Wash Plant Primary
Metal/Non-Metal, Surface·Construction Sand and Gravel·Matanuska-Susitna, Alaska·Mine ID 5001700
Operator QAP·Controller Colas S A·MSHA status Intermittent since Jul 1, 2013
What MSHA has on file for this mine
MSHA records as of Nov 13, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Inspections
Regular Safety and Health InspectionOct 14 to Oct 15, 2025Inspectors 1 | Hours on site 11Began: Oct 14, 2025Ended: Oct 15, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 11Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 14, 2025
- Closed outINSPECTION_END_DT
- Oct 15, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F018842
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 21, 2025Inspectors 1 | Hours on site 3Began: Jul 21, 2025Ended: Jul 21, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 21, 2025
- Closed outINSPECTION_END_DT
- Jul 21, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F01A05D
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMay 30, 2024Inspectors 1 | Hours on site 4Began: May 30, 2024Ended: May 30, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 30, 2024
- Closed outINSPECTION_END_DT
- May 30, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6876592
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 7
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 13, 2023Inspectors 1 | Hours on site 7Began: Jul 13, 2023Ended: Jul 13, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 7Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 13, 2023
- Closed outINSPECTION_END_DT
- Jul 13, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6876473
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Special Emphasis ProgramsMay 17, 2023Inspectors 1 | Hours on site 0.25Began: May 17, 2023Ended: May 17, 2023Activity: Special Emphasis ProgramsInspectors: 1Hours on site: 0.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 17, 2023
- Closed outINSPECTION_END_DT
- May 17, 2023
- ActivityACTIVITY
- Special Emphasis Programs
- Activity codeACTIVITY_CODE
- E17
- Program areaPROGRAM_AREA
- M/NM--Special Emphasis Programs
- Event numberEVENT_NO
- 6876446
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 2.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionApr 13, 2023Inspectors 1 | Hours on site 0Began: Apr 13, 2023Ended: Apr 13, 2023Activity: Spot InspectionInspectors: 1Hours on site: 0Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 13, 2023
- Closed outINSPECTION_END_DT
- Apr 13, 2023
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 6876904
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 2
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (14)
Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionSep 23, 2022Inspectors 1 | Hours on site 0.75Began: Sep 23, 2022Ended: Sep 23, 2022Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 0.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 23, 2022
- Closed outINSPECTION_END_DT
- Sep 23, 2022
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 1124192
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionSep 2 to Sep 6, 2022Inspectors 1 | Hours on site 9.5Began: Sep 2, 2022Ended: Sep 6, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 2, 2022
- Closed outINSPECTION_END_DT
- Sep 6, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 7026116
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Verbal Hazard Complaint InspectionsOct 12 to Oct 13, 2021Inspectors 1 | Hours on site 3.5Began: Oct 12, 2021Ended: Oct 13, 2021Activity: Verbal Hazard Complaint InspectionsInspectors: 1Hours on site: 3.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 12, 2021
- Closed outINSPECTION_END_DT
- Oct 13, 2021
- ActivityACTIVITY
- Verbal Hazard Complaint Inspections
- Activity codeACTIVITY_CODE
- E04
- Program areaPROGRAM_AREA
- M/NM--Verbal Hazard Complaint Inspections
- Event numberEVENT_NO
- 1124991
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 9.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionApr 27, 2021Inspectors 1 | Hours on site 8Began: Apr 27, 2021Ended: Apr 27, 2021Activity: Spot InspectionInspectors: 1Hours on site: 8Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Apr 27, 2021
- Closed outINSPECTION_END_DT
- Apr 27, 2021
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 1146735
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 8
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 9.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionOct 15 to Oct 16, 2020Inspectors 1 | Hours on site 1.25Began: Oct 15, 2020Ended: Oct 16, 2020Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 1.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 15, 2020
- Closed outINSPECTION_END_DT
- Oct 16, 2020
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 1146700
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 6 to Oct 7, 2020Inspectors 1 | Hours on site 11Began: Oct 6, 2020Ended: Oct 7, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 11Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 6, 2020
- Closed outINSPECTION_END_DT
- Oct 7, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1146696
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 11
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 19
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionMay 15 to May 18, 2020Inspectors 1 | Hours on site 14.5Began: May 15, 2020Ended: May 18, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 14.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- May 15, 2020
- Closed outINSPECTION_END_DT
- May 18, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1124404
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 14.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 27.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Spot InspectionSep 17 to Sep 18, 2019Inspectors 1 | Hours on site 5Began: Sep 17, 2019Ended: Sep 18, 2019Activity: Spot InspectionInspectors: 1Hours on site: 5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 17, 2019
- Closed outINSPECTION_END_DT
- Sep 18, 2019
- ActivityACTIVITY
- Spot Inspection
- Activity codeACTIVITY_CODE
- E16
- Program areaPROGRAM_AREA
- M/NM--Spot Inspection
- Event numberEVENT_NO
- 1153918
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 11, 2019Inspectors 1 | Hours on site 4.75Began: Jul 11, 2019Ended: Jul 11, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 11, 2019
- Closed outINSPECTION_END_DT
- Jul 11, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1124398
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 19 to Jul 20, 2018Inspectors 1 | Hours on site 6Began: Jul 19, 2018Ended: Jul 20, 2018Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 19, 2018
- Closed outINSPECTION_END_DT
- Jul 20, 2018
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1146410
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 3, 2016Inspectors 1 | Hours on site 5Began: Oct 3, 2016Ended: Oct 3, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 3, 2016
- Closed outINSPECTION_END_DT
- Oct 3, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1153736
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionJun 29, 2016Inspectors 1 | Hours on site 1Began: Jun 29, 2016Ended: Jun 29, 2016Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 1Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 29, 2016
- Closed outINSPECTION_END_DT
- Jun 29, 2016
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 1140460
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionJun 8, 2016Inspectors 1 | Hours on site 3Began: Jun 8, 2016Ended: Jun 8, 2016Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 3Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 8, 2016
- Closed outINSPECTION_END_DT
- Jun 8, 2016
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 1153692
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 3 to Jun 10, 2016Inspectors 1 | Hours on site 4.75Began: Jun 3, 2016Ended: Jun 10, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 3, 2016
- Closed outINSPECTION_END_DT
- Jun 10, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1140457
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 10.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionSep 29, 2015Inspectors 1 | Hours on site 1.75Began: Sep 29, 2015Ended: Sep 29, 2015Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 1.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 29, 2015
- Closed outINSPECTION_END_DT
- Sep 29, 2015
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 1153653
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 1.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 16
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 2 to Jul 31, 2015Inspectors 1 | Hours on site 2.5Began: Jul 2, 2015Ended: Jul 31, 2015Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 2.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 2, 2015
- Closed outINSPECTION_END_DT
- Jul 31, 2015
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1153628
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 29
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 2 to Jul 3, 2014Inspectors 1 | Hours on site 0Began: Jul 2, 2014Ended: Jul 3, 2014Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 0Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 2, 2014
- Closed outINSPECTION_END_DT
- Jul 3, 2014
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1153482
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 9
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (14)
Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionOct 6 to Oct 7, 2008Inspectors 1 | Hours on site 5.25Began: Oct 6, 2008Ended: Oct 7, 2008Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Oct 6, 2008
- Closed outINSPECTION_END_DT
- Oct 7, 2008
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1140300
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2008
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2009
- MSHA fiscal quarterFISCAL_QTR
- 1
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 4 to Jun 8, 2008Inspectors 1 | Hours on site 5.5Began: Jun 4, 2008Ended: Jun 8, 2008Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 5.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 4, 2008
- Closed outINSPECTION_END_DT
- Jun 8, 2008
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1140502
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 5.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Calendar yearCAL_YR
- 2008
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2008
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
25 most recent of 32 inspections and other MSHA visits since Aug 13, 2001; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Jul 13, 2023Type: CitationStandard: 56.12004S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6563304
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 13, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1110
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 13, 2023
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 13, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Jul 13, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- Jul 13, 2023
- Terminated, timeTERMINATION_TIME
- 1300
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Aug 15, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 20, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 14, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 6876473
- Inspection beganINSPECTION_BEGIN_DT
- Jul 13, 2023
- Inspection closed outINSPECTION_END_DT
- Jul 13, 2023
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 13, 2023Type: CitationStandard: 56.4201(a)(1)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6563305
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 13, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1145
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 13, 2023
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 13, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Jul 13, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- Jul 13, 2023
- Terminated, timeTERMINATION_TIME
- 1200
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- Aug 15, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 20, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 14, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 6876473
- Inspection beganINSPECTION_BEGIN_DT
- Jul 13, 2023
- Inspection closed outINSPECTION_END_DT
- Jul 13, 2023
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Apr 13, 2023Type: CitationStandard: 50.20-7S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $143.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6478507
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Apr 13, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1257
- Date of occurrenceVIOLATION_OCCUR_DT
- Apr 13, 2023
- 30 CFR part and sectionPART_SECTION
- 50.20-7
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Apr 13, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1259
- Latest dueLATEST_TERM_DUE_DT
- Apr 13, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1259
- TerminatedTERMINATION_DT
- Apr 13, 2023
- Terminated, timeTERMINATION_TIME
- 1258
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 143
- Current proposed assessmentAMOUNT_DUE
- 143
- Amount paidAMOUNT_PAID
- 143
- Bill first printedBILL_PRINT_DT
- May 16, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Jun 21, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 6, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 6876904
- Inspection beganINSPECTION_BEGIN_DT
- Apr 13, 2023
- Inspection closed outINSPECTION_END_DT
- Apr 13, 2023
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 6, 2022Type: CitationStandard: 56.14101(a)(3)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9580548
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 6, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1005
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 6, 2022
- 30 CFR part and sectionPART_SECTION
- 56.14101(a)(3)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 16, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Sep 16, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Sep 23, 2022
- Terminated, timeTERMINATION_TIME
- 1137
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Oct 11, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 16, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 10, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 7026116
- Inspection beganINSPECTION_BEGIN_DT
- Sep 2, 2022
- Inspection closed outINSPECTION_END_DT
- Sep 6, 2022
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 6, 2022Type: CitationStandard: 56.12030S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9580547
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 6, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 0915
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 6, 2022
- 30 CFR part and sectionPART_SECTION
- 56.12030
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 6, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Sep 6, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Sep 6, 2022
- Terminated, timeTERMINATION_TIME
- 0930
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Oct 11, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 16, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 10, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 7026116
- Inspection beganINSPECTION_BEGIN_DT
- Sep 2, 2022
- Inspection closed outINSPECTION_END_DT
- Sep 6, 2022
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 2, 2022Type: CitationStandard: 56.12030S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $481.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9580546
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 2, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1245
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 2, 2022
- 30 CFR part and sectionPART_SECTION
- 56.12030
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 2, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1330
- Latest dueLATEST_TERM_DUE_DT
- Sep 2, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1330
- TerminatedTERMINATION_DT
- Sep 2, 2022
- Terminated, timeTERMINATION_TIME
- 1300
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 481
- Current proposed assessmentAMOUNT_DUE
- 481
- Amount paidAMOUNT_PAID
- 481
- Bill first printedBILL_PRINT_DT
- Oct 11, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 16, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 10, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 7026116
- Inspection beganINSPECTION_BEGIN_DT
- Sep 2, 2022
- Inspection closed outINSPECTION_END_DT
- Sep 6, 2022
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 2, 2022Type: CitationStandard: 56.12004S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9580545
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 2, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1210
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 2, 2022
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 2, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1300
- Latest dueLATEST_TERM_DUE_DT
- Sep 2, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Sep 2, 2022
- Terminated, timeTERMINATION_TIME
- 1220
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Oct 11, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 16, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 10, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 7026116
- Inspection beganINSPECTION_BEGIN_DT
- Sep 2, 2022
- Inspection closed outINSPECTION_END_DT
- Sep 6, 2022
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 2, 2022Type: CitationStandard: 56.12004S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9580544
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 2, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 1040
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 2, 2022
- 30 CFR part and sectionPART_SECTION
- 56.12004
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 2, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Sep 2, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Sep 2, 2022
- Terminated, timeTERMINATION_TIME
- 1050
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Oct 11, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 16, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 10, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 7026116
- Inspection beganINSPECTION_BEGIN_DT
- Sep 2, 2022
- Inspection closed outINSPECTION_END_DT
- Sep 6, 2022
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 13, 2021Type: CitationStandard: 56.9101S&S: YNegligence: LowNegligenceIssued to: OperatorProposed penalty: $125.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9615851
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 13, 2021
- Time issuedVIOLATION_ISSUE_TIME
- 1200
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 13, 2021
- 30 CFR part and sectionPART_SECTION
- 56.9101
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 13, 2021
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Oct 13, 2021
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- Oct 13, 2021
- Terminated, timeTERMINATION_TIME
- 1300
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 125
- Current proposed assessmentAMOUNT_DUE
- 125
- Amount paidAMOUNT_PAID
- 125
- Bill first printedBILL_PRINT_DT
- Nov 16, 2021
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 29, 2021
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 19, 2021
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1124991
- Inspection beganINSPECTION_BEGIN_DT
- Oct 12, 2021
- Inspection closed outINSPECTION_END_DT
- Oct 13, 2021
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 7, 2020Type: CitationStandard: 56.14107(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9435904
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 7, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1047
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 7, 2020
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 7, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Oct 7, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Oct 7, 2020
- Terminated, timeTERMINATION_TIME
- 1438
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Nov 17, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 30, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 31, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1146696
- Inspection beganINSPECTION_BEGIN_DT
- Oct 6, 2020
- Inspection closed outINSPECTION_END_DT
- Oct 7, 2020
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 6, 2020Type: CitationStandard: 56.4201(a)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9435901
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 6, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1138
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 6, 2020
- 30 CFR part and sectionPART_SECTION
- 56.4201(a)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 6, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1400
- Latest dueLATEST_TERM_DUE_DT
- Oct 6, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1400
- TerminatedTERMINATION_DT
- Oct 7, 2020
- Terminated, timeTERMINATION_TIME
- 1208
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Nov 17, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 30, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 31, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1146696
- Inspection beganINSPECTION_BEGIN_DT
- Oct 6, 2020
- Inspection closed outINSPECTION_END_DT
- Oct 7, 2020
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 6, 2020Type: CitationStandard: 56.11003S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9435902
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 6, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1150
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 6, 2020
- 30 CFR part and sectionPART_SECTION
- 56.11003
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 6, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1500
- Latest dueLATEST_TERM_DUE_DT
- Oct 6, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Oct 6, 2020
- Terminated, timeTERMINATION_TIME
- 1430
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Nov 17, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 30, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 31, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1146696
- Inspection beganINSPECTION_BEGIN_DT
- Oct 6, 2020
- Inspection closed outINSPECTION_END_DT
- Oct 7, 2020
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Oct 6, 2020Type: CitationStandard: 56.12040S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9435903
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Oct 6, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1245
- Date of occurrenceVIOLATION_OCCUR_DT
- Oct 6, 2020
- 30 CFR part and sectionPART_SECTION
- 56.12040
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Oct 16, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Nov 20, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Oct 23, 2020
- Terminated, timeTERMINATION_TIME
- 1149
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Nov 17, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 30, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 31, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1146696
- Inspection beganINSPECTION_BEGIN_DT
- Oct 6, 2020
- Inspection closed outINSPECTION_END_DT
- Oct 7, 2020
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: May 15, 2020Type: CitationStandard: 56.14130(g)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6334501
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 15, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1305
- Date of occurrenceVIOLATION_OCCUR_DT
- May 15, 2020
- 30 CFR part and sectionPART_SECTION
- 56.14130(g)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 15, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1320
- Latest dueLATEST_TERM_DUE_DT
- May 15, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1320
- TerminatedTERMINATION_DT
- May 15, 2020
- Terminated, timeTERMINATION_TIME
- 1315
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Jun 16, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 26, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 21, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1124404
- Inspection beganINSPECTION_BEGIN_DT
- May 15, 2020
- Inspection closed outINSPECTION_END_DT
- May 18, 2020
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: May 15, 2020Type: CitationStandard: 56.20003(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8554467
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- May 15, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1135
- Date of occurrenceVIOLATION_OCCUR_DT
- May 15, 2020
- 30 CFR part and sectionPART_SECTION
- 56.20003(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- May 15, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- May 15, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- May 18, 2020
- Terminated, timeTERMINATION_TIME
- 0915
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Jun 16, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Jul 26, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jul 21, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1124404
- Inspection beganINSPECTION_BEGIN_DT
- May 15, 2020
- Inspection closed outINSPECTION_END_DT
- May 18, 2020
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 17, 2019Type: CitationStandard: 56.16007(a)S&S: YNegligence: LowNegligenceIssued to: OperatorProposed penalty: $135.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6348150
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 17, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 0911
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 17, 2019
- 30 CFR part and sectionPART_SECTION
- 56.16007(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- TerminatedTERMINATION_DT
- Sep 17, 2019
- Terminated, timeTERMINATION_TIME
- 0912
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 135
- Current proposed assessmentAMOUNT_DUE
- 135
- Amount paidAMOUNT_PAID
- 135
- Bill first printedBILL_PRINT_DT
- Nov 12, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 18, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 13, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1153918
- Inspection beganINSPECTION_BEGIN_DT
- Sep 17, 2019
- Inspection closed outINSPECTION_END_DT
- Sep 18, 2019
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (16)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 17, 2019Type: CitationStandard: 56.3130S&S: YNegligence: HighNegligenceIssued to: OperatorProposed penalty: $768.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6348151
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 17, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 0915
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 17, 2019
- 30 CFR part and sectionPART_SECTION
- 56.3130
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 17, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Sep 17, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Sep 18, 2019
- Terminated, timeTERMINATION_TIME
- 1100
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 768
- Current proposed assessmentAMOUNT_DUE
- 768
- Amount paidAMOUNT_PAID
- 768
- Bill first printedBILL_PRINT_DT
- Nov 12, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Dec 18, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 13, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1153918
- Inspection beganINSPECTION_BEGIN_DT
- Sep 17, 2019
- Inspection closed outINSPECTION_END_DT
- Sep 18, 2019
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 17, 2019Type: OrderStandard: Not recordedS&S: Not recordedNegligence: Not recordedIssued to: OperatorProposed penalty: None recordedDetails
The citation
- Citation or order numberVIOLATION_NO
- 6348149
- TypeCIT_ORD_SAFE
- Order
- IssuedVIOLATION_ISSUE_DT
- Sep 17, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 0911
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 17, 2019
- Section of the Act, primarySECTION_OF_ACT_1
- 107(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Abatement
- TerminatedTERMINATION_DT
- Sep 17, 2019
- Terminated, timeTERMINATION_TIME
- 0912
- Termination typeTERMINATION_TYPE
- Terminated
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1153918
- Inspection beganINSPECTION_BEGIN_DT
- Sep 17, 2019
- Inspection closed outINSPECTION_END_DT
- Sep 18, 2019
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Persons potentially affectedNO_AFFECTED
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (30)
30 CFR part and sectionPART_SECTION, Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID
Issued: Jul 11, 2019Type: CitationStandard: 56.4101S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6334749
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 11, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 1120
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 11, 2019
- 30 CFR part and sectionPART_SECTION
- 56.4101
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 11, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 1530
- Latest dueLATEST_TERM_DUE_DT
- Jul 11, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 1530
- TerminatedTERMINATION_DT
- Jul 11, 2019
- Terminated, timeTERMINATION_TIME
- 1225
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- Aug 13, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 18, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 2, 2019
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1124398
- Inspection beganINSPECTION_BEGIN_DT
- Jul 11, 2019
- Inspection closed outINSPECTION_END_DT
- Jul 11, 2019
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 11, 2019Type: CitationStandard: 56.14112(a)(1)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6334748
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 11, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 1100
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 11, 2019
- 30 CFR part and sectionPART_SECTION
- 56.14112(a)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 11, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 1530
- Latest dueLATEST_TERM_DUE_DT
- Jul 11, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 1530
- TerminatedTERMINATION_DT
- Jul 11, 2019
- Terminated, timeTERMINATION_TIME
- 1215
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- Aug 13, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 18, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 2, 2019
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1124398
- Inspection beganINSPECTION_BEGIN_DT
- Jul 11, 2019
- Inspection closed outINSPECTION_END_DT
- Jul 11, 2019
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 19, 2018Type: CitationStandard: 56.12032S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $118.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367512
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 19, 2018
- Time issuedVIOLATION_ISSUE_TIME
- 1525
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 19, 2018
- 30 CFR part and sectionPART_SECTION
- 56.12032
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 20, 2018
- Originally due, timeORIG_TERM_DUE_TIME
- 1800
- Latest dueLATEST_TERM_DUE_DT
- Jul 20, 2018
- Latest due, timeLATEST_TERM_DUE_TIME
- 1800
- TerminatedTERMINATION_DT
- Jul 20, 2018
- Terminated, timeTERMINATION_TIME
- 1430
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 118
- Current proposed assessmentAMOUNT_DUE
- 118
- Amount paidAMOUNT_PAID
- 118
- Bill first printedBILL_PRINT_DT
- Sep 11, 2018
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 18, 2018
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 16, 2018
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1146410
- Inspection beganINSPECTION_BEGIN_DT
- Jul 19, 2018
- Inspection closed outINSPECTION_END_DT
- Jul 20, 2018
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 19, 2018Type: CitationStandard: 56.4101S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $118.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367513
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 19, 2018
- Time issuedVIOLATION_ISSUE_TIME
- 1540
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 19, 2018
- 30 CFR part and sectionPART_SECTION
- 56.4101
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 20, 2018
- Originally due, timeORIG_TERM_DUE_TIME
- 1830
- Latest dueLATEST_TERM_DUE_DT
- Jul 20, 2018
- Latest due, timeLATEST_TERM_DUE_TIME
- 1830
- TerminatedTERMINATION_DT
- Jul 20, 2018
- Terminated, timeTERMINATION_TIME
- 1428
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 118
- Current proposed assessmentAMOUNT_DUE
- 118
- Amount paidAMOUNT_PAID
- 118
- Bill first printedBILL_PRINT_DT
- Sep 11, 2018
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 18, 2018
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 16, 2018
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1146410
- Inspection beganINSPECTION_BEGIN_DT
- Jul 19, 2018
- Inspection closed outINSPECTION_END_DT
- Jul 20, 2018
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jun 3, 2016Type: CitationStandard: 56.14132(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367495
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 3, 2016
- Time issuedVIOLATION_ISSUE_TIME
- 0955
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 3, 2016
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 4, 2016
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jul 7, 2016
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jun 29, 2016
- Terminated, timeTERMINATION_TIME
- 1113
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Jul 12, 2016
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 26, 2016
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 3, 2016
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1140457
- Inspection beganINSPECTION_BEGIN_DT
- Jun 3, 2016
- Inspection closed outINSPECTION_END_DT
- Jun 10, 2016
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jun 3, 2016Type: CitationStandard: 56.14107(a)S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367494
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 3, 2016
- Time issuedVIOLATION_ISSUE_TIME
- 0920
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 3, 2016
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 4, 2016
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jun 4, 2016
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jun 8, 2016
- Terminated, timeTERMINATION_TIME
- 1708
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Jul 12, 2016
- Final order dateFINAL_ORDER_ISSUE_DT
- Aug 26, 2016
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Aug 3, 2016
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1140457
- Inspection beganINSPECTION_BEGIN_DT
- Jun 3, 2016
- Inspection closed outINSPECTION_END_DT
- Jun 10, 2016
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 2, 2015Type: CitationStandard: 56.3131S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $162.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8601582
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 2, 2015
- Time issuedVIOLATION_ISSUE_TIME
- 1004
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 2, 2015
- 30 CFR part and sectionPART_SECTION
- 56.3131
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 8, 2015
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Oct 28, 2015
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Oct 23, 2015
- Terminated, timeTERMINATION_TIME
- 1145
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 162
- Current proposed assessmentAMOUNT_DUE
- 162
- Amount paidAMOUNT_PAID
- 162
- Bill first printedBILL_PRINT_DT
- Aug 11, 2015
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 14, 2015
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 9, 2015
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- QAP
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1153628
- Inspection beganINSPECTION_BEGIN_DT
- Jul 2, 2015
- Inspection closed outINSPECTION_END_DT
- Jul 31, 2015
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
55 citations and orders since Aug 13, 2001: 55 issued to the operator, 0 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Jul 13, 2023Citation number: 6563305Standard: 56.4201(a)(1)Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6563305
- Assessment control numberASSESS_CASE_NO
- 000582872
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 14, 2023
- Citation issuedISSUE_DT
- Jul 13, 2023
- Date of occurrenceOCCURRENCE_DT
- Jul 13, 2023
- Final order dateFINAL_ORDER_DT
- Sep 20, 2023
- Bill first printedBILL_PRINT_DT
- Aug 15, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 20, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 42
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6842
- Size of mineSIZE_OF_MINE
- 6842
- Controller hours workedCONTROLLER_HRS
- 782045
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 782045
- History period startHISTORY_START_DT
- Apr 13, 2022
- History period endHISTORY_END_DT
- Jul 12, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6876473
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 13, 2023Citation number: 6563304Standard: 56.12004Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6563304
- Assessment control numberASSESS_CASE_NO
- 000582872
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 14, 2023
- Citation issuedISSUE_DT
- Jul 13, 2023
- Date of occurrenceOCCURRENCE_DT
- Jul 13, 2023
- Final order dateFINAL_ORDER_DT
- Sep 20, 2023
- Bill first printedBILL_PRINT_DT
- Aug 15, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 20, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 57
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 1
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 2
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 2
- Repeat violations per inspection dayRPID
- 0.667
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6842
- Size of mineSIZE_OF_MINE
- 6842
- Controller hours workedCONTROLLER_HRS
- 782045
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 782045
- History period startHISTORY_START_DT
- Apr 13, 2022
- History period endHISTORY_END_DT
- Jul 12, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6876473
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (10)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Apr 13, 2023Citation number: 6478507Standard: 50.20-7Proposed penalty: $143.00Current assessment: $143.00Paid against proposed penalty: $143.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6478507
- Assessment control numberASSESS_CASE_NO
- 000577070
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 6, 2023
- Citation issuedISSUE_DT
- Apr 13, 2023
- Date of occurrenceOCCURRENCE_DT
- Apr 13, 2023
- Final order dateFINAL_ORDER_DT
- Jun 21, 2023
- Bill first printedBILL_PRINT_DT
- May 16, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jun 21, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.20-7
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 143.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 143.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 143.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 16
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 1
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 5
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 1.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 6842
- Size of mineSIZE_OF_MINE
- 6842
- Controller hours workedCONTROLLER_HRS
- 774045
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 774045
- History period startHISTORY_START_DT
- Jan 13, 2022
- History period endHISTORY_END_DT
- Apr 12, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6876904
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 6, 2022Citation number: 9580547Standard: 56.12030Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9580547
- Assessment control numberASSESS_CASE_NO
- 000564855
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 10, 2022
- Citation issuedISSUE_DT
- Sep 6, 2022
- Date of occurrenceOCCURRENCE_DT
- Sep 6, 2022
- Final order dateFINAL_ORDER_DT
- Nov 16, 2022
- Bill first printedBILL_PRINT_DT
- Oct 11, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 16, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12030
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 46
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4573
- Size of mineSIZE_OF_MINE
- 4573
- Controller hours workedCONTROLLER_HRS
- 837127
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 837127
- History period startHISTORY_START_DT
- Jun 6, 2021
- History period endHISTORY_END_DT
- Sep 5, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 7026116
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 6, 2022Citation number: 9580548Standard: 56.14101(a)(3)Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9580548
- Assessment control numberASSESS_CASE_NO
- 000564855
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 10, 2022
- Citation issuedISSUE_DT
- Sep 6, 2022
- Date of occurrenceOCCURRENCE_DT
- Sep 6, 2022
- Final order dateFINAL_ORDER_DT
- Nov 16, 2022
- Bill first printedBILL_PRINT_DT
- Oct 11, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 16, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14101(a)(3)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 31
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4573
- Size of mineSIZE_OF_MINE
- 4573
- Controller hours workedCONTROLLER_HRS
- 837127
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 837127
- History period startHISTORY_START_DT
- Jun 6, 2021
- History period endHISTORY_END_DT
- Sep 5, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 7026116
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 2, 2022Citation number: 9580544Standard: 56.12004Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9580544
- Assessment control numberASSESS_CASE_NO
- 000564855
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 10, 2022
- Citation issuedISSUE_DT
- Sep 2, 2022
- Date of occurrenceOCCURRENCE_DT
- Sep 2, 2022
- Final order dateFINAL_ORDER_DT
- Nov 16, 2022
- Bill first printedBILL_PRINT_DT
- Oct 11, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 16, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 46
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4573
- Size of mineSIZE_OF_MINE
- 4573
- Controller hours workedCONTROLLER_HRS
- 837127
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 837127
- History period startHISTORY_START_DT
- Jun 2, 2021
- History period endHISTORY_END_DT
- Sep 1, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 7026116
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 2, 2022Citation number: 9580545Standard: 56.12004Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9580545
- Assessment control numberASSESS_CASE_NO
- 000564855
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 10, 2022
- Citation issuedISSUE_DT
- Sep 2, 2022
- Date of occurrenceOCCURRENCE_DT
- Sep 2, 2022
- Final order dateFINAL_ORDER_DT
- Nov 16, 2022
- Bill first printedBILL_PRINT_DT
- Oct 11, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 16, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12004
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 46
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4573
- Size of mineSIZE_OF_MINE
- 4573
- Controller hours workedCONTROLLER_HRS
- 837127
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 837127
- History period startHISTORY_START_DT
- Jun 2, 2021
- History period endHISTORY_END_DT
- Sep 1, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 7026116
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 2, 2022Citation number: 9580546Standard: 56.12030Proposed penalty: $481.00Current assessment: $481.00Paid against proposed penalty: $481.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9580546
- Assessment control numberASSESS_CASE_NO
- 000564855
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 10, 2022
- Citation issuedISSUE_DT
- Sep 2, 2022
- Date of occurrenceOCCURRENCE_DT
- Sep 2, 2022
- Final order dateFINAL_ORDER_DT
- Nov 16, 2022
- Bill first printedBILL_PRINT_DT
- Oct 11, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 16, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12030
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 481.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 481.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 481.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 76
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4573
- Size of mineSIZE_OF_MINE
- 4573
- Controller hours workedCONTROLLER_HRS
- 837127
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 837127
- History period startHISTORY_START_DT
- Jun 2, 2021
- History period endHISTORY_END_DT
- Sep 1, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 7026116
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 13, 2021Citation number: 9615851Standard: 56.9101Proposed penalty: $125.00Current assessment: $125.00Paid against proposed penalty: $125.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9615851
- Assessment control numberASSESS_CASE_NO
- 000545491
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 17, 2021
- Citation issuedISSUE_DT
- Oct 13, 2021
- Date of occurrenceOCCURRENCE_DT
- Oct 13, 2021
- Final order dateFINAL_ORDER_DT
- Dec 29, 2021
- Bill first printedBILL_PRINT_DT
- Nov 16, 2021
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2022
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 29, 2021
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9101
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 125.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 125.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 125.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 56
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 1.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4854
- Size of mineSIZE_OF_MINE
- 4854
- Controller hours workedCONTROLLER_HRS
- 841985
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 841985
- History period startHISTORY_START_DT
- Jul 13, 2020
- History period endHISTORY_END_DT
- Oct 12, 2021
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1124991
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 7, 2020Citation number: 9435904Standard: 56.14107(a)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9435904
- Assessment control numberASSESS_CASE_NO
- 000525372
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 31, 2020
- Citation issuedISSUE_DT
- Oct 7, 2020
- Date of occurrenceOCCURRENCE_DT
- Oct 7, 2020
- Final order dateFINAL_ORDER_DT
- Dec 30, 2020
- Bill first printedBILL_PRINT_DT
- Nov 17, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2021
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 30, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 48
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 7
- Violations per inspection dayVPID
- 0.86
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 11356
- Size of mineSIZE_OF_MINE
- 11356
- Controller hours workedCONTROLLER_HRS
- 858641
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 858641
- History period startHISTORY_START_DT
- Jul 7, 2019
- History period endHISTORY_END_DT
- Oct 6, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1146696
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 6, 2020Citation number: 9435903Standard: 56.12040Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9435903
- Assessment control numberASSESS_CASE_NO
- 000525372
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 31, 2020
- Citation issuedISSUE_DT
- Oct 6, 2020
- Date of occurrenceOCCURRENCE_DT
- Oct 6, 2020
- Final order dateFINAL_ORDER_DT
- Dec 30, 2020
- Bill first printedBILL_PRINT_DT
- Nov 17, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2021
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 30, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12040
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 48
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 1.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 11356
- Size of mineSIZE_OF_MINE
- 11356
- Controller hours workedCONTROLLER_HRS
- 858641
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 858641
- History period startHISTORY_START_DT
- Jul 6, 2019
- History period endHISTORY_END_DT
- Oct 5, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1146696
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 6, 2020Citation number: 9435902Standard: 56.11003Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9435902
- Assessment control numberASSESS_CASE_NO
- 000525372
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 31, 2020
- Citation issuedISSUE_DT
- Oct 6, 2020
- Date of occurrenceOCCURRENCE_DT
- Oct 6, 2020
- Final order dateFINAL_ORDER_DT
- Dec 30, 2020
- Bill first printedBILL_PRINT_DT
- Nov 17, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2021
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 30, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11003
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 1.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 11356
- Size of mineSIZE_OF_MINE
- 11356
- Controller hours workedCONTROLLER_HRS
- 858641
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 858641
- History period startHISTORY_START_DT
- Jul 6, 2019
- History period endHISTORY_END_DT
- Oct 5, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1146696
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Oct 6, 2020Citation number: 9435901Standard: 56.4201(a)(2)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9435901
- Assessment control numberASSESS_CASE_NO
- 000525372
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 31, 2020
- Citation issuedISSUE_DT
- Oct 6, 2020
- Date of occurrenceOCCURRENCE_DT
- Oct 6, 2020
- Final order dateFINAL_ORDER_DT
- Dec 30, 2020
- Bill first printedBILL_PRINT_DT
- Nov 17, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2021
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 30, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4201(a)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 6
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 5
- Violations per inspection dayVPID
- 1.2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 11356
- Size of mineSIZE_OF_MINE
- 11356
- Controller hours workedCONTROLLER_HRS
- 858641
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 858641
- History period startHISTORY_START_DT
- Jul 6, 2019
- History period endHISTORY_END_DT
- Oct 5, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1146696
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 15, 2020Citation number: 8554467Standard: 56.20003(a)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8554467
- Assessment control numberASSESS_CASE_NO
- 000516458
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 21, 2020
- Citation issuedISSUE_DT
- May 15, 2020
- Date of occurrenceOCCURRENCE_DT
- May 15, 2020
- Final order dateFINAL_ORDER_DT
- Jul 26, 2020
- Bill first printedBILL_PRINT_DT
- Jun 16, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 26, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 11356
- Size of mineSIZE_OF_MINE
- 11356
- Controller hours workedCONTROLLER_HRS
- 858641
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 858641
- History period startHISTORY_START_DT
- Feb 15, 2019
- History period endHISTORY_END_DT
- May 14, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1124404
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: May 15, 2020Citation number: 6334501Standard: 56.14130(g)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6334501
- Assessment control numberASSESS_CASE_NO
- 000516458
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 21, 2020
- Citation issuedISSUE_DT
- May 15, 2020
- Date of occurrenceOCCURRENCE_DT
- May 15, 2020
- Final order dateFINAL_ORDER_DT
- Jul 26, 2020
- Bill first printedBILL_PRINT_DT
- Jun 16, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jul 26, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14130(g)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 33
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 11356
- Size of mineSIZE_OF_MINE
- 11356
- Controller hours workedCONTROLLER_HRS
- 858641
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 858641
- History period startHISTORY_START_DT
- Feb 15, 2019
- History period endHISTORY_END_DT
- May 14, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1124404
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (12)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 17, 2019Citation number: 6348150Standard: 56.16007(a)Proposed penalty: $135.00Current assessment: $135.00Paid against proposed penalty: $135.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6348150
- Assessment control numberASSESS_CASE_NO
- 000503719
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 21, 2020
- Citation issuedISSUE_DT
- Sep 17, 2019
- Date of occurrenceOCCURRENCE_DT
- Sep 17, 2019
- Final order dateFINAL_ORDER_DT
- Dec 18, 2019
- Bill first printedBILL_PRINT_DT
- Nov 12, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 18, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.16007(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 135.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 135.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.78
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 135.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 1.78
Penalty points
- Violation history pointsPENALTY_POINTS
- 58
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10083
- Size of mineSIZE_OF_MINE
- 10083
- Controller hours workedCONTROLLER_HRS
- 832928
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 832928
- History period startHISTORY_START_DT
- Jun 17, 2018
- History period endHISTORY_END_DT
- Sep 16, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1153918
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (10)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 17, 2019Citation number: 6348151Standard: 56.3130Proposed penalty: $768.00Current assessment: $768.00Paid against proposed penalty: $768.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6348151
- Assessment control numberASSESS_CASE_NO
- 000503719
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jul 21, 2020
- Citation issuedISSUE_DT
- Sep 17, 2019
- Date of occurrenceOCCURRENCE_DT
- Sep 17, 2019
- Final order dateFINAL_ORDER_DT
- Dec 18, 2019
- Bill first printedBILL_PRINT_DT
- Nov 12, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Dec 18, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.3130
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 768.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 768.00
- Mine Act interestMINEACT_INTEREST_AMT
- 10.10
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 768.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 10.10
Penalty points
- Violation history pointsPENALTY_POINTS
- 83
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 3
- Violations per inspection dayVPID
- 0.67
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10083
- Size of mineSIZE_OF_MINE
- 10083
- Controller hours workedCONTROLLER_HRS
- 832928
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 832928
- History period startHISTORY_START_DT
- Jun 17, 2018
- History period endHISTORY_END_DT
- Sep 16, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1153918
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (10)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 11, 2019Citation number: 6334748Standard: 56.14112(a)(1)Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6334748
- Assessment control numberASSESS_CASE_NO
- 000497391
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 2, 2019
- Citation issuedISSUE_DT
- Jul 11, 2019
- Date of occurrenceOCCURRENCE_DT
- Jul 11, 2019
- Final order dateFINAL_ORDER_DT
- Sep 18, 2019
- Bill first printedBILL_PRINT_DT
- Aug 13, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2019
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 18, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14112(a)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.66
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 0.66
Penalty points
- Violation history pointsPENALTY_POINTS
- 38
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10083
- Size of mineSIZE_OF_MINE
- 10083
- Controller hours workedCONTROLLER_HRS
- 832928
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 832928
- History period startHISTORY_START_DT
- Apr 11, 2018
- History period endHISTORY_END_DT
- Jul 10, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1124398
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (10)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 11, 2019Citation number: 6334749Standard: 56.4101Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6334749
- Assessment control numberASSESS_CASE_NO
- 000497391
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 2, 2019
- Citation issuedISSUE_DT
- Jul 11, 2019
- Date of occurrenceOCCURRENCE_DT
- Jul 11, 2019
- Final order dateFINAL_ORDER_DT
- Sep 18, 2019
- Bill first printedBILL_PRINT_DT
- Aug 13, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2019
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 18, 2019
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4101
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Mine Act interestMINEACT_INTEREST_AMT
- 0.66
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
- Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
- 0.66
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 2
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- Violations per inspection dayVPID
- 1
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Repeat violations per inspection dayRPID
- 0.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 10083
- Size of mineSIZE_OF_MINE
- 10083
- Controller hours workedCONTROLLER_HRS
- 832928
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 832928
- History period startHISTORY_START_DT
- Apr 11, 2018
- History period endHISTORY_END_DT
- Jul 10, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1124398
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (8)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 19, 2018Citation number: 6367512Standard: 56.12032Proposed penalty: $118.00Current assessment: $118.00Paid against proposed penalty: $118.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367512
- Assessment control numberASSESS_CASE_NO
- 000473146
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 11, 2018
- Citation issuedISSUE_DT
- Jul 19, 2018
- Date of occurrenceOCCURRENCE_DT
- Jul 19, 2018
- Final order dateFINAL_ORDER_DT
- Oct 18, 2018
- Bill first printedBILL_PRINT_DT
- Sep 11, 2018
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2018
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 18, 2018
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12032
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 118.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 118.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 118.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 58
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 15798
- Size of mineSIZE_OF_MINE
- 15798
- Controller hours workedCONTROLLER_HRS
- 827222
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 827222
- History period startHISTORY_START_DT
- Apr 19, 2017
- History period endHISTORY_END_DT
- Jul 18, 2018
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1146410
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 19, 2018Citation number: 6367513Standard: 56.4101Proposed penalty: $118.00Current assessment: $118.00Paid against proposed penalty: $118.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367513
- Assessment control numberASSESS_CASE_NO
- 000473146
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 11, 2018
- Citation issuedISSUE_DT
- Jul 19, 2018
- Date of occurrenceOCCURRENCE_DT
- Jul 19, 2018
- Final order dateFINAL_ORDER_DT
- Oct 18, 2018
- Bill first printedBILL_PRINT_DT
- Sep 11, 2018
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2018
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 18, 2018
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.4101
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 118.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 118.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 118.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 43
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Mine size pointsMINE_SIZE_POINTS
- 2
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 15798
- Size of mineSIZE_OF_MINE
- 15798
- Controller hours workedCONTROLLER_HRS
- 827222
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 827222
- History period startHISTORY_START_DT
- Apr 19, 2017
- History period endHISTORY_END_DT
- Jul 18, 2018
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1146410
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 3, 2016Citation number: 6367494Standard: 56.14107(a)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367494
- Assessment control numberASSESS_CASE_NO
- 000415199
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 3, 2016
- Citation issuedISSUE_DT
- Jun 3, 2016
- Date of occurrenceOCCURRENCE_DT
- Jun 3, 2016
- Final order dateFINAL_ORDER_DT
- Aug 26, 2016
- Bill first printedBILL_PRINT_DT
- Jul 12, 2016
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2016
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 31
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Violations per inspection dayVPID
- 4
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 2
- Repeat violations per inspection dayRPID
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4861
- Size of mineSIZE_OF_MINE
- 4861
- Controller hours workedCONTROLLER_HRS
- 720782
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 720782
- History period startHISTORY_START_DT
- Mar 3, 2015
- History period endHISTORY_END_DT
- Jun 2, 2016
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1140457
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (11)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 3, 2016Citation number: 6367495Standard: 56.14132(a)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367495
- Assessment control numberASSESS_CASE_NO
- 000415199
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Aug 3, 2016
- Citation issuedISSUE_DT
- Jun 3, 2016
- Date of occurrenceOCCURRENCE_DT
- Jun 3, 2016
- Final order dateFINAL_ORDER_DT
- Aug 26, 2016
- Bill first printedBILL_PRINT_DT
- Jul 12, 2016
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2016
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 31
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 4
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Violations per inspection dayVPID
- 4
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 4861
- Size of mineSIZE_OF_MINE
- 4861
- Controller hours workedCONTROLLER_HRS
- 720782
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 720782
- History period startHISTORY_START_DT
- Mar 3, 2015
- History period endHISTORY_END_DT
- Jun 2, 2016
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1140457
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 2, 2015Citation number: 8601583Standard: 56.12030Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8601583
- Assessment control numberASSESS_CASE_NO
- 000389198
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 9, 2015
- Citation issuedISSUE_DT
- Jul 2, 2015
- Date of occurrenceOCCURRENCE_DT
- Jul 2, 2015
- Final order dateFINAL_ORDER_DT
- Sep 14, 2015
- Bill first printedBILL_PRINT_DT
- Aug 11, 2015
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2015
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 14, 2015
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12030
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 56
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 2392
- Size of mineSIZE_OF_MINE
- 2392
- Controller hours workedCONTROLLER_HRS
- 639800
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 639800
- History period startHISTORY_START_DT
- Apr 2, 2014
- History period endHISTORY_END_DT
- Jul 1, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1153628
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (14)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 2, 2015Citation number: 8601581Standard: 56.14107(a)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8601581
- Assessment control numberASSESS_CASE_NO
- 000389198
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 9, 2015
- Citation issuedISSUE_DT
- Jul 2, 2015
- Date of occurrenceOCCURRENCE_DT
- Jul 2, 2015
- Final order dateFINAL_ORDER_DT
- Sep 14, 2015
- Bill first printedBILL_PRINT_DT
- Aug 11, 2015
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2015
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 14, 2015
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 46
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 2392
- Size of mineSIZE_OF_MINE
- 2392
- Controller hours workedCONTROLLER_HRS
- 639800
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 639800
- History period startHISTORY_START_DT
- Apr 2, 2014
- History period endHISTORY_END_DT
- Jul 1, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- QAP
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1153628
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
25 most recent of 54 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Imminent danger orders, section 107(a)
Issued: Sep 17, 2019Order number: 6348149Terminated: Sep 17, 2019Issued to: OperatorDetails
The order
- Order numberVIOLATION_NO
- 6348149
- IssuedVIOLATION_DATE_ISSUED
- Sep 17, 2019
- TerminatedTERMINATION_DATE
- Sep 17, 2019
- Issued toVIOLATOR_TYPE
- Operator
Who
- Operator at the timeOPERATOR_NAME_VIOLATIONS
- QAP
- Controller at the timeCONTROLLER_NAME_VIOLATIONS
- Colas S A
- Controller IDCONTROLLER_ID_VIOLATIONS
- M03183
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- StateSTATE_ABBREVIATION
- AK
- Coal or Metal/Non-MetalCOAL_OR_METAL
- M
Not recorded by MSHA (2)
ContractorCONTRACTOR_NAME, Contractor IDCONTRACTOR_ID
1 imminent danger order in MSHA's list, which starts July 1, 2010.
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- NO DYS AWY FRM WRK,NO RSTR ACT
- 2
- DAYS RESTRICTED ACTIVITY ONLY
- 1
Date: Oct 23, 2025Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: HANDLING OF MATERIALSAccident type: Struck by... NECDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220253170572
- DateACCIDENT_DT
- Oct 23, 2025
- TimeACCIDENT_TIME
- 0950
- Shift beganSHIFT_BEGIN_TIME
- 0700
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- HANDLING OF MATERIALS
- Classification codeCLASSIFICATION_CD
- 09
- Accident typeACCIDENT_TYPE
- Struck by... NEC
- Accident type codeACCIDENT_TYPE_CD
- 08
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Handling supplies or material
- Activity codeACTIVITY_CD
- 028
- Source of injuryINJURY_SOURCE
- METAL,NEC(PIPE,WIRE,NAIL)
- Source of injury codeINJURY_SOURCE_CD
- 088
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- MOUTH/LIP/TEETH/TONGUE/THROAT/TASTE
- Part of body codeINJ_BODY_PART_CD
- 142
- Returned to workRETURN_TO_WORK_DT
- Oct 23, 2025
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Machine, NEC - Wheelbarrow, Well drilling Rig, Post hole auger
- Equipment codeMINING_EQUIP_CD
- 71
- Equipment manufacturerEQUIP_MFR_NAME
- Not on this list
- Equipment manufacturer codeEQUIP_MFR_CD
- 119
- Equipment model numberEQUIP_MODEL_NO
- NLKPROII
- FIPS state codeFIPS_STATE_CD
- 02
Who and period
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID
Date: Oct 2, 2021Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: MACHINERYAccident type: Struck against a moving objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220212850023
- DateACCIDENT_DT
- Oct 2, 2021
- TimeACCIDENT_TIME
- 1420
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- MACHINERY
- Classification codeCLASSIFICATION_CD
- 17
- Accident typeACCIDENT_TYPE
- Struck against a moving object
- Accident type codeACCIDENT_TYPE_CD
- 02
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320220980014
Injury
- Activity at the timeACTIVITY
- Bulldozer
- Activity codeACTIVITY_CD
- 047
- Source of injuryINJURY_SOURCE
- SURFACE MINING MACHINES
- Source of injury codeINJURY_SOURCE_CD
- 076
- Nature of injuryNATURE_INJURY
- CUT,LACER,PUNCT-OPN WOUND
- Nature of injury codeNATURE_INJURY_CD
- 180
- Part of bodyINJ_BODY_PART
- MULTIPLE PARTS (MORE THAN ONE MAJOR)
- Part of body codeINJ_BODY_PART_CD
- 700
- Days of restricted workDAYS_RESTRICT
- 166
- Returned to workRETURN_TO_WORK_DT
- Mar 18, 2022
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Bulldozer, Dozer, Crawler tractor, Push cat
- Equipment codeMINING_EQUIP_CD
- 08
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- Equipment model numberEQUIP_MODEL_NO
- D-10
- FIPS state codeFIPS_STATE_CD
- 02
Who and period
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 4
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 1
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (2)
MSHA investigation beganINVEST_BEGIN_DT, Contractor IDCONTRACTOR_ID
Date: Aug 5, 2019Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACTClassification: FALL OF FACE/RIB/PILLAR/SIDE/HIGHWALLAccident type: Struck against a moving objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220192270018
- DateACCIDENT_DT
- Aug 5, 2019
- TimeACCIDENT_TIME
- 1430
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- NO DYS AWY FRM WRK,NO RSTR ACT
- Degree of injury codeDEGREE_INJURY_CD
- 06
- ClassificationCLASSIFICATION
- FALL OF FACE/RIB/PILLAR/SIDE/HIGHWALL
- Classification codeCLASSIFICATION_CD
- 06
- Accident typeACCIDENT_TYPE
- Struck against a moving object
- Accident type codeACCIDENT_TYPE_CD
- 02
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
Injury
- Activity at the timeACTIVITY
- Front-end loader
- Activity codeACTIVITY_CD
- 053
- Source of injuryINJURY_SOURCE
- SURFACE MINING MACHINES
- Source of injury codeINJURY_SOURCE_CD
- 076
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- MULTIPLE PARTS (MORE THAN ONE MAJOR)
- Part of body codeINJ_BODY_PART_CD
- 700
- Returned to workRETURN_TO_WORK_DT
- Aug 5, 2019
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- Front-end loader, Tractor-shovel, Payloader, Highlift, Skip loader
- Equipment codeMINING_EQUIP_CD
- 24
- Equipment manufacturerEQUIP_MFR_NAME
- Caterpillar
- Equipment manufacturer codeEQUIP_MFR_CD
- 018
- Equipment model numberEQUIP_MODEL_NO
- 988
- FIPS state codeFIPS_STATE_CD
- 02
Who and period
- Operator at the timeOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (3)
Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Contractor IDCONTRACTOR_ID
3 reports filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: OFFICE WORKERS AT MINE SITEAverage employees: 0Hours worked: 0Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- OFFICE WORKERS AT MINE SITE
- Part of the mine codeSUBUNIT_CD
- 99
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileCURR_MINE_NM
- Wash Plant Primary
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (4)
Average employeesAVG_ANNUAL_EMPL, Hours workedANNUAL_HRS, Average hours per employeeAVG_EMPLOYEE_HOURS, Coal productionANNUAL_COAL_PROD
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 4Hours worked: 4,817Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 4
- Hours workedANNUAL_HRS
- 4817
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1204
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileCURR_MINE_NM
- Wash Plant Primary
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 9,193Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 9193
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1313
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileCURR_MINE_NM
- Wash Plant Primary
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 5Hours worked: 6,819Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 5
- Hours workedANNUAL_HRS
- 6819
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1364
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileCURR_MINE_NM
- Wash Plant Primary
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 6,010Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 6010
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1002
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileCURR_MINE_NM
- Wash Plant Primary
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 6,842Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 6842
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 977
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileCURR_MINE_NM
- Wash Plant Primary
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 4,573Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 4573
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 762
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileCURR_MINE_NM
- Wash Plant Primary
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 6Hours worked: 4,854Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 6
- Hours workedANNUAL_HRS
- 4854
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 809
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileCURR_MINE_NM
- Wash Plant Primary
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 7Hours worked: 11,356Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 7
- Hours workedANNUAL_HRS
- 11356
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 1622
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileCURR_MINE_NM
- Wash Plant Primary
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Anchorage AK Field Office
- Nearest town
- Willow
- Days worked per week
- 5
- Hours per shift
- 8
- Production shifts per day
- 1
- Maintenance shifts per day
- 0
- Employees, current record
- 3
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- Wash Plant Primary
- Mine IDMINE_ID
- 5001700
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Intermittent
- Status sinceCURRENT_STATUS_DT
- Jul 1, 2013
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- QAP
- Operator IDCURRENT_OPERATOR_ID
- 0070323
- ControllerCURRENT_CONTROLLER_NAME
- Colas S A
- Controller IDCURRENT_CONTROLLER_ID
- M03183
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Mar 31, 2006
Location and MSHA office
- StateSTATE
- AK
- Bureau of Mines state codeBOM_STATE_CD
- 50
- FIPS county codeFIPS_CNTY_CD
- 170
- FIPS county nameFIPS_CNTY_NM
- Matanuska-Susitna
- Congressional districtCONG_DIST_CD
- 01
- Nearest townNEAREST_TOWN
- Willow
- MSHA districtDISTRICT
- M7
- MSHA office codeOFFICE_CD
- M7861
- MSHA officeOFFICE_NAME
- Anchorage AK Field Office
- Most recent assessment control numberASSESS_CTRL_NO
- 000582872
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Construction Sand and Gravel
- Primary commodity codePRIMARY_SIC_CD
- 144200
- Primary SIC codePRIMARY_SIC_CD_1
- 1442
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 00
- Primary industry groupPRIMARY_CANVASS
- SandAndGravel
- Primary industry group codePRIMARY_CANVASS_CD
- 5
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 5
- Hours per shiftHOURS_PER_SHIFT
- 8
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 1
- Workers employedNO_EMPLOYEES
- 3
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (3)
Driving miles from the MSHA officeMILES_FROM_OFFICE, Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS
Recorded as N (5)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND
Not recorded by MSHA (13)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: QAPFrom: Mar 31, 2006To: No end dateController: Colas S AFrom : Sep 1, 2000To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Operator fromOPERATOR_START_DT
- Mar 31, 2006
Controller
- ControllerCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Sep 1, 2000
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine status at this pointMINE_STATUS
- Intermittent
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT
Operator: QAPFrom: Mar 31, 2006To: No end dateController: Not shownFrom : Mar 1, 1995To : Aug 31, 2000Details
Operator
- OperatorOPERATOR_NAME
- QAP
- Operator IDOPERATOR_ID
- 0070323
- Operator fromOPERATOR_START_DT
- Mar 31, 2006
Controller
- Controller IDCONTROLLER_ID
- M10707
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Mar 1, 1995
- Controller toCONTROLLER_END_DT
- Aug 31, 2000
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine status at this pointMINE_STATUS
- Intermittent
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME
Operator: H & H Contractors IncFrom: May 1, 2001To: Mar 30, 2006Controller: Not shownFrom : Jan 1, 1950To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- H & H Contractors Inc
- Operator IDOPERATOR_ID
- L01608
- Operator fromOPERATOR_START_DT
- May 1, 2001
- Operator toOPERATOR_END_DT
- Mar 30, 2006
Controller
- Controller IDCONTROLLER_ID
- M01440
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Jan 1, 1950
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Mine status at this pointMINE_STATUS
- Intermittent
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
As MSHA records it, newest operator first.
Address of record
QAP·Contact title Director Of Risk Managment·4000 Old Seward Highway, Suite 101, Anchorage AK 99503
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- QAP
- Contact titleCONTACT_TITLE
- Director Of Risk Managment
- StreetSTREET
- 4000 Old Seward Highway, Suite 101
- CityCITY
- Anchorage
- StateSTATE_ABBR
- AK
- State nameSTATE
- Alaska
- ZIP codeZIP_CD
- 99503
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 02
Mine
- Mine IDMINE_ID
- 5001700
- Mine name in this fileMINE_NAME
- Wash Plant Primary
- Nearest townNEAREST_TOWN
- Willow
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Intermittent
- Status sinceMINE_STATUS_DT
- Jul 1, 2013
- Primary commodity (SIC)PRIMARY_SIC_CD
- Construction Sand and Gravel
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 13, 2026. Data and methodology