45
since Jun 8, 2008 · 45 to the operator, 0 to contractors · 16 marked S&S
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Accident, injury or illness reports
None on record
MSHA's file starts January 2000
Yearly employment and hours
8 years
one row per part of the mine

MSHA records as of Nov 6, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Verbal Hazard Complaint Inspections
Aug 10, 2026Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Aug 10, 2026
Closed outINSPECTION_END_DT
Aug 10, 2026
ActivityACTIVITY
Verbal Hazard Complaint Inspections
Activity codeACTIVITY_CODE
E04
Program areaPROGRAM_AREA
M/NM--Verbal Hazard Complaint Inspections
Event numberEVENT_NO
F02C1C9
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Controller IDCONTROLLER_ID
0133101
Mine IDMINE_ID
5001874
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 9 to Aug 12, 2026Inspectors 1 | Hours on site 4.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 9, 2026
Closed outINSPECTION_END_DT
Aug 12, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F02C1CA
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
39

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Controller IDCONTROLLER_ID
0133101
Mine IDMINE_ID
5001874
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 13, 2020Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
Jul 13, 2020
Closed outINSPECTION_END_DT
Jul 13, 2020
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1153192
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
19

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Controller IDCONTROLLER_ID
0133101
Mine IDMINE_ID
5001874
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 12, 2019Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
Aug 12, 2019
Closed outINSPECTION_END_DT
Aug 12, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1153908
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
11.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Controller IDCONTROLLER_ID
0133101
Mine IDMINE_ID
5001874
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Sep 19, 2018Inspectors 1 | Hours on site 2.5

The inspection

BeganINSPECTION_BEGIN_DT
Sep 19, 2018
Closed outINSPECTION_END_DT
Sep 19, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1153864
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
9

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Controller IDCONTROLLER_ID
0133101
Mine IDMINE_ID
5001874
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 18 to Aug 19, 2016Inspectors 1 | Hours on site 5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 18, 2016
Closed outINSPECTION_END_DT
Aug 19, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6666953
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
5
Total inspection hoursSUM_TOTAL_INSP_HOURS
11

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Mine IDMINE_ID
5001874
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Mine Idle Activity
Aug 25 to Aug 26, 2015Inspectors 1 | Hours on site 2.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 25, 2015
Closed outINSPECTION_END_DT
Aug 26, 2015
ActivityACTIVITY
Mine Idle Activity
Activity codeACTIVITY_CODE
E28
Program areaPROGRAM_AREA
M/NM--Mine Idle Activity
Event numberEVENT_NO
6666566
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
9

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Mine IDMINE_ID
5001874
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 4, 2011Inspectors 1 | Hours on site 4

The inspection

BeganINSPECTION_BEGIN_DT
Aug 4, 2011
Closed outINSPECTION_END_DT
Aug 4, 2011
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1140997
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4
Total inspection hoursSUM_TOTAL_INSP_HOURS
7.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Mine IDMINE_ID
5001874
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Mine Idle Activity
Aug 26, 2010Inspectors 1 | Hours on site 0.5

The inspection

BeganINSPECTION_BEGIN_DT
Aug 26, 2010
Closed outINSPECTION_END_DT
Aug 26, 2010
ActivityACTIVITY
Mine Idle Activity
Activity codeACTIVITY_CODE
E28
Program areaPROGRAM_AREA
M/NM--Mine Idle Activity
Event numberEVENT_NO
1140966
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
8.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Mine IDMINE_ID
5001874
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Spot Inspection
May 12, 2010Inspectors 1 | Hours on site 0.5

The inspection

BeganINSPECTION_BEGIN_DT
May 12, 2010
Closed outINSPECTION_END_DT
May 12, 2010
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
1153057
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
4.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Mine IDMINE_ID
5001874
Calendar yearCAL_YR
2010
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2010
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 30 to Jun 1, 2009Inspectors 1 | Hours on site 1.75

The inspection

BeganINSPECTION_BEGIN_DT
May 30, 2009
Closed outINSPECTION_END_DT
Jun 1, 2009
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1140671
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
9.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Mine IDMINE_ID
5001874
Calendar yearCAL_YR
2009
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Compliance Follow-up Inspection
Jun 22 to Jun 25, 2008Inspectors 1 | Hours on site 4.75

The inspection

BeganINSPECTION_BEGIN_DT
Jun 22, 2008
Closed outINSPECTION_END_DT
Jun 25, 2008
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
1140254
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
15.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Mine IDMINE_ID
5001874
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 8 to Jun 11, 2008Inspectors 1 | Hours on site 10.5

The inspection

BeganINSPECTION_BEGIN_DT
Jun 8, 2008
Closed outINSPECTION_END_DT
Jun 11, 2008
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1140244
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
20.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Mine IDMINE_ID
5001874
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

13 inspections and other MSHA visits since Jun 8, 2008; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Aug 10, 2026
Type: Citation
Standard: 56.18002(b)
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $245.00
Details

The citation

Citation or order numberVIOLATION_NO
9687774
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 10, 2026
Time issuedVIOLATION_ISSUE_TIME
1220
Date of occurrenceVIOLATION_OCCUR_DT
Aug 10, 2026
30 CFR part and sectionPART_SECTION
56.18002(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 14, 2026
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Aug 14, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Aug 13, 2026
Terminated, timeTERMINATION_TIME
0935
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
245
Current proposed assessmentAMOUNT_DUE
245
Bill first printedBILL_PRINT_DT
Oct 7, 2026
Last actionLAST_ACTION_CD
Proposed
Last action dateLAST_ACTION_DT
Oct 7, 2026

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
0133101
Inspection eventEVENT_NO
F02C1CA
Inspection beganINSPECTION_BEGIN_DT
Aug 9, 2026
Inspection closed outINSPECTION_END_DT
Aug 12, 2026
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 10, 2026
Type: Citation
Standard: 56.14103(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9687772
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 10, 2026
Time issuedVIOLATION_ISSUE_TIME
1306
Date of occurrenceVIOLATION_OCCUR_DT
Aug 10, 2026
30 CFR part and sectionPART_SECTION
56.14103(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 28, 2026
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Aug 28, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Aug 28, 2026
Terminated, timeTERMINATION_TIME
1220
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Bill first printedBILL_PRINT_DT
Oct 7, 2026
Last actionLAST_ACTION_CD
Proposed
Last action dateLAST_ACTION_DT
Oct 7, 2026

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
0133101
Inspection eventEVENT_NO
F02C1CA
Inspection beganINSPECTION_BEGIN_DT
Aug 9, 2026
Inspection closed outINSPECTION_END_DT
Aug 12, 2026
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 10, 2026
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9687773
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 10, 2026
Time issuedVIOLATION_ISSUE_TIME
1215
Date of occurrenceVIOLATION_OCCUR_DT
Aug 10, 2026
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 11, 2026
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Aug 11, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Aug 10, 2026
Terminated, timeTERMINATION_TIME
1215
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Bill first printedBILL_PRINT_DT
Oct 7, 2026
Last actionLAST_ACTION_CD
Proposed
Last action dateLAST_ACTION_DT
Oct 7, 2026

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
0133101
Inspection eventEVENT_NO
F02C1CA
Inspection beganINSPECTION_BEGIN_DT
Aug 9, 2026
Inspection closed outINSPECTION_END_DT
Aug 12, 2026
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (4)

Persons potentially affectedNO_AFFECTED, Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 10, 2026
Type: Citation
Standard: 56.6306(e)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $398.00
Details

The citation

Citation or order numberVIOLATION_NO
9687770
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 10, 2026
Time issuedVIOLATION_ISSUE_TIME
1005
Date of occurrenceVIOLATION_OCCUR_DT
Aug 10, 2026
30 CFR part and sectionPART_SECTION
56.6306(e)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
2
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 10, 2026
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Sep 10, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Aug 28, 2026
Terminated, timeTERMINATION_TIME
1220
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
398
Current proposed assessmentAMOUNT_DUE
398
Bill first printedBILL_PRINT_DT
Oct 7, 2026
Last actionLAST_ACTION_CD
Proposed
Last action dateLAST_ACTION_DT
Oct 7, 2026

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
0133101
Inspection eventEVENT_NO
F02C1C9
Inspection beganINSPECTION_BEGIN_DT
Aug 10, 2026
Inspection closed outINSPECTION_END_DT
Aug 10, 2026
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 10, 2026
Type: Citation
Standard: 56.23002(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9687775
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 10, 2026
Time issuedVIOLATION_ISSUE_TIME
1233
Date of occurrenceVIOLATION_OCCUR_DT
Aug 10, 2026
30 CFR part and sectionPART_SECTION
56.23002(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 10, 2026
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Sep 10, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Aug 28, 2026
Terminated, timeTERMINATION_TIME
1220
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Bill first printedBILL_PRINT_DT
Oct 7, 2026
Last actionLAST_ACTION_CD
Proposed
Last action dateLAST_ACTION_DT
Oct 7, 2026

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
0133101
Inspection eventEVENT_NO
F02C1CA
Inspection beganINSPECTION_BEGIN_DT
Aug 9, 2026
Inspection closed outINSPECTION_END_DT
Aug 12, 2026
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Amount paidAMOUNT_PAID, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Final order dateFINAL_ORDER_ISSUE_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 13, 2020
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $123.00
Details

The citation

Citation or order numberVIOLATION_NO
9435621
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 13, 2020
Time issuedVIOLATION_ISSUE_TIME
1100
Date of occurrenceVIOLATION_OCCUR_DT
Jul 13, 2020
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 13, 2020
Originally due, timeORIG_TERM_DUE_TIME
1101
Latest dueLATEST_TERM_DUE_DT
Jul 13, 2020
Latest due, timeLATEST_TERM_DUE_TIME
1101
TerminatedTERMINATION_DT
Jul 13, 2020
Terminated, timeTERMINATION_TIME
1101
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
123
Current proposed assessmentAMOUNT_DUE
123
Amount paidAMOUNT_PAID
123
Bill first printedBILL_PRINT_DT
Sep 9, 2020
Final order dateFINAL_ORDER_ISSUE_DT
Dec 12, 2020
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 2, 2023
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
0133101
Inspection eventEVENT_NO
1153192
Inspection beganINSPECTION_BEGIN_DT
Jul 13, 2020
Inspection closed outINSPECTION_END_DT
Jul 13, 2020
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 13, 2020
Type: Citation
Standard: 56.12004
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $123.00
Details

The citation

Citation or order numberVIOLATION_NO
9435620
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 13, 2020
Time issuedVIOLATION_ISSUE_TIME
0950
Date of occurrenceVIOLATION_OCCUR_DT
Jul 13, 2020
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 13, 2020
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Jul 13, 2020
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jul 13, 2020
Terminated, timeTERMINATION_TIME
0957
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
123
Current proposed assessmentAMOUNT_DUE
123
Amount paidAMOUNT_PAID
123
Bill first printedBILL_PRINT_DT
Sep 9, 2020
Final order dateFINAL_ORDER_ISSUE_DT
Dec 12, 2020
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 2, 2023
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
0133101
Inspection eventEVENT_NO
1153192
Inspection beganINSPECTION_BEGIN_DT
Jul 13, 2020
Inspection closed outINSPECTION_END_DT
Jul 13, 2020
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 19, 2016
Type: Citation
Standard: 56.4201(a)(2)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $114.00
Details

The citation

Citation or order numberVIOLATION_NO
8881365
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 19, 2016
Time issuedVIOLATION_ISSUE_TIME
1020
Date of occurrenceVIOLATION_OCCUR_DT
Aug 19, 2016
30 CFR part and sectionPART_SECTION
56.4201(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 19, 2016
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Aug 19, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1300
TerminatedTERMINATION_DT
Aug 19, 2016
Terminated, timeTERMINATION_TIME
1310
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
114
Current proposed assessmentAMOUNT_DUE
114
Amount paidAMOUNT_PAID
114
Bill first printedBILL_PRINT_DT
Oct 5, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Nov 10, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 14, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
6666953
Inspection beganINSPECTION_BEGIN_DT
Aug 18, 2016
Inspection closed outINSPECTION_END_DT
Aug 19, 2016
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 26, 2015
Type: Citation
Standard: 56.1000
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8881061
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 26, 2015
Time issuedVIOLATION_ISSUE_TIME
0900
Date of occurrenceVIOLATION_OCCUR_DT
Aug 26, 2015
30 CFR part and sectionPART_SECTION
56.1000
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 26, 2015
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Aug 26, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Aug 26, 2015
Terminated, timeTERMINATION_TIME
0950
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Oct 7, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Nov 14, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Apr 22, 2016

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
6666566
Inspection beganINSPECTION_BEGIN_DT
Aug 25, 2015
Inspection closed outINSPECTION_END_DT
Aug 26, 2015
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (3)

Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 4, 2011
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8601015
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 4, 2011
Time issuedVIOLATION_ISSUE_TIME
1435
Date of occurrenceVIOLATION_OCCUR_DT
Aug 4, 2011
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 4, 2011
Originally due, timeORIG_TERM_DUE_TIME
1435
Latest dueLATEST_TERM_DUE_DT
Aug 4, 2011
Latest due, timeLATEST_TERM_DUE_TIME
1435
TerminatedTERMINATION_DT
Aug 4, 2011
Terminated, timeTERMINATION_TIME
1435
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 7, 2011
Final order dateFINAL_ORDER_ISSUE_DT
Oct 14, 2011
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 13, 2011
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140997
Inspection beganINSPECTION_BEGIN_DT
Aug 4, 2011
Inspection closed outINSPECTION_END_DT
Aug 4, 2011
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2011
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2011
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 30, 2009
Type: Citation
Standard: 56.14112(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $176.00
Details

The citation

Citation or order numberVIOLATION_NO
6478579
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 30, 2009
Time issuedVIOLATION_ISSUE_TIME
1510
Date of occurrenceVIOLATION_OCCUR_DT
May 30, 2009
30 CFR part and sectionPART_SECTION
56.14112(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 30, 2009
Originally due, timeORIG_TERM_DUE_TIME
1510
Latest dueLATEST_TERM_DUE_DT
May 30, 2009
Latest due, timeLATEST_TERM_DUE_TIME
1510
TerminatedTERMINATION_DT
May 30, 2009
Terminated, timeTERMINATION_TIME
1520
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
176
Current proposed assessmentAMOUNT_DUE
176
Amount paidAMOUNT_PAID
176
Bill first printedBILL_PRINT_DT
Jul 8, 2009
Final order dateFINAL_ORDER_ISSUE_DT
Aug 12, 2009
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 14, 2009
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
24
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140671
Inspection beganINSPECTION_BEGIN_DT
May 30, 2009
Inspection closed outINSPECTION_END_DT
Jun 1, 2009
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2009
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: May 30, 2009
Type: Citation
Standard: 56.11002
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $873.00
Details

The citation

Citation or order numberVIOLATION_NO
6478578
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
May 30, 2009
Time issuedVIOLATION_ISSUE_TIME
1531
Date of occurrenceVIOLATION_OCCUR_DT
May 30, 2009
30 CFR part and sectionPART_SECTION
56.11002
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
May 30, 2009
Originally due, timeORIG_TERM_DUE_TIME
1631
Latest dueLATEST_TERM_DUE_DT
May 30, 2009
Latest due, timeLATEST_TERM_DUE_TIME
1631
TerminatedTERMINATION_DT
May 30, 2009
Terminated, timeTERMINATION_TIME
1545
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
873
Current proposed assessmentAMOUNT_DUE
873
Amount paidAMOUNT_PAID
873
Bill first printedBILL_PRINT_DT
Jul 8, 2009
Final order dateFINAL_ORDER_ISSUE_DT
May 28, 2011
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jun 14, 2011
ContestedCONTESTED_IND
Y
Most recent docket status dateCONTESTED_DT
Aug 12, 2009
Docket numberDOCKET_NO
WEST 2009-1249M
Docket statusDOCKET_STATUS_CD
Accepted
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
24
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140671
Inspection beganINSPECTION_BEGIN_DT
May 30, 2009
Inspection closed outINSPECTION_END_DT
Jun 1, 2009
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2009
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2009
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (2)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND

Not recorded by MSHA (11)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 22, 2008
Type: Order
Standard: 56.14100(b)
S&S: Not recorded
Negligence: Not recorded
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
6444321
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Jun 22, 2008
Time issuedVIOLATION_ISSUE_TIME
1605
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2008
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(b)
Primary mine or millPRIMARY_OR_MILL
Primary
Preceding citationINITIAL_VIOL_NO
6444287

Abatement

TerminatedTERMINATION_DT
May 30, 2009
Terminated, timeTERMINATION_TIME
1445
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140254
Inspection beganINSPECTION_BEGIN_DT
Jun 22, 2008
Inspection closed outINSPECTION_END_DT
Jun 25, 2008
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (30)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 22, 2008
Type: Order
Standard: 56.14107(a)
S&S: Not recorded
Negligence: Not recorded
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
6444318
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Jun 22, 2008
Time issuedVIOLATION_ISSUE_TIME
1545
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2008
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(b)
Primary mine or millPRIMARY_OR_MILL
Primary
Preceding citationINITIAL_VIOL_NO
6444282

Abatement

TerminatedTERMINATION_DT
May 30, 2009
Terminated, timeTERMINATION_TIME
1415
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140254
Inspection beganINSPECTION_BEGIN_DT
Jun 22, 2008
Inspection closed outINSPECTION_END_DT
Jun 25, 2008
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (30)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 22, 2008
Type: Order
Standard: 56.14107(a)
S&S: Not recorded
Negligence: Not recorded
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
6444316
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Jun 22, 2008
Time issuedVIOLATION_ISSUE_TIME
1544
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2008
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(b)
Primary mine or millPRIMARY_OR_MILL
Primary
Preceding citationINITIAL_VIOL_NO
6444280

Abatement

TerminatedTERMINATION_DT
May 30, 2009
Terminated, timeTERMINATION_TIME
1400
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140254
Inspection beganINSPECTION_BEGIN_DT
Jun 22, 2008
Inspection closed outINSPECTION_END_DT
Jun 25, 2008
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (30)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 22, 2008
Type: Order
Standard: 56.12028
S&S: Not recorded
Negligence: Not recorded
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
6444322
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Jun 22, 2008
Time issuedVIOLATION_ISSUE_TIME
1600
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2008
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(b)
Primary mine or millPRIMARY_OR_MILL
Primary
Preceding citationINITIAL_VIOL_NO
6444289

Abatement

TerminatedTERMINATION_DT
May 30, 2009
Terminated, timeTERMINATION_TIME
1450
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140254
Inspection beganINSPECTION_BEGIN_DT
Jun 22, 2008
Inspection closed outINSPECTION_END_DT
Jun 25, 2008
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (30)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 22, 2008
Type: Order
Standard: 56.12032
S&S: Not recorded
Negligence: Not recorded
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
6444315
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Jun 22, 2008
Time issuedVIOLATION_ISSUE_TIME
1537
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2008
30 CFR part and sectionPART_SECTION
56.12032
Section of the Act, primarySECTION_OF_ACT_1
104(b)
Primary mine or millPRIMARY_OR_MILL
Primary
Preceding citationINITIAL_VIOL_NO
6444275

Abatement

TerminatedTERMINATION_DT
May 30, 2009
Terminated, timeTERMINATION_TIME
1430
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140254
Inspection beganINSPECTION_BEGIN_DT
Jun 22, 2008
Inspection closed outINSPECTION_END_DT
Jun 25, 2008
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (30)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 22, 2008
Type: Order
Standard: 56.14107(a)
S&S: Not recorded
Negligence: Not recorded
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
6444317
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Jun 22, 2008
Time issuedVIOLATION_ISSUE_TIME
1542
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2008
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(b)
Primary mine or millPRIMARY_OR_MILL
Primary
Preceding citationINITIAL_VIOL_NO
6444281

Abatement

TerminatedTERMINATION_DT
May 30, 2009
Terminated, timeTERMINATION_TIME
1410
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140254
Inspection beganINSPECTION_BEGIN_DT
Jun 22, 2008
Inspection closed outINSPECTION_END_DT
Jun 25, 2008
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (30)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 22, 2008
Type: Order
Standard: 56.14107(a)
S&S: Not recorded
Negligence: Not recorded
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
6444319
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Jun 22, 2008
Time issuedVIOLATION_ISSUE_TIME
1548
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2008
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(b)
Primary mine or millPRIMARY_OR_MILL
Primary
Preceding citationINITIAL_VIOL_NO
6444283

Abatement

TerminatedTERMINATION_DT
May 30, 2009
Terminated, timeTERMINATION_TIME
1420
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140254
Inspection beganINSPECTION_BEGIN_DT
Jun 22, 2008
Inspection closed outINSPECTION_END_DT
Jun 25, 2008
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (30)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 22, 2008
Type: Order
Standard: 56.14107(a)
S&S: Not recorded
Negligence: Not recorded
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
6444311
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Jun 22, 2008
Time issuedVIOLATION_ISSUE_TIME
1535
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2008
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(b)
Primary mine or millPRIMARY_OR_MILL
Primary
Preceding citationINITIAL_VIOL_NO
6444278

Abatement

TerminatedTERMINATION_DT
May 30, 2009
Terminated, timeTERMINATION_TIME
1345
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140254
Inspection beganINSPECTION_BEGIN_DT
Jun 22, 2008
Inspection closed outINSPECTION_END_DT
Jun 25, 2008
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (30)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 22, 2008
Type: Order
Standard: 56.11002
S&S: Not recorded
Negligence: Not recorded
Issued to: Operator
Proposed penalty: None recorded
Details

The citation

Citation or order numberVIOLATION_NO
6444320
TypeCIT_ORD_SAFE
Order
IssuedVIOLATION_ISSUE_DT
Jun 22, 2008
Time issuedVIOLATION_ISSUE_TIME
1549
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2008
30 CFR part and sectionPART_SECTION
56.11002
Section of the Act, primarySECTION_OF_ACT_1
104(b)
Primary mine or millPRIMARY_OR_MILL
Primary
Preceding citationINITIAL_VIOL_NO
6444284

Abatement

TerminatedTERMINATION_DT
May 30, 2009
Terminated, timeTERMINATION_TIME
1440
Termination typeTERMINATION_TYPE
Terminated

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140254
Inspection beganINSPECTION_BEGIN_DT
Jun 22, 2008
Inspection closed outINSPECTION_END_DT
Jun 25, 2008
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (30)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Replaced by orderREPLACED_BY_ORDER_NO, Significant and substantialSIG_SUB, LikelihoodLIKELIHOOD, Expected injury or illnessINJ_ILLNESS, NegligenceNEGLIGENCE, Originally dueORIG_TERM_DUE_DT, Originally due, timeORIG_TERM_DUE_TIME, Latest dueLATEST_TERM_DUE_DT, Latest due, timeLATEST_TERM_DUE_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Proposed penaltyPROPOSED_PENALTY, Current proposed assessmentAMOUNT_DUE, Amount paidAMOUNT_PAID, Bill first printedBILL_PRINT_DT, Final order dateFINAL_ORDER_ISSUE_DT, Last actionLAST_ACTION_CD, Last action dateLAST_ACTION_DT, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 8, 2008
Type: Citation
Standard: 56.14132(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6444273
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 8, 2008
Time issuedVIOLATION_ISSUE_TIME
1022
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2008
30 CFR part and sectionPART_SECTION
56.14132(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 10, 2008
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Jun 10, 2008
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jun 22, 2008
Terminated, timeTERMINATION_TIME
1534
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Aug 6, 2008
Final order dateFINAL_ORDER_ISSUE_DT
Sep 13, 2008
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 2, 2008

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140244
Inspection beganINSPECTION_BEGIN_DT
Jun 8, 2008
Inspection closed outINSPECTION_END_DT
Jun 11, 2008
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 8, 2008
Type: Citation
Standard: 56.14100(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6444286
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 8, 2008
Time issuedVIOLATION_ISSUE_TIME
1136
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2008
30 CFR part and sectionPART_SECTION
56.14100(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 8, 2008
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jun 8, 2008
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jun 8, 2008
Terminated, timeTERMINATION_TIME
1531
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Aug 6, 2008
Final order dateFINAL_ORDER_ISSUE_DT
Sep 13, 2008
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 2, 2008

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140244
Inspection beganINSPECTION_BEGIN_DT
Jun 8, 2008
Inspection closed outINSPECTION_END_DT
Jun 11, 2008
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 8, 2008
Type: Citation
Standard: 56.9315
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6444279
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 8, 2008
Time issuedVIOLATION_ISSUE_TIME
1103
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2008
30 CFR part and sectionPART_SECTION
56.9315
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 8, 2008
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jun 8, 2008
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jun 8, 2008
Terminated, timeTERMINATION_TIME
1413
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Aug 6, 2008
Final order dateFINAL_ORDER_ISSUE_DT
Sep 13, 2008
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 2, 2008

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140244
Inspection beganINSPECTION_BEGIN_DT
Jun 8, 2008
Inspection closed outINSPECTION_END_DT
Jun 11, 2008
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 8, 2008
Type: Citation
Standard: 56.14107(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $270.00
Details

The citation

Citation or order numberVIOLATION_NO
6444281
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 8, 2008
Time issuedVIOLATION_ISSUE_TIME
1106
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2008
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary
Replaced by orderREPLACED_BY_ORDER_NO
6444317

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 9, 2008
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 9, 2008
Latest due, timeLATEST_TERM_DUE_TIME
1200
Termination typeTERMINATION_TYPE
ReplacedByOrder

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
270
Current proposed assessmentAMOUNT_DUE
270
Amount paidAMOUNT_PAID
270
Bill first printedBILL_PRINT_DT
Sep 10, 2008
Final order dateFINAL_ORDER_ISSUE_DT
Oct 22, 2008
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jan 2, 2009

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Hamilton Construction LLC
Operator IDVIOLATOR_ID
L16876
Controller IDCONTROLLER_ID
M12888
Inspection eventEVENT_NO
1140244
Inspection beganINSPECTION_BEGIN_DT
Jun 8, 2008
Inspection closed outINSPECTION_END_DT
Jun 11, 2008
Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2008
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2008
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (15)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, TerminatedTERMINATION_DT, Terminated, timeTERMINATION_TIME, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

45 citations and orders since Jun 8, 2008: 45 issued to the operator, 0 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Aug 10, 2026
Citation number: 9687772
Standard: 56.14103(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $0.00
Case status: Printed
Details

The assessment

Citation or order numberVIOLATION_NO
9687772
Assessment control numberASSESS_CASE_NO
000650511
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Printed
Case status dateASSESS_CASE_STATUS_DT
Oct 7, 2026
Citation issuedISSUE_DT
Aug 10, 2026
Date of occurrenceOCCURRENCE_DT
Aug 10, 2026
Bill first printedBILL_PRINT_DT
Oct 7, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2027
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14103(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
1520
Size of mineSIZE_OF_MINE
1520
Controller hours workedCONTROLLER_HRS
9520
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9520
History period startHISTORY_START_DT
May 10, 2025
History period endHISTORY_END_DT
Aug 9, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction LLC
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F02C1CA
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (18)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (3)

Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 10, 2026
Citation number: 9687770
Standard: 56.6306(e)
Proposed penalty: $398.00
Current assessment: $398.00
Paid against proposed penalty: $0.00
Case status: Printed
Details

The assessment

Citation or order numberVIOLATION_NO
9687770
Assessment control numberASSESS_CASE_NO
000650511
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Printed
Case status dateASSESS_CASE_STATUS_DT
Oct 7, 2026
Citation issuedISSUE_DT
Aug 10, 2026
Date of occurrenceOCCURRENCE_DT
Aug 10, 2026
Bill first printedBILL_PRINT_DT
Oct 7, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2027
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.6306(e)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
398.00
Current assessmentCURRENT_ASSESSMENT_AMT
398.00

Penalty points

Violation history pointsPENALTY_POINTS
72
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
2
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
1520
Size of mineSIZE_OF_MINE
1520
Controller hours workedCONTROLLER_HRS
9520
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9520
History period startHISTORY_START_DT
May 10, 2025
History period endHISTORY_END_DT
Aug 9, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction LLC
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F02C1C9
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (18)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (3)

Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 10, 2026
Citation number: 9687773
Standard: 50.30(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $0.00
Case status: Printed
Details

The assessment

Citation or order numberVIOLATION_NO
9687773
Assessment control numberASSESS_CASE_NO
000650511
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Printed
Case status dateASSESS_CASE_STATUS_DT
Oct 7, 2026
Citation issuedISSUE_DT
Aug 10, 2026
Date of occurrenceOCCURRENCE_DT
Aug 10, 2026
Bill first printedBILL_PRINT_DT
Oct 7, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2027
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
1520
Size of mineSIZE_OF_MINE
1520
Controller hours workedCONTROLLER_HRS
9520
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9520
History period startHISTORY_START_DT
May 10, 2025
History period endHISTORY_END_DT
Aug 9, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction LLC
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F02C1CA
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (21)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (3)

Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 10, 2026
Citation number: 9687774
Standard: 56.18002(b)
Proposed penalty: $245.00
Current assessment: $245.00
Paid against proposed penalty: $0.00
Case status: Printed
Details

The assessment

Citation or order numberVIOLATION_NO
9687774
Assessment control numberASSESS_CASE_NO
000650511
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Printed
Case status dateASSESS_CASE_STATUS_DT
Oct 7, 2026
Citation issuedISSUE_DT
Aug 10, 2026
Date of occurrenceOCCURRENCE_DT
Aug 10, 2026
Bill first printedBILL_PRINT_DT
Oct 7, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2027
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.18002(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
245.00
Current assessmentCURRENT_ASSESSMENT_AMT
245.00

Penalty points

Violation history pointsPENALTY_POINTS
66
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
1520
Size of mineSIZE_OF_MINE
1520
Controller hours workedCONTROLLER_HRS
9520
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9520
History period startHISTORY_START_DT
May 10, 2025
History period endHISTORY_END_DT
Aug 9, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction LLC
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F02C1CA
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (18)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (3)

Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 10, 2026
Citation number: 9687775
Standard: 56.23002(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $0.00
Case status: Printed
Details

The assessment

Citation or order numberVIOLATION_NO
9687775
Assessment control numberASSESS_CASE_NO
000650511
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Printed
Case status dateASSESS_CASE_STATUS_DT
Oct 7, 2026
Citation issuedISSUE_DT
Aug 10, 2026
Date of occurrenceOCCURRENCE_DT
Aug 10, 2026
Bill first printedBILL_PRINT_DT
Oct 7, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2027
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.23002(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
26
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
1520
Size of mineSIZE_OF_MINE
1520
Controller hours workedCONTROLLER_HRS
9520
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9520
History period startHISTORY_START_DT
May 10, 2025
History period endHISTORY_END_DT
Aug 9, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction LLC
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F02C1CA
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (18)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (3)

Final order dateFINAL_ORDER_DT, Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT, Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 13, 2020
Citation number: 9435621
Standard: 50.30(a)
Proposed penalty: $123.00
Current assessment: $123.00
Paid against proposed penalty: $123.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9435621
Assessment control numberASSESS_CASE_NO
000521633
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 18, 2021
Citation issuedISSUE_DT
Jul 13, 2020
Date of occurrenceOCCURRENCE_DT
Jul 13, 2020
Final order dateFINAL_ORDER_DT
Dec 12, 2020
Bill first printedBILL_PRINT_DT
Sep 9, 2020
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2020
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 12, 2020
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
123.00
Current assessmentCURRENT_ASSESSMENT_AMT
123.00
Mine Act interestMINEACT_INTEREST_AMT
1.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
123.00

Penalty points

Violation history pointsPENALTY_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
1791
Size of mineSIZE_OF_MINE
1791
Controller hours workedCONTROLLER_HRS
9791
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9791
History period startHISTORY_START_DT
Apr 13, 2019
History period endHISTORY_END_DT
Jul 12, 2020

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1153192
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (18)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 13, 2020
Citation number: 9435620
Standard: 56.12004
Proposed penalty: $123.00
Current assessment: $123.00
Paid against proposed penalty: $123.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9435620
Assessment control numberASSESS_CASE_NO
000521633
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Feb 18, 2021
Citation issuedISSUE_DT
Jul 13, 2020
Date of occurrenceOCCURRENCE_DT
Jul 13, 2020
Final order dateFINAL_ORDER_DT
Dec 12, 2020
Bill first printedBILL_PRINT_DT
Sep 9, 2020
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2020
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 12, 2020
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
123.00
Current assessmentCURRENT_ASSESSMENT_AMT
123.00
Mine Act interestMINEACT_INTEREST_AMT
0.81
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
123.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
1791
Size of mineSIZE_OF_MINE
1791
Controller hours workedCONTROLLER_HRS
9791
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9791
History period startHISTORY_START_DT
Apr 13, 2019
History period endHISTORY_END_DT
Jul 12, 2020

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1153192
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (15)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 19, 2016
Citation number: 8881365
Standard: 56.4201(a)(2)
Proposed penalty: $114.00
Current assessment: $114.00
Paid against proposed penalty: $114.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8881365
Assessment control numberASSESS_CASE_NO
000421876
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 14, 2016
Citation issuedISSUE_DT
Aug 19, 2016
Date of occurrenceOCCURRENCE_DT
Aug 19, 2016
Final order dateFINAL_ORDER_DT
Nov 10, 2016
Bill first printedBILL_PRINT_DT
Oct 5, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 10, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
114.00
Current assessmentCURRENT_ASSESSMENT_AMT
114.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
114.00

Penalty points

Violation history pointsPENALTY_POINTS
27
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
5404
Size of mineSIZE_OF_MINE
5404
Controller hours workedCONTROLLER_HRS
26699
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
26699
History period startHISTORY_START_DT
May 19, 2015
History period endHISTORY_END_DT
Aug 18, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6666953
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 26, 2015
Citation number: 8881061
Standard: 56.1000
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8881061
Assessment control numberASSESS_CASE_NO
000394033
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Apr 7, 2016
Citation issuedISSUE_DT
Aug 26, 2015
Date of occurrenceOCCURRENCE_DT
Aug 26, 2015
Final order dateFINAL_ORDER_DT
Nov 14, 2015
Bill first printedBILL_PRINT_DT
Oct 7, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 14, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.1000
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Mine Act interestMINEACT_INTEREST_AMT
1.27
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.27

Penalty points

Violation history pointsPENALTY_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Controller hours workedCONTROLLER_HRS
11211
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
11211
History period startHISTORY_START_DT
May 26, 2014
History period endHISTORY_END_DT
Aug 25, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6666566
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (20)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator hours worked at the mineVIOLATOR_MINE_HRS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Size of mineSIZE_OF_MINE, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 4, 2011
Citation number: 8601015
Standard: 56.14107(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8601015
Assessment control numberASSESS_CASE_NO
000266287
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 12, 2011
Citation issuedISSUE_DT
Aug 4, 2011
Date of occurrenceOCCURRENCE_DT
Aug 4, 2011
Final order dateFINAL_ORDER_DT
Oct 14, 2011
Bill first printedBILL_PRINT_DT
Sep 7, 2011
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2011
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 14, 2011
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
2107
Size of mineSIZE_OF_MINE
2107
Controller hours workedCONTROLLER_HRS
10141
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
10141
History period startHISTORY_START_DT
May 4, 2010
History period endHISTORY_END_DT
Aug 3, 2011

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140997
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 30, 2009
Citation number: 6478578
Standard: 56.11001
Proposed penalty: $873.00
Current assessment: $873.00
Paid against proposed penalty: $873.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6478578
Assessment control numberASSESS_CASE_NO
000190636
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 29, 2011
Citation issuedISSUE_DT
May 30, 2009
Date of occurrenceOCCURRENCE_DT
May 30, 2009
Final order dateFINAL_ORDER_DT
May 28, 2011
Bill first printedBILL_PRINT_DT
Jul 8, 2009
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2009
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
May 28, 2011
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11001
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
873.00
Current assessmentCURRENT_ASSESSMENT_AMT
873.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
873.00

Penalty points

Violation history pointsPENALTY_POINTS
87
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
24
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
6
Operator hours worked at the mineVIOLATOR_MINE_HRS
7792
Size of mineSIZE_OF_MINE
7792
Controller hours workedCONTROLLER_HRS
19316
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
19316
History period startHISTORY_START_DT
Feb 29, 2008
History period endHISTORY_END_DT
May 29, 2009

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140671
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: May 30, 2009
Citation number: 6478579
Standard: 56.14112(a)(2)
Proposed penalty: $176.00
Current assessment: $176.00
Paid against proposed penalty: $176.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6478579
Assessment control numberASSESS_CASE_NO
000190636
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Mar 29, 2011
Citation issuedISSUE_DT
May 30, 2009
Date of occurrenceOCCURRENCE_DT
May 30, 2009
Final order dateFINAL_ORDER_DT
Aug 12, 2009
Bill first printedBILL_PRINT_DT
Jul 8, 2009
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2009
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 12, 2009
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
176.00
Current assessmentCURRENT_ASSESSMENT_AMT
176.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
176.00

Penalty points

Violation history pointsPENALTY_POINTS
67
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS
25
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
24
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
6
Operator hours worked at the mineVIOLATOR_MINE_HRS
7792
Size of mineSIZE_OF_MINE
7792
Controller hours workedCONTROLLER_HRS
19316
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
19316
History period startHISTORY_START_DT
Feb 29, 2008
History period endHISTORY_END_DT
May 29, 2009

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140671
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 8, 2008
Citation number: 6444283
Standard: 56.14107(a)
Proposed penalty: $270.00
Current assessment: $270.00
Paid against proposed penalty: $270.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444283
Assessment control numberASSESS_CASE_NO
000162387
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 31, 2008
Citation issuedISSUE_DT
Jun 8, 2008
Date of occurrenceOCCURRENCE_DT
Jun 8, 2008
Final order dateFINAL_ORDER_DT
Oct 22, 2008
Bill first printedBILL_PRINT_DT
Sep 10, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 22, 2008
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
270.00
Current assessmentCURRENT_ASSESSMENT_AMT
270.00
Mine Act interestMINEACT_INTEREST_AMT
1.12
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
270.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.12

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4210
Size of mineSIZE_OF_MINE
4210
Controller hours workedCONTROLLER_HRS
20821
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
20821
History period startHISTORY_START_DT
Oct 4, 2007
History period endHISTORY_END_DT
Jun 7, 2008

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140244
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (15)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 8, 2008
Citation number: 6444285
Standard: 56.14132(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444285
Assessment control numberASSESS_CASE_NO
000159525
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 1, 2008
Citation issuedISSUE_DT
Jun 8, 2008
Date of occurrenceOCCURRENCE_DT
Jun 8, 2008
Final order dateFINAL_ORDER_DT
Sep 13, 2008
Bill first printedBILL_PRINT_DT
Aug 6, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 13, 2008
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Mine Act interestMINEACT_INTEREST_AMT
0.50
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4210
Size of mineSIZE_OF_MINE
4210
Controller hours workedCONTROLLER_HRS
20821
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
20821
History period startHISTORY_START_DT
Oct 4, 2007
History period endHISTORY_END_DT
Jun 7, 2008

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140244
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 8, 2008
Citation number: 6444279
Standard: 56.9315
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444279
Assessment control numberASSESS_CASE_NO
000159525
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 1, 2008
Citation issuedISSUE_DT
Jun 8, 2008
Date of occurrenceOCCURRENCE_DT
Jun 8, 2008
Final order dateFINAL_ORDER_DT
Sep 13, 2008
Bill first printedBILL_PRINT_DT
Aug 6, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 13, 2008
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9315
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Mine Act interestMINEACT_INTEREST_AMT
0.50
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
56
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4210
Size of mineSIZE_OF_MINE
4210
Controller hours workedCONTROLLER_HRS
20821
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
20821
History period startHISTORY_START_DT
Oct 4, 2007
History period endHISTORY_END_DT
Jun 7, 2008

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140244
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 8, 2008
Citation number: 6444276
Standard: 56.9300(b)
Proposed penalty: $243.00
Current assessment: $243.00
Paid against proposed penalty: $243.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444276
Assessment control numberASSESS_CASE_NO
000159525
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 1, 2008
Citation issuedISSUE_DT
Jun 8, 2008
Date of occurrenceOCCURRENCE_DT
Jun 8, 2008
Final order dateFINAL_ORDER_DT
Sep 13, 2008
Bill first printedBILL_PRINT_DT
Aug 6, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 13, 2008
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
243.00
Current assessmentCURRENT_ASSESSMENT_AMT
243.00
Mine Act interestMINEACT_INTEREST_AMT
1.22
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
243.00

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4210
Size of mineSIZE_OF_MINE
4210
Controller hours workedCONTROLLER_HRS
20821
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
20821
History period startHISTORY_START_DT
Oct 4, 2007
History period endHISTORY_END_DT
Jun 7, 2008

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140244
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 8, 2008
Citation number: 6444290
Standard: Not recorded
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444290
Assessment control numberASSESS_CASE_NO
000159525
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 1, 2008
Citation issuedISSUE_DT
Jun 8, 2008
Date of occurrenceOCCURRENCE_DT
Jun 8, 2008
Final order dateFINAL_ORDER_DT
Sep 13, 2008
Bill first printedBILL_PRINT_DT
Aug 6, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 13, 2008
Citation typeCITATION_TYPE_CD
Citation
Mine Act sectionMINE_ACT_SECTION_CD
109(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Mine Act interestMINEACT_INTEREST_AMT
0.50
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4210
Size of mineSIZE_OF_MINE
4210
Controller hours workedCONTROLLER_HRS
20821
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
20821
History period startHISTORY_START_DT
Oct 4, 2007
History period endHISTORY_END_DT
Jun 7, 2008

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140244
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (19)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

30 CFR standardCFR_STANDARD_CD

Issued: Jun 8, 2008
Citation number: 6444282
Standard: 56.14107(a)
Proposed penalty: $270.00
Current assessment: $270.00
Paid against proposed penalty: $270.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444282
Assessment control numberASSESS_CASE_NO
000162387
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 31, 2008
Citation issuedISSUE_DT
Jun 8, 2008
Date of occurrenceOCCURRENCE_DT
Jun 8, 2008
Final order dateFINAL_ORDER_DT
Oct 22, 2008
Bill first printedBILL_PRINT_DT
Sep 10, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 22, 2008
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
270.00
Current assessmentCURRENT_ASSESSMENT_AMT
270.00
Mine Act interestMINEACT_INTEREST_AMT
1.12
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
270.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.12

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4210
Size of mineSIZE_OF_MINE
4210
Controller hours workedCONTROLLER_HRS
20821
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
20821
History period startHISTORY_START_DT
Oct 4, 2007
History period endHISTORY_END_DT
Jun 7, 2008

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140244
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (15)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 8, 2008
Citation number: 6444272
Standard: 56.14100(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444272
Assessment control numberASSESS_CASE_NO
000159525
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 1, 2008
Citation issuedISSUE_DT
Jun 8, 2008
Date of occurrenceOCCURRENCE_DT
Jun 8, 2008
Final order dateFINAL_ORDER_DT
Sep 13, 2008
Bill first printedBILL_PRINT_DT
Aug 6, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 13, 2008
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Mine Act interestMINEACT_INTEREST_AMT
0.50
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4210
Size of mineSIZE_OF_MINE
4210
Controller hours workedCONTROLLER_HRS
20821
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
20821
History period startHISTORY_START_DT
Oct 4, 2007
History period endHISTORY_END_DT
Jun 7, 2008

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140244
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 8, 2008
Citation number: 6444275
Standard: 56.12032
Proposed penalty: $270.00
Current assessment: $270.00
Paid against proposed penalty: $270.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444275
Assessment control numberASSESS_CASE_NO
000162387
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 31, 2008
Citation issuedISSUE_DT
Jun 8, 2008
Date of occurrenceOCCURRENCE_DT
Jun 8, 2008
Final order dateFINAL_ORDER_DT
Oct 22, 2008
Bill first printedBILL_PRINT_DT
Sep 10, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 22, 2008
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12032
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
270.00
Current assessmentCURRENT_ASSESSMENT_AMT
270.00
Mine Act interestMINEACT_INTEREST_AMT
1.12
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
270.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.12

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4210
Size of mineSIZE_OF_MINE
4210
Controller hours workedCONTROLLER_HRS
20821
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
20821
History period startHISTORY_START_DT
Oct 4, 2007
History period endHISTORY_END_DT
Jun 7, 2008

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140244
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (15)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 8, 2008
Citation number: 6444280
Standard: 56.14107(a)
Proposed penalty: $270.00
Current assessment: $270.00
Paid against proposed penalty: $270.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444280
Assessment control numberASSESS_CASE_NO
000162387
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 31, 2008
Citation issuedISSUE_DT
Jun 8, 2008
Date of occurrenceOCCURRENCE_DT
Jun 8, 2008
Final order dateFINAL_ORDER_DT
Oct 22, 2008
Bill first printedBILL_PRINT_DT
Sep 10, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 22, 2008
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
270.00
Current assessmentCURRENT_ASSESSMENT_AMT
270.00
Mine Act interestMINEACT_INTEREST_AMT
1.12
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
270.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.12

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4210
Size of mineSIZE_OF_MINE
4210
Controller hours workedCONTROLLER_HRS
20821
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
20821
History period startHISTORY_START_DT
Oct 4, 2007
History period endHISTORY_END_DT
Jun 7, 2008

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140244
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (15)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 8, 2008
Citation number: 6444278
Standard: 56.14107(a)
Proposed penalty: $270.00
Current assessment: $270.00
Paid against proposed penalty: $270.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444278
Assessment control numberASSESS_CASE_NO
000162387
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 31, 2008
Citation issuedISSUE_DT
Jun 8, 2008
Date of occurrenceOCCURRENCE_DT
Jun 8, 2008
Final order dateFINAL_ORDER_DT
Oct 22, 2008
Bill first printedBILL_PRINT_DT
Sep 10, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 22, 2008
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
270.00
Current assessmentCURRENT_ASSESSMENT_AMT
270.00
Mine Act interestMINEACT_INTEREST_AMT
1.12
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
270.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.12

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4210
Size of mineSIZE_OF_MINE
4210
Controller hours workedCONTROLLER_HRS
20821
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
20821
History period startHISTORY_START_DT
Oct 4, 2007
History period endHISTORY_END_DT
Jun 7, 2008

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140244
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (15)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 8, 2008
Citation number: 6444293
Standard: 56.18010
Proposed penalty: $243.00
Current assessment: $243.00
Paid against proposed penalty: $243.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444293
Assessment control numberASSESS_CASE_NO
000159525
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 1, 2008
Citation issuedISSUE_DT
Jun 8, 2008
Date of occurrenceOCCURRENCE_DT
Jun 8, 2008
Final order dateFINAL_ORDER_DT
Sep 13, 2008
Bill first printedBILL_PRINT_DT
Aug 6, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 13, 2008
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.18010
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
243.00
Current assessmentCURRENT_ASSESSMENT_AMT
243.00
Mine Act interestMINEACT_INTEREST_AMT
1.22
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
243.00

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4210
Size of mineSIZE_OF_MINE
4210
Controller hours workedCONTROLLER_HRS
20821
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
20821
History period startHISTORY_START_DT
Oct 4, 2007
History period endHISTORY_END_DT
Jun 7, 2008

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140244
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 8, 2008
Citation number: 6444289
Standard: 56.12028
Proposed penalty: $270.00
Current assessment: $270.00
Paid against proposed penalty: $270.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444289
Assessment control numberASSESS_CASE_NO
000162387
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 31, 2008
Citation issuedISSUE_DT
Jun 8, 2008
Date of occurrenceOCCURRENCE_DT
Jun 8, 2008
Final order dateFINAL_ORDER_DT
Oct 22, 2008
Bill first printedBILL_PRINT_DT
Sep 10, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 22, 2008
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
270.00
Current assessmentCURRENT_ASSESSMENT_AMT
270.00
Mine Act interestMINEACT_INTEREST_AMT
1.12
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
270.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
1.12

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4210
Size of mineSIZE_OF_MINE
4210
Controller hours workedCONTROLLER_HRS
20821
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
20821
History period startHISTORY_START_DT
Oct 4, 2007
History period endHISTORY_END_DT
Jun 7, 2008

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140244
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (15)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Good faith reduction appliedGOOD_FAITH_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 8, 2008
Citation number: 6444277
Standard: 56.14112(b)
Proposed penalty: $243.00
Current assessment: $243.00
Paid against proposed penalty: $243.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6444277
Assessment control numberASSESS_CASE_NO
000159525
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 1, 2008
Citation issuedISSUE_DT
Jun 8, 2008
Date of occurrenceOCCURRENCE_DT
Jun 8, 2008
Final order dateFINAL_ORDER_DT
Sep 13, 2008
Bill first printedBILL_PRINT_DT
Aug 6, 2008
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2008
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 13, 2008
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14112(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
243.00
Current assessmentCURRENT_ASSESSMENT_AMT
243.00
Mine Act interestMINEACT_INTEREST_AMT
1.22
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
243.00

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
4210
Size of mineSIZE_OF_MINE
4210
Controller hours workedCONTROLLER_HRS
20821
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
20821
History period startHISTORY_START_DT
Oct 4, 2007
History period endHISTORY_END_DT
Jun 7, 2008

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Hamilton Construction
IDVIOLATOR_ID
L16876
Operator start at the mine, as assessedVIOLATOR_START_DT
Oct 4, 2007
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140244
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 36 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Contested citations and decisions

Contested: Aug 12, 2009
Citation issued: May 30, 2009
Docket: WEST 2009-1249M
Standard: 56.11001
Proposed penalty: $873.00
Penalty after decision: $873.00
Decided: Apr 27, 2011
Decision type: Settlement
Details

The contest

Citation or order numberCITATION_NO
6478578
Citation issuedCITATION_ISSUE_DT
May 30, 2009
Hearing request receivedCONTEST_DT
Aug 12, 2009
Docket numberDOCKET_NO
WEST 2009-1249M
Assessment typeASSESS_TYPE_CODE
Regular
Decided byDOCKET_DECISION_BY_CODE
ALJ
Judge, first nameJUDGE_FIRST_NAME
Robert
Judge, last nameJUDGE_LAST_NAME
Lesnick
Decision typeDOCKET_DECISION_TYPE_CODE
Settlement
DecidedDECISION_DT
Apr 27, 2011
Petition duePETITION_DUE_DT
Sep 26, 2009
Petition filedPETITION_FILED_DT
Sep 23, 2009

Penalty

Proposed penalty when contestedPROPOSED_PENALTY_AMT
873.00
Penalty after the decisionDECISION_PENALTY_AMT
873.00

When contested, and when decided

30 CFR standardCFR_STANDARD_CODE
56.11001
Type when contestedORIGINAL_CITATION_TYPE_CODE
Citation
Type when decidedDECISION_CITATION_TYPE_CODE
Citation
Section of the Act when contestedORIGINAL_PRIMARY_ACTION_CODE
104(a)
Section of the Act when decidedDECISION_PRIMARY_ACTION_CODE
104(a)
S&S when contestedORIGINAL_SIG_SUB_IND
Y
S&S when decidedDECISION_SIG_SUB_IND
Y
Likelihood when contestedORIGINAL_GRAVITY_LIKELIHOOD
Reasonably
Likelihood when decidedDECISION_GRAVITY_LIKELIHOOD
Reasonably
Persons potentially affected when contestedORIGINAL_GRAVITY_PERSONS
1
Persons potentially affected when decidedDECISION_GRAVITY_PERSONS
1
Expected injury or illness when contestedORIGINAL_GRAVITY_INJURY
Permanent
Expected injury or illness when decidedDECISION_GRAVITY_INJURY
Permanent
Negligence when contestedORIGINAL_NEGLIGENCE
ModNegligence
Negligence when decidedDECISION_NEGLIGENCE
ModNegligence

MSHA offices

Issuing program areaISSUING_PROGRAM_AREA
M/NM
Issuing districtISSUING_DISTRICT
M7000
MSHA representative program areaMSHA_REP_PROGRAM_AREA_CODE
M/NM
MSHA representative office codeMSHA_REP_OFFICE_CODE
M7000
MSHA representative officeMSHA_REP_OFFICE_NAME
Vacaville District

Mine

Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry

Other fields

ISSUING_FIELD_OFFICE
M7861

Not recorded by MSHA (2)

Petition extension datePETITION_EXTENSION_DT, Mine Act sectionMINE_ACT_SECTION_CODE

1 contested citation or order; decision types are MSHA's own text.

Employment and hours worked

Year: 2026
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 0
Hours worked: 0
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99

Mine

Mine IDMINE_ID
5001874
Mine name in this fileCURR_MINE_NM
#928 SC400 Big Rock Quarry
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (4)

Average employeesAVG_ANNUAL_EMPL, Hours workedANNUAL_HRS, Average hours per employeeAVG_EMPLOYEE_HOURS, Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 9
Hours worked: 15,176
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
9
Hours workedANNUAL_HRS
15176
Average hours per employeeAVG_EMPLOYEE_HOURS
1686

Mine

Mine IDMINE_ID
5001874
Mine name in this fileCURR_MINE_NM
#928 SC400 Big Rock Quarry
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 1,520
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
1520
Average hours per employeeAVG_EMPLOYEE_HOURS
760

Mine

Mine IDMINE_ID
5001874
Mine name in this fileCURR_MINE_NM
#928 SC400 Big Rock Quarry
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 1,936
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
1936
Average hours per employeeAVG_EMPLOYEE_HOURS
968

Mine

Mine IDMINE_ID
5001874
Mine name in this fileCURR_MINE_NM
#928 SC400 Big Rock Quarry
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 1,820
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
1820
Average hours per employeeAVG_EMPLOYEE_HOURS
910

Mine

Mine IDMINE_ID
5001874
Mine name in this fileCURR_MINE_NM
#928 SC400 Big Rock Quarry
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 1,973
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
1973
Average hours per employeeAVG_EMPLOYEE_HOURS
658

Mine

Mine IDMINE_ID
5001874
Mine name in this fileCURR_MINE_NM
#928 SC400 Big Rock Quarry
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2021
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 5
Hours worked: 1,086
Details

The report

YearCALENDAR_YR
2021
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
5
Hours workedANNUAL_HRS
1086
Average hours per employeeAVG_EMPLOYEE_HOURS
217

Mine

Mine IDMINE_ID
5001874
Mine name in this fileCURR_MINE_NM
#928 SC400 Big Rock Quarry
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2020
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 5
Hours worked: 920
Details

The report

YearCALENDAR_YR
2020
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
5
Hours workedANNUAL_HRS
920
Average hours per employeeAVG_EMPLOYEE_HOURS
184

Mine

Mine IDMINE_ID
5001874
Mine name in this fileCURR_MINE_NM
#928 SC400 Big Rock Quarry
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 2
Hours worked: 1,791
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
1791
Average hours per employeeAVG_EMPLOYEE_HOURS
896

Mine

Mine IDMINE_ID
5001874
Mine name in this fileCURR_MINE_NM
#928 SC400 Big Rock Quarry
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 8 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Anchorage AK Field Office
Nearest town
Skagway
Days worked per week
5
Hours per shift
8
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
12
Tailing ponds
0
103(i) spot inspection status
Never Had 103I Status
Safety committee
N
Portable operation
Y
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
#928 SC400 Big Rock Quarry
Mine IDMINE_ID
5001874
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Intermittent
Status sinceCURRENT_STATUS_DT
Aug 1, 2026
Legal entity typeCOMPANY_TYPE
Other
Portable minePORTABLE_OPERATION
Y
Portable mine FIPS state codePORTABLE_FIPS_ST_CD
02

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Hamilton Construction LLC
Operator IDCURRENT_OPERATOR_ID
L16876
Controller IDCURRENT_CONTROLLER_ID
0133101
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Oct 4, 2007

Location and MSHA office

StateSTATE
AK
Bureau of Mines state codeBOM_STATE_CD
50
FIPS county codeFIPS_CNTY_CD
230
FIPS county nameFIPS_CNTY_NM
Skagway
Nearest townNEAREST_TOWN
Skagway
MSHA districtDISTRICT
M7
MSHA office codeOFFICE_CD
M7861
MSHA officeOFFICE_NAME
Anchorage AK Field Office
Most recent assessment control numberASSESS_CTRL_NO
000650511

Commodity

Primary commodity (SIC)PRIMARY_SIC
Construction Sand and Gravel
Primary commodity codePRIMARY_SIC_CD
144200
Primary SIC codePRIMARY_SIC_CD_1
1442
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
SandAndGravel
Primary industry group codePRIMARY_CANVASS_CD
5

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
5
Hours per shiftHOURS_PER_SHIFT
8
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
12
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y
103(i) statusCURRENT_103I
Never Had 103I Status

Recorded as 0 (3)

Driving miles from the MSHA officeMILES_FROM_OFFICE, Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (4)

Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (14)

ControllerCURRENT_CONTROLLER_NAME, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: Hamilton Construction LLC
From: Oct 4, 2007
To: No end date
Controller: Not shown
From : Feb 24, 2017
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Operator fromOPERATOR_START_DT
Oct 4, 2007

Controller

Controller IDCONTROLLER_ID
0133101
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Feb 24, 2017

Mine

Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Hamilton Construction LLC
From: Oct 4, 2007
To: No end date
Controller: Not shown
From : Feb 24, 2017
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Operator fromOPERATOR_START_DT
Oct 4, 2007

Controller

Controller IDCONTROLLER_ID
0133101
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Feb 24, 2017

Mine

Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Hamilton Construction LLC
From: Oct 4, 2007
To: No end date
Controller: Not shown
From : Oct 1, 1999
To : Feb 23, 2017
Details

Operator

OperatorOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Operator fromOPERATOR_START_DT
Oct 4, 2007

Controller

Controller IDCONTROLLER_ID
M12888
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Oct 1, 1999
Controller toCONTROLLER_END_DT
Feb 23, 2017

Mine

Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME

Operator: Hamilton Construction LLC
From: Oct 4, 2007
To: No end date
Controller: Not shown
From : Oct 1, 1999
To : Feb 23, 2017
Details

Operator

OperatorOPERATOR_NAME
Hamilton Construction LLC
Operator IDOPERATOR_ID
L16876
Operator fromOPERATOR_START_DT
Oct 4, 2007

Controller

Controller IDCONTROLLER_ID
M12888
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Oct 1, 1999
Controller toCONTROLLER_END_DT
Feb 23, 2017

Mine

Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME

As MSHA records it, newest operator first.

Address of record

Hamilton Construction LLC·Contact title Member·Street not recorded, Skagway AK 99840

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Hamilton Construction LLC
Contact titleCONTACT_TITLE
Member
CityCITY
Skagway
StateSTATE_ABBR
AK
State nameSTATE
Alaska
ZIP codeZIP_CD
99840
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
02

Mine

Mine IDMINE_ID
5001874
Mine name in this fileMINE_NAME
#928 SC400 Big Rock Quarry
Nearest townNEAREST_TOWN
Skagway
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Intermittent
Status sinceMINE_STATUS_DT
Aug 1, 2026
Primary commodity (SIC)PRIMARY_SIC_CD
Construction Sand and Gravel
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 6, 2026. Data and methodology