Skip to content
SafetyRecord logoSafetyRecord

Mobile Plant #3

Metal/Non-Metal, SurfaceConstruction Sand and GravelFairbanks North Star, AlaskaMine ID 5001766

Operator University Redi-MixController Colas S AMSHA status Intermittent since Mar 29, 2005

What MSHA has on file for this mine

Citations and orders
47
since Jul 6, 2004 · 47 to the operator, 0 to contractors · 17 marked S&S
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 13, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
Jun 5, 2026Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Jun 5, 2026
Closed outINSPECTION_END_DT
Jun 5, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F018857
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
1

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jun 3, 2025Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Jun 3, 2025
Closed outINSPECTION_END_DT
Jun 3, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F010BEA
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jun 7, 2024Inspectors 1 | Hours on site 2.75

The inspection

BeganINSPECTION_BEGIN_DT
Jun 7, 2024
Closed outINSPECTION_END_DT
Jun 7, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6876599
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
4.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Oct 5, 2022Inspectors 1 | Hours on site 3.5

The inspection

BeganINSPECTION_BEGIN_DT
Oct 5, 2022
Closed outINSPECTION_END_DT
Oct 5, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6876065
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Aug 12, 2022Inspectors 1 | Hours on site 3.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 12, 2022
Closed outINSPECTION_END_DT
Aug 12, 2022
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6876226
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Oct 10, 2020Inspectors 1 | Hours on site 3.5

The inspection

BeganINSPECTION_BEGIN_DT
Oct 10, 2020
Closed outINSPECTION_END_DT
Oct 10, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1153996
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Apr 23, 2020Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Apr 23, 2020
Closed outINSPECTION_END_DT
Apr 23, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1146659
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
16.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jun 15, 2019Inspectors 1 | Hours on site 3.5

The inspection

BeganINSPECTION_BEGIN_DT
Jun 15, 2019
Closed outINSPECTION_END_DT
Jun 15, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1146495
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jun 4 to Jun 6, 2018Inspectors 1 | Hours on site 6.25

The inspection

BeganINSPECTION_BEGIN_DT
Jun 4, 2018
Closed outINSPECTION_END_DT
Jun 6, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1146395
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
21

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jun 27 to Jun 28, 2017Inspectors 1 | Hours on site 7

The inspection

BeganINSPECTION_BEGIN_DT
Jun 27, 2017
Closed outINSPECTION_END_DT
Jun 28, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6722260
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
7
Total inspection hoursSUM_TOTAL_INSP_HOURS
10.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Sep 17 to Oct 1, 2015Inspectors 1 | Hours on site 3.75

The inspection

BeganINSPECTION_BEGIN_DT
Sep 17, 2015
Closed outINSPECTION_END_DT
Oct 1, 2015
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6663820
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
8.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 15 to Jul 16, 2015Inspectors 1 | Hours on site 9

The inspection

BeganINSPECTION_BEGIN_DT
Jul 15, 2015
Closed outINSPECTION_END_DT
Jul 16, 2015
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6596242
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9
Total inspection hoursSUM_TOTAL_INSP_HOURS
17.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Spot Inspection
Apr 30, 2015Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Apr 30, 2015
Closed outINSPECTION_END_DT
Apr 30, 2015
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
6596215
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
4

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 16, 2014Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
Jul 16, 2014
Closed outINSPECTION_END_DT
Jul 16, 2014
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6656216
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Sep 15, 2012Inspectors 1 | Hours on site 0.25

The inspection

BeganINSPECTION_BEGIN_DT
Sep 15, 2012
Closed outINSPECTION_END_DT
Sep 15, 2012
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1146033
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
0.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Sep 14 to Oct 1, 2012Inspectors 2 | Hours on site 9

The inspection

BeganINSPECTION_BEGIN_DT
Sep 14, 2012
Closed outINSPECTION_END_DT
Oct 1, 2012
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1153400
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
9
Total inspection hoursSUM_TOTAL_INSP_HOURS
21

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2013
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jun 21 to Jun 23, 2012Inspectors 1 | Hours on site 6

The inspection

BeganINSPECTION_BEGIN_DT
Jun 21, 2012
Closed outINSPECTION_END_DT
Jun 23, 2012
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1153373
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6
Total inspection hoursSUM_TOTAL_INSP_HOURS
13

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
May 22 to May 24, 2011Inspectors 1 | Hours on site 7.5

The inspection

BeganINSPECTION_BEGIN_DT
May 22, 2011
Closed outINSPECTION_END_DT
May 24, 2011
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1140877
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
7.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
20.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 20 to Jul 22, 2010Inspectors 2 | Hours on site 10

The inspection

BeganINSPECTION_BEGIN_DT
Jul 20, 2010
Closed outINSPECTION_END_DT
Jul 22, 2010
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1140950
InspectorsNBR_INSPECTOR
2
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10
Total inspection hoursSUM_TOTAL_INSP_HOURS
41.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Sep 10 to Oct 1, 2009Inspectors 1 | Hours on site 6.25

The inspection

BeganINSPECTION_BEGIN_DT
Sep 10, 2009
Closed outINSPECTION_END_DT
Oct 1, 2009
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1140912
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
19.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2009
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Oct 6 to Oct 7, 2008Inspectors 1 | Hours on site 5

The inspection

BeganINSPECTION_BEGIN_DT
Oct 6, 2008
Closed outINSPECTION_END_DT
Oct 7, 2008
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1140701
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5
Total inspection hoursSUM_TOTAL_INSP_HOURS
6.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jun 4 to Jun 5, 2008Inspectors 1 | Hours on site 6

The inspection

BeganINSPECTION_BEGIN_DT
Jun 4, 2008
Closed outINSPECTION_END_DT
Jun 5, 2008
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1140501
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6
Total inspection hoursSUM_TOTAL_INSP_HOURS
20.75
Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE
2

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (14)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Regular Safety and Health Inspection
Aug 9 to Aug 10, 2007Inspectors 1 | Hours on site 18.25

The inspection

BeganINSPECTION_BEGIN_DT
Aug 9, 2007
Closed outINSPECTION_END_DT
Aug 10, 2007
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1124883
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
18.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
31

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2007
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2007
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Mine Idle Activity
Jun 15, 2006Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Jun 15, 2006
Closed outINSPECTION_END_DT
Jun 15, 2006
ActivityACTIVITY
Mine Idle Activity
Activity codeACTIVITY_CODE
E28
Program areaPROGRAM_AREA
M/NM--Mine Idle Activity
Event numberEVENT_NO
1131537
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
4

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2006
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2006
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jun 15 to Jun 17, 2005Inspectors 1 | Hours on site 18.25

The inspection

BeganINSPECTION_BEGIN_DT
Jun 15, 2005
Closed outINSPECTION_END_DT
Jun 17, 2005
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1124253
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
18.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
27.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Calendar yearCAL_YR
2005
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2005
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

25 most recent of 28 inspections and other MSHA visits since Jul 2, 2003; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Oct 5, 2022
Type: Citation
Standard: 56.14101(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $133.00
Details

The citation

Citation or order numberVIOLATION_NO
9615530
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Oct 5, 2022
Time issuedVIOLATION_ISSUE_TIME
1430
Date of occurrenceVIOLATION_OCCUR_DT
Oct 5, 2022
30 CFR part and sectionPART_SECTION
56.14101(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Oct 5, 2022
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Oct 5, 2022
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Oct 5, 2022
Terminated, timeTERMINATION_TIME
1600
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
133
Current proposed assessmentAMOUNT_DUE
133
Amount paidAMOUNT_PAID
133
Bill first printedBILL_PRINT_DT
Nov 15, 2022
Final order dateFINAL_ORDER_ISSUE_DT
Dec 21, 2022
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 11, 2023
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6876065
Inspection beganINSPECTION_BEGIN_DT
Oct 5, 2022
Inspection closed outINSPECTION_END_DT
Oct 5, 2022
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
1

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 15, 2019
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
6333624
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 15, 2019
Time issuedVIOLATION_ISSUE_TIME
1250
Date of occurrenceVIOLATION_OCCUR_DT
Jun 15, 2019
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 15, 2019
Originally due, timeORIG_TERM_DUE_TIME
1530
Latest dueLATEST_TERM_DUE_DT
Jun 15, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1530
TerminatedTERMINATION_DT
Jun 15, 2019
Terminated, timeTERMINATION_TIME
1300
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Jul 16, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Aug 21, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 7, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1146495
Inspection beganINSPECTION_BEGIN_DT
Jun 15, 2019
Inspection closed outINSPECTION_END_DT
Jun 15, 2019
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 4, 2018
Type: Citation
Standard: 56.12030
S&S: Y
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $1,421.00
Details

The citation

Citation or order numberVIOLATION_NO
6395916
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 4, 2018
Time issuedVIOLATION_ISSUE_TIME
1125
Date of occurrenceVIOLATION_OCCUR_DT
Jun 4, 2018
30 CFR part and sectionPART_SECTION
56.12030
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 4, 2018
Originally due, timeORIG_TERM_DUE_TIME
1135
Latest dueLATEST_TERM_DUE_DT
Jun 4, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1135
TerminatedTERMINATION_DT
Jun 5, 2018
Terminated, timeTERMINATION_TIME
1415
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
1421
Current proposed assessmentAMOUNT_DUE
1421
Amount paidAMOUNT_PAID
1421
Bill first printedBILL_PRINT_DT
Jul 17, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Aug 22, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 26, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1146395
Inspection beganINSPECTION_BEGIN_DT
Jun 4, 2018
Inspection closed outINSPECTION_END_DT
Jun 6, 2018
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 4, 2018
Type: Citation
Standard: 56.12028
S&S: Y
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $1,421.00
Details

The citation

Citation or order numberVIOLATION_NO
6395917
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 4, 2018
Time issuedVIOLATION_ISSUE_TIME
1030
Date of occurrenceVIOLATION_OCCUR_DT
Jun 4, 2018
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 5, 2018
Originally due, timeORIG_TERM_DUE_TIME
1100
Latest dueLATEST_TERM_DUE_DT
Jun 5, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1100
TerminatedTERMINATION_DT
Jun 5, 2018
Terminated, timeTERMINATION_TIME
1415
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
1421
Current proposed assessmentAMOUNT_DUE
1421
Amount paidAMOUNT_PAID
1421
Bill first printedBILL_PRINT_DT
Jul 17, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Aug 22, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 26, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1146395
Inspection beganINSPECTION_BEGIN_DT
Jun 4, 2018
Inspection closed outINSPECTION_END_DT
Jun 6, 2018
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 4, 2018
Type: Citation
Standard: 56.12008
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $286.00
Details

The citation

Citation or order numberVIOLATION_NO
6395914
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 4, 2018
Time issuedVIOLATION_ISSUE_TIME
1010
Date of occurrenceVIOLATION_OCCUR_DT
Jun 4, 2018
30 CFR part and sectionPART_SECTION
56.12008
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 4, 2018
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Jun 4, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jun 4, 2018
Terminated, timeTERMINATION_TIME
1658
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
286
Current proposed assessmentAMOUNT_DUE
286
Amount paidAMOUNT_PAID
286
Bill first printedBILL_PRINT_DT
Jul 17, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Aug 22, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 26, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1146395
Inspection beganINSPECTION_BEGIN_DT
Jun 4, 2018
Inspection closed outINSPECTION_END_DT
Jun 6, 2018
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 4, 2018
Type: Citation
Standard: 56.14107(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $429.00
Details

The citation

Citation or order numberVIOLATION_NO
6395915
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 4, 2018
Time issuedVIOLATION_ISSUE_TIME
1035
Date of occurrenceVIOLATION_OCCUR_DT
Jun 4, 2018
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 4, 2018
Originally due, timeORIG_TERM_DUE_TIME
1045
Latest dueLATEST_TERM_DUE_DT
Jun 4, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1045
TerminatedTERMINATION_DT
Jun 4, 2018
Terminated, timeTERMINATION_TIME
1631
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
429
Current proposed assessmentAMOUNT_DUE
429
Amount paidAMOUNT_PAID
429
Bill first printedBILL_PRINT_DT
Jul 17, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Aug 22, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 26, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1146395
Inspection beganINSPECTION_BEGIN_DT
Jun 4, 2018
Inspection closed outINSPECTION_END_DT
Jun 6, 2018
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 4, 2018
Type: Citation
Standard: 56.4101
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
6395913
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 4, 2018
Time issuedVIOLATION_ISSUE_TIME
0920
Date of occurrenceVIOLATION_OCCUR_DT
Jun 4, 2018
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 4, 2018
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
Jun 4, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
Jun 4, 2018
Terminated, timeTERMINATION_TIME
0930
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Jul 17, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Aug 22, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 26, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1146395
Inspection beganINSPECTION_BEGIN_DT
Jun 4, 2018
Inspection closed outINSPECTION_END_DT
Jun 6, 2018
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 4, 2018
Type: Citation
Standard: 56.18002(a)
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
6395918
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 4, 2018
Time issuedVIOLATION_ISSUE_TIME
1200
Date of occurrenceVIOLATION_OCCUR_DT
Jun 4, 2018
30 CFR part and sectionPART_SECTION
56.18002(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 7, 2018
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Jun 7, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jun 7, 2018
Terminated, timeTERMINATION_TIME
1052
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Jul 17, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Aug 22, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 26, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1146395
Inspection beganINSPECTION_BEGIN_DT
Jun 4, 2018
Inspection closed outINSPECTION_END_DT
Jun 6, 2018
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 27, 2017
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
8877991
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 27, 2017
Time issuedVIOLATION_ISSUE_TIME
0838
Date of occurrenceVIOLATION_OCCUR_DT
Jun 27, 2017
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 27, 2017
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Jun 27, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Jun 27, 2017
Terminated, timeTERMINATION_TIME
1322
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Aug 15, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Sep 29, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 27, 2017

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6722260
Inspection beganINSPECTION_BEGIN_DT
Jun 27, 2017
Inspection closed outINSPECTION_END_DT
Jun 28, 2017
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 27, 2017
Type: Citation
Standard: 56.12004
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
8877992
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 27, 2017
Time issuedVIOLATION_ISSUE_TIME
0857
Date of occurrenceVIOLATION_OCCUR_DT
Jun 27, 2017
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 27, 2017
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Jun 27, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Jun 27, 2017
Terminated, timeTERMINATION_TIME
1326
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Aug 15, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Sep 29, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 27, 2017

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6722260
Inspection beganINSPECTION_BEGIN_DT
Jun 27, 2017
Inspection closed outINSPECTION_END_DT
Jun 28, 2017
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Sep 17, 2015
Type: Citation
Standard: 56.11027
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8879438
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 17, 2015
Time issuedVIOLATION_ISSUE_TIME
1305
Date of occurrenceVIOLATION_OCCUR_DT
Sep 17, 2015
30 CFR part and sectionPART_SECTION
56.11027
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 17, 2015
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Sep 17, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Sep 17, 2015
Terminated, timeTERMINATION_TIME
1320
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Nov 17, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Dec 24, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 6, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6663820
Inspection beganINSPECTION_BEGIN_DT
Sep 17, 2015
Inspection closed outINSPECTION_END_DT
Oct 1, 2015
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Sep 17, 2015
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8879437
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 17, 2015
Time issuedVIOLATION_ISSUE_TIME
1255
Date of occurrenceVIOLATION_OCCUR_DT
Sep 17, 2015
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 17, 2015
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Sep 17, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Sep 17, 2015
Terminated, timeTERMINATION_TIME
1300
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Nov 17, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Dec 24, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 6, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6663820
Inspection beganINSPECTION_BEGIN_DT
Sep 17, 2015
Inspection closed outINSPECTION_END_DT
Oct 1, 2015
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jul 16, 2015
Type: Citation
Standard: 62.120
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8870833
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 16, 2015
Time issuedVIOLATION_ISSUE_TIME
1700
Date of occurrenceVIOLATION_OCCUR_DT
Jul 16, 2015
30 CFR part and sectionPART_SECTION
62.120
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 6, 2015
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Sep 25, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Sep 24, 2015
Terminated, timeTERMINATION_TIME
0915
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 15, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 21, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 25, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6596242
Inspection beganINSPECTION_BEGIN_DT
Jul 15, 2015
Inspection closed outINSPECTION_END_DT
Jul 16, 2015
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jul 15, 2015
Type: Citation
Standard: 56.12008
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8870831
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 15, 2015
Time issuedVIOLATION_ISSUE_TIME
1030
Date of occurrenceVIOLATION_OCCUR_DT
Jul 15, 2015
30 CFR part and sectionPART_SECTION
56.12008
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 15, 2015
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Jul 15, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jul 16, 2015
Terminated, timeTERMINATION_TIME
0715
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 15, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 21, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 25, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6596242
Inspection beganINSPECTION_BEGIN_DT
Jul 15, 2015
Inspection closed outINSPECTION_END_DT
Jul 16, 2015
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jul 15, 2015
Type: Citation
Standard: 56.11002
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8870830
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 15, 2015
Time issuedVIOLATION_ISSUE_TIME
0945
Date of occurrenceVIOLATION_OCCUR_DT
Jul 15, 2015
30 CFR part and sectionPART_SECTION
56.11002
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 15, 2015
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Jul 15, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jul 16, 2015
Terminated, timeTERMINATION_TIME
0710
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 15, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 21, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 25, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6596242
Inspection beganINSPECTION_BEGIN_DT
Jul 15, 2015
Inspection closed outINSPECTION_END_DT
Jul 16, 2015
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jul 15, 2015
Type: Citation
Standard: 56.12028
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8870832
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 15, 2015
Time issuedVIOLATION_ISSUE_TIME
1032
Date of occurrenceVIOLATION_OCCUR_DT
Jul 15, 2015
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 15, 2015
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Jul 15, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jul 16, 2015
Terminated, timeTERMINATION_TIME
0720
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 15, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 21, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 25, 2015
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6596242
Inspection beganINSPECTION_BEGIN_DT
Jul 15, 2015
Inspection closed outINSPECTION_END_DT
Jul 16, 2015
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jul 16, 2014
Type: Citation
Standard: 56.9300(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8766678
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 16, 2014
Time issuedVIOLATION_ISSUE_TIME
0830
Date of occurrenceVIOLATION_OCCUR_DT
Jul 16, 2014
30 CFR part and sectionPART_SECTION
56.9300(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 16, 2014
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Jul 16, 2014
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Jul 16, 2014
Terminated, timeTERMINATION_TIME
0850
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 16, 2014
Final order dateFINAL_ORDER_ISSUE_DT
Oct 20, 2014
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 16, 2014
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
6656216
Inspection beganINSPECTION_BEGIN_DT
Jul 16, 2014
Inspection closed outINSPECTION_END_DT
Jul 16, 2014
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Sep 14, 2012
Type: Citation
Standard: 56.14112(b)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $1,203.00
Details

The citation

Citation or order numberVIOLATION_NO
6444185
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 14, 2012
Time issuedVIOLATION_ISSUE_TIME
1450
Date of occurrenceVIOLATION_OCCUR_DT
Sep 14, 2012
30 CFR part and sectionPART_SECTION
56.14112(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 14, 2012
Originally due, timeORIG_TERM_DUE_TIME
1550
Latest dueLATEST_TERM_DUE_DT
Sep 14, 2012
Latest due, timeLATEST_TERM_DUE_TIME
1550
TerminatedTERMINATION_DT
Sep 14, 2012
Terminated, timeTERMINATION_TIME
1505
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
1203
Current proposed assessmentAMOUNT_DUE
1203
Amount paidAMOUNT_PAID
1203
Bill first printedBILL_PRINT_DT
Oct 16, 2012
Final order dateFINAL_ORDER_ISSUE_DT
Nov 21, 2012
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 17, 2013
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1153400
Inspection beganINSPECTION_BEGIN_DT
Sep 14, 2012
Inspection closed outINSPECTION_END_DT
Oct 1, 2012
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 23, 2012
Type: Citation
Standard: 56.12030
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $8,893.00
Details

The citation

Citation or order numberVIOLATION_NO
6444134
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 23, 2012
Time issuedVIOLATION_ISSUE_TIME
1405
Date of occurrenceVIOLATION_OCCUR_DT
Jun 23, 2012
30 CFR part and sectionPART_SECTION
56.12030
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 23, 2012
Originally due, timeORIG_TERM_DUE_TIME
1505
Latest dueLATEST_TERM_DUE_DT
Jun 23, 2012
Latest due, timeLATEST_TERM_DUE_TIME
1505
TerminatedTERMINATION_DT
Jun 23, 2012
Terminated, timeTERMINATION_TIME
1430
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
8893
Current proposed assessmentAMOUNT_DUE
2678
Amount paidAMOUNT_PAID
2678
Bill first printedBILL_PRINT_DT
Aug 14, 2012
Final order dateFINAL_ORDER_ISSUE_DT
Apr 22, 2013
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 26, 2013
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1153373
Inspection beganINSPECTION_BEGIN_DT
Jun 21, 2012
Inspection closed outINSPECTION_END_DT
Jun 23, 2012
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jun 23, 2012
Type: Citation
Standard: 56.11002
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $162.00
Details

The citation

Citation or order numberVIOLATION_NO
6444135
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 23, 2012
Time issuedVIOLATION_ISSUE_TIME
1425
Date of occurrenceVIOLATION_OCCUR_DT
Jun 23, 2012
30 CFR part and sectionPART_SECTION
56.11002
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 25, 2012
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Jun 25, 2012
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jun 25, 2012
Terminated, timeTERMINATION_TIME
1100
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
162
Current proposed assessmentAMOUNT_DUE
162
Amount paidAMOUNT_PAID
162
Bill first printedBILL_PRINT_DT
Aug 14, 2012
Final order dateFINAL_ORDER_ISSUE_DT
Sep 19, 2012
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 13, 2012
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1153373
Inspection beganINSPECTION_BEGIN_DT
Jun 21, 2012
Inspection closed outINSPECTION_END_DT
Jun 23, 2012
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2012
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2012
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: May 24, 2011
Type: Citation
Standard: 56.9300(b)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $108.00
Details

The citation

Citation or order numberVIOLATION_NO
6375558
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 24, 2011
Time issuedVIOLATION_ISSUE_TIME
0945
Date of occurrenceVIOLATION_OCCUR_DT
May 24, 2011
30 CFR part and sectionPART_SECTION
56.9300(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 24, 2011
Originally due, timeORIG_TERM_DUE_TIME
1000
Latest dueLATEST_TERM_DUE_DT
May 24, 2011
Latest due, timeLATEST_TERM_DUE_TIME
1000
TerminatedTERMINATION_DT
May 24, 2011
Terminated, timeTERMINATION_TIME
1000
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
108
Current proposed assessmentAMOUNT_DUE
108
Amount paidAMOUNT_PAID
108
Bill first printedBILL_PRINT_DT
Jul 12, 2011
Final order dateFINAL_ORDER_ISSUE_DT
Aug 17, 2011
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 28, 2011
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1140877
Inspection beganINSPECTION_BEGIN_DT
May 22, 2011
Inspection closed outINSPECTION_END_DT
May 24, 2011
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Jul 20, 2010
Type: Citation
Standard: 56.18002(a)
S&S: Y
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $1,203.00
Details

The citation

Citation or order numberVIOLATION_NO
8554537
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 20, 2010
Time issuedVIOLATION_ISSUE_TIME
1820
Date of occurrenceVIOLATION_OCCUR_DT
Jul 20, 2010
30 CFR part and sectionPART_SECTION
56.18002(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 20, 2010
Originally due, timeORIG_TERM_DUE_TIME
1900
Latest dueLATEST_TERM_DUE_DT
Jul 20, 2010
Latest due, timeLATEST_TERM_DUE_TIME
1900
TerminatedTERMINATION_DT
Jul 21, 2010
Terminated, timeTERMINATION_TIME
2010
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
1203
Current proposed assessmentAMOUNT_DUE
1203
Amount paidAMOUNT_PAID
1203
Bill first printedBILL_PRINT_DT
Sep 14, 2010
Final order dateFINAL_ORDER_ISSUE_DT
Aug 12, 2011
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 7, 2011
ContestedCONTESTED_IND
Y
Most recent docket status dateCONTESTED_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Docket statusDOCKET_STATUS_CD
Accepted
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1140950
Inspection beganINSPECTION_BEGIN_DT
Jul 20, 2010
Inspection closed outINSPECTION_END_DT
Jul 22, 2010
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (2)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND

Not recorded by MSHA (10)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Contractor IDCONTRACTOR_ID

Issued: Jul 20, 2010
Type: Citation
Standard: 56.14107(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $362.00
Details

The citation

Citation or order numberVIOLATION_NO
8554526
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 20, 2010
Time issuedVIOLATION_ISSUE_TIME
1640
Date of occurrenceVIOLATION_OCCUR_DT
Jul 20, 2010
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 20, 2010
Originally due, timeORIG_TERM_DUE_TIME
1740
Latest dueLATEST_TERM_DUE_DT
Jul 20, 2010
Latest due, timeLATEST_TERM_DUE_TIME
1740
TerminatedTERMINATION_DT
Jul 21, 2010
Terminated, timeTERMINATION_TIME
1200
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
362
Current proposed assessmentAMOUNT_DUE
362
Amount paidAMOUNT_PAID
362
Bill first printedBILL_PRINT_DT
Sep 14, 2010
Final order dateFINAL_ORDER_ISSUE_DT
Aug 12, 2011
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 7, 2011
ContestedCONTESTED_IND
Y
Most recent docket status dateCONTESTED_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Docket statusDOCKET_STATUS_CD
Accepted
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1140950
Inspection beganINSPECTION_BEGIN_DT
Jul 20, 2010
Inspection closed outINSPECTION_END_DT
Jul 22, 2010
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (2)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND

Not recorded by MSHA (10)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Contractor IDCONTRACTOR_ID

Issued: Jul 20, 2010
Type: Citation
Standard: 56.14107(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $362.00
Details

The citation

Citation or order numberVIOLATION_NO
8554528
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 20, 2010
Time issuedVIOLATION_ISSUE_TIME
1700
Date of occurrenceVIOLATION_OCCUR_DT
Jul 20, 2010
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 20, 2010
Originally due, timeORIG_TERM_DUE_TIME
1800
Latest dueLATEST_TERM_DUE_DT
Jul 20, 2010
Latest due, timeLATEST_TERM_DUE_TIME
1800
TerminatedTERMINATION_DT
Jul 21, 2010
Terminated, timeTERMINATION_TIME
1210
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
362
Current proposed assessmentAMOUNT_DUE
362
Amount paidAMOUNT_PAID
362
Bill first printedBILL_PRINT_DT
Sep 14, 2010
Final order dateFINAL_ORDER_ISSUE_DT
Aug 12, 2011
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 7, 2011
ContestedCONTESTED_IND
Y
Most recent docket status dateCONTESTED_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Docket statusDOCKET_STATUS_CD
Accepted
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1140950
Inspection beganINSPECTION_BEGIN_DT
Jul 20, 2010
Inspection closed outINSPECTION_END_DT
Jul 22, 2010
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (2)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND

Not recorded by MSHA (10)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Contractor IDCONTRACTOR_ID

Issued: Jul 20, 2010
Type: Citation
Standard: 56.4201(a)(1)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8554533
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 20, 2010
Time issuedVIOLATION_ISSUE_TIME
1735
Date of occurrenceVIOLATION_OCCUR_DT
Jul 20, 2010
30 CFR part and sectionPART_SECTION
56.4201(a)(1)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 21, 2010
Originally due, timeORIG_TERM_DUE_TIME
0900
Latest dueLATEST_TERM_DUE_DT
Jul 21, 2010
Latest due, timeLATEST_TERM_DUE_TIME
0900
TerminatedTERMINATION_DT
Jul 21, 2010
Terminated, timeTERMINATION_TIME
1240
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 14, 2010
Final order dateFINAL_ORDER_ISSUE_DT
Aug 12, 2011
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 7, 2011
ContestedCONTESTED_IND
Y
Most recent docket status dateCONTESTED_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Docket statusDOCKET_STATUS_CD
Accepted
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
University Redi-Mix
Operator IDVIOLATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Inspection eventEVENT_NO
1140950
Inspection beganINSPECTION_BEGIN_DT
Jul 20, 2010
Inspection closed outINSPECTION_END_DT
Jul 22, 2010
Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (3)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND

Not recorded by MSHA (10)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Contractor IDCONTRACTOR_ID

47 citations and orders since Jul 6, 2004: 47 issued to the operator, 0 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Oct 5, 2022
Citation number: 9615530
Standard: 56.14101(a)(2)
Proposed penalty: $133.00
Current assessment: $133.00
Paid against proposed penalty: $133.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9615530
Assessment control numberASSESS_CASE_NO
000566610
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 12, 2022
Citation issuedISSUE_DT
Oct 5, 2022
Date of occurrenceOCCURRENCE_DT
Oct 5, 2022
Final order dateFINAL_ORDER_DT
Dec 21, 2022
Bill first printedBILL_PRINT_DT
Nov 15, 2022
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2023
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 21, 2022
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14101(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
133.00
Current assessmentCURRENT_ASSESSMENT_AMT
133.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
133.00

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
2106
Size of mineSIZE_OF_MINE
2106
Controller hours workedCONTROLLER_HRS
821446
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
821446
History period startHISTORY_START_DT
Jul 5, 2021
History period endHISTORY_END_DT
Oct 4, 2022

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6876065
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 15, 2019
Citation number: 6333624
Standard: 56.14107(a)
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6333624
Assessment control numberASSESS_CASE_NO
000495213
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 7, 2019
Citation issuedISSUE_DT
Jun 15, 2019
Date of occurrenceOCCURRENCE_DT
Jun 15, 2019
Final order dateFINAL_ORDER_DT
Aug 21, 2019
Bill first printedBILL_PRINT_DT
Jul 16, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 21, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
31
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
3
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
3044
Size of mineSIZE_OF_MINE
3044
Controller hours workedCONTROLLER_HRS
833651
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
833651
History period startHISTORY_START_DT
Mar 15, 2018
History period endHISTORY_END_DT
Jun 14, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1146495
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 4, 2018
Citation number: 6395913
Standard: 56.4101
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6395913
Assessment control numberASSESS_CASE_NO
000469128
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 26, 2018
Citation issuedISSUE_DT
Jun 4, 2018
Date of occurrenceOCCURRENCE_DT
Jun 4, 2018
Final order dateFINAL_ORDER_DT
Aug 22, 2018
Bill first printedBILL_PRINT_DT
Jul 17, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 22, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
3059
Size of mineSIZE_OF_MINE
3059
Controller hours workedCONTROLLER_HRS
826132
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
826132
History period startHISTORY_START_DT
Mar 4, 2017
History period endHISTORY_END_DT
Jun 3, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1146395
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 4, 2018
Citation number: 6395917
Standard: 56.12028
Proposed penalty: $1,421.00
Current assessment: $1,421.00
Paid against proposed penalty: $1,421.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6395917
Assessment control numberASSESS_CASE_NO
000469128
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 26, 2018
Citation issuedISSUE_DT
Jun 4, 2018
Date of occurrenceOCCURRENCE_DT
Jun 4, 2018
Final order dateFINAL_ORDER_DT
Aug 22, 2018
Bill first printedBILL_PRINT_DT
Jul 17, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 22, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
1421.00
Current assessmentCURRENT_ASSESSMENT_AMT
1421.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
1421.00

Penalty points

Violation history pointsPENALTY_POINTS
91
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
35
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
3059
Size of mineSIZE_OF_MINE
3059
Controller hours workedCONTROLLER_HRS
826132
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
826132
History period startHISTORY_START_DT
Mar 4, 2017
History period endHISTORY_END_DT
Jun 3, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1146395
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 4, 2018
Citation number: 6395915
Standard: 56.14107(a)
Proposed penalty: $429.00
Current assessment: $429.00
Paid against proposed penalty: $429.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6395915
Assessment control numberASSESS_CASE_NO
000469128
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 26, 2018
Citation issuedISSUE_DT
Jun 4, 2018
Date of occurrenceOCCURRENCE_DT
Jun 4, 2018
Final order dateFINAL_ORDER_DT
Aug 22, 2018
Bill first printedBILL_PRINT_DT
Jul 17, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 22, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
429.00
Current assessmentCURRENT_ASSESSMENT_AMT
429.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
429.00

Penalty points

Violation history pointsPENALTY_POINTS
76
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
3059
Size of mineSIZE_OF_MINE
3059
Controller hours workedCONTROLLER_HRS
826132
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
826132
History period startHISTORY_START_DT
Mar 4, 2017
History period endHISTORY_END_DT
Jun 3, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1146395
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 4, 2018
Citation number: 6395918
Standard: 56.18002(a)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6395918
Assessment control numberASSESS_CASE_NO
000469128
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 26, 2018
Citation issuedISSUE_DT
Jun 4, 2018
Date of occurrenceOCCURRENCE_DT
Jun 4, 2018
Final order dateFINAL_ORDER_DT
Aug 22, 2018
Bill first printedBILL_PRINT_DT
Jul 17, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 22, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.18002(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Negligence pointsNEGLIGENCE_POINTS
35
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
3059
Size of mineSIZE_OF_MINE
3059
Controller hours workedCONTROLLER_HRS
826132
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
826132
History period startHISTORY_START_DT
Mar 4, 2017
History period endHISTORY_END_DT
Jun 3, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1146395
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 4, 2018
Citation number: 6395914
Standard: 56.12008
Proposed penalty: $286.00
Current assessment: $286.00
Paid against proposed penalty: $286.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6395914
Assessment control numberASSESS_CASE_NO
000469128
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 26, 2018
Citation issuedISSUE_DT
Jun 4, 2018
Date of occurrenceOCCURRENCE_DT
Jun 4, 2018
Final order dateFINAL_ORDER_DT
Aug 22, 2018
Bill first printedBILL_PRINT_DT
Jul 17, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 22, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12008
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
286.00
Current assessmentCURRENT_ASSESSMENT_AMT
286.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
286.00

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
3059
Size of mineSIZE_OF_MINE
3059
Controller hours workedCONTROLLER_HRS
826132
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
826132
History period startHISTORY_START_DT
Mar 4, 2017
History period endHISTORY_END_DT
Jun 3, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1146395
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 4, 2018
Citation number: 6395916
Standard: 56.12030
Proposed penalty: $1,421.00
Current assessment: $1,421.00
Paid against proposed penalty: $1,421.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6395916
Assessment control numberASSESS_CASE_NO
000469128
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 26, 2018
Citation issuedISSUE_DT
Jun 4, 2018
Date of occurrenceOCCURRENCE_DT
Jun 4, 2018
Final order dateFINAL_ORDER_DT
Aug 22, 2018
Bill first printedBILL_PRINT_DT
Jul 17, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 22, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12030
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
1421.00
Current assessmentCURRENT_ASSESSMENT_AMT
1421.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
1421.00

Penalty points

Violation history pointsPENALTY_POINTS
91
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
35
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
3059
Size of mineSIZE_OF_MINE
3059
Controller hours workedCONTROLLER_HRS
826132
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
826132
History period startHISTORY_START_DT
Mar 4, 2017
History period endHISTORY_END_DT
Jun 3, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1146395
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 27, 2017
Citation number: 8877992
Standard: 56.12004
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8877992
Assessment control numberASSESS_CASE_NO
000445861
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 27, 2017
Citation issuedISSUE_DT
Jun 27, 2017
Date of occurrenceOCCURRENCE_DT
Jun 27, 2017
Final order dateFINAL_ORDER_DT
Sep 29, 2017
Bill first printedBILL_PRINT_DT
Aug 15, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
46
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4647
Size of mineSIZE_OF_MINE
4647
Controller hours workedCONTROLLER_HRS
791415
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
791415
History period startHISTORY_START_DT
Mar 27, 2016
History period endHISTORY_END_DT
Jun 26, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6722260
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 27, 2017
Citation number: 8877991
Standard: 56.14107(a)
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8877991
Assessment control numberASSESS_CASE_NO
000445861
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 27, 2017
Citation issuedISSUE_DT
Jun 27, 2017
Date of occurrenceOCCURRENCE_DT
Jun 27, 2017
Final order dateFINAL_ORDER_DT
Sep 29, 2017
Bill first printedBILL_PRINT_DT
Aug 15, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
46
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4647
Size of mineSIZE_OF_MINE
4647
Controller hours workedCONTROLLER_HRS
791415
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
791415
History period startHISTORY_START_DT
Mar 27, 2016
History period endHISTORY_END_DT
Jun 26, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6722260
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (2)

Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 17, 2015
Citation number: 8879438
Standard: 56.11027
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8879438
Assessment control numberASSESS_CASE_NO
000396847
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 6, 2015
Citation issuedISSUE_DT
Sep 17, 2015
Date of occurrenceOCCURRENCE_DT
Sep 17, 2015
Final order dateFINAL_ORDER_DT
Dec 24, 2015
Bill first printedBILL_PRINT_DT
Nov 17, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 24, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11027
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
3979
Size of mineSIZE_OF_MINE
3979
Controller hours workedCONTROLLER_HRS
641868
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
641868
History period startHISTORY_START_DT
Jun 17, 2014
History period endHISTORY_END_DT
Sep 16, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6663820
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 17, 2015
Citation number: 8879437
Standard: 56.12004
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8879437
Assessment control numberASSESS_CASE_NO
000396847
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 6, 2015
Citation issuedISSUE_DT
Sep 17, 2015
Date of occurrenceOCCURRENCE_DT
Sep 17, 2015
Final order dateFINAL_ORDER_DT
Dec 24, 2015
Bill first printedBILL_PRINT_DT
Nov 17, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 24, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.33
Operator hours worked at the mineVIOLATOR_MINE_HRS
3979
Size of mineSIZE_OF_MINE
3979
Controller hours workedCONTROLLER_HRS
641868
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
641868
History period startHISTORY_START_DT
Jun 17, 2014
History period endHISTORY_END_DT
Sep 16, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6663820
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 16, 2015
Citation number: 8870833
Standard: 62.120
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8870833
Assessment control numberASSESS_CASE_NO
000391867
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 25, 2015
Citation issuedISSUE_DT
Jul 16, 2015
Date of occurrenceOCCURRENCE_DT
Jul 16, 2015
Final order dateFINAL_ORDER_DT
Oct 21, 2015
Bill first printedBILL_PRINT_DT
Sep 15, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 21, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
62.120
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
46
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
3979
Size of mineSIZE_OF_MINE
3979
Controller hours workedCONTROLLER_HRS
641868
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
641868
History period startHISTORY_START_DT
Apr 16, 2014
History period endHISTORY_END_DT
Jul 15, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6596242
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 15, 2015
Citation number: 8870830
Standard: 56.11002
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8870830
Assessment control numberASSESS_CASE_NO
000391867
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 25, 2015
Citation issuedISSUE_DT
Jul 15, 2015
Date of occurrenceOCCURRENCE_DT
Jul 15, 2015
Final order dateFINAL_ORDER_DT
Oct 21, 2015
Bill first printedBILL_PRINT_DT
Sep 15, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 21, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11002
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
3979
Size of mineSIZE_OF_MINE
3979
Controller hours workedCONTROLLER_HRS
641868
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
641868
History period startHISTORY_START_DT
Apr 15, 2014
History period endHISTORY_END_DT
Jul 14, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6596242
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 15, 2015
Citation number: 8870832
Standard: 56.12028
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8870832
Assessment control numberASSESS_CASE_NO
000391867
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 25, 2015
Citation issuedISSUE_DT
Jul 15, 2015
Date of occurrenceOCCURRENCE_DT
Jul 15, 2015
Final order dateFINAL_ORDER_DT
Oct 21, 2015
Bill first printedBILL_PRINT_DT
Sep 15, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 21, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
3979
Size of mineSIZE_OF_MINE
3979
Controller hours workedCONTROLLER_HRS
641868
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
641868
History period startHISTORY_START_DT
Apr 15, 2014
History period endHISTORY_END_DT
Jul 14, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6596242
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 15, 2015
Citation number: 8870831
Standard: 56.12008
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8870831
Assessment control numberASSESS_CASE_NO
000391867
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 25, 2015
Citation issuedISSUE_DT
Jul 15, 2015
Date of occurrenceOCCURRENCE_DT
Jul 15, 2015
Final order dateFINAL_ORDER_DT
Oct 21, 2015
Bill first printedBILL_PRINT_DT
Sep 15, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 21, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12008
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
3979
Size of mineSIZE_OF_MINE
3979
Controller hours workedCONTROLLER_HRS
641868
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
641868
History period startHISTORY_START_DT
Apr 15, 2014
History period endHISTORY_END_DT
Jul 14, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6596242
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 16, 2014
Citation number: 8766678
Standard: 56.9300(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8766678
Assessment control numberASSESS_CASE_NO
000361691
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 15, 2014
Citation issuedISSUE_DT
Jul 16, 2014
Date of occurrenceOCCURRENCE_DT
Jul 16, 2014
Final order dateFINAL_ORDER_DT
Oct 20, 2014
Bill first printedBILL_PRINT_DT
Sep 16, 2014
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2014
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 20, 2014
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
1623
Size of mineSIZE_OF_MINE
1623
Controller hours workedCONTROLLER_HRS
619198
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
619198
History period startHISTORY_START_DT
Apr 16, 2013
History period endHISTORY_END_DT
Jul 15, 2014

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
University Redi-Mix
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6656216
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 14, 2012
Citation number: 6444185
Standard: 56.14112(b)
Proposed penalty: $1,203.00
Current assessment: $1,203.00
Paid against proposed penalty: $1,203.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444185
Assessment control numberASSESS_CASE_NO
000303699
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jan 3, 2014
Citation issuedISSUE_DT
Sep 14, 2012
Date of occurrenceOCCURRENCE_DT
Sep 14, 2012
Final order dateFINAL_ORDER_DT
Nov 21, 2012
Bill first printedBILL_PRINT_DT
Oct 16, 2012
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2013
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 21, 2012
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
1203.00
Current assessmentCURRENT_ASSESSMENT_AMT
1203.00
Mine Act interestMINEACT_INTEREST_AMT
6.59
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
1203.00

Penalty points

Violation history pointsPENALTY_POINTS
91
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
6.5
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
2
Repeat violations per inspection dayRPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
3128
Size of mineSIZE_OF_MINE
3128
Controller hours workedCONTROLLER_HRS
715172
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
715172
History period startHISTORY_START_DT
Jun 14, 2011
History period endHISTORY_END_DT
Sep 13, 2012

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Exclusive Paving
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1153400
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (9)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 23, 2012
Citation number: 6444135
Standard: 56.11002
Proposed penalty: $162.00
Current assessment: $162.00
Paid against proposed penalty: $162.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444135
Assessment control numberASSESS_CASE_NO
000297918
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 11, 2013
Citation issuedISSUE_DT
Jun 23, 2012
Date of occurrenceOCCURRENCE_DT
Jun 23, 2012
Final order dateFINAL_ORDER_DT
Sep 19, 2012
Bill first printedBILL_PRINT_DT
Aug 14, 2012
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2012
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 19, 2012
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11002
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
162.00
Current assessmentCURRENT_ASSESSMENT_AMT
162.00
Mine Act interestMINEACT_INTEREST_AMT
1.88
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
162.00

Penalty points

Violation history pointsPENALTY_POINTS
66
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
6.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
3128
Size of mineSIZE_OF_MINE
3128
Controller hours workedCONTROLLER_HRS
715172
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
715172
History period startHISTORY_START_DT
Mar 23, 2011
History period endHISTORY_END_DT
Jun 22, 2012

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Exclusive Paving
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1153373
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (11)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 23, 2012
Citation number: 6444134
Standard: 56.12030
Proposed penalty: $8,893.00
Current assessment: $2,678.00
Paid against proposed penalty: $2,678.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444134
Assessment control numberASSESS_CASE_NO
000297918
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 11, 2013
Citation issuedISSUE_DT
Jun 23, 2012
Date of occurrenceOCCURRENCE_DT
Jun 23, 2012
Final order dateFINAL_ORDER_DT
Apr 22, 2013
Bill first printedBILL_PRINT_DT
Aug 14, 2012
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2012
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Apr 12, 2013
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12030
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
8893.00
Current assessmentCURRENT_ASSESSMENT_AMT
2678.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
2678.00

Penalty points

Violation history pointsPENALTY_POINTS
101
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
13
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
6.5
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
3128
Size of mineSIZE_OF_MINE
3128
Controller hours workedCONTROLLER_HRS
715172
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
715172
History period startHISTORY_START_DT
Mar 23, 2011
History period endHISTORY_END_DT
Jun 22, 2012

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Exclusive Paving
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1153373
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (10)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 24, 2011
Citation number: 6375558
Standard: 56.9300(b)
Proposed penalty: $108.00
Current assessment: $108.00
Paid against proposed penalty: $108.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6375558
Assessment control numberASSESS_CASE_NO
000260714
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 27, 2011
Citation issuedISSUE_DT
May 24, 2011
Date of occurrenceOCCURRENCE_DT
May 24, 2011
Final order dateFINAL_ORDER_DT
Aug 17, 2011
Bill first printedBILL_PRINT_DT
Jul 12, 2011
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2011
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 17, 2011
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
108.00
Current assessmentCURRENT_ASSESSMENT_AMT
108.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
108.00

Penalty points

Violation history pointsPENALTY_POINTS
61
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
2243
Size of mineSIZE_OF_MINE
2243
Controller hours workedCONTROLLER_HRS
749333
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
749333
History period startHISTORY_START_DT
Feb 24, 2010
History period endHISTORY_END_DT
May 23, 2011

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Exclusive Paving
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140877
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 20, 2010
Citation number: 8554532
Standard: 56.14107(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8554532
Assessment control numberASSESS_CASE_NO
000232191
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 22, 2010
Citation issuedISSUE_DT
Jul 20, 2010
Date of occurrenceOCCURRENCE_DT
Jul 20, 2010
Final order dateFINAL_ORDER_DT
Aug 12, 2011
Bill first printedBILL_PRINT_DT
Sep 14, 2010
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2010
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 12, 2011
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
2231
Size of mineSIZE_OF_MINE
2231
Controller hours workedCONTROLLER_HRS
744486
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
744486
History period startHISTORY_START_DT
Apr 20, 2009
History period endHISTORY_END_DT
Jul 19, 2010

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Exclusive Paving
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140950
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 20, 2010
Citation number: 8554536
Standard: 56.16005
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8554536
Assessment control numberASSESS_CASE_NO
000232191
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 22, 2010
Citation issuedISSUE_DT
Jul 20, 2010
Date of occurrenceOCCURRENCE_DT
Jul 20, 2010
Final order dateFINAL_ORDER_DT
Aug 12, 2011
Bill first printedBILL_PRINT_DT
Sep 14, 2010
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2010
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 12, 2011
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.16005
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
2231
Size of mineSIZE_OF_MINE
2231
Controller hours workedCONTROLLER_HRS
744486
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
744486
History period startHISTORY_START_DT
Apr 20, 2009
History period endHISTORY_END_DT
Jul 19, 2010

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Exclusive Paving
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140950
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 20, 2010
Citation number: 8554535
Standard: 56.14107(a)
Proposed penalty: $1,203.00
Current assessment: $243.00
Paid against proposed penalty: $243.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8554535
Assessment control numberASSESS_CASE_NO
000232191
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 22, 2010
Citation issuedISSUE_DT
Jul 20, 2010
Date of occurrenceOCCURRENCE_DT
Jul 20, 2010
Final order dateFINAL_ORDER_DT
Aug 12, 2011
Bill first printedBILL_PRINT_DT
Sep 14, 2010
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2010
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 12, 2011
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
1203.00
Current assessmentCURRENT_ASSESSMENT_AMT
243.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
243.00

Penalty points

Violation history pointsPENALTY_POINTS
76
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
2231
Size of mineSIZE_OF_MINE
2231
Controller hours workedCONTROLLER_HRS
741486
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
741486
History period startHISTORY_START_DT
Apr 20, 2009
History period endHISTORY_END_DT
Jul 19, 2010

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Exclusive Paving
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140950
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 20, 2010
Citation number: 8554530
Standard: 56.14112(b)
Proposed penalty: $1,203.00
Current assessment: $243.00
Paid against proposed penalty: $243.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8554530
Assessment control numberASSESS_CASE_NO
000232191
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 22, 2010
Citation issuedISSUE_DT
Jul 20, 2010
Date of occurrenceOCCURRENCE_DT
Jul 20, 2010
Final order dateFINAL_ORDER_DT
Aug 12, 2011
Bill first printedBILL_PRINT_DT
Sep 14, 2010
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2010
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 12, 2011
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
1203.00
Current assessmentCURRENT_ASSESSMENT_AMT
243.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
243.00

Penalty points

Violation history pointsPENALTY_POINTS
76
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Controller size pointsCONTROLLER_SIZE_POINTS
5

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
1
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
2
Repeat violations per inspection dayRPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
2231
Size of mineSIZE_OF_MINE
2231
Controller hours workedCONTROLLER_HRS
741486
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
741486
History period startHISTORY_START_DT
Apr 20, 2009
History period endHISTORY_END_DT
Jul 19, 2010

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Exclusive Paving
IDVIOLATOR_ID
0070323
Operator start at the mine, as assessedVIOLATOR_START_DT
Nov 1, 2004
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140950
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 46 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Contested citations and decisions

Contested: Oct 31, 2012
Citation issued: Sep 15, 2012
Docket: WEST 2013-131M
Standard: 56.11003
Proposed penalty: $162.00
Penalty after decision: $0.00
Decided: Oct 25, 2013
Decision type: Withdrawal
Details

The contest

Citation or order numberCITATION_NO
6444186
Citation issuedCITATION_ISSUE_DT
Sep 15, 2012
Hearing request receivedCONTEST_DT
Oct 31, 2012
Docket numberDOCKET_NO
WEST 2013-131M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Withdrawal
DecidedDECISION_DT
Oct 25, 2013
Petition duePETITION_DUE_DT
Dec 17, 2012
Petition filedPETITION_FILED_DT
Dec 10, 2012

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
162.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.11003
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as 0 (1)

Penalty after the decisionDECISION_PENALTY_AMT

Recorded as N (1)

S&S when contestedORIGINAL_SIG_SUB_IND

Not recorded by MSHA (9)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE, Type when decidedDECISION_CITATION_TYPE_CODE, Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE, S&S when decidedDECISION_SIG_SUB_IND, Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD, Persons potentially affected when decidedDECISION_GRAVITY_PERSONS, Expected injury or illness when decidedDECISION_GRAVITY_INJURY, Negligence when decidedDECISION_NEGLIGENCE

Contested: Aug 28, 2012
Citation issued: Jun 23, 2012
Docket: WEST 2012-1387M
Standard: 56.12030
Proposed penalty: $8,893.00
Penalty after decision: $2,678.00
Decided: Mar 12, 2013
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
6444134
Citation issuedCITATION_ISSUE_DT
Jun 23, 2012
Hearing request receivedCONTEST_DT
Aug 28, 2012
Docket numberDOCKET_NO
WEST 2012-1387M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Mar 12, 2013
Petition duePETITION_DUE_DT
Oct 12, 2012
Petition filedPETITION_FILED_DT
Oct 10, 2012

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
8893.00
Penalty after the decisionDECISION_PENALTY_AMT
2678.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.12030
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 8, 2010
Citation issued: Jul 20, 2010
Docket: WEST 2011-60M
Standard: 56.14112(b)
Proposed penalty: $1,203.00
Penalty after decision: $243.00
Decided: Jul 12, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8554530
Citation issuedCITATION_ISSUE_DT
Jul 20, 2010
Hearing request receivedCONTEST_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 12, 2011
Petition duePETITION_DUE_DT
Nov 22, 2010
Petition filedPETITION_FILED_DT
Dec 2, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
1203.00
Penalty after the decisionDECISION_PENALTY_AMT
243.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14112(b)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 8, 2010
Citation issued: Jul 20, 2010
Docket: WEST 2011-60M
Standard: 56.14107(a)
Proposed penalty: $362.00
Penalty after decision: $362.00
Decided: Jul 12, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8554528
Citation issuedCITATION_ISSUE_DT
Jul 20, 2010
Hearing request receivedCONTEST_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 12, 2011
Petition duePETITION_DUE_DT
Nov 22, 2010
Petition filedPETITION_FILED_DT
Dec 2, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
362.00
Penalty after the decisionDECISION_PENALTY_AMT
362.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14107(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 8, 2010
Citation issued: Jul 20, 2010
Docket: WEST 2011-60M
Standard: 56.12030
Proposed penalty: $362.00
Penalty after decision: $362.00
Decided: Jul 12, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8554534
Citation issuedCITATION_ISSUE_DT
Jul 20, 2010
Hearing request receivedCONTEST_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 12, 2011
Petition duePETITION_DUE_DT
Nov 22, 2010
Petition filedPETITION_FILED_DT
Dec 2, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
362.00
Penalty after the decisionDECISION_PENALTY_AMT
362.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.12030
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 8, 2010
Citation issued: Jul 20, 2010
Docket: WEST 2011-60M
Standard: 56.14112(a)(1)
Proposed penalty: $100.00
Penalty after decision: $100.00
Decided: Jul 12, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8554531
Citation issuedCITATION_ISSUE_DT
Jul 20, 2010
Hearing request receivedCONTEST_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 12, 2011
Petition duePETITION_DUE_DT
Nov 22, 2010
Petition filedPETITION_FILED_DT
Dec 2, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14112(a)(1)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 8, 2010
Citation issued: Jul 20, 2010
Docket: WEST 2011-60M
Standard: 56.16005
Proposed penalty: $100.00
Penalty after decision: $100.00
Decided: Jul 12, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8554536
Citation issuedCITATION_ISSUE_DT
Jul 20, 2010
Hearing request receivedCONTEST_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 12, 2011
Petition duePETITION_DUE_DT
Nov 22, 2010
Petition filedPETITION_FILED_DT
Dec 2, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.16005
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 8, 2010
Citation issued: Jul 20, 2010
Docket: WEST 2011-60M
Standard: 56.14107(a)
Proposed penalty: $100.00
Penalty after decision: $100.00
Decided: Jul 12, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8554527
Citation issuedCITATION_ISSUE_DT
Jul 20, 2010
Hearing request receivedCONTEST_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 12, 2011
Petition duePETITION_DUE_DT
Nov 22, 2010
Petition filedPETITION_FILED_DT
Dec 2, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14107(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence
Negligence when decidedDECISION_NEGLIGENCE
HighNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 8, 2010
Citation issued: Jul 20, 2010
Docket: WEST 2011-60M
Standard: 56.18002(a)
Proposed penalty: $1,203.00
Penalty after decision: $1,203.00
Decided: Jul 12, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8554537
Citation issuedCITATION_ISSUE_DT
Jul 20, 2010
Hearing request receivedCONTEST_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 12, 2011
Petition duePETITION_DUE_DT
Nov 22, 2010
Petition filedPETITION_FILED_DT
Dec 2, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
1203.00
Penalty after the decisionDECISION_PENALTY_AMT
1203.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.18002(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence
Negligence when decidedDECISION_NEGLIGENCE
HighNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 8, 2010
Citation issued: Jul 20, 2010
Docket: WEST 2011-60M
Standard: 56.14107(a)
Proposed penalty: $100.00
Penalty after decision: $100.00
Decided: Jul 12, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8554532
Citation issuedCITATION_ISSUE_DT
Jul 20, 2010
Hearing request receivedCONTEST_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 12, 2011
Petition duePETITION_DUE_DT
Nov 22, 2010
Petition filedPETITION_FILED_DT
Dec 2, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14107(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 8, 2010
Citation issued: Jul 20, 2010
Docket: WEST 2011-60M
Standard: 56.14107(a)
Proposed penalty: $1,203.00
Penalty after decision: $243.00
Decided: Jul 12, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8554535
Citation issuedCITATION_ISSUE_DT
Jul 20, 2010
Hearing request receivedCONTEST_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 12, 2011
Petition duePETITION_DUE_DT
Nov 22, 2010
Petition filedPETITION_FILED_DT
Dec 2, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
1203.00
Penalty after the decisionDECISION_PENALTY_AMT
243.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14107(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 8, 2010
Citation issued: Jul 20, 2010
Docket: WEST 2011-60M
Standard: 56.14112(b)
Proposed penalty: $1,203.00
Penalty after decision: $243.00
Decided: Jul 12, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8554529
Citation issuedCITATION_ISSUE_DT
Jul 20, 2010
Hearing request receivedCONTEST_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 12, 2011
Petition duePETITION_DUE_DT
Nov 22, 2010
Petition filedPETITION_FILED_DT
Dec 2, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
1203.00
Penalty after the decisionDECISION_PENALTY_AMT
243.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14112(b)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
HighNegligence
Negligence when decidedDECISION_NEGLIGENCE
HighNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 8, 2010
Citation issued: Jul 20, 2010
Docket: WEST 2011-60M
Standard: 56.4201(a)(1)
Proposed penalty: $100.00
Penalty after decision: $100.00
Decided: Jul 12, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8554533
Citation issuedCITATION_ISSUE_DT
Jul 20, 2010
Hearing request receivedCONTEST_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 12, 2011
Petition duePETITION_DUE_DT
Nov 22, 2010
Petition filedPETITION_FILED_DT
Dec 2, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
100.00
Penalty after the decisionDECISION_PENALTY_AMT
100.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.4201(a)(1)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Unlikely
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Unlikely
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
LostDays
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
LostDays
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Recorded as N (2)

S&S when contestedORIGINAL_SIG_SUB_IND, S&S when decidedDECISION_SIG_SUB_IND

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

Contested: Oct 8, 2010
Citation issued: Jul 20, 2010
Docket: WEST 2011-60M
Standard: 56.14107(a)
Proposed penalty: $362.00
Penalty after decision: $362.00
Decided: Jul 12, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
8554526
Citation issuedCITATION_ISSUE_DT
Jul 20, 2010
Hearing request receivedCONTEST_DT
Oct 8, 2010
Docket numberDOCKET_NO
WEST 2011-60M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Jul 12, 2011
Petition duePETITION_DUE_DT
Nov 22, 2010
Petition filedPETITION_FILED_DT
Dec 2, 2010

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
362.00
Penalty after the decisionDECISION_PENALTY_AMT
362.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.14107(a)
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Fatal
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Fatal
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3

Other fields

ISSUING_FIELD_OFFICE
M7861

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

14 contested citations and orders; decision types are MSHA's own text.

Reported injuries, illnesses and accidents

Reports by degree of injury, as MSHA records it. FATALITY rows are left out of this breakdown: MSHA leaves deaths it finds unrelated to mining out of its fatality statistics, so a count of these reports can differ from MSHA's figures. See MSHA's fatality report search.

NO DYS AWY FRM WRK,NO RSTR ACT
1
Date: Apr 28, 2015
Degree of injury: NO DYS AWY FRM WRK,NO RSTR ACT
Classification: FIRE
Accident type: Contact with hot objects or substances
Days lost: 0
Details

The report

Document numberDOCUMENT_NO
220151200037
DateACCIDENT_DT
Apr 28, 2015
TimeACCIDENT_TIME
1330
Shift beganSHIFT_BEGIN_TIME
0700
Degree of injuryDEGREE_INJURY
NO DYS AWY FRM WRK,NO RSTR ACT
Degree of injury codeDEGREE_INJURY_CD
06
ClassificationCLASSIFICATION
FIRE
Classification codeCLASSIFICATION_CD
08
Accident typeACCIDENT_TYPE
Contact with hot objects or substances
Accident type codeACCIDENT_TYPE_CD
33
Reportable injuries or illnessesNO_INJURIES
1
Immediately reportable typeIMMED_NOTIFY
NO VALUE FOUND
Immediately reportable codeIMMED_NOTIFY_CD
?

Injury

Activity at the timeACTIVITY
Welding or cutting
Activity codeACTIVITY_CD
093
Source of injuryINJURY_SOURCE
FLAME,FIRE,SMOKE,NEC
Source of injury codeINJURY_SOURCE_CD
045
Nature of injuryNATURE_INJURY
BURN OR SCALD (HEAT)
Nature of injury codeNATURE_INJURY_CD
120
Part of bodyINJ_BODY_PART
CHEST (RIBS/BREAST BONE/CHEST ORGNS)
Part of body codeINJ_BODY_PART_CD
430
Returned to workRETURN_TO_WORK_DT
Apr 29, 2015

Where, and equipment

Location in the mineSUBUNIT
STRIP, QUARY, OPEN PIT
Location codeSUBUNIT_CD
03
Underground locationUG_LOCATION
NO VALUE FOUND
Underground location codeUG_LOCATION_CD
?
Underground mining methodUG_MINING_METHOD
NO VALUE FOUND
Underground mining method codeUG_MINING_METHOD_CD
?
Equipment involvedMINING_EQUIP
NO VALUE FOUND
Equipment codeMINING_EQUIP_CD
?
Equipment manufacturerEQUIP_MFR_NAME
NO VALUE FOUND
Equipment manufacturer codeEQUIP_MFR_CD
?
FIPS state codeFIPS_STATE_CD
02

Who and period

Operator at the timeOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Controller at the timeCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (3)

Schedule charge, daysSCHEDULE_CHARGE, Days of restricted workDAYS_RESTRICT, Days lostDAYS_LOST

Recorded as N (1)

Permanently transferred or terminatedTRANS_TERM

Not recorded by MSHA (4)

MSHA investigation beganINVEST_BEGIN_DT, Returned to Duty document numberCLOSED_DOC_NO, Equipment model numberEQUIP_MODEL_NO, Contractor IDCONTRACTOR_ID

1 report filed on MSHA Form 7000-1; categories are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 0
Hours worked: 0
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99

Mine

Mine IDMINE_ID
5001766
Mine name in this fileCURR_MINE_NM
Mobile Plant #3
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (4)

Average employeesAVG_ANNUAL_EMPL, Hours workedANNUAL_HRS, Average hours per employeeAVG_EMPLOYEE_HOURS, Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 2,065
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
2065
Average hours per employeeAVG_EMPLOYEE_HOURS
688

Mine

Mine IDMINE_ID
5001766
Mine name in this fileCURR_MINE_NM
Mobile Plant #3
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 5
Hours worked: 3,275
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
5
Hours workedANNUAL_HRS
3275
Average hours per employeeAVG_EMPLOYEE_HOURS
655

Mine

Mine IDMINE_ID
5001766
Mine name in this fileCURR_MINE_NM
Mobile Plant #3
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 5
Hours worked: 2,258
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
5
Hours workedANNUAL_HRS
2258
Average hours per employeeAVG_EMPLOYEE_HOURS
452

Mine

Mine IDMINE_ID
5001766
Mine name in this fileCURR_MINE_NM
Mobile Plant #3
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 1,526
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
1526
Average hours per employeeAVG_EMPLOYEE_HOURS
382

Mine

Mine IDMINE_ID
5001766
Mine name in this fileCURR_MINE_NM
Mobile Plant #3
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 5
Hours worked: 3,126
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
5
Hours workedANNUAL_HRS
3126
Average hours per employeeAVG_EMPLOYEE_HOURS
625

Mine

Mine IDMINE_ID
5001766
Mine name in this fileCURR_MINE_NM
Mobile Plant #3
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 2,106
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
2106
Average hours per employeeAVG_EMPLOYEE_HOURS
527

Mine

Mine IDMINE_ID
5001766
Mine name in this fileCURR_MINE_NM
Mobile Plant #3
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 2,588
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
2588
Average hours per employeeAVG_EMPLOYEE_HOURS
863

Mine

Mine IDMINE_ID
5001766
Mine name in this fileCURR_MINE_NM
Mobile Plant #3
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 5
Hours worked: 2,862
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
5
Hours workedANNUAL_HRS
2862
Average hours per employeeAVG_EMPLOYEE_HOURS
572

Mine

Mine IDMINE_ID
5001766
Mine name in this fileCURR_MINE_NM
Mobile Plant #3
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Anchorage AK Field Office
Nearest town
North Pole
Days worked per week
6
Hours per shift
10
Production shifts per day
2
Maintenance shifts per day
0
Employees, current record
4
Tailing ponds
0
Safety committee
N
Portable operation
Y
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Mobile Plant #3
Mine IDMINE_ID
5001766
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Intermittent
Status sinceCURRENT_STATUS_DT
Mar 29, 2005
Legal entity typeCOMPANY_TYPE
Corporation
Portable minePORTABLE_OPERATION
Y
Portable mine FIPS state codePORTABLE_FIPS_ST_CD
02

Operator and controller

OperatorCURRENT_OPERATOR_NAME
University Redi-Mix
Operator IDCURRENT_OPERATOR_ID
0070323
ControllerCURRENT_CONTROLLER_NAME
Colas S A
Controller IDCURRENT_CONTROLLER_ID
M03183
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Nov 1, 2004

Location and MSHA office

StateSTATE
AK
Bureau of Mines state codeBOM_STATE_CD
50
FIPS county codeFIPS_CNTY_CD
090
FIPS county nameFIPS_CNTY_NM
Fairbanks North Star
Nearest townNEAREST_TOWN
North Pole
MSHA districtDISTRICT
M7
MSHA office codeOFFICE_CD
M7861
MSHA officeOFFICE_NAME
Anchorage AK Field Office
Most recent assessment control numberASSESS_CTRL_NO
000566610

Commodity

Primary commodity (SIC)PRIMARY_SIC
Construction Sand and Gravel
Primary commodity codePRIMARY_SIC_CD
144200
Primary SIC codePRIMARY_SIC_CD_1
1442
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
SandAndGravel
Primary industry group codePRIMARY_CANVASS_CD
5

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
6
Hours per shiftHOURS_PER_SHIFT
10
Production shifts per dayPROD_SHIFTS_PER_DAY
2
Workers employedNO_EMPLOYEES
4
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y

Recorded as 0 (3)

Driving miles from the MSHA officeMILES_FROM_OFFICE, Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (4)

Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (14)

Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) statusCURRENT_103I, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: University Redi-Mix
From: Nov 1, 2004
To: No end date
Controller: Colas S A
From : Sep 1, 2000
To : No end date
Details

Operator

OperatorOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Operator fromOPERATOR_START_DT
Nov 1, 2004

Controller

ControllerCONTROLLER_NAME
Colas S A
Controller IDCONTROLLER_ID
M03183
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Sep 1, 2000

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, Controller toCONTROLLER_END_DT

Operator: University Redi-Mix
From: Nov 1, 2004
To: No end date
Controller: Not shown
From : Mar 1, 1995
To : Aug 31, 2000
Details

Operator

OperatorOPERATOR_NAME
University Redi-Mix
Operator IDOPERATOR_ID
0070323
Operator fromOPERATOR_START_DT
Nov 1, 2004

Controller

Controller IDCONTROLLER_ID
M10707
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Mar 1, 1995
Controller toCONTROLLER_END_DT
Aug 31, 2000

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME

Operator: Exclusive Landscaping & Paving Inc.
From: May 15, 2003
To: Oct 31, 2004
Controller: Not shown
From : May 1, 1995
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Exclusive Landscaping & Paving Inc.
Operator IDOPERATOR_ID
L14140
Operator fromOPERATOR_START_DT
May 15, 2003
Operator toOPERATOR_END_DT
Oct 31, 2004

Controller

Controller IDCONTROLLER_ID
M10806
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
May 1, 1995

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

As MSHA records it, newest operator first.

Address of record

University Redi-Mix·Contact title Director Of Risk Managment·4000 Old Seward Highway, Suite 101, Anchorage AK 99503

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
University Redi-Mix
Contact titleCONTACT_TITLE
Director Of Risk Managment
StreetSTREET
4000 Old Seward Highway, Suite 101
CityCITY
Anchorage
StateSTATE_ABBR
AK
State nameSTATE
Alaska
ZIP codeZIP_CD
99503
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
02

Mine

Mine IDMINE_ID
5001766
Mine name in this fileMINE_NAME
Mobile Plant #3
Nearest townNEAREST_TOWN
North Pole
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Intermittent
Status sinceMINE_STATUS_DT
Mar 29, 2005
Primary commodity (SIC)PRIMARY_SIC_CD
Construction Sand and Gravel
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 13, 2026. Data and methodology