Delta Wash Plant
Metal/Non-Metal, Surface·Crushed, Broken Stone NEC·Southeast Fairbanks, Alaska·Mine ID 5001712
Operator University Redi-Mix·Controller Colas S A·MSHA status Intermittent since Oct 1, 2014
What MSHA has on file for this mine
MSHA records as of Nov 13, 2026. Having MSHA inspection records is common for operating mines. Data and methodology
Inspections
Regular Safety and Health InspectionJun 8, 2026Inspectors 1 | Hours on site 3.5Began: Jun 8, 2026Ended: Jun 8, 2026Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 8, 2026
- Closed outINSPECTION_END_DT
- Jun 8, 2026
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F01885C
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 4.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2026
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2026
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 27, 2025Inspectors 1 | Hours on site 0.75Began: Jun 27, 2025Ended: Jun 27, 2025Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 0.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 27, 2025
- Closed outINSPECTION_END_DT
- Jun 27, 2025
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F010BF0
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2025
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2025
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 5, 2024Inspectors 1 | Hours on site 2Began: Aug 5, 2024Ended: Aug 5, 2024Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 2Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 5, 2024
- Closed outINSPECTION_END_DT
- Aug 5, 2024
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- F009F76
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2024
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2024
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 27 to Jun 28, 2023Inspectors 1 | Hours on site 9Began: Jun 27, 2023Ended: Jun 28, 2023Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 9Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 27, 2023
- Closed outINSPECTION_END_DT
- Jun 28, 2023
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6876110
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 9
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 20.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 31, 2022Inspectors 1 | Hours on site 3.5Began: Aug 31, 2022Ended: Aug 31, 2022Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 31, 2022
- Closed outINSPECTION_END_DT
- Aug 31, 2022
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 7026113
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 1, 2021Inspectors 1 | Hours on site 0Began: Jul 1, 2021Ended: Jul 1, 2021Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 0Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 1, 2021
- Closed outINSPECTION_END_DT
- Jul 1, 2021
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1124738
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2021
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2021
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (14)
Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 29, 2020Inspectors 1 | Hours on site 4Began: Jun 29, 2020Ended: Jun 29, 2020Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 29, 2020
- Closed outINSPECTION_END_DT
- Jun 29, 2020
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1153498
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionSep 10, 2019Inspectors 1 | Hours on site 4.75Began: Sep 10, 2019Ended: Sep 10, 2019Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 10, 2019
- Closed outINSPECTION_END_DT
- Sep 10, 2019
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6823466
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 7.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Mine Idle ActivitySep 12, 2018Inspectors 1 | Hours on site 0.5Began: Sep 12, 2018Ended: Sep 12, 2018Activity: Mine Idle ActivityInspectors: 1Hours on site: 0.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Sep 12, 2018
- Closed outINSPECTION_END_DT
- Sep 12, 2018
- ActivityACTIVITY
- Mine Idle Activity
- Activity codeACTIVITY_CODE
- E28
- Program areaPROGRAM_AREA
- M/NM--Mine Idle Activity
- Event numberEVENT_NO
- 6822885
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 1.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2018
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2018
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 6, 2017Inspectors 1 | Hours on site 3Began: Jul 6, 2017Ended: Jul 6, 2017Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 3Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 6, 2017
- Closed outINSPECTION_END_DT
- Jul 6, 2017
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6722265
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 3
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 9
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2017
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2017
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 25, 2016Inspectors 1 | Hours on site 2.5Began: Jul 25, 2016Ended: Jul 25, 2016Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 2.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 25, 2016
- Closed outINSPECTION_END_DT
- Jul 25, 2016
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6664484
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 4.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2016
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2016
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Compliance Follow-up InspectionJul 27, 2015Inspectors 1 | Hours on site 0.5Began: Jul 27, 2015Ended: Jul 27, 2015Activity: Compliance Follow-up InspectionInspectors: 1Hours on site: 0.5Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 27, 2015
- Closed outINSPECTION_END_DT
- Jul 27, 2015
- ActivityACTIVITY
- Compliance Follow-up Inspection
- Activity codeACTIVITY_CODE
- E15
- Program areaPROGRAM_AREA
- M/NM--Compliance Follow-up Inspection
- Event numberEVENT_NO
- 6596404
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 0.5
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 6.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 14, 2015Inspectors 1 | Hours on site 6.75Began: Jul 14, 2015Ended: Jul 14, 2015Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 6.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 14, 2015
- Closed outINSPECTION_END_DT
- Jul 14, 2015
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6596241
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 15.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionAug 20, 2013Inspectors 1 | Hours on site 4.75Began: Aug 20, 2013Ended: Aug 20, 2013Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 20, 2013
- Closed outINSPECTION_END_DT
- Aug 20, 2013
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 6597932
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 8.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2013
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Mine Idle ActivityJul 27 to Jul 28, 2010Inspectors 1 | Hours on site 6Began: Jul 27, 2010Ended: Jul 28, 2010Activity: Mine Idle ActivityInspectors: 1Hours on site: 6Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 27, 2010
- Closed outINSPECTION_END_DT
- Jul 28, 2010
- ActivityACTIVITY
- Mine Idle Activity
- Activity codeACTIVITY_CODE
- E28
- Program areaPROGRAM_AREA
- M/NM--Mine Idle Activity
- Event numberEVENT_NO
- 1153242
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 6
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2010
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2010
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJul 10 to Jul 12, 2009Inspectors 1 | Hours on site 4Began: Jul 10, 2009Ended: Jul 12, 2009Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 10, 2009
- Closed outINSPECTION_END_DT
- Jul 12, 2009
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1140596
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 11.5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2009
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2009
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Regular Safety and Health InspectionJun 26, 2008Inspectors 1 | Hours on site 4Began: Jun 26, 2008Ended: Jun 26, 2008Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 4Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jun 26, 2008
- Closed outINSPECTION_END_DT
- Jun 26, 2008
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1146007
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 5
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2008
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2008
- MSHA fiscal quarterFISCAL_QTR
- 3
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (2)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
Part 50 AuditAug 29, 2005Inspectors 1 | Hours on site 2.25Began: Aug 29, 2005Ended: Aug 29, 2005Activity: Part 50 AuditInspectors: 1Hours on site: 2.25Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 29, 2005
- Closed outINSPECTION_END_DT
- Aug 29, 2005
- ActivityACTIVITY
- Part 50 Audit
- Activity codeACTIVITY_CODE
- E25
- Program areaPROGRAM_AREA
- M/NM--Part 50 Audit
- Event numberEVENT_NO
- 1124285
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 2.25
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 3.75
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDOPERATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2005
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2005
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
Regular Safety and Health InspectionAug 28 to Aug 31, 2005Inspectors 1 | Hours on site 17.75Began: Aug 28, 2005Ended: Aug 31, 2005Activity: Regular Safety and Health InspectionInspectors: 1Hours on site: 17.75Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Aug 28, 2005
- Closed outINSPECTION_END_DT
- Aug 31, 2005
- ActivityACTIVITY
- Regular Safety and Health Inspection
- Activity codeACTIVITY_CODE
- E01
- Program areaPROGRAM_AREA
- M/NM--Regular Safety and Health Inspection
- Event numberEVENT_NO
- 1124284
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 17.75
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 22.25
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDOPERATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2005
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2005
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
REGULAR INSPECTIONJul 1 to Jul 4, 2004Inspectors 1 | Hours on site 7Began: Jul 1, 2004Ended: Jul 4, 2004Activity: REGULAR INSPECTIONInspectors: 1Hours on site: 7Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Closed outINSPECTION_END_DT
- Jul 4, 2004
- ActivityACTIVITY
- REGULAR INSPECTION
- Activity codeACTIVITY_CODE
- 01
- Program areaPROGRAM_AREA
- M/NM--REGULAR INSPECTION
- Event numberEVENT_NO
- 0755827
- InspectorsNBR_INSPECTOR
- 1
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 7
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 17
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDOPERATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
REGULAR INSPECTIONJul 31, 2003Inspectors 2 | Hours on site 4Began: Jul 31, 2003Ended: Jul 31, 2003Activity: REGULAR INSPECTIONInspectors: 2Hours on site: 4Details
The inspection
- BeganINSPECTION_BEGIN_DT
- Jul 31, 2003
- Closed outINSPECTION_END_DT
- Jul 31, 2003
- ActivityACTIVITY
- REGULAR INSPECTION
- Activity codeACTIVITY_CODE
- 01
- Program areaPROGRAM_AREA
- M/NM--REGULAR INSPECTION
- Event numberEVENT_NO
- 0755779
- InspectorsNBR_INSPECTOR
- 2
- Inspector's office codeINSPECT_OFFICE_CD
- M7861
- Hours on siteSUM_TOTAL_ON_SITE_HOURS
- 4
- Total inspection hoursSUM_TOTAL_INSP_HOURS
- 18
Who and when, as recorded
- Operator at the timeOPERATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDOPERATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Mine IDMINE_ID
- 5001712
- Calendar yearCAL_YR
- 2003
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2003
- MSHA fiscal quarterFISCAL_QTR
- 4
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Recorded as 0 (13)
Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER
Recorded as N (10)
Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA
Not recorded by MSHA (3)
Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME
21 inspections and other MSHA visits since Jul 31, 2003; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.
Citations and orders
Issued: Jun 27, 2023Type: CitationStandard: 56.3130S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $518.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9615559
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 27, 2023
- Time issuedVIOLATION_ISSUE_TIME
- 1130
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 27, 2023
- 30 CFR part and sectionPART_SECTION
- 56.3130
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 21, 2023
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jul 21, 2023
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jul 19, 2023
- Terminated, timeTERMINATION_TIME
- 1311
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 518
- Current proposed assessmentAMOUNT_DUE
- 518
- Amount paidAMOUNT_PAID
- 518
- Bill first printedBILL_PRINT_DT
- Aug 15, 2023
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 20, 2023
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 30, 2023
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- University Redi-Mix
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 6876110
- Inspection beganINSPECTION_BEGIN_DT
- Jun 27, 2023
- Inspection closed outINSPECTION_END_DT
- Jun 28, 2023
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2023
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2023
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (4)
From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Aug 31, 2022Type: CitationStandard: 56.12005S&S: NNegligence: LowNegligenceIssued to: OperatorProposed penalty: $133.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9580543
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 31, 2022
- Time issuedVIOLATION_ISSUE_TIME
- 0730
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 31, 2022
- 30 CFR part and sectionPART_SECTION
- 56.12005
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- LowNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 31, 2022
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Aug 31, 2022
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Aug 31, 2022
- Terminated, timeTERMINATION_TIME
- 1104
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 133
- Current proposed assessmentAMOUNT_DUE
- 133
- Amount paidAMOUNT_PAID
- 133
- Bill first printedBILL_PRINT_DT
- Oct 11, 2022
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 16, 2022
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Nov 20, 2022
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- University Redi-Mix
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 7026113
- Inspection beganINSPECTION_BEGIN_DT
- Aug 31, 2022
- Inspection closed outINSPECTION_END_DT
- Aug 31, 2022
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2022
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2022
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jun 29, 2020Type: CitationStandard: 56.14112(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $123.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6334508
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jun 29, 2020
- Time issuedVIOLATION_ISSUE_TIME
- 1305
- Date of occurrenceVIOLATION_OCCUR_DT
- Jun 29, 2020
- 30 CFR part and sectionPART_SECTION
- 56.14112(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jun 29, 2020
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Jun 29, 2020
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Jun 29, 2020
- Terminated, timeTERMINATION_TIME
- 1320
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 123
- Current proposed assessmentAMOUNT_DUE
- 123
- Amount paidAMOUNT_PAID
- 123
- Bill first printedBILL_PRINT_DT
- Aug 11, 2020
- Final order dateFINAL_ORDER_ISSUE_DT
- Sep 23, 2020
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 4, 2020
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- University Redi-Mix
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 1153498
- Inspection beganINSPECTION_BEGIN_DT
- Jun 29, 2020
- Inspection closed outINSPECTION_END_DT
- Jun 29, 2020
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2020
- Calendar quarterCAL_QTR
- 2
- MSHA fiscal yearFISCAL_YR
- 2020
- MSHA fiscal quarterFISCAL_QTR
- 3
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Sep 10, 2019Type: CitationStandard: 56.14107(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $121.00Details
The citation
- Citation or order numberVIOLATION_NO
- 9431696
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Sep 10, 2019
- Time issuedVIOLATION_ISSUE_TIME
- 0950
- Date of occurrenceVIOLATION_OCCUR_DT
- Sep 10, 2019
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 11, 2019
- Originally due, timeORIG_TERM_DUE_TIME
- 0800
- Latest dueLATEST_TERM_DUE_DT
- Sep 11, 2019
- Latest due, timeLATEST_TERM_DUE_TIME
- 0800
- TerminatedTERMINATION_DT
- Sep 10, 2019
- Terminated, timeTERMINATION_TIME
- 1300
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 121
- Current proposed assessmentAMOUNT_DUE
- 121
- Amount paidAMOUNT_PAID
- 121
- Bill first printedBILL_PRINT_DT
- Oct 15, 2019
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 29, 2019
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Oct 29, 2019
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- University Redi-Mix
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 6823466
- Inspection beganINSPECTION_BEGIN_DT
- Sep 10, 2019
- Inspection closed outINSPECTION_END_DT
- Sep 10, 2019
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2019
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2019
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (5)
From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (12)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 14, 2015Type: CitationStandard: 56.11012S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8870827
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 14, 2015
- Time issuedVIOLATION_ISSUE_TIME
- 1155
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 14, 2015
- 30 CFR part and sectionPART_SECTION
- 56.11012
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 15, 2015
- Originally due, timeORIG_TERM_DUE_TIME
- 1200
- Latest dueLATEST_TERM_DUE_DT
- Jul 15, 2015
- Latest due, timeLATEST_TERM_DUE_TIME
- 1200
- TerminatedTERMINATION_DT
- Jul 27, 2015
- Terminated, timeTERMINATION_TIME
- 1405
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Sep 15, 2015
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 21, 2015
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 25, 2015
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- University Redi-Mix
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 6596241
- Inspection beganINSPECTION_BEGIN_DT
- Jul 14, 2015
- Inspection closed outINSPECTION_END_DT
- Jul 14, 2015
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 14, 2015Type: CitationStandard: 56.12013(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $100.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8870826
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 14, 2015
- Time issuedVIOLATION_ISSUE_TIME
- 1150
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 14, 2015
- 30 CFR part and sectionPART_SECTION
- 56.12013(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 15, 2015
- Originally due, timeORIG_TERM_DUE_TIME
- 1600
- Latest dueLATEST_TERM_DUE_DT
- Jul 15, 2015
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 27, 2015
- Terminated, timeTERMINATION_TIME
- 1410
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 100
- Current proposed assessmentAMOUNT_DUE
- 100
- Amount paidAMOUNT_PAID
- 100
- Bill first printedBILL_PRINT_DT
- Sep 15, 2015
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 21, 2015
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 25, 2015
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- University Redi-Mix
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 6596241
- Inspection beganINSPECTION_BEGIN_DT
- Jul 14, 2015
- Inspection closed outINSPECTION_END_DT
- Jul 14, 2015
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Jul 14, 2015Type: CitationStandard: 56.12040S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $362.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8870828
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 14, 2015
- Time issuedVIOLATION_ISSUE_TIME
- 1220
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 14, 2015
- 30 CFR part and sectionPART_SECTION
- 56.12040
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Jul 14, 2015
- Originally due, timeORIG_TERM_DUE_TIME
- 1320
- Latest dueLATEST_TERM_DUE_DT
- Jul 17, 2015
- Latest due, timeLATEST_TERM_DUE_TIME
- 1600
- TerminatedTERMINATION_DT
- Jul 27, 2015
- Terminated, timeTERMINATION_TIME
- 1415
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 362
- Current proposed assessmentAMOUNT_DUE
- 362
- Amount paidAMOUNT_PAID
- 362
- Bill first printedBILL_PRINT_DT
- Sep 15, 2015
- Final order dateFINAL_ORDER_ISSUE_DT
- Oct 21, 2015
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Sep 25, 2015
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- University Redi-Mix
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 6596241
- Inspection beganINSPECTION_BEGIN_DT
- Jul 14, 2015
- Inspection closed outINSPECTION_END_DT
- Jul 14, 2015
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2015
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2015
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Aug 20, 2013Type: CitationStandard: 56.14107(a)S&S: YNegligence: HighNegligenceIssued to: OperatorProposed penalty: $540.00Details
The citation
- Citation or order numberVIOLATION_NO
- 8693971
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 20, 2013
- Time issuedVIOLATION_ISSUE_TIME
- 1249
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 20, 2013
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 20, 2013
- Originally due, timeORIG_TERM_DUE_TIME
- 1700
- Latest dueLATEST_TERM_DUE_DT
- Aug 20, 2013
- Latest due, timeLATEST_TERM_DUE_TIME
- 1700
- TerminatedTERMINATION_DT
- Aug 20, 2013
- Terminated, timeTERMINATION_TIME
- 1657
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 540
- Current proposed assessmentAMOUNT_DUE
- 540
- Amount paidAMOUNT_PAID
- 540
- Bill first printedBILL_PRINT_DT
- Dec 17, 2013
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 22, 2014
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jan 15, 2014
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- University Redi-Mix
- Operator IDVIOLATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Inspection eventEVENT_NO
- 6597932
- Inspection beganINSPECTION_BEGIN_DT
- Aug 20, 2013
- Inspection closed outINSPECTION_END_DT
- Aug 20, 2013
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2013
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2013
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (13)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID
Issued: Aug 30, 2005Type: CitationStandard: 50.30(a)S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $60.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6375185
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 30, 2005
- Time issuedVIOLATION_ISSUE_TIME
- 0956
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 16, 2005
- 30 CFR part and sectionPART_SECTION
- 50.30(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 31, 2005
- Originally due, timeORIG_TERM_DUE_TIME
- 1800
- Latest dueLATEST_TERM_DUE_DT
- Aug 31, 2005
- Latest due, timeLATEST_TERM_DUE_TIME
- 1800
- TerminatedTERMINATION_DT
- Aug 30, 2005
- Terminated, timeTERMINATION_TIME
- 1000
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 60
- Current proposed assessmentAMOUNT_DUE
- 60
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 10, 2006
- Last actionLAST_ACTION_CD
- Recalled From Treasury
- Last action dateLAST_ACTION_DT
- Apr 22, 2021
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 1124284
- Inspection beganINSPECTION_BEGIN_DT
- Aug 28, 2005
- Inspection closed outINSPECTION_END_DT
- Aug 31, 2005
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2005
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2005
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Persons potentially affectedNO_AFFECTED, Amount paidAMOUNT_PAID
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Aug 30, 2005Type: CitationStandard: 47.32(b)(1)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $247.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6375186
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 30, 2005
- Time issuedVIOLATION_ISSUE_TIME
- 1008
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 30, 2005
- 30 CFR part and sectionPART_SECTION
- 47.32(b)(1)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 15, 2005
- Originally due, timeORIG_TERM_DUE_TIME
- 1800
- Latest dueLATEST_TERM_DUE_DT
- Sep 15, 2005
- Latest due, timeLATEST_TERM_DUE_TIME
- 1800
- TerminatedTERMINATION_DT
- Feb 23, 2006
- Terminated, timeTERMINATION_TIME
- 0907
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 247
- Current proposed assessmentAMOUNT_DUE
- 247
- Bill first printedBILL_PRINT_DT
- Dec 7, 2006
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 21, 2007
- Last actionLAST_ACTION_CD
- Recalled From Treasury
- Last action dateLAST_ACTION_DT
- Jan 26, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 14
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 1124284
- Inspection beganINSPECTION_BEGIN_DT
- Aug 28, 2005
- Inspection closed outINSPECTION_END_DT
- Aug 31, 2005
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2005
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2005
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Aug 30, 2005Type: CitationStandard: 62.130(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $324.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6375187
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 30, 2005
- Time issuedVIOLATION_ISSUE_TIME
- 1726
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 30, 2005
- 30 CFR part and sectionPART_SECTION
- 62.130(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Sep 15, 2005
- Originally due, timeORIG_TERM_DUE_TIME
- 1800
- Latest dueLATEST_TERM_DUE_DT
- Sep 6, 2006
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Sep 28, 2006
- Terminated, timeTERMINATION_TIME
- 0849
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 324
- Current proposed assessmentAMOUNT_DUE
- 324
- Bill first printedBILL_PRINT_DT
- Dec 7, 2006
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 21, 2007
- Last actionLAST_ACTION_CD
- Recalled From Treasury
- Last action dateLAST_ACTION_DT
- Jan 26, 2022
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 14
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 1124284
- Inspection beganINSPECTION_BEGIN_DT
- Aug 28, 2005
- Inspection closed outINSPECTION_END_DT
- Aug 31, 2005
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2005
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2005
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Aug 30, 2005Type: CitationStandard: 56.14100(b)S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $60.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6375184
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Aug 30, 2005
- Time issuedVIOLATION_ISSUE_TIME
- 0844
- Date of occurrenceVIOLATION_OCCUR_DT
- Aug 30, 2005
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Originally dueORIG_TERM_DUE_DT
- Aug 31, 2005
- Originally due, timeORIG_TERM_DUE_TIME
- 1800
- Latest dueLATEST_TERM_DUE_DT
- Aug 31, 2005
- Latest due, timeLATEST_TERM_DUE_TIME
- 1800
- TerminatedTERMINATION_DT
- Aug 30, 2005
- Terminated, timeTERMINATION_TIME
- 1534
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 60
- Current proposed assessmentAMOUNT_DUE
- 60
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 10, 2006
- Last actionLAST_ACTION_CD
- Recalled From Treasury
- Last action dateLAST_ACTION_DT
- Apr 22, 2021
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 1124284
- Inspection beganINSPECTION_BEGIN_DT
- Aug 28, 2005
- Inspection closed outINSPECTION_END_DT
- Aug 31, 2005
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2005
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2005
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Amount paidAMOUNT_PAID
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (14)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 2, 2004Type: CitationStandard: 46.9(b)(2)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $60.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367073
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 2, 2004
- Time issuedVIOLATION_ISSUE_TIME
- 1046
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 2, 2004
- 30 CFR part and sectionPART_SECTION
- 46.9(b)(2)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Latest dueLATEST_TERM_DUE_DT
- Jul 9, 2004
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Aug 30, 2005
- Terminated, timeTERMINATION_TIME
- 0921
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 60
- Current proposed assessmentAMOUNT_DUE
- 60
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 10, 2006
- Last actionLAST_ACTION_CD
- Recalled From Treasury
- Last action dateLAST_ACTION_DT
- Apr 22, 2021
- Advised of right to a conferenceRIGHT_TO_CONF_DT
- Jul 2, 2004
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 0755827
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Inspection closed outINSPECTION_END_DT
- Jul 4, 2004
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (3)
Persons potentially affectedNO_AFFECTED, Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (15)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 2, 2004Type: CitationStandard: 46.3(i)S&S: NNegligence: HighNegligenceIssued to: OperatorProposed penalty: $60.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367074
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 2, 2004
- Time issuedVIOLATION_ISSUE_TIME
- 1048
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 2, 2004
- 30 CFR part and sectionPART_SECTION
- 46.3(i)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- HighNegligence
Abatement
- Latest dueLATEST_TERM_DUE_DT
- Jul 6, 2004
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Aug 30, 2005
- Terminated, timeTERMINATION_TIME
- 0918
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 60
- Current proposed assessmentAMOUNT_DUE
- 60
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 10, 2006
- Last actionLAST_ACTION_CD
- Recalled From Treasury
- Last action dateLAST_ACTION_DT
- Apr 22, 2021
- Advised of right to a conferenceRIGHT_TO_CONF_DT
- Jul 2, 2004
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 0755827
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Inspection closed outINSPECTION_END_DT
- Jul 4, 2004
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (3)
Persons potentially affectedNO_AFFECTED, Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (15)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 2, 2004Type: CitationStandard: 46.9(g)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $60.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367075
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 2, 2004
- Time issuedVIOLATION_ISSUE_TIME
- 1050
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 2, 2004
- 30 CFR part and sectionPART_SECTION
- 46.9(g)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- NoLikelihood
- Expected injury or illnessINJ_ILLNESS
- NoLostDays
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Latest dueLATEST_TERM_DUE_DT
- Jul 6, 2004
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Aug 30, 2005
- Terminated, timeTERMINATION_TIME
- 0922
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 60
- Current proposed assessmentAMOUNT_DUE
- 60
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 10, 2006
- Last actionLAST_ACTION_CD
- Recalled From Treasury
- Last action dateLAST_ACTION_DT
- Apr 22, 2021
- Advised of right to a conferenceRIGHT_TO_CONF_DT
- Jul 2, 2004
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 0755827
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Inspection closed outINSPECTION_END_DT
- Jul 4, 2004
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (3)
Persons potentially affectedNO_AFFECTED, Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (15)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 1, 2004Type: CitationStandard: 56.16006S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $60.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367069
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 1, 2004
- Time issuedVIOLATION_ISSUE_TIME
- 0957
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 1, 2004
- 30 CFR part and sectionPART_SECTION
- 56.16006
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Latest dueLATEST_TERM_DUE_DT
- Jul 2, 2004
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Jul 2, 2004
- Terminated, timeTERMINATION_TIME
- 1110
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 60
- Current proposed assessmentAMOUNT_DUE
- 60
- Amount paidAMOUNT_PAID
- 60
- Bill first printedBILL_PRINT_DT
- Dec 9, 2004
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 28, 2005
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 28, 2005
- Advised of right to a conferenceRIGHT_TO_CONF_DT
- Jul 1, 2004
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 0755827
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Inspection closed outINSPECTION_END_DT
- Jul 4, 2004
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (15)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 1, 2004Type: CitationStandard: 56.14107(a)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $124.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367063
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 1, 2004
- Time issuedVIOLATION_ISSUE_TIME
- 0926
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 1, 2004
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Latest dueLATEST_TERM_DUE_DT
- Jul 2, 2004
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Jul 2, 2004
- Terminated, timeTERMINATION_TIME
- 1102
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 124
- Current proposed assessmentAMOUNT_DUE
- 124
- Amount paidAMOUNT_PAID
- 124
- Bill first printedBILL_PRINT_DT
- Dec 9, 2004
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 28, 2005
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 28, 2005
- Advised of right to a conferenceRIGHT_TO_CONF_DT
- Jul 1, 2004
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 0755827
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Inspection closed outINSPECTION_END_DT
- Jul 4, 2004
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (15)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 1, 2004Type: CitationStandard: 56.14100(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $60.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367067
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 1, 2004
- Time issuedVIOLATION_ISSUE_TIME
- 0950
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 1, 2004
- 30 CFR part and sectionPART_SECTION
- 56.14100(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Latest dueLATEST_TERM_DUE_DT
- Jul 8, 2004
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Aug 29, 2005
- Terminated, timeTERMINATION_TIME
- 1258
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 60
- Current proposed assessmentAMOUNT_DUE
- 60
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 10, 2006
- Last actionLAST_ACTION_CD
- Recalled From Treasury
- Last action dateLAST_ACTION_DT
- Apr 22, 2021
- Advised of right to a conferenceRIGHT_TO_CONF_DT
- Jul 1, 2004
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 0755827
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Inspection closed outINSPECTION_END_DT
- Jul 4, 2004
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (15)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 1, 2004Type: CitationStandard: 56.14107(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $60.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367064
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 1, 2004
- Time issuedVIOLATION_ISSUE_TIME
- 0932
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 1, 2004
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Latest dueLATEST_TERM_DUE_DT
- Jul 2, 2004
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Jul 2, 2004
- Terminated, timeTERMINATION_TIME
- 1103
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 60
- Current proposed assessmentAMOUNT_DUE
- 60
- Amount paidAMOUNT_PAID
- 60
- Bill first printedBILL_PRINT_DT
- Dec 9, 2004
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 28, 2005
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 28, 2005
- Advised of right to a conferenceRIGHT_TO_CONF_DT
- Jul 1, 2004
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 0755827
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Inspection closed outINSPECTION_END_DT
- Jul 4, 2004
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (15)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 1, 2004Type: CitationStandard: 56.9100(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $60.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367071
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 1, 2004
- Time issuedVIOLATION_ISSUE_TIME
- 1007
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 1, 2004
- 30 CFR part and sectionPART_SECTION
- 56.9100(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Latest dueLATEST_TERM_DUE_DT
- Jul 8, 2004
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Aug 29, 2005
- Terminated, timeTERMINATION_TIME
- 1216
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 60
- Current proposed assessmentAMOUNT_DUE
- 60
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Final order dateFINAL_ORDER_ISSUE_DT
- Mar 10, 2006
- Last actionLAST_ACTION_CD
- Recalled From Treasury
- Last action dateLAST_ACTION_DT
- Apr 22, 2021
- Advised of right to a conferenceRIGHT_TO_CONF_DT
- Jul 1, 2004
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 0755827
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Inspection closed outINSPECTION_END_DT
- Jul 4, 2004
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (15)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 1, 2004Type: CitationStandard: 56.14206(b)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $60.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367065
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 1, 2004
- Time issuedVIOLATION_ISSUE_TIME
- 0942
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 1, 2004
- 30 CFR part and sectionPART_SECTION
- 56.14206(b)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- LostDays
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Latest dueLATEST_TERM_DUE_DT
- Jul 2, 2004
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Jul 1, 2004
- Terminated, timeTERMINATION_TIME
- 0945
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 60
- Current proposed assessmentAMOUNT_DUE
- 60
- Amount paidAMOUNT_PAID
- 60
- Bill first printedBILL_PRINT_DT
- Oct 7, 2004
- Final order dateFINAL_ORDER_ISSUE_DT
- Nov 29, 2004
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Dec 2, 2004
- Advised of right to a conferenceRIGHT_TO_CONF_DT
- Jul 1, 2004
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 0755827
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Inspection closed outINSPECTION_END_DT
- Jul 4, 2004
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (15)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 1, 2004Type: CitationStandard: 56.14107(a)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $124.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367062
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 1, 2004
- Time issuedVIOLATION_ISSUE_TIME
- 0921
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 1, 2004
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Latest dueLATEST_TERM_DUE_DT
- Jul 2, 2004
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Jul 2, 2004
- Terminated, timeTERMINATION_TIME
- 1100
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 124
- Current proposed assessmentAMOUNT_DUE
- 124
- Amount paidAMOUNT_PAID
- 124
- Bill first printedBILL_PRINT_DT
- Dec 9, 2004
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 28, 2005
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 28, 2005
- Advised of right to a conferenceRIGHT_TO_CONF_DT
- Jul 1, 2004
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 0755827
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Inspection closed outINSPECTION_END_DT
- Jul 4, 2004
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (15)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 1, 2004Type: CitationStandard: 56.14130(i)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $124.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367068
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 1, 2004
- Time issuedVIOLATION_ISSUE_TIME
- 0952
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 1, 2004
- 30 CFR part and sectionPART_SECTION
- 56.14130(i)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Latest dueLATEST_TERM_DUE_DT
- Jul 2, 2004
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Jul 2, 2004
- Terminated, timeTERMINATION_TIME
- 1107
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 124
- Current proposed assessmentAMOUNT_DUE
- 124
- Amount paidAMOUNT_PAID
- 124
- Bill first printedBILL_PRINT_DT
- Dec 9, 2004
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 28, 2005
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 28, 2005
- Advised of right to a conferenceRIGHT_TO_CONF_DT
- Jul 1, 2004
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 0755827
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Inspection closed outINSPECTION_END_DT
- Jul 4, 2004
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (15)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 1, 2004Type: CitationStandard: 56.14132(a)S&S: NNegligence: ModNegligenceIssued to: OperatorProposed penalty: $60.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367072
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 1, 2004
- Time issuedVIOLATION_ISSUE_TIME
- 0954
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 1, 2004
- 30 CFR part and sectionPART_SECTION
- 56.14132(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- LikelihoodLIKELIHOOD
- Unlikely
- Expected injury or illnessINJ_ILLNESS
- Fatal
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Latest dueLATEST_TERM_DUE_DT
- Jul 3, 2004
- Latest due, timeLATEST_TERM_DUE_TIME
- 1500
- TerminatedTERMINATION_DT
- Jul 2, 2004
- Terminated, timeTERMINATION_TIME
- 1106
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 60
- Current proposed assessmentAMOUNT_DUE
- 60
- Amount paidAMOUNT_PAID
- 60
- Bill first printedBILL_PRINT_DT
- Dec 9, 2004
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 28, 2005
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 28, 2005
- Advised of right to a conferenceRIGHT_TO_CONF_DT
- Jul 1, 2004
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 0755827
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Inspection closed outINSPECTION_END_DT
- Jul 4, 2004
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (4)
Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (15)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
Issued: Jul 1, 2004Type: CitationStandard: 56.14107(a)S&S: YNegligence: ModNegligenceIssued to: OperatorProposed penalty: $99.00Details
The citation
- Citation or order numberVIOLATION_NO
- 6367066
- TypeCIT_ORD_SAFE
- Citation
- IssuedVIOLATION_ISSUE_DT
- Jul 1, 2004
- Time issuedVIOLATION_ISSUE_TIME
- 0948
- Date of occurrenceVIOLATION_OCCUR_DT
- Jul 1, 2004
- 30 CFR part and sectionPART_SECTION
- 56.14107(a)
- Section of the Act, primarySECTION_OF_ACT_1
- 104(a)
- Primary mine or millPRIMARY_OR_MILL
- Primary
Gravity and negligence, as the inspector recorded them
- Significant and substantialSIG_SUB
- Y
- LikelihoodLIKELIHOOD
- Reasonably
- Expected injury or illnessINJ_ILLNESS
- Permanent
- Persons potentially affectedNO_AFFECTED
- 1
- NegligenceNEGLIGENCE
- ModNegligence
Abatement
- Latest dueLATEST_TERM_DUE_DT
- Jul 2, 2004
- Latest due, timeLATEST_TERM_DUE_TIME
- 1300
- TerminatedTERMINATION_DT
- Jul 2, 2004
- Terminated, timeTERMINATION_TIME
- 1108
- Termination typeTERMINATION_TYPE
- Terminated
Penalty and contest
- Proposed penaltyPROPOSED_PENALTY
- 99
- Current proposed assessmentAMOUNT_DUE
- 99
- Amount paidAMOUNT_PAID
- 99
- Bill first printedBILL_PRINT_DT
- Dec 9, 2004
- Final order dateFINAL_ORDER_ISSUE_DT
- Jan 28, 2005
- Last actionLAST_ACTION_CD
- Paid
- Last action dateLAST_ACTION_DT
- Jun 28, 2005
- Advised of right to a conferenceRIGHT_TO_CONF_DT
- Jul 1, 2004
- Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
Who, inspection and period
- Issued toVIOLATOR_TYPE_CD
- Operator
- Operator at the timeVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDVIOLATOR_ID
- 0051244
- Controller IDCONTROLLER_ID
- 0041673
- Inspection eventEVENT_NO
- 0755827
- Inspection beganINSPECTION_BEGIN_DT
- Jul 1, 2004
- Inspection closed outINSPECTION_END_DT
- Jul 4, 2004
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine type in this fileMINE_TYPE
- Surface
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2004
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2004
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (1)
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
Recorded as N (3)
Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND
Not recorded by MSHA (15)
Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME
26 citations and orders since Jul 1, 2004: 26 issued to the operator, 0 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.
Penalties as assessed
Issued: Jun 27, 2023Citation number: 9615559Standard: 56.3130Proposed penalty: $518.00Current assessment: $518.00Paid against proposed penalty: $518.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9615559
- Assessment control numberASSESS_CASE_NO
- 000582873
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 28, 2023
- Citation issuedISSUE_DT
- Jun 27, 2023
- Date of occurrenceOCCURRENCE_DT
- Jun 27, 2023
- Final order dateFINAL_ORDER_DT
- Sep 20, 2023
- Bill first printedBILL_PRINT_DT
- Aug 15, 2023
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 20, 2023
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.3130
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 518.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 518.00
- Mine Act interestMINEACT_INTEREST_AMT
- 2.84
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 518.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 76
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 251
- Size of mineSIZE_OF_MINE
- 251
- Controller hours workedCONTROLLER_HRS
- 782045
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 782045
- History period startHISTORY_START_DT
- Mar 27, 2022
- History period endHISTORY_END_DT
- Jun 26, 2023
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- University Redi-Mix
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6876110
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (12)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 31, 2022Citation number: 9580543Standard: 56.12005Proposed penalty: $133.00Current assessment: $133.00Paid against proposed penalty: $133.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9580543
- Assessment control numberASSESS_CASE_NO
- 000564856
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Nov 20, 2022
- Citation issuedISSUE_DT
- Aug 31, 2022
- Date of occurrenceOCCURRENCE_DT
- Aug 31, 2022
- Final order dateFINAL_ORDER_DT
- Nov 16, 2022
- Bill first printedBILL_PRINT_DT
- Oct 11, 2022
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2023
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Nov 16, 2022
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12005
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 133.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 133.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 133.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 46
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 10
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 277
- Size of mineSIZE_OF_MINE
- 277
- Controller hours workedCONTROLLER_HRS
- 837127
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 837127
- History period startHISTORY_START_DT
- May 31, 2021
- History period endHISTORY_END_DT
- Aug 30, 2022
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- University Redi-Mix
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 7026113
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jun 29, 2020Citation number: 6334508Standard: 56.14112(b)Proposed penalty: $123.00Current assessment: $123.00Paid against proposed penalty: $123.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6334508
- Assessment control numberASSESS_CASE_NO
- 000520204
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 4, 2020
- Citation issuedISSUE_DT
- Jun 29, 2020
- Date of occurrenceOCCURRENCE_DT
- Jun 29, 2020
- Final order dateFINAL_ORDER_DT
- Sep 23, 2020
- Bill first printedBILL_PRINT_DT
- Aug 11, 2020
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Sep 23, 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14112(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 123.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 123.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 123.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 46
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 1
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Violations per inspection dayVPID
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 1179
- Size of mineSIZE_OF_MINE
- 1179
- Controller hours workedCONTROLLER_HRS
- 858641
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 858641
- History period startHISTORY_START_DT
- Mar 29, 2019
- History period endHISTORY_END_DT
- Jun 28, 2020
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- University Redi-Mix
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1153498
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Sep 10, 2019Citation number: 9431696Standard: 56.14107(a)Proposed penalty: $121.00Current assessment: $121.00Paid against proposed penalty: $121.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 9431696
- Assessment control numberASSESS_CASE_NO
- 000501905
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Oct 29, 2019
- Citation issuedISSUE_DT
- Sep 10, 2019
- Date of occurrenceOCCURRENCE_DT
- Sep 10, 2019
- Final order dateFINAL_ORDER_DT
- Nov 29, 2019
- Bill first printedBILL_PRINT_DT
- Oct 15, 2019
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2020
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 121.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 121.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 121.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 46
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 97
- Size of mineSIZE_OF_MINE
- 97
- Controller hours workedCONTROLLER_HRS
- 832928
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 832928
- History period startHISTORY_START_DT
- Jun 10, 2018
- History period endHISTORY_END_DT
- Sep 9, 2019
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- University Redi-Mix
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6823466
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (15)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 14, 2015Citation number: 8870826Standard: 56.12013(b)Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8870826
- Assessment control numberASSESS_CASE_NO
- 000391866
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 25, 2015
- Citation issuedISSUE_DT
- Jul 14, 2015
- Date of occurrenceOCCURRENCE_DT
- Jul 14, 2015
- Final order dateFINAL_ORDER_DT
- Oct 21, 2015
- Bill first printedBILL_PRINT_DT
- Sep 15, 2015
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2015
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 21, 2015
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12013(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 56
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 101
- Size of mineSIZE_OF_MINE
- 101
- Controller hours workedCONTROLLER_HRS
- 641868
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641868
- History period startHISTORY_START_DT
- Apr 14, 2014
- History period endHISTORY_END_DT
- Jul 13, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- University Redi-Mix
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6596241
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 14, 2015Citation number: 8870827Standard: 56.11012Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8870827
- Assessment control numberASSESS_CASE_NO
- 000391866
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 25, 2015
- Citation issuedISSUE_DT
- Jul 14, 2015
- Date of occurrenceOCCURRENCE_DT
- Jul 14, 2015
- Final order dateFINAL_ORDER_DT
- Oct 21, 2015
- Bill first printedBILL_PRINT_DT
- Sep 15, 2015
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2015
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 21, 2015
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11012
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 101
- Size of mineSIZE_OF_MINE
- 101
- Controller hours workedCONTROLLER_HRS
- 641868
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641868
- History period startHISTORY_START_DT
- Apr 14, 2014
- History period endHISTORY_END_DT
- Jul 13, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- University Redi-Mix
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6596241
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 14, 2015Citation number: 8870828Standard: 56.12040Proposed penalty: $362.00Current assessment: $362.00Paid against proposed penalty: $362.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8870828
- Assessment control numberASSESS_CASE_NO
- 000391866
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Sep 25, 2015
- Citation issuedISSUE_DT
- Jul 14, 2015
- Date of occurrenceOCCURRENCE_DT
- Jul 14, 2015
- Final order dateFINAL_ORDER_DT
- Oct 21, 2015
- Bill first printedBILL_PRINT_DT
- Sep 15, 2015
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2015
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Oct 21, 2015
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.12040
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 362.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 362.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 362.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 76
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 20
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 101
- Size of mineSIZE_OF_MINE
- 101
- Controller hours workedCONTROLLER_HRS
- 641868
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 641868
- History period startHISTORY_START_DT
- Apr 14, 2014
- History period endHISTORY_END_DT
- Jul 13, 2015
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- University Redi-Mix
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6596241
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 20, 2013Citation number: 8693971Standard: 56.14107(a)Proposed penalty: $540.00Current assessment: $540.00Paid against proposed penalty: $540.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8693971
- Assessment control numberASSESS_CASE_NO
- 000339015
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 15, 2014
- Citation issuedISSUE_DT
- Aug 20, 2013
- Date of occurrenceOCCURRENCE_DT
- Aug 20, 2013
- Final order dateFINAL_ORDER_DT
- Jan 22, 2014
- Bill first printedBILL_PRINT_DT
- Dec 17, 2013
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2014
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 22, 2014
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 540.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 540.00
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 540.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 81
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 35
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 102
- Size of mineSIZE_OF_MINE
- 102
- Controller hours workedCONTROLLER_HRS
- 656247
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 656247
- History period startHISTORY_START_DT
- May 20, 2012
- History period endHISTORY_END_DT
- Aug 19, 2013
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Exclusive Paving
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 6597932
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (16)
Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 27, 2010Citation number: 8554460Standard: 56.11002Proposed penalty: $100.00Current assessment: $100.00Paid against proposed penalty: $100.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8554460
- Assessment control numberASSESS_CASE_NO
- 000232190
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 15, 2010
- Citation issuedISSUE_DT
- Jul 27, 2010
- Date of occurrenceOCCURRENCE_DT
- Jul 27, 2010
- Final order dateFINAL_ORDER_DT
- Aug 12, 2011
- Bill first printedBILL_PRINT_DT
- Sep 14, 2010
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2010
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 12, 2011
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.11002
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 100.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 100.00
- Mine Act interestMINEACT_INTEREST_AMT
- 2.81
- Excessive late payment interestEXLATE_INTEREST_AMT
- 1.68
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 100.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 10
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 2399
- Size of mineSIZE_OF_MINE
- 2399
- Controller hours workedCONTROLLER_HRS
- 744486
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 744486
- History period startHISTORY_START_DT
- Apr 27, 2009
- History period endHISTORY_END_DT
- Jul 26, 2010
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Exclusive Paving
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1153244
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 27, 2010Citation number: 8554461Standard: 56.14107(a)Proposed penalty: $162.00Current assessment: $162.00Paid against proposed penalty: $162.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8554461
- Assessment control numberASSESS_CASE_NO
- 000232190
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 15, 2010
- Citation issuedISSUE_DT
- Jul 27, 2010
- Date of occurrenceOCCURRENCE_DT
- Jul 27, 2010
- Final order dateFINAL_ORDER_DT
- Aug 12, 2011
- Bill first printedBILL_PRINT_DT
- Sep 14, 2010
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2010
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 12, 2011
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 162.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 162.00
- Mine Act interestMINEACT_INTEREST_AMT
- 4.54
- Excessive late payment interestEXLATE_INTEREST_AMT
- 2.71
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 162.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 66
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 2399
- Size of mineSIZE_OF_MINE
- 2399
- Controller hours workedCONTROLLER_HRS
- 744486
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 744486
- History period startHISTORY_START_DT
- Apr 27, 2009
- History period endHISTORY_END_DT
- Jul 26, 2010
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Exclusive Paving
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1153244
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 27, 2010Citation number: 8554459Standard: 56.20003(b)Proposed penalty: $108.00Current assessment: $108.00Paid against proposed penalty: $108.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 8554459
- Assessment control numberASSESS_CASE_NO
- 000232190
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Dec 15, 2010
- Citation issuedISSUE_DT
- Jul 27, 2010
- Date of occurrenceOCCURRENCE_DT
- Jul 27, 2010
- Final order dateFINAL_ORDER_DT
- Aug 12, 2011
- Bill first printedBILL_PRINT_DT
- Sep 14, 2010
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2010
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Aug 12, 2011
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.20003(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 108.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 108.00
- Mine Act interestMINEACT_INTEREST_AMT
- 3.03
- Excessive late payment interestEXLATE_INTEREST_AMT
- 1.81
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 108.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 61
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 5
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 30
- Negligence pointsNEGLIGENCE_POINTS
- 20
- Controller size pointsCONTROLLER_SIZE_POINTS
- 5
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 1
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 2399
- Size of mineSIZE_OF_MINE
- 2399
- Controller hours workedCONTROLLER_HRS
- 744486
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 744486
- History period startHISTORY_START_DT
- Apr 27, 2009
- History period endHISTORY_END_DT
- Jul 26, 2010
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Exclusive Paving
- IDVIOLATOR_ID
- 0070323
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Mar 31, 2006
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1153244
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 30, 2005Citation number: 6375185Standard: 50.30(a)Proposed penalty: $60.00Current assessment: $60.00Paid against proposed penalty: $0.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6375185
- Assessment control numberASSESS_CASE_NO
- 000072102
- Assessment typeASSESS_TYPE_CD
- Single
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 22, 2021
- Citation issuedISSUE_DT
- Aug 30, 2005
- Date of occurrenceOCCURRENCE_DT
- Jul 16, 2005
- Final order dateFINAL_ORDER_DT
- Mar 10, 2006
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2006
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 10, 2006
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 50.30(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 60.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 60.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.95
- Excessive late payment interestEXLATE_INTEREST_AMT
- 0.71
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 2120
- Size of mineSIZE_OF_MINE
- 2120
- Controller hours workedCONTROLLER_HRS
- 2120
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2120
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Dec 31, 2004
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1124284
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (7)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (12)
Mine Act sectionMINE_ACT_SECTION_CD, Violation history pointsPENALTY_POINTS, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Negligence pointsNEGLIGENCE_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Aug 30, 2005Citation number: 6375184Standard: 56.14100(b)Proposed penalty: $60.00Current assessment: $60.00Paid against proposed penalty: $0.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6375184
- Assessment control numberASSESS_CASE_NO
- 000072102
- Assessment typeASSESS_TYPE_CD
- Single
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 22, 2021
- Citation issuedISSUE_DT
- Aug 30, 2005
- Date of occurrenceOCCURRENCE_DT
- Aug 30, 2005
- Final order dateFINAL_ORDER_DT
- Mar 10, 2006
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2006
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 10, 2006
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 60.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 60.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.95
- Excessive late payment interestEXLATE_INTEREST_AMT
- 0.71
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 8
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 2
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 2120
- Size of mineSIZE_OF_MINE
- 2120
- Controller hours workedCONTROLLER_HRS
- 2120
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2120
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Jan 31, 2005
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 1124284
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (7)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (12)
Mine Act sectionMINE_ACT_SECTION_CD, Violation history pointsPENALTY_POINTS, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Negligence pointsNEGLIGENCE_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Aug 30, 2005Citation number: 6375187Standard: 62.130(a)Proposed penalty: $324.00Current assessment: $324.00Paid against proposed penalty: $0.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6375187
- Assessment control numberASSESS_CASE_NO
- 000105290
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 26, 2022
- Citation issuedISSUE_DT
- Aug 30, 2005
- Date of occurrenceOCCURRENCE_DT
- Aug 30, 2005
- Final order dateFINAL_ORDER_DT
- Jan 21, 2007
- Bill first printedBILL_PRINT_DT
- Dec 7, 2006
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2007
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 21, 2007
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 62.130(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 324.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 324.00
- Mine Act interestMINEACT_INTEREST_AMT
- 7.61
- Excessive late payment interestEXLATE_INTEREST_AMT
- 4.85
Penalty points
- Violation history pointsPENALTY_POINTS
- 45
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 7
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 2
- Negligence pointsNEGLIGENCE_POINTS
- 15
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 14
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 3.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 2120
- Size of mineSIZE_OF_MINE
- 2120
- Controller hours workedCONTROLLER_HRS
- 2120
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2120
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Jan 31, 2005
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Mar 30, 2006
- Inspection eventEVENT_NBR
- 1124284
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (12)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Aug 30, 2005Citation number: 6375186Standard: 47.32(b)(1)Proposed penalty: $247.00Current assessment: $247.00Paid against proposed penalty: $0.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6375186
- Assessment control numberASSESS_CASE_NO
- 000105290
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Jan 26, 2022
- Citation issuedISSUE_DT
- Aug 30, 2005
- Date of occurrenceOCCURRENCE_DT
- Aug 30, 2005
- Final order dateFINAL_ORDER_DT
- Jan 21, 2007
- Bill first printedBILL_PRINT_DT
- Dec 7, 2006
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2007
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 21, 2007
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 47.32(b)(1)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 247.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 247.00
- Mine Act interestMINEACT_INTEREST_AMT
- 5.80
- Excessive late payment interestEXLATE_INTEREST_AMT
- 3.70
Penalty points
- Violation history pointsPENALTY_POINTS
- 41
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 3
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 2
- Negligence pointsNEGLIGENCE_POINTS
- 15
- Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
- 20
Inputs to the penalty calculation
- Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
- 14
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 4
- Violations per inspection dayVPID
- 3.5
- Operator hours worked at the mineVIOLATOR_MINE_HRS
- 2120
- Size of mineSIZE_OF_MINE
- 2120
- Controller hours workedCONTROLLER_HRS
- 2120
- Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
- 2120
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Jan 31, 2005
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Mar 30, 2006
- Inspection eventEVENT_NBR
- 1124284
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (12)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (1)
Mine Act sectionMINE_ACT_SECTION_CD
Issued: Jul 2, 2004Citation number: 6367075Standard: 46.9(g)Proposed penalty: $60.00Current assessment: $60.00Paid against proposed penalty: $0.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367075
- Assessment control numberASSESS_CASE_NO
- 000072102
- Assessment typeASSESS_TYPE_CD
- Single
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 22, 2021
- Citation issuedISSUE_DT
- Jul 2, 2004
- Date of occurrenceOCCURRENCE_DT
- Jul 2, 2004
- Final order dateFINAL_ORDER_DT
- Mar 10, 2006
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2006
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 10, 2006
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 46.9(g)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 60.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 60.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.95
- Excessive late payment interestEXLATE_INTEREST_AMT
- 0.71
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Dec 31, 2003
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 0755827
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (12)
Mine Act sectionMINE_ACT_SECTION_CD, Violation history pointsPENALTY_POINTS, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Negligence pointsNEGLIGENCE_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Jul 2, 2004Citation number: 6367073Standard: 46.9(b)(2)Proposed penalty: $60.00Current assessment: $60.00Paid against proposed penalty: $0.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367073
- Assessment control numberASSESS_CASE_NO
- 000072102
- Assessment typeASSESS_TYPE_CD
- Single
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 22, 2021
- Citation issuedISSUE_DT
- Jul 2, 2004
- Date of occurrenceOCCURRENCE_DT
- Jul 2, 2004
- Final order dateFINAL_ORDER_DT
- Mar 10, 2006
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2006
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 10, 2006
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 46.9(b)(2)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 60.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 60.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.95
- Excessive late payment interestEXLATE_INTEREST_AMT
- 0.71
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Dec 31, 2003
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 0755827
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (12)
Mine Act sectionMINE_ACT_SECTION_CD, Violation history pointsPENALTY_POINTS, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Negligence pointsNEGLIGENCE_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Jul 2, 2004Citation number: 6367074Standard: 46.3(i)Proposed penalty: $60.00Current assessment: $60.00Paid against proposed penalty: $0.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367074
- Assessment control numberASSESS_CASE_NO
- 000072102
- Assessment typeASSESS_TYPE_CD
- Single
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 22, 2021
- Citation issuedISSUE_DT
- Jul 2, 2004
- Date of occurrenceOCCURRENCE_DT
- Jul 2, 2004
- Final order dateFINAL_ORDER_DT
- Mar 10, 2006
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2006
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 10, 2006
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 46.3(i)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 60.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 60.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.95
- Excessive late payment interestEXLATE_INTEREST_AMT
- 0.71
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Dec 31, 2003
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 0755827
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (12)
Mine Act sectionMINE_ACT_SECTION_CD, Violation history pointsPENALTY_POINTS, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Negligence pointsNEGLIGENCE_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Jul 1, 2004Citation number: 6367072Standard: 56.14132(a)Proposed penalty: $60.00Current assessment: $60.00Paid against proposed penalty: $60.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367072
- Assessment control numberASSESS_CASE_NO
- 000045347
- Assessment typeASSESS_TYPE_CD
- Single
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 12, 2005
- Citation issuedISSUE_DT
- Jul 1, 2004
- Date of occurrenceOCCURRENCE_DT
- Jul 1, 2004
- Final order dateFINAL_ORDER_DT
- Jan 28, 2005
- Bill first printedBILL_PRINT_DT
- Dec 9, 2004
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2005
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 28, 2005
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14132(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 60.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 60.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.34
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 60.00
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Dec 31, 2003
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 0755827
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (12)
Mine Act sectionMINE_ACT_SECTION_CD, Violation history pointsPENALTY_POINTS, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Negligence pointsNEGLIGENCE_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Jul 1, 2004Citation number: 6367069Standard: 56.16006Proposed penalty: $60.00Current assessment: $60.00Paid against proposed penalty: $60.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367069
- Assessment control numberASSESS_CASE_NO
- 000045347
- Assessment typeASSESS_TYPE_CD
- Single
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 12, 2005
- Citation issuedISSUE_DT
- Jul 1, 2004
- Date of occurrenceOCCURRENCE_DT
- Jul 1, 2004
- Final order dateFINAL_ORDER_DT
- Jan 28, 2005
- Bill first printedBILL_PRINT_DT
- Dec 9, 2004
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2005
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 28, 2005
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.16006
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 60.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 60.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.34
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 60.00
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Dec 31, 2003
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 0755827
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (12)
Mine Act sectionMINE_ACT_SECTION_CD, Violation history pointsPENALTY_POINTS, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Negligence pointsNEGLIGENCE_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Jul 1, 2004Citation number: 6367071Standard: 56.9100(a)Proposed penalty: $60.00Current assessment: $60.00Paid against proposed penalty: $0.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367071
- Assessment control numberASSESS_CASE_NO
- 000072102
- Assessment typeASSESS_TYPE_CD
- Single
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 22, 2021
- Citation issuedISSUE_DT
- Jul 1, 2004
- Date of occurrenceOCCURRENCE_DT
- Jul 1, 2004
- Final order dateFINAL_ORDER_DT
- Mar 10, 2006
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2006
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 10, 2006
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9100(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 60.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 60.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.95
- Excessive late payment interestEXLATE_INTEREST_AMT
- 0.71
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Dec 31, 2003
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 0755827
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (12)
Mine Act sectionMINE_ACT_SECTION_CD, Violation history pointsPENALTY_POINTS, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Negligence pointsNEGLIGENCE_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Jul 1, 2004Citation number: 6367070Standard: 56.9300(a)Proposed penalty: $60.00Current assessment: $60.00Paid against proposed penalty: $0.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367070
- Assessment control numberASSESS_CASE_NO
- 000072102
- Assessment typeASSESS_TYPE_CD
- Single
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 22, 2021
- Citation issuedISSUE_DT
- Jul 1, 2004
- Date of occurrenceOCCURRENCE_DT
- Jul 1, 2004
- Final order dateFINAL_ORDER_DT
- Mar 10, 2006
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2006
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 10, 2006
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.9300(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 60.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 60.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.95
- Excessive late payment interestEXLATE_INTEREST_AMT
- 0.71
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Dec 31, 2003
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 0755827
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (12)
Mine Act sectionMINE_ACT_SECTION_CD, Violation history pointsPENALTY_POINTS, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Negligence pointsNEGLIGENCE_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Jul 1, 2004Citation number: 6367067Standard: 56.14100(b)Proposed penalty: $60.00Current assessment: $60.00Paid against proposed penalty: $0.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367067
- Assessment control numberASSESS_CASE_NO
- 000072102
- Assessment typeASSESS_TYPE_CD
- Single
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 22, 2021
- Citation issuedISSUE_DT
- Jul 1, 2004
- Date of occurrenceOCCURRENCE_DT
- Jul 1, 2004
- Final order dateFINAL_ORDER_DT
- Mar 10, 2006
- Bill first printedBILL_PRINT_DT
- Nov 10, 2005
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2006
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Mar 10, 2006
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14100(b)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 60.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 60.00
- Mine Act interestMINEACT_INTEREST_AMT
- 1.95
- Excessive late payment interestEXLATE_INTEREST_AMT
- 0.71
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Dec 31, 2003
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 0755827
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (13)
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (2)
Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (12)
Mine Act sectionMINE_ACT_SECTION_CD, Violation history pointsPENALTY_POINTS, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Negligence pointsNEGLIGENCE_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS
Issued: Jul 1, 2004Citation number: 6367066Standard: 56.14107(a)Proposed penalty: $99.00Current assessment: $99.00Paid against proposed penalty: $99.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367066
- Assessment control numberASSESS_CASE_NO
- 000045347
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 12, 2005
- Citation issuedISSUE_DT
- Jul 1, 2004
- Date of occurrenceOCCURRENCE_DT
- Jul 1, 2004
- Final order dateFINAL_ORDER_DT
- Jan 28, 2005
- Bill first printedBILL_PRINT_DT
- Dec 9, 2004
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2005
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 28, 2005
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14107(a)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 99.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 99.00
- Mine Act interestMINEACT_INTEREST_AMT
- 2.21
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 99.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 28
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 7
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 5
- Negligence pointsNEGLIGENCE_POINTS
- 15
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Dec 31, 2003
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 0755827
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (18)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
Issued: Jul 1, 2004Citation number: 6367068Standard: 56.14130(i)Proposed penalty: $124.00Current assessment: $124.00Paid against proposed penalty: $124.00Case status: ClosedDetails
The assessment
- Citation or order numberVIOLATION_NO
- 6367068
- Assessment control numberASSESS_CASE_NO
- 000045347
- Assessment typeASSESS_TYPE_CD
- Regular
- Case statusASSESS_CASE_STATUS_CD
- Closed
- Case status dateASSESS_CASE_STATUS_DT
- Apr 12, 2005
- Citation issuedISSUE_DT
- Jul 1, 2004
- Date of occurrenceOCCURRENCE_DT
- Jul 1, 2004
- Final order dateFINAL_ORDER_DT
- Jan 28, 2005
- Bill first printedBILL_PRINT_DT
- Dec 9, 2004
- Bill print fiscal yearBILL_PRINT_FISCAL_YR
- 2005
- Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
- Jan 28, 2005
- Citation typeCITATION_TYPE_CD
- Citation
- 30 CFR standardCFR_STANDARD_CD
- 56.14130(i)
- Section of the Act, primaryPRIMARY_ACTION_CD
- 104(a)
- Significant and substantialSIG_SUB_IND
- Y
- Good faith reduction appliedGOOD_FAITH_IND
- Y
Amounts
- Proposed penaltyPROPOSED_PENALTY_AMT
- 124.00
- Current assessmentCURRENT_ASSESSMENT_AMT
- 124.00
- Mine Act interestMINEACT_INTEREST_AMT
- 2.77
- Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
- 124.00
Penalty points
- Violation history pointsPENALTY_POINTS
- 31
- Persons potentially affected pointsGRAVITY_PERSONS_POINTS
- 1
- Injury severity pointsGRAVITY_INJURY_POINTS
- 10
- Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
- 5
- Negligence pointsNEGLIGENCE_POINTS
- 15
Inputs to the penalty calculation
- Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
- 2
- History period startHISTORY_START_DT
- Apr 15, 2003
- History period endHISTORY_END_DT
- Dec 31, 2003
Who
- Issued toVIOLATOR_TYPE_CD
- Operator
- Name at the time of the assessmentVIOLATOR_NAME
- Delta Sand & Gravel, LLC
- IDVIOLATOR_ID
- 0051244
- Operator start at the mine, as assessedVIOLATOR_START_DT
- Apr 15, 2003
- Operator end at the mine, as assessedVIOLATOR_END_DT
- Sep 9, 9999 (as recorded by MSHA, after the file date)
- Inspection eventEVENT_NBR
- 0755827
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- MSHA office codeOFFICE_CD
- M7861
Recorded as 0 (18)
Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller hours workedCONTROLLER_HRS, Controller tonnageCONTROLLER_PRODUCTION_AMT, Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
Recorded as N (1)
Excessive history indicatorEXCESSIVE_HISTORY_IND
Not recorded by MSHA (2)
Mine Act sectionMINE_ACT_SECTION_CD, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS
25 most recent of 29 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).
Contested citations and decisions
Contested: Oct 8, 2010Citation issued: Jul 27, 2010Docket: WEST 2011-59MStandard: 56.11002Proposed penalty: $100.00Penalty after decision: $100.00Decided: Jul 12, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8554460
- Citation issuedCITATION_ISSUE_DT
- Jul 27, 2010
- Hearing request receivedCONTEST_DT
- Oct 8, 2010
- Docket numberDOCKET_NO
- WEST 2011-59M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Jul 12, 2011
- Petition duePETITION_DUE_DT
- Nov 22, 2010
- Petition filedPETITION_FILED_DT
- Nov 30, 2010
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 100.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 100.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.11002
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Unlikely
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Unlikely
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M7000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M7000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Vacaville District
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
Other fields
- ISSUING_FIELD_OFFICE
- M7861
Recorded as N (2)
S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Oct 8, 2010Citation issued: Jul 27, 2010Docket: WEST 2011-59MStandard: 56.20003(b)Proposed penalty: $108.00Penalty after decision: $108.00Decided: Jul 12, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8554459
- Citation issuedCITATION_ISSUE_DT
- Jul 27, 2010
- Hearing request receivedCONTEST_DT
- Oct 8, 2010
- Docket numberDOCKET_NO
- WEST 2011-59M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Jul 12, 2011
- Petition duePETITION_DUE_DT
- Nov 22, 2010
- Petition filedPETITION_FILED_DT
- Nov 30, 2010
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 108.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 108.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.20003(b)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- LostDays
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- LostDays
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M7000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M7000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Vacaville District
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
Other fields
- ISSUING_FIELD_OFFICE
- M7861
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
Contested: Oct 8, 2010Citation issued: Jul 27, 2010Docket: WEST 2011-59MStandard: 56.14107(a)Proposed penalty: $162.00Penalty after decision: $162.00Decided: Jul 12, 2011Decision type: SettlementDetails
The contest
- Citation or order numberCITATION_NO
- 8554461
- Citation issuedCITATION_ISSUE_DT
- Jul 27, 2010
- Hearing request receivedCONTEST_DT
- Oct 8, 2010
- Docket numberDOCKET_NO
- WEST 2011-59M
- Assessment typeASSESS_TYPE_CODE
- Regular
- Decided byDOCKET_DECISION_BY_CODE
- ALJ
- Judge, first nameJUDGE_FIRST_NAME
- Robert
- Judge, last nameJUDGE_LAST_NAME
- Lesnick
- Decision typeDOCKET_DECISION_TYPE_CODE
- Settlement
- DecidedDECISION_DT
- Jul 12, 2011
- Petition duePETITION_DUE_DT
- Nov 22, 2010
- Petition filedPETITION_FILED_DT
- Nov 30, 2010
Penalty
- Proposed penalty when contestedPROPOSED_PENALTY_AMT
- 162.00
- Penalty after the decisionDECISION_PENALTY_AMT
- 162.00
When contested, and when decided
- 30 CFR standardCFR_STANDARD_CODE
- 56.14107(a)
- Type when contestedORIGINAL_CITATION_TYPE_CODE
- Citation
- Type when decidedDECISION_CITATION_TYPE_CODE
- Citation
- Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
- 104(a)
- Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
- 104(a)
- S&S when contestedORIGINAL_SIG_SUB_IND
- Y
- S&S when decidedDECISION_SIG_SUB_IND
- Y
- Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
- Reasonably
- Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
- Reasonably
- Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
- 1
- Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
- 1
- Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
- Permanent
- Expected injury or illness when decidedDECISION_GRAVITY_INJURY
- Permanent
- Negligence when contestedORIGINAL_NEGLIGENCE
- ModNegligence
- Negligence when decidedDECISION_NEGLIGENCE
- ModNegligence
MSHA offices
- Issuing program areaISSUING_PROGRAM_AREA
- M/NM
- Issuing districtISSUING_DISTRICT
- M7000
- MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
- M/NM
- MSHA representative office codeMSHA_REP_OFFICE_CODE
- M7000
- MSHA representative officeMSHA_REP_OFFICE_NAME
- Vacaville District
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
Other fields
- ISSUING_FIELD_OFFICE
- M7861
Not recorded by MSHA (2)
Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE
3 contested citations and orders; decision types are MSHA's own text.
Reported injuries, illnesses and accidents
Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.
- DAYS RESTRICTED ACTIVITY ONLY
- 1
Date: Jul 22, 2014Degree of injury: DAYS RESTRICTED ACTIVITY ONLYClassification: STEPPING OR KNEELING ON OBJECTAccident type: Struck against stationary objectDays lost: 0Details
The report
- Document numberDOCUMENT_NO
- 220143530035
- DateACCIDENT_DT
- Jul 22, 2014
- TimeACCIDENT_TIME
- 9999
- Shift beganSHIFT_BEGIN_TIME
- 0600
- Degree of injuryDEGREE_INJURY
- DAYS RESTRICTED ACTIVITY ONLY
- Degree of injury codeDEGREE_INJURY_CD
- 05
- ClassificationCLASSIFICATION
- STEPPING OR KNEELING ON OBJECT
- Classification codeCLASSIFICATION_CD
- 19
- Accident typeACCIDENT_TYPE
- Struck against stationary object
- Accident type codeACCIDENT_TYPE_CD
- 01
- Reportable injuries or illnessesNO_INJURIES
- 1
- Immediately reportable typeIMMED_NOTIFY
- NO VALUE FOUND
- Immediately reportable codeIMMED_NOTIFY_CD
- ?
- Returned to Duty document numberCLOSED_DOC_NO
- 320151530015
Injury
- Activity at the timeACTIVITY
- Machine maintenance
- Activity codeACTIVITY_CD
- 039
- Source of injuryINJURY_SOURCE
- BROKEN ROCK,COAL,ORE,WSTE
- Source of injury codeINJURY_SOURCE_CD
- 089
- Nature of injuryNATURE_INJURY
- SPRAIN,STRAIN RUPT DISC
- Nature of injury codeNATURE_INJURY_CD
- 330
- Part of bodyINJ_BODY_PART
- KNEE/PATELLA
- Part of body codeINJ_BODY_PART_CD
- 512
- Days of restricted workDAYS_RESTRICT
- 50
- Returned to workRETURN_TO_WORK_DT
- Feb 9, 2015
Where, and equipment
- Location in the mineSUBUNIT
- STRIP, QUARY, OPEN PIT
- Location codeSUBUNIT_CD
- 03
- Underground locationUG_LOCATION
- NO VALUE FOUND
- Underground location codeUG_LOCATION_CD
- ?
- Underground mining methodUG_MINING_METHOD
- NO VALUE FOUND
- Underground mining method codeUG_MINING_METHOD_CD
- ?
- Equipment involvedMINING_EQUIP
- NO VALUE FOUND
- Equipment codeMINING_EQUIP_CD
- ?
- Equipment manufacturerEQUIP_MFR_NAME
- NO VALUE FOUND
- Equipment manufacturer codeEQUIP_MFR_CD
- ?
- FIPS state codeFIPS_STATE_CD
- 02
Who and period
- Operator at the timeOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Controller at the timeCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Calendar yearCAL_YR
- 2014
- Calendar quarterCAL_QTR
- 3
- MSHA fiscal yearFISCAL_YR
- 2014
- MSHA fiscal quarterFISCAL_QTR
- 4
Recorded as 0 (2)
Schedule charge, daysSCHEDULE_CHARGE, Days lostDAYS_LOST
Recorded as N (1)
Permanently transferred or terminatedTRANS_TERM
Not recorded by MSHA (3)
MSHA investigation beganINVEST_BEGIN_DT, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID
1 report filed on MSHA Form 7000-1; categories are MSHA's own text.
Employment and hours worked
Year: 2026Part of mine: STRIP, QUARY, OPEN PITAverage employees: 1Hours worked: 184Details
The report
- YearCALENDAR_YR
- 2026
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 184
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 184
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileCURR_MINE_NM
- Delta Wash Plant
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2025Part of mine: STRIP, QUARY, OPEN PITAverage employees: 1Hours worked: 402Details
The report
- YearCALENDAR_YR
- 2025
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 402
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 402
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileCURR_MINE_NM
- Delta Wash Plant
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2024Part of mine: STRIP, QUARY, OPEN PITAverage employees: 1Hours worked: 433Details
The report
- YearCALENDAR_YR
- 2024
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 433
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 433
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileCURR_MINE_NM
- Delta Wash Plant
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2023Part of mine: STRIP, QUARY, OPEN PITAverage employees: 1Hours worked: 309Details
The report
- YearCALENDAR_YR
- 2023
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 309
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 309
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileCURR_MINE_NM
- Delta Wash Plant
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2022Part of mine: STRIP, QUARY, OPEN PITAverage employees: 1Hours worked: 251Details
The report
- YearCALENDAR_YR
- 2022
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 1
- Hours workedANNUAL_HRS
- 251
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 251
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileCURR_MINE_NM
- Delta Wash Plant
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2021Part of mine: STRIP, QUARY, OPEN PITAverage employees: 3Hours worked: 277Details
The report
- YearCALENDAR_YR
- 2021
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 277
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 92
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileCURR_MINE_NM
- Delta Wash Plant
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2020Part of mine: STRIP, QUARY, OPEN PITAverage employees: 2Hours worked: 285Details
The report
- YearCALENDAR_YR
- 2020
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 2
- Hours workedANNUAL_HRS
- 285
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 143
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileCURR_MINE_NM
- Delta Wash Plant
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
Year: 2019Part of mine: STRIP, QUARY, OPEN PITAverage employees: 3Hours worked: 1,179Details
The report
- YearCALENDAR_YR
- 2019
- Part of the mineSUBUNIT_DESC
- STRIP, QUARY, OPEN PIT
- Part of the mine codeSUBUNIT_CD
- 03
- Average employeesAVG_ANNUAL_EMPL
- 3
- Hours workedANNUAL_HRS
- 1179
- Average hours per employeeAVG_EMPLOYEE_HOURS
- 393
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileCURR_MINE_NM
- Delta Wash Plant
- StateSTATE_ABBR
- AK
- Coal or Metal/Non-MetalC_M_IND
- M
Recorded as 0 (1)
Coal productionANNUAL_COAL_PROD
What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.
Mine details
- MSHA field office
- Anchorage AK Field Office
- Nearest town
- Delta Junction
- Days worked per week
- 3
- Hours per shift
- 8
- Production shifts per day
- 1
- Maintenance shifts per day
- 0
- Employees, current record
- 2
- Tailing ponds
- 0
- 103(i) spot inspection status
- Never Had 103I Status
- Safety committee
- N
- Portable operation
- N
Every field in MSHA's mine record
The mine
- Mine nameCURRENT_MINE_NAME
- Delta Wash Plant
- Mine IDMINE_ID
- 5001712
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
- Mine typeCURRENT_MINE_TYPE
- Surface
- Current statusCURRENT_MINE_STATUS
- Intermittent
- Status sinceCURRENT_STATUS_DT
- Oct 1, 2014
- Legal entity typeCOMPANY_TYPE
- Corporation
Operator and controller
- OperatorCURRENT_OPERATOR_NAME
- University Redi-Mix
- Operator IDCURRENT_OPERATOR_ID
- 0070323
- ControllerCURRENT_CONTROLLER_NAME
- Colas S A
- Controller IDCURRENT_CONTROLLER_ID
- M03183
- Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
- Mar 31, 2006
Location and MSHA office
- StateSTATE
- AK
- Bureau of Mines state codeBOM_STATE_CD
- 50
- FIPS county codeFIPS_CNTY_CD
- 240
- FIPS county nameFIPS_CNTY_NM
- Southeast Fairbanks
- Nearest townNEAREST_TOWN
- Delta Junction
- MSHA districtDISTRICT
- M7
- MSHA office codeOFFICE_CD
- M7861
- MSHA officeOFFICE_NAME
- Anchorage AK Field Office
- Most recent assessment control numberASSESS_CTRL_NO
- 000582873
Commodity
- Primary commodity (SIC)PRIMARY_SIC
- Crushed, Broken Stone NEC
- Primary commodity codePRIMARY_SIC_CD
- 142900
- Primary SIC codePRIMARY_SIC_CD_1
- 1429
- Primary SIC suffixPRIMARY_SIC_CD_SFX
- 00
- Primary industry groupPRIMARY_CANVASS
- Stone
- Primary industry group codePRIMARY_CANVASS_CD
- 6
Operations, from the Mine Information Form
- Days operating per weekDAYS_PER_WEEK
- 3
- Hours per shiftHOURS_PER_SHIFT
- 8
- Production shifts per dayPROD_SHIFTS_PER_DAY
- 1
- Workers employedNO_EMPLOYEES
- 2
- MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
- Y
- 103(i) statusCURRENT_103I
- Never Had 103I Status
Recorded as 0 (3)
Driving miles from the MSHA officeMILES_FROM_OFFICE, Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS
Recorded as N (5)
Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND
Not recorded by MSHA (14)
Portable mine FIPS state codePORTABLE_FIPS_ST_CD, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT
Operator and controller history
Operator: University Redi-MixFrom: Mar 31, 2006To: No end dateController: Colas S AFrom : Sep 1, 2000To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Operator fromOPERATOR_START_DT
- Mar 31, 2006
Controller
- ControllerCONTROLLER_NAME
- Colas S A
- Controller IDCONTROLLER_ID
- M03183
- Company or personCONTROLLER_TYPE
- COMPANY
- Controller fromCONTROLLER_START_DT
- Sep 1, 2000
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine status at this pointMINE_STATUS
- Intermittent
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT
Operator: University Redi-MixFrom: Mar 31, 2006To: No end dateController: Not shownFrom : Mar 1, 1995To : Aug 31, 2000Details
Operator
- OperatorOPERATOR_NAME
- University Redi-Mix
- Operator IDOPERATOR_ID
- 0070323
- Operator fromOPERATOR_START_DT
- Mar 31, 2006
Controller
- Controller IDCONTROLLER_ID
- M10707
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Mar 1, 1995
- Controller toCONTROLLER_END_DT
- Aug 31, 2000
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine status at this pointMINE_STATUS
- Intermittent
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME
Operator: Delta Sand & Gravel, LLCFrom: Apr 15, 2003To: Mar 30, 2006Controller: Not shownFrom : Apr 15, 2003To : No end dateDetails
Operator
- OperatorOPERATOR_NAME
- Delta Sand & Gravel, LLC
- Operator IDOPERATOR_ID
- 0051244
- Operator fromOPERATOR_START_DT
- Apr 15, 2003
- Operator toOPERATOR_END_DT
- Mar 30, 2006
Controller
- Controller IDCONTROLLER_ID
- 0041673
- Company or personCONTROLLER_TYPE
- PERSON
- Controller fromCONTROLLER_START_DT
- Apr 15, 2003
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Mine status at this pointMINE_STATUS
- Intermittent
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (2)
ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT
As MSHA records it, newest operator first.
Address of record
University Redi-Mix·Contact title Director Of Risk Managment·4000 Old Seward Highway, Suite 101, Anchorage AK 99503
MSHA says an address of record "does not represent the actual mine location."
Every field in the address record
Address
- Business nameBUSINESS_NAME
- University Redi-Mix
- Contact titleCONTACT_TITLE
- Director Of Risk Managment
- StreetSTREET
- 4000 Old Seward Highway, Suite 101
- CityCITY
- Anchorage
- StateSTATE_ABBR
- AK
- State nameSTATE
- Alaska
- ZIP codeZIP_CD
- 99503
- CountryCOUNTRY
- USA
- FIPS state codeFIPS_STATE_CD
- 02
Mine
- Mine IDMINE_ID
- 5001712
- Mine name in this fileMINE_NAME
- Delta Wash Plant
- Nearest townNEAREST_TOWN
- Delta Junction
- Mine typeMINE_TYPE_CD
- Surface
- Mine statusMINE_STATUS
- Intermittent
- Status sinceMINE_STATUS_DT
- Oct 1, 2014
- Primary commodity (SIC)PRIMARY_SIC_CD
- Crushed, Broken Stone NEC
- Coal or Metal/Non-MetalCOAL_METAL_IND
- M
Not recorded by MSHA (3)
PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD
Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data
These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 13, 2026. Data and methodology