftHOURS_PER_SHIFT
9
Production shifts per dayPROD_SHIFTS_PER_DAY
2
Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY
2
Workers employedNO_EMPLOYEES
80
Average mining height, inchesAVG_MINE_HEIGHT
360
Producing pitsNO_PRODUCING_PITS
2
Multiple pitsMULTIPLE_PITS
Y
Safety committeeSAFETY_COMMITTEE_IND
Y
103(i) statusCURRENT_103I
Removed From 103I Status
103(i) status sinceCURRENT_103I_DT
Sep 30, 1981

Recorded as 0 (2)

Driving miles from the MSHA officeMILES_FROM_OFFICE, Non-producing pitsNO_NONPRODUCING_PITS

Recorded as N (4)

Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, MSHA restricted from enforcing Part 48 trainingPART48_TRAINING

Not recorded by MSHA (11)

Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Tailing pondsNO_TAILING_PONDS

Operator and controller history

Operator: Usibelli Coal Mine Inc
From: Jan 1, 1950
To: No end date
Controller: Not shown
From : Jan 1, 1950
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Usibelli Coal Mine Inc
Operator IDOPERATOR_ID
P04002
Operator fromOPERATOR_START_DT
Jan 1, 1950

Controller

Controller IDCONTROLLER_ID
C03295
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jan 1, 1950

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Mine status at this pointMINE_STATUS
Active
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

As MSHA records it, newest operator first.

Address of record

Usibelli Coal Mine Inc·Contact title Safety Director·Street not recorded, Healy AK 99743

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Usibelli Coal Mine Inc
Contact titleCONTACT_TITLE
Safety Director
CityCITY
Healy
StateSTATE_ABBR
AK
State nameSTATE
Alaska
ZIP codeZIP_CD
99743
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
02

Mine

Mine IDMINE_ID
5000030
Mine name in this fileMINE_NAME
Usibelli
Nearest townNEAREST_TOWN
Healy
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Active
Status sinceMINE_STATUS_DT
Nov 30, 1980
Primary commodity (SIC)PRIMARY_SIC_CD
Coal (Bituminous)
Coal or Metal/Non-MetalCOAL_METAL_IND
C

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology