What MSHA has on file for this mine

Citations and orders
8
since Jul 24, 2015 · 8 to the operator, 0 to contractors · 0 marked S&S
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Yearly employment and hours
7 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Non-Chargeable Accident Investigation
Jul 2 to Jul 24, 2018Inspectors 2 | Hours on site 17.5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 2, 2018
Closed outINSPECTION_END_DT
Jul 24, 2018
ActivityACTIVITY
Non-Chargeable Accident Investigation
Activity codeACTIVITY_CODE
E33
Program areaPROGRAM_AREA
M/NM--Non-Chargeable Accident Investigation
Event numberEVENT_NO
6722757
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
17.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
37.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDOPERATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Mine IDMINE_ID
5001402
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Mar 13 to Mar 15, 2018Inspectors 1 | Hours on site 23.5

The inspection

BeganINSPECTION_BEGIN_DT
Mar 13, 2018
Closed outINSPECTION_END_DT
Mar 15, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1146383
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
23.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
38

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDOPERATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Mine IDMINE_ID
5001402
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
May 14, 2017Inspectors 1 | Hours on site 2.5

The inspection

BeganINSPECTION_BEGIN_DT
May 14, 2017
Closed outINSPECTION_END_DT
May 14, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1153760
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDOPERATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Mine IDMINE_ID
5001402
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Verbal Hazard Complaint Inspections
Jul 13, 2016Inspectors 1 | Hours on site 2.5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 13, 2016
Closed outINSPECTION_END_DT
Jul 13, 2016
ActivityACTIVITY
Verbal Hazard Complaint Inspections
Activity codeACTIVITY_CODE
E04
Program areaPROGRAM_AREA
M/NM--Verbal Hazard Complaint Inspections
Event numberEVENT_NO
1153702
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
8.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDOPERATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Mine IDMINE_ID
5001402
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 13, 2016Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Jul 13, 2016
Closed outINSPECTION_END_DT
Jul 13, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1153706
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDOPERATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Mine IDMINE_ID
5001402
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 24, 2015Inspectors 1 | Hours on site 4.5

The inspection

BeganINSPECTION_BEGIN_DT
Jul 24, 2015
Closed outINSPECTION_END_DT
Jul 24, 2015
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6596401
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
12.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDOPERATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Mine IDMINE_ID
5001402
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

6 inspections and other MSHA visits since Jul 24, 2015; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Jul 2, 2018
Type: Order
Standard: Not recorded
S&S: Not recorded
Negligence: Not recorded
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
8992923
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Jul 2, 2018
Time issuedVIOLATION_ISSUE_TIME
0453
Date of occurrenceVIOLATION_OCCUR_DT
Jul 2, 2018
Section of the Act, primarySECTION_OF_ACT_1
103(k)
Primary mine or millPRIMARY_OR_MILL
Primary

Abatement

TerminatedTERMINATION_DT
Jul 6, 2018
Terminated, timeTERMINATION_TIME
1815
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDVIOLATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Inspection eventEVENT_NO
6722757
Inspection beganINSPECTION_BEGIN_DT
Jul 2, 2018
Inspection closed outINSPECTION_END_DT
Jul 24, 2018
Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (31)

30 CFR part and sectionPART_SECTION, Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID

Issued: Mar 14, 2018
Type: Citation
Standard: 48.29(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
6367200
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 14, 2018
Time issuedVIOLATION_ISSUE_TIME
1130
Date of occurrenceVIOLATION_OCCUR_DT
Mar 14, 2018
30 CFR part and sectionPART_SECTION
48.29(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 14, 2018
Originally due, timeORIG_TERM_DUE_TIME
1900
Latest dueLATEST_TERM_DUE_DT
Mar 14, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1900
TerminatedTERMINATION_DT
Mar 14, 2018
Terminated, timeTERMINATION_TIME
1350
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
May 3, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Jun 17, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 17, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDVIOLATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Inspection eventEVENT_NO
1146383
Inspection beganINSPECTION_BEGIN_DT
Mar 13, 2018
Inspection closed outINSPECTION_END_DT
Mar 15, 2018
Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
2

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: May 14, 2017
Type: Citation
Standard: 56.16006
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
8601790
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 14, 2017
Time issuedVIOLATION_ISSUE_TIME
1006
Date of occurrenceVIOLATION_OCCUR_DT
May 14, 2017
30 CFR part and sectionPART_SECTION
56.16006
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 14, 2017
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
May 14, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
May 14, 2017
Terminated, timeTERMINATION_TIME
1050
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Jun 29, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Aug 13, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 25, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDVIOLATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Inspection eventEVENT_NO
1153760
Inspection beganINSPECTION_BEGIN_DT
May 14, 2017
Inspection closed outINSPECTION_END_DT
May 14, 2017
Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: May 14, 2017
Type: Citation
Standard: 56.4101
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
8554256
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 14, 2017
Time issuedVIOLATION_ISSUE_TIME
1047
Date of occurrenceVIOLATION_OCCUR_DT
May 14, 2017
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 31, 2017
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Sep 30, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Oct 27, 2017
Terminated, timeTERMINATION_TIME
1221
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Jun 29, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Aug 13, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 25, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDVIOLATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Inspection eventEVENT_NO
1153760
Inspection beganINSPECTION_BEGIN_DT
May 14, 2017
Inspection closed outINSPECTION_END_DT
May 14, 2017
Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jul 13, 2016
Type: Citation
Standard: 56.14132(b)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $114.00
Details

The citation

Citation or order numberVIOLATION_NO
8601691
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 13, 2016
Time issuedVIOLATION_ISSUE_TIME
1201
Date of occurrenceVIOLATION_OCCUR_DT
Jul 13, 2016
30 CFR part and sectionPART_SECTION
56.14132(b)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 16, 2016
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Oct 26, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Oct 28, 2016
Terminated, timeTERMINATION_TIME
0932
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
114
Current proposed assessmentAMOUNT_DUE
114
Amount paidAMOUNT_PAID
114
Bill first printedBILL_PRINT_DT
Sep 1, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Oct 10, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 21, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDVIOLATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Inspection eventEVENT_NO
1153702
Inspection beganINSPECTION_BEGIN_DT
Jul 13, 2016
Inspection closed outINSPECTION_END_DT
Jul 13, 2016
Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jul 24, 2015
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8870843
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 24, 2015
Time issuedVIOLATION_ISSUE_TIME
1256
Date of occurrenceVIOLATION_OCCUR_DT
Jul 24, 2015
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 24, 2015
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 24, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 24, 2015
Terminated, timeTERMINATION_TIME
1430
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Oct 1, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Nov 4, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 15, 2015

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDVIOLATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Inspection eventEVENT_NO
6596401
Inspection beganINSPECTION_BEGIN_DT
Jul 24, 2015
Inspection closed outINSPECTION_END_DT
Jul 24, 2015
Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jul 24, 2015
Type: Citation
Standard: 56.9300(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8870845
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 24, 2015
Time issuedVIOLATION_ISSUE_TIME
1400
Date of occurrenceVIOLATION_OCCUR_DT
Jul 24, 2015
30 CFR part and sectionPART_SECTION
56.9300(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 24, 2015
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Aug 28, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Sep 24, 2015
Terminated, timeTERMINATION_TIME
0749
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 3, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 8, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 23, 2015

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDVIOLATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Inspection eventEVENT_NO
6596401
Inspection beganINSPECTION_BEGIN_DT
Jul 24, 2015
Inspection closed outINSPECTION_END_DT
Jul 24, 2015
Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jul 24, 2015
Type: Citation
Standard: 56.14132(b)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8870844
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 24, 2015
Time issuedVIOLATION_ISSUE_TIME
1305
Date of occurrenceVIOLATION_OCCUR_DT
Jul 24, 2015
30 CFR part and sectionPART_SECTION
56.14132(b)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 24, 2015
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Aug 28, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Sep 24, 2015
Terminated, timeTERMINATION_TIME
0742
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 3, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 8, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 23, 2015

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDVIOLATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Inspection eventEVENT_NO
6596401
Inspection beganINSPECTION_BEGIN_DT
Jul 24, 2015
Inspection closed outINSPECTION_END_DT
Jul 24, 2015
Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

8 citations and orders since Jul 24, 2015: 8 issued to the operator, 0 to contractors working at the mine. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Mar 14, 2018
Citation number: 6367200
Standard: 48.29(a)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6367200
Assessment control numberASSESS_CASE_NO
000464192
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 17, 2018
Citation issuedISSUE_DT
Mar 14, 2018
Date of occurrenceOCCURRENCE_DT
Mar 14, 2018
Final order dateFINAL_ORDER_DT
Jun 17, 2018
Bill first printedBILL_PRINT_DT
May 3, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
48.29(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
28
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
6
Controller size pointsCONTROLLER_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.67
Operator hours worked at the mineVIOLATOR_MINE_HRS
103295
Size of mineSIZE_OF_MINE
103295
Controller hours workedCONTROLLER_HRS
103295
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
103295
History period startHISTORY_START_DT
Dec 14, 2016
History period endHISTORY_END_DT
Mar 13, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Goldrich NyacAU Placer LLC
IDVIOLATOR_ID
0123251
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 2, 2012
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1146383
Mine IDMINE_ID
5001402
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 14, 2017
Citation number: 8554256
Standard: 56.4101
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8554256
Assessment control numberASSESS_CASE_NO
000442617
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 25, 2017
Citation issuedISSUE_DT
May 14, 2017
Date of occurrenceOCCURRENCE_DT
May 14, 2017
Final order dateFINAL_ORDER_DT
Aug 13, 2017
Bill first printedBILL_PRINT_DT
Jun 29, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
37
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
66019
Size of mineSIZE_OF_MINE
66019
Controller hours workedCONTROLLER_HRS
66019
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
66019
History period startHISTORY_START_DT
Feb 14, 2016
History period endHISTORY_END_DT
May 13, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Goldrich NyacAU Placer LLC
IDVIOLATOR_ID
0123251
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 2, 2012
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1153760
Mine IDMINE_ID
5001402
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 14, 2017
Citation number: 8601790
Standard: 56.16006
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8601790
Assessment control numberASSESS_CASE_NO
000442617
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 25, 2017
Citation issuedISSUE_DT
May 14, 2017
Date of occurrenceOCCURRENCE_DT
May 14, 2017
Final order dateFINAL_ORDER_DT
Aug 13, 2017
Bill first printedBILL_PRINT_DT
Jun 29, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.16006
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
47
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
66019
Size of mineSIZE_OF_MINE
66019
Controller hours workedCONTROLLER_HRS
66019
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
66019
History period startHISTORY_START_DT
Feb 14, 2016
History period endHISTORY_END_DT
May 13, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Goldrich NyacAU Placer LLC
IDVIOLATOR_ID
0123251
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 2, 2012
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1153760
Mine IDMINE_ID
5001402
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 13, 2016
Citation number: 8601691
Standard: 56.14132(b)(1)
Proposed penalty: $114.00
Current assessment: $114.00
Paid against proposed penalty: $114.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8601691
Assessment control numberASSESS_CASE_NO
000419144
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 21, 2016
Citation issuedISSUE_DT
Jul 13, 2016
Date of occurrenceOCCURRENCE_DT
Jul 13, 2016
Final order dateFINAL_ORDER_DT
Oct 10, 2016
Bill first printedBILL_PRINT_DT
Sep 1, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 10, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(b)(1)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
114.00
Current assessmentCURRENT_ASSESSMENT_AMT
114.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
114.00

Penalty points

Violation history pointsPENALTY_POINTS
47
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
5
Controller size pointsCONTROLLER_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
3
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
3
Operator hours worked at the mineVIOLATOR_MINE_HRS
80562
Size of mineSIZE_OF_MINE
80562
Controller hours workedCONTROLLER_HRS
80562
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
80562
History period startHISTORY_START_DT
Apr 13, 2015
History period endHISTORY_END_DT
Jul 12, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Goldrich NyacAU Placer LLC
IDVIOLATOR_ID
0123251
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 2, 2012
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1153702
Mine IDMINE_ID
5001402
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 24, 2015
Citation number: 8870844
Standard: 56.14132(b)(2)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8870844
Assessment control numberASSESS_CASE_NO
000390843
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 23, 2015
Citation issuedISSUE_DT
Jul 24, 2015
Date of occurrenceOCCURRENCE_DT
Jul 24, 2015
Final order dateFINAL_ORDER_DT
Oct 8, 2015
Bill first printedBILL_PRINT_DT
Sep 3, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 8, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(b)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
53
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
10287
Size of mineSIZE_OF_MINE
10287
Controller hours workedCONTROLLER_HRS
10287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
10287
History period startHISTORY_START_DT
Apr 24, 2014
History period endHISTORY_END_DT
Jul 23, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Goldrich NyacAU Placer LLC
IDVIOLATOR_ID
0123251
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 2, 2012
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6596401
Mine IDMINE_ID
5001402
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 24, 2015
Citation number: 8870843
Standard: 56.14100(b)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8870843
Assessment control numberASSESS_CASE_NO
000393552
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 15, 2015
Citation issuedISSUE_DT
Jul 24, 2015
Date of occurrenceOCCURRENCE_DT
Jul 24, 2015
Final order dateFINAL_ORDER_DT
Nov 4, 2015
Bill first printedBILL_PRINT_DT
Oct 1, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 4, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
38
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
10287
Size of mineSIZE_OF_MINE
10287
Controller hours workedCONTROLLER_HRS
10287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
10287
History period startHISTORY_START_DT
Apr 24, 2014
History period endHISTORY_END_DT
Jul 23, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Goldrich NyacAU Placer LLC
IDVIOLATOR_ID
0123251
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 2, 2012
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6596401
Mine IDMINE_ID
5001402
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 24, 2015
Citation number: 8870845
Standard: 56.9300(b)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8870845
Assessment control numberASSESS_CASE_NO
000390843
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 23, 2015
Citation issuedISSUE_DT
Jul 24, 2015
Date of occurrenceOCCURRENCE_DT
Jul 24, 2015
Final order dateFINAL_ORDER_DT
Oct 8, 2015
Bill first printedBILL_PRINT_DT
Sep 3, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 8, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
38
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
10287
Size of mineSIZE_OF_MINE
10287
Controller hours workedCONTROLLER_HRS
10287
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
10287
History period startHISTORY_START_DT
Apr 24, 2014
History period endHISTORY_END_DT
Jul 23, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Goldrich NyacAU Placer LLC
IDVIOLATOR_ID
0123251
Operator start at the mine, as assessedVIOLATOR_START_DT
Apr 2, 2012
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6596401
Mine IDMINE_ID
5001402
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

7 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Contested citations and decisions

Contested: Sep 26, 2018
Citation issued: Jul 3, 2018
Docket: WEST 2018-0564
Standard: 50.10(b)
Proposed penalty: $5,903.00
Penalty after decision: $0.00
Decided: Nov 21, 2018
Decision type: Withdrawal
Details

The contest

Citation or order numberCITATION_NO
8992924
Citation issuedCITATION_ISSUE_DT
Jul 3, 2018
Hearing request receivedCONTEST_DT
Sep 26, 2018
Docket numberDOCKET_NO
WEST 2018-0564
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Withdrawal
DecidedDECISION_DT
Nov 21, 2018
Petition duePETITION_DUE_DT
Nov 13, 2018
Petition filedPETITION_FILED_DT
Oct 23, 2018

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
5903.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
50.10(b)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
NoLikelihood
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
NoLostDays
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
SOL
MSHA representative office codeMSHA_REP_OFFICE_CODE
SR900
MSHA representative officeMSHA_REP_OFFICE_NAME
San Francisco

Mine

Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as 0 (2)

Penalty after the decisionDECISION_PENALTY_AMT, Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Sep 26, 2018
Citation issued: Jul 3, 2018
Docket: WEST 2018-0563
Standard: 50.12
Proposed penalty: $363.00
Penalty after decision: $0.00
Decided: Jan 18, 2019
Decision type: Withdrawal
Details

The contest

Citation or order numberCITATION_NO
8992925
Citation issuedCITATION_ISSUE_DT
Jul 3, 2018
Hearing request receivedCONTEST_DT
Sep 26, 2018
Docket numberDOCKET_NO
WEST 2018-0563
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
John
Judge, last nameJUDGE_LAST_NAME
Lewis
Decision typeDOCKET_DECISION_TYPE_CODE
Withdrawal
DecidedDECISION_DT
Jan 18, 2019
Petition duePETITION_DUE_DT
Nov 13, 2018
Petition filedPETITION_FILED_DT
Oct 31, 2018

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
363.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
50.12
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as 0 (1)

Penalty after the decisionDECISION_PENALTY_AMT

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

2 contested citations and orders; decision types are MSHA's own text.

Reported injuries, illnesses and accidents

Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.

INJURIES DUE TO NATURAL CAUSES
1
Date: Jun 29, 2018
Degree of injury: INJURIES DUE TO NATURAL CAUSES
Classification: OTHER
Accident type: NEC
Days lost: Not recorded
Details

The report

Document numberDOCUMENT_NO
220181910004
DateACCIDENT_DT
Jun 29, 2018
TimeACCIDENT_TIME
2100
Shift beganSHIFT_BEGIN_TIME
1900
Degree of injuryDEGREE_INJURY
INJURIES DUE TO NATURAL CAUSES
Degree of injury codeDEGREE_INJURY_CD
08
ClassificationCLASSIFICATION
OTHER
Classification codeCLASSIFICATION_CD
21
Accident typeACCIDENT_TYPE
NEC
Accident type codeACCIDENT_TYPE_CD
42
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?
MSHA investigation beganINVEST_BEGIN_DT
Jun 29, 2018

Injury

Activity at the timeACTIVITY
Power shovel, Dragline
Activity codeACTIVITY_CD
065
Source of injuryINJURY_SOURCE
MISCELLANEOUS,NEC
Source of injury codeINJURY_SOURCE_CD
127
Nature of injuryNATURE_INJURY
CEREBRAL HEMORAGE-NT CCUS
Nature of injury codeNATURE_INJURY_CD
350
Part of bodyINJ_BODY_PART
BRAIN
Part of body codeINJ_BODY_PART_CD
110
Schedule charge, daysSCHEDULE_CHARGE
6000

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDOPERATOR_ID
0123251
Controller at the timeCONTROLLER_NAME
Goldrich Mining Company; Nyac Gold, LLC
Controller IDCONTROLLER_ID
0104655
Mine IDMINE_ID
5001402
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
3

Not recorded by MSHA (7)

Returned to Duty document numberCLOSED_DOC_NO, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST, Permanently transferred or terminatedTRANS_TERM, Returned to workRETURN_TO_WORK_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

1 report filed on MSHA Form 7000-1; categories are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 0
Hours worked: 0
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03

Mine

Mine IDMINE_ID
5001402
Mine name in this fileCURR_MINE_NM
Little Squaw Creek
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (4)

Average employeesAVG_ANNUAL_EMPL, Hours workedANNUAL_HRS, Average hours per employeeAVG_EMPLOYEE_HOURS, Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 2,269
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
2269
Average hours per employeeAVG_EMPLOYEE_HOURS
567

Mine

Mine IDMINE_ID
5001402
Mine name in this fileCURR_MINE_NM
Little Squaw Creek
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 2,288
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
2288
Average hours per employeeAVG_EMPLOYEE_HOURS
572

Mine

Mine IDMINE_ID
5001402
Mine name in this fileCURR_MINE_NM
Little Squaw Creek
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 1,420
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
1420
Average hours per employeeAVG_EMPLOYEE_HOURS
473

Mine

Mine IDMINE_ID
5001402
Mine name in this fileCURR_MINE_NM
Little Squaw Creek
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 1,192
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
1192
Average hours per employeeAVG_EMPLOYEE_HOURS
596

Mine

Mine IDMINE_ID
5001402
Mine name in this fileCURR_MINE_NM
Little Squaw Creek
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 1
Hours worked: 452
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
452
Average hours per employeeAVG_EMPLOYEE_HOURS
452

Mine

Mine IDMINE_ID
5001402
Mine name in this fileCURR_MINE_NM
Little Squaw Creek
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 8
Hours worked: 15,165
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
8
Hours workedANNUAL_HRS
15165
Average hours per employeeAVG_EMPLOYEE_HOURS
1896

Mine

Mine IDMINE_ID
5001402
Mine name in this fileCURR_MINE_NM
Little Squaw Creek
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 7 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Anchorage AK Field Office
Nearest town
Coldfoot
Days worked per week
7
Hours per shift
10
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
10
Tailing ponds
0
103(i) spot inspection status
Never Had 103I Status
Safety committee
N
Portable operation
N
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Little Squaw Creek
Mine IDMINE_ID
5001402
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Intermittent
Status sinceCURRENT_STATUS_DT
Jul 4, 2026
Legal entity typeCOMPANY_TYPE
Corporation

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Goldrich Mining Company
Operator IDCURRENT_OPERATOR_ID
0112586
Controller IDCURRENT_CONTROLLER_ID
0200921
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Jun 11, 2026

Location and MSHA office

StateSTATE
AK
Bureau of Mines state codeBOM_STATE_CD
50
FIPS county codeFIPS_CNTY_CD
290
FIPS county nameFIPS_CNTY_NM
Yukon-Koyukuk
Nearest townNEAREST_TOWN
Coldfoot
MSHA districtDISTRICT
M7
MSHA office codeOFFICE_CD
M7861
MSHA officeOFFICE_NAME
Anchorage AK Field Office
Most recent assessment control numberASSESS_CTRL_NO
000472385

Commodity

Primary commodity (SIC)PRIMARY_SIC
Gold Ore
Primary commodity codePRIMARY_SIC_CD
104100
Primary SIC codePRIMARY_SIC_CD_1
1041
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
Metal
Primary industry group codePRIMARY_CANVASS_CD
8

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
7
Hours per shiftHOURS_PER_SHIFT
10
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
10
103(i) statusCURRENT_103I
Never Had 103I Status

Recorded as 0 (3)

Driving miles from the MSHA officeMILES_FROM_OFFICE, Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (6)

Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND, MSHA restricted from enforcing Part 48 trainingPART48_TRAINING

Not recorded by MSHA (15)

Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: Goldrich Mining Company
From: Jun 11, 2026
To: No end date
Controller: Not shown
From : Jan 8, 2024
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Goldrich Mining Company
Operator IDOPERATOR_ID
0112586
Operator fromOPERATOR_START_DT
Jun 11, 2026

Controller

Controller IDCONTROLLER_ID
0200921
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jan 8, 2024

Mine

Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Goldrich Mining Company
From: Jun 11, 2026
To: No end date
Controller: Not shown
From : Jun 1, 2010
To : Jan 7, 2024
Details

Operator

OperatorOPERATOR_NAME
Goldrich Mining Company
Operator IDOPERATOR_ID
0112586
Operator fromOPERATOR_START_DT
Jun 11, 2026

Controller

Controller IDCONTROLLER_ID
0095333
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jun 1, 2010
Controller toCONTROLLER_END_DT
Jan 7, 2024

Mine

Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME

Operator: Goldrich NyacAU Placer LLC
From: Apr 2, 2012
To: Jun 10, 2026
Controller: Goldrich Mining Company et al
From : Apr 2, 2012
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDOPERATOR_ID
0123251
Operator fromOPERATOR_START_DT
Apr 2, 2012
Operator toOPERATOR_END_DT
Jun 10, 2026

Controller

ControllerCONTROLLER_NAME
Goldrich Mining Company et al
Controller IDCONTROLLER_ID
0104655
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Apr 2, 2012

Mine

Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Controller toCONTROLLER_END_DT

Operator: Goldrich NyacAU Placer LLC
From: Apr 2, 2012
To: Jun 10, 2026
Controller: Nyac Gold, LLC et al
From : Apr 2, 2012
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Goldrich NyacAU Placer LLC
Operator IDOPERATOR_ID
0123251
Operator fromOPERATOR_START_DT
Apr 2, 2012
Operator toOPERATOR_END_DT
Jun 10, 2026

Controller

ControllerCONTROLLER_NAME
Nyac Gold, LLC et al
Controller IDCONTROLLER_ID
0104655
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Apr 2, 2012

Mine

Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Controller toCONTROLLER_END_DT

Operator: Cdc Partners
From: Feb 8, 1982
To: Apr 1, 2012
Controller: Footh Douglas
From : Feb 8, 1982
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Cdc Partners
Operator IDOPERATOR_ID
L05910
Operator fromOPERATOR_START_DT
Feb 8, 1982
Operator toOPERATOR_END_DT
Apr 1, 2012

Controller

ControllerCONTROLLER_NAME
Footh Douglas
Controller IDCONTROLLER_ID
M04758
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Feb 8, 1982

Mine

Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Controller toCONTROLLER_END_DT

Operator: Meadowlark Mining Company
From: Jun 1, 1981
To: Feb 7, 1982
Controller: Meadowlark Mining Company
From : May 1, 1980
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Meadowlark Mining Company
Operator IDOPERATOR_ID
L05320
Operator fromOPERATOR_START_DT
Jun 1, 1981
Operator toOPERATOR_END_DT
Feb 7, 1982

Controller

ControllerCONTROLLER_NAME
Meadowlark Mining Company
Controller IDCONTROLLER_ID
M04292
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
May 1, 1980

Mine

Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Controller toCONTROLLER_END_DT

As MSHA records it, newest operator first.

Address of record

Goldrich Mining Company·Contact title CEO·Street not recorded, Edina MN 55436

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Goldrich Mining Company
Contact titleCONTACT_TITLE
CEO
CityCITY
Edina
StateSTATE_ABBR
MN
State nameSTATE
Minnesota
ZIP codeZIP_CD
55436
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
27

Mine

Mine IDMINE_ID
5001402
Mine name in this fileMINE_NAME
Little Squaw Creek
Nearest townNEAREST_TOWN
Coldfoot
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Intermittent
Status sinceMINE_STATUS_DT
Jul 4, 2026
Primary commodity (SIC)PRIMARY_SIC_CD
Gold Ore
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology