Skip to content
SafetyRecord logoSafetyRecord

Wild Goose

Metal/Non-Metal, SurfaceGold OreFairbanks North Star, AlaskaMine ID 5001957

Operator Quasar Gold CorpController not shownMSHA status Intermittent since Oct 1, 2024

What MSHA has on file for this mine

Citations and orders
31
since Aug 12, 2014 · 31 to the operator, 0 to contractors · 6 marked S&S
Contested citations
None on record
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Accident, injury or illness reports
None on record
MSHA's file starts January 2000
Yearly employment and hours
4 years
one row per part of the mine

MSHA records as of Nov 13, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Compliance Follow-up Inspection
Jul 29 to Jul 31, 2026Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Jul 29, 2026
Closed outINSPECTION_END_DT
Jul 31, 2026
ActivityACTIVITY
Compliance Follow-up Inspection
Activity codeACTIVITY_CODE
E15
Program areaPROGRAM_AREA
M/NM--Compliance Follow-up Inspection
Event numberEVENT_NO
F0381F3
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
17.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Quasar Gold Corp
Operator IDOPERATOR_ID
0197393
Controller IDCONTROLLER_ID
0186681
Mine IDMINE_ID
5001957
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 17 to Jun 18, 2026Inspectors 1 | Hours on site 8

The inspection

BeganINSPECTION_BEGIN_DT
Jun 17, 2026
Closed outINSPECTION_END_DT
Jun 18, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F03B9AA
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8
Total inspection hoursSUM_TOTAL_INSP_HOURS
29.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Quasar Gold Corp
Operator IDOPERATOR_ID
0197393
Controller IDCONTROLLER_ID
0186681
Mine IDMINE_ID
5001957
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 11, 2025Inspectors 1 | Hours on site 3.75

The inspection

BeganINSPECTION_BEGIN_DT
Aug 11, 2025
Closed outINSPECTION_END_DT
Aug 11, 2025
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F022F39
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
12

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Quasar Gold Corp
Operator IDOPERATOR_ID
0197393
Controller IDCONTROLLER_ID
0186681
Mine IDMINE_ID
5001957
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 3, 2019Inspectors 1 | Hours on site 3.75

The inspection

BeganINSPECTION_BEGIN_DT
Aug 3, 2019
Closed outINSPECTION_END_DT
Aug 3, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1124566
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
11.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
North Star Mining
Operator IDOPERATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Mine IDMINE_ID
5001957
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Aug 6 to Aug 9, 2018Inspectors 1 | Hours on site 12.75

The inspection

BeganINSPECTION_BEGIN_DT
Aug 6, 2018
Closed outINSPECTION_END_DT
Aug 9, 2018
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6722773
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
12.75
Total inspection hoursSUM_TOTAL_INSP_HOURS
26.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
North Star Mining
Operator IDOPERATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Mine IDMINE_ID
5001957
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Spot Inspection
Sep 16 to Sep 17, 2017Inspectors 1 | Hours on site 12.25

The inspection

BeganINSPECTION_BEGIN_DT
Sep 16, 2017
Closed outINSPECTION_END_DT
Sep 17, 2017
ActivityACTIVITY
Spot Inspection
Activity codeACTIVITY_CODE
E16
Program areaPROGRAM_AREA
M/NM--Spot Inspection
Event numberEVENT_NO
1146244
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
12.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
20

Who and when, as recorded

Operator at the timeOPERATOR_NAME
North Star Mining
Operator IDOPERATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Mine IDMINE_ID
5001957
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Regular Safety and Health Inspection
Jul 25, 2017Inspectors 1 | Hours on site 7

The inspection

BeganINSPECTION_BEGIN_DT
Jul 25, 2017
Closed outINSPECTION_END_DT
Jul 25, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6723145
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
7
Total inspection hoursSUM_TOTAL_INSP_HOURS
18

Who and when, as recorded

Operator at the timeOPERATOR_NAME
North Star Mining
Operator IDOPERATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Mine IDMINE_ID
5001957
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (2)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE

Verbal Hazard Complaint Inspections
Jul 30 to Jul 31, 2016Inspectors 1 | Hours on site 3.25

The inspection

BeganINSPECTION_BEGIN_DT
Jul 30, 2016
Closed outINSPECTION_END_DT
Jul 31, 2016
ActivityACTIVITY
Verbal Hazard Complaint Inspections
Activity codeACTIVITY_CODE
E04
Program areaPROGRAM_AREA
M/NM--Verbal Hazard Complaint Inspections
Event numberEVENT_NO
1140477
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
27.75

Who and when, as recorded

Operator at the timeOPERATOR_NAME
North Star Mining
Operator IDOPERATOR_ID
0146255
Controller IDCONTROLLER_ID
0127281
Mine IDMINE_ID
5001957
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Aug 12, 2014Inspectors 1 | Hours on site 2

The inspection

BeganINSPECTION_BEGIN_DT
Aug 12, 2014
Closed outINSPECTION_END_DT
Aug 12, 2014
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6594448
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
2
Total inspection hoursSUM_TOTAL_INSP_HOURS
12.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Billy M Dobson
Operator IDOPERATOR_ID
0123090
Controller IDCONTROLLER_ID
0104533
Mine IDMINE_ID
5001957
Calendar yearCAL_YR
2014
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2014
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

9 inspections and other MSHA visits since Aug 12, 2014; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Jun 18, 2026
Type: Citation
Standard: 56.14132(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5100888
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 18, 2026
Time issuedVIOLATION_ISSUE_TIME
1535
Date of occurrenceVIOLATION_OCCUR_DT
Jun 18, 2026
30 CFR part and sectionPART_SECTION
56.14132(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
2
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 9, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Aug 10, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jul 30, 2026
Terminated, timeTERMINATION_TIME
1200
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 24, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Quasar Gold Corp
Operator IDVIOLATOR_ID
0197393
Controller IDCONTROLLER_ID
0186681
Inspection eventEVENT_NO
F03B9AA
Inspection beganINSPECTION_BEGIN_DT
Jun 17, 2026
Inspection closed outINSPECTION_END_DT
Jun 18, 2026
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 18, 2026
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5100887
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 18, 2026
Time issuedVIOLATION_ISSUE_TIME
1423
Date of occurrenceVIOLATION_OCCUR_DT
Jun 18, 2026
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
2
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 9, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Aug 3, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jul 30, 2026
Terminated, timeTERMINATION_TIME
1201
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 24, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Quasar Gold Corp
Operator IDVIOLATOR_ID
0197393
Controller IDCONTROLLER_ID
0186681
Inspection eventEVENT_NO
F03B9AA
Inspection beganINSPECTION_BEGIN_DT
Jun 17, 2026
Inspection closed outINSPECTION_END_DT
Jun 18, 2026
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 17, 2026
Type: Citation
Standard: 56.12032
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $398.00
Details

The citation

Citation or order numberVIOLATION_NO
5100882
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 17, 2026
Time issuedVIOLATION_ISSUE_TIME
1321
Date of occurrenceVIOLATION_OCCUR_DT
Jun 17, 2026
30 CFR part and sectionPART_SECTION
56.12032
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 17, 2026
Originally due, timeORIG_TERM_DUE_TIME
1335
Latest dueLATEST_TERM_DUE_DT
Jun 17, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1335
TerminatedTERMINATION_DT
Jun 18, 2026
Terminated, timeTERMINATION_TIME
1228
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
398
Current proposed assessmentAMOUNT_DUE
398
Amount paidAMOUNT_PAID
398
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 24, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Quasar Gold Corp
Operator IDVIOLATOR_ID
0197393
Controller IDCONTROLLER_ID
0186681
Inspection eventEVENT_NO
F03B9AA
Inspection beganINSPECTION_BEGIN_DT
Jun 17, 2026
Inspection closed outINSPECTION_END_DT
Jun 18, 2026
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 17, 2026
Type: Citation
Standard: 56.14100(b)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5100883
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 17, 2026
Time issuedVIOLATION_ISSUE_TIME
1325
Date of occurrenceVIOLATION_OCCUR_DT
Jun 17, 2026
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 18, 2026
Originally due, timeORIG_TERM_DUE_TIME
1340
Latest dueLATEST_TERM_DUE_DT
Jun 18, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1340
TerminatedTERMINATION_DT
Jun 18, 2026
Terminated, timeTERMINATION_TIME
1229
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 24, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Quasar Gold Corp
Operator IDVIOLATOR_ID
0197393
Controller IDCONTROLLER_ID
0186681
Inspection eventEVENT_NO
F03B9AA
Inspection beganINSPECTION_BEGIN_DT
Jun 17, 2026
Inspection closed outINSPECTION_END_DT
Jun 18, 2026
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 17, 2026
Type: Citation
Standard: 56.4101
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5100880
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 17, 2026
Time issuedVIOLATION_ISSUE_TIME
1301
Date of occurrenceVIOLATION_OCCUR_DT
Jun 17, 2026
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 17, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jun 17, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jun 18, 2026
Terminated, timeTERMINATION_TIME
1224
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 24, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Quasar Gold Corp
Operator IDVIOLATOR_ID
0197393
Controller IDCONTROLLER_ID
0186681
Inspection eventEVENT_NO
F03B9AA
Inspection beganINSPECTION_BEGIN_DT
Jun 17, 2026
Inspection closed outINSPECTION_END_DT
Jun 18, 2026
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 17, 2026
Type: Citation
Standard: 56.4402
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5100879
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 17, 2026
Time issuedVIOLATION_ISSUE_TIME
1250
Date of occurrenceVIOLATION_OCCUR_DT
Jun 17, 2026
30 CFR part and sectionPART_SECTION
56.4402
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 17, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jun 17, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jun 17, 2026
Terminated, timeTERMINATION_TIME
1255
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 24, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Quasar Gold Corp
Operator IDVIOLATOR_ID
0197393
Controller IDCONTROLLER_ID
0186681
Inspection eventEVENT_NO
F03B9AA
Inspection beganINSPECTION_BEGIN_DT
Jun 17, 2026
Inspection closed outINSPECTION_END_DT
Jun 18, 2026
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 17, 2026
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5100881
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 17, 2026
Time issuedVIOLATION_ISSUE_TIME
1309
Date of occurrenceVIOLATION_OCCUR_DT
Jun 17, 2026
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 17, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jun 17, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jun 17, 2026
Terminated, timeTERMINATION_TIME
1400
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 24, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Quasar Gold Corp
Operator IDVIOLATOR_ID
0197393
Controller IDCONTROLLER_ID
0186681
Inspection eventEVENT_NO
F03B9AA
Inspection beganINSPECTION_BEGIN_DT
Jun 17, 2026
Inspection closed outINSPECTION_END_DT
Jun 18, 2026
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jun 17, 2026
Type: Citation
Standard: 56.11003
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
5100885
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 17, 2026
Time issuedVIOLATION_ISSUE_TIME
1414
Date of occurrenceVIOLATION_OCCUR_DT
Jun 17, 2026
30 CFR part and sectionPART_SECTION
56.11003
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 17, 2026
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jun 17, 2026
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jun 17, 2026
Terminated, timeTERMINATION_TIME
1500
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Final order dateFINAL_ORDER_ISSUE_DT
Sep 9, 2026
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Aug 24, 2026
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Quasar Gold Corp
Operator IDVIOLATOR_ID
0197393
Controller IDCONTROLLER_ID
0186681
Inspection eventEVENT_NO
F03B9AA
Inspection beganINSPECTION_BEGIN_DT
Jun 17, 2026
Inspection closed outINSPECTION_END_DT
Jun 18, 2026
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2026
MSHA fiscal quarterFISCAL_QTR
3

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 11, 2025
Type: Citation
Standard: 57.12006
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $151.00
Details

The citation

Citation or order numberVIOLATION_NO
9890815
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 11, 2025
Time issuedVIOLATION_ISSUE_TIME
1030
Date of occurrenceVIOLATION_OCCUR_DT
Aug 11, 2025
30 CFR part and sectionPART_SECTION
57.12006
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 11, 2025
Originally due, timeORIG_TERM_DUE_TIME
1130
Latest dueLATEST_TERM_DUE_DT
Aug 11, 2025
Latest due, timeLATEST_TERM_DUE_TIME
1130
TerminatedTERMINATION_DT
Aug 11, 2025
Terminated, timeTERMINATION_TIME
1140
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
151
Current proposed assessmentAMOUNT_DUE
151
Amount paidAMOUNT_PAID
151
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Final order dateFINAL_ORDER_ISSUE_DT
Dec 24, 2025
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 5, 2025

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Quasar Gold Corp
Operator IDVIOLATOR_ID
0197393
Controller IDCONTROLLER_ID
0186681
Inspection eventEVENT_NO
F022F39
Inspection beganINSPECTION_BEGIN_DT
Aug 11, 2025
Inspection closed outINSPECTION_END_DT
Aug 11, 2025
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2025
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2025
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Aug 3, 2019
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
6334446
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 3, 2019
Time issuedVIOLATION_ISSUE_TIME
1110
Date of occurrenceVIOLATION_OCCUR_DT
Aug 3, 2019
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 3, 2019
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Aug 3, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1300
TerminatedTERMINATION_DT
Aug 3, 2019
Terminated, timeTERMINATION_TIME
1255
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Oct 23, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 3, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
1124566
Inspection beganINSPECTION_BEGIN_DT
Aug 3, 2019
Inspection closed outINSPECTION_END_DT
Aug 3, 2019
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 3, 2019
Type: Citation
Standard: 56.4201(a)(2)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
6334448
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 3, 2019
Time issuedVIOLATION_ISSUE_TIME
1125
Date of occurrenceVIOLATION_OCCUR_DT
Aug 3, 2019
30 CFR part and sectionPART_SECTION
56.4201(a)(2)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 9, 2019
Originally due, timeORIG_TERM_DUE_TIME
1900
Latest dueLATEST_TERM_DUE_DT
Aug 9, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1900
TerminatedTERMINATION_DT
Aug 21, 2019
Terminated, timeTERMINATION_TIME
1428
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Oct 23, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 3, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
1124566
Inspection beganINSPECTION_BEGIN_DT
Aug 3, 2019
Inspection closed outINSPECTION_END_DT
Aug 3, 2019
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 3, 2019
Type: Citation
Standard: 56.1000
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
6334445
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 3, 2019
Time issuedVIOLATION_ISSUE_TIME
1105
Date of occurrenceVIOLATION_OCCUR_DT
Aug 3, 2019
30 CFR part and sectionPART_SECTION
56.1000
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 3, 2019
Originally due, timeORIG_TERM_DUE_TIME
1114
Latest dueLATEST_TERM_DUE_DT
Aug 3, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1114
TerminatedTERMINATION_DT
Aug 3, 2019
Terminated, timeTERMINATION_TIME
1250
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Oct 23, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 3, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
1124566
Inspection beganINSPECTION_BEGIN_DT
Aug 3, 2019
Inspection closed outINSPECTION_END_DT
Aug 3, 2019
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 3, 2019
Type: Citation
Standard: 56.14130(g)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $344.00
Details

The citation

Citation or order numberVIOLATION_NO
6334447
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 3, 2019
Time issuedVIOLATION_ISSUE_TIME
1120
Date of occurrenceVIOLATION_OCCUR_DT
Aug 3, 2019
30 CFR part and sectionPART_SECTION
56.14130(g)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 3, 2019
Originally due, timeORIG_TERM_DUE_TIME
1310
Latest dueLATEST_TERM_DUE_DT
Aug 3, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1310
TerminatedTERMINATION_DT
Aug 3, 2019
Terminated, timeTERMINATION_TIME
1144
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
344
Current proposed assessmentAMOUNT_DUE
344
Amount paidAMOUNT_PAID
344
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Oct 23, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 3, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
1124566
Inspection beganINSPECTION_BEGIN_DT
Aug 3, 2019
Inspection closed outINSPECTION_END_DT
Aug 3, 2019
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

From a 103(g) written noticeWRITTEN_NOTICE, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 3, 2019
Type: Citation
Standard: 56.4601
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
6334450
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 3, 2019
Time issuedVIOLATION_ISSUE_TIME
1135
Date of occurrenceVIOLATION_OCCUR_DT
Aug 3, 2019
30 CFR part and sectionPART_SECTION
56.4601
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 3, 2019
Originally due, timeORIG_TERM_DUE_TIME
1150
Latest dueLATEST_TERM_DUE_DT
Aug 3, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1150
TerminatedTERMINATION_DT
Aug 3, 2019
Terminated, timeTERMINATION_TIME
1145
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Oct 23, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 3, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
1124566
Inspection beganINSPECTION_BEGIN_DT
Aug 3, 2019
Inspection closed outINSPECTION_END_DT
Aug 3, 2019
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 3, 2019
Type: Citation
Standard: 56.12028
S&S: N
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $230.00
Details

The citation

Citation or order numberVIOLATION_NO
6334451
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 3, 2019
Time issuedVIOLATION_ISSUE_TIME
1140
Date of occurrenceVIOLATION_OCCUR_DT
Aug 3, 2019
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 9, 2019
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Aug 9, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Aug 21, 2019
Terminated, timeTERMINATION_TIME
1436
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
230
Current proposed assessmentAMOUNT_DUE
230
Amount paidAMOUNT_PAID
230
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Oct 23, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 3, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
1124566
Inspection beganINSPECTION_BEGIN_DT
Aug 3, 2019
Inspection closed outINSPECTION_END_DT
Aug 3, 2019
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 3, 2019
Type: Citation
Standard: 56.4102
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $121.00
Details

The citation

Citation or order numberVIOLATION_NO
6334449
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 3, 2019
Time issuedVIOLATION_ISSUE_TIME
1130
Date of occurrenceVIOLATION_OCCUR_DT
Aug 3, 2019
30 CFR part and sectionPART_SECTION
56.4102
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 3, 2019
Originally due, timeORIG_TERM_DUE_TIME
1630
Latest dueLATEST_TERM_DUE_DT
Aug 3, 2019
Latest due, timeLATEST_TERM_DUE_TIME
1630
TerminatedTERMINATION_DT
Aug 21, 2019
Terminated, timeTERMINATION_TIME
1432
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
121
Current proposed assessmentAMOUNT_DUE
121
Amount paidAMOUNT_PAID
121
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Final order dateFINAL_ORDER_ISSUE_DT
Oct 23, 2019
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 3, 2019
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
1124566
Inspection beganINSPECTION_BEGIN_DT
Aug 3, 2019
Inspection closed outINSPECTION_END_DT
Aug 3, 2019
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (12)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 7, 2018
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
8992967
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 7, 2018
Time issuedVIOLATION_ISSUE_TIME
1506
Date of occurrenceVIOLATION_OCCUR_DT
Aug 7, 2018
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 7, 2018
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Aug 7, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Aug 7, 2018
Terminated, timeTERMINATION_TIME
1510
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Sep 12, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Oct 17, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 25, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
6722773
Inspection beganINSPECTION_BEGIN_DT
Aug 6, 2018
Inspection closed outINSPECTION_END_DT
Aug 9, 2018
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 7, 2018
Type: Citation
Standard: 56.12028
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
8992965
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 7, 2018
Time issuedVIOLATION_ISSUE_TIME
1414
Date of occurrenceVIOLATION_OCCUR_DT
Aug 7, 2018
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 7, 2018
Originally due, timeORIG_TERM_DUE_TIME
1900
Latest dueLATEST_TERM_DUE_DT
Aug 7, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1900
TerminatedTERMINATION_DT
Aug 7, 2018
Terminated, timeTERMINATION_TIME
1825
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Sep 12, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Oct 17, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 25, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
6722773
Inspection beganINSPECTION_BEGIN_DT
Aug 6, 2018
Inspection closed outINSPECTION_END_DT
Aug 9, 2018
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 7, 2018
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
8992966
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 7, 2018
Time issuedVIOLATION_ISSUE_TIME
1504
Date of occurrenceVIOLATION_OCCUR_DT
Aug 7, 2018
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 7, 2018
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Aug 7, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Aug 7, 2018
Terminated, timeTERMINATION_TIME
1510
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Sep 12, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Oct 17, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 25, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
6722773
Inspection beganINSPECTION_BEGIN_DT
Aug 6, 2018
Inspection closed outINSPECTION_END_DT
Aug 9, 2018
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Persons potentially affectedNO_AFFECTED

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 6, 2018
Type: Citation
Standard: 56.4101
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
8992963
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 6, 2018
Time issuedVIOLATION_ISSUE_TIME
1640
Date of occurrenceVIOLATION_OCCUR_DT
Aug 6, 2018
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 7, 2018
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Aug 7, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Aug 7, 2018
Terminated, timeTERMINATION_TIME
1216
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Sep 12, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Oct 17, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 25, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
6722773
Inspection beganINSPECTION_BEGIN_DT
Aug 6, 2018
Inspection closed outINSPECTION_END_DT
Aug 9, 2018
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 6, 2018
Type: Citation
Standard: 56.14107(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $138.00
Details

The citation

Citation or order numberVIOLATION_NO
8992964
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 6, 2018
Time issuedVIOLATION_ISSUE_TIME
1759
Date of occurrenceVIOLATION_OCCUR_DT
Aug 6, 2018
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 6, 2018
Originally due, timeORIG_TERM_DUE_TIME
1845
Latest dueLATEST_TERM_DUE_DT
Aug 6, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1845
TerminatedTERMINATION_DT
Aug 6, 2018
Terminated, timeTERMINATION_TIME
1830
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
138
Current proposed assessmentAMOUNT_DUE
138
Amount paidAMOUNT_PAID
138
Bill first printedBILL_PRINT_DT
Sep 12, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Oct 17, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 25, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
6722773
Inspection beganINSPECTION_BEGIN_DT
Aug 6, 2018
Inspection closed outINSPECTION_END_DT
Aug 9, 2018
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Aug 6, 2018
Type: Citation
Standard: 56.12032
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $118.00
Details

The citation

Citation or order numberVIOLATION_NO
8992962
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Aug 6, 2018
Time issuedVIOLATION_ISSUE_TIME
1615
Date of occurrenceVIOLATION_OCCUR_DT
Aug 6, 2018
30 CFR part and sectionPART_SECTION
56.12032
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Aug 7, 2018
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Aug 7, 2018
Latest due, timeLATEST_TERM_DUE_TIME
1300
TerminatedTERMINATION_DT
Aug 7, 2018
Terminated, timeTERMINATION_TIME
1215
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
118
Current proposed assessmentAMOUNT_DUE
118
Amount paidAMOUNT_PAID
118
Bill first printedBILL_PRINT_DT
Sep 12, 2018
Final order dateFINAL_ORDER_ISSUE_DT
Oct 17, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Sep 25, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
6722773
Inspection beganINSPECTION_BEGIN_DT
Aug 6, 2018
Inspection closed outINSPECTION_END_DT
Aug 9, 2018
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2018
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Sep 17, 2017
Type: Citation
Standard: 56.16005
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
6392931
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 17, 2017
Time issuedVIOLATION_ISSUE_TIME
1103
Date of occurrenceVIOLATION_OCCUR_DT
Sep 17, 2017
30 CFR part and sectionPART_SECTION
56.16005
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 17, 2017
Originally due, timeORIG_TERM_DUE_TIME
1115
Latest dueLATEST_TERM_DUE_DT
Sep 17, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1115
TerminatedTERMINATION_DT
Sep 17, 2017
Terminated, timeTERMINATION_TIME
1110
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Oct 18, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Nov 23, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 7, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
1146244
Inspection beganINSPECTION_BEGIN_DT
Sep 16, 2017
Inspection closed outINSPECTION_END_DT
Sep 17, 2017
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Sep 17, 2017
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
6392926
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 17, 2017
Time issuedVIOLATION_ISSUE_TIME
0845
Date of occurrenceVIOLATION_OCCUR_DT
Sep 17, 2017
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 17, 2017
Originally due, timeORIG_TERM_DUE_TIME
1400
Latest dueLATEST_TERM_DUE_DT
Sep 17, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1400
TerminatedTERMINATION_DT
Sep 17, 2017
Terminated, timeTERMINATION_TIME
1454
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Oct 18, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Nov 23, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 7, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
1146244
Inspection beganINSPECTION_BEGIN_DT
Sep 16, 2017
Inspection closed outINSPECTION_END_DT
Sep 17, 2017
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

Issued: Sep 17, 2017
Type: Citation
Standard: 56.20011
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
6392929
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Sep 17, 2017
Time issuedVIOLATION_ISSUE_TIME
1012
Date of occurrenceVIOLATION_OCCUR_DT
Sep 17, 2017
30 CFR part and sectionPART_SECTION
56.20011
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Sep 17, 2017
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Sep 17, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Sep 17, 2017
Terminated, timeTERMINATION_TIME
1627
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Oct 18, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Nov 23, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Nov 7, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
North Star Mining
Operator IDVIOLATOR_ID
0146255
Controller at the timeCONTROLLER_NAME
Noble Casing, Inc; Arowe, Inc; Shirley Bar Gold Group, LLC
Controller IDCONTROLLER_ID
0133661
Inspection eventEVENT_NO
1146244
Inspection beganINSPECTION_BEGIN_DT
Sep 16, 2017
Inspection closed outINSPECTION_END_DT
Sep 17, 2017
Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID

31 citations and orders since Aug 12, 2014: 31 issued to the operator, 0 to contractors working at the mine; the 25 most recent are listed. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Jun 18, 2026
Citation number: 5100888
Standard: 56.14132(a)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5100888
Assessment control numberASSESS_CASE_NO
000646141
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 22, 2026
Citation issuedISSUE_DT
Jun 18, 2026
Date of occurrenceOCCURRENCE_DT
Jun 18, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
38
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
2
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
9300
Size of mineSIZE_OF_MINE
9300
Controller hours workedCONTROLLER_HRS
9300
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9300
History period startHISTORY_START_DT
Mar 18, 2025
History period endHISTORY_END_DT
Jun 17, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Quasar Gold Corp
IDVIOLATOR_ID
0197393
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 12, 2024
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03B9AA
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 18, 2026
Citation number: 5100887
Standard: 56.14100(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5100887
Assessment control numberASSESS_CASE_NO
000646141
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 22, 2026
Citation issuedISSUE_DT
Jun 18, 2026
Date of occurrenceOCCURRENCE_DT
Jun 18, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
38
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
2
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
9300
Size of mineSIZE_OF_MINE
9300
Controller hours workedCONTROLLER_HRS
9300
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9300
History period startHISTORY_START_DT
Mar 18, 2025
History period endHISTORY_END_DT
Jun 17, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Quasar Gold Corp
IDVIOLATOR_ID
0197393
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 12, 2024
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03B9AA
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 17, 2026
Citation number: 5100881
Standard: 56.14100(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5100881
Assessment control numberASSESS_CASE_NO
000646141
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 22, 2026
Citation issuedISSUE_DT
Jun 17, 2026
Date of occurrenceOCCURRENCE_DT
Jun 17, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
9300
Size of mineSIZE_OF_MINE
9300
Controller hours workedCONTROLLER_HRS
9300
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9300
History period startHISTORY_START_DT
Mar 17, 2025
History period endHISTORY_END_DT
Jun 16, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Quasar Gold Corp
IDVIOLATOR_ID
0197393
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 12, 2024
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03B9AA
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 17, 2026
Citation number: 5100882
Standard: 56.12032
Proposed penalty: $398.00
Current assessment: $398.00
Paid against proposed penalty: $398.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5100882
Assessment control numberASSESS_CASE_NO
000646141
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 22, 2026
Citation issuedISSUE_DT
Jun 17, 2026
Date of occurrenceOCCURRENCE_DT
Jun 17, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12032
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
398.00
Current assessmentCURRENT_ASSESSMENT_AMT
398.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
398.00

Penalty points

Violation history pointsPENALTY_POINTS
72
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
9300
Size of mineSIZE_OF_MINE
9300
Controller hours workedCONTROLLER_HRS
9300
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9300
History period startHISTORY_START_DT
Mar 17, 2025
History period endHISTORY_END_DT
Jun 16, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Quasar Gold Corp
IDVIOLATOR_ID
0197393
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 12, 2024
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03B9AA
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 17, 2026
Citation number: 5100883
Standard: 56.14100(b)
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5100883
Assessment control numberASSESS_CASE_NO
000646141
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 22, 2026
Citation issuedISSUE_DT
Jun 17, 2026
Date of occurrenceOCCURRENCE_DT
Jun 17, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
57
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
9300
Size of mineSIZE_OF_MINE
9300
Controller hours workedCONTROLLER_HRS
9300
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9300
History period startHISTORY_START_DT
Mar 17, 2025
History period endHISTORY_END_DT
Jun 16, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Quasar Gold Corp
IDVIOLATOR_ID
0197393
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 12, 2024
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03B9AA
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 17, 2026
Citation number: 5100885
Standard: 56.11003
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5100885
Assessment control numberASSESS_CASE_NO
000646141
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 22, 2026
Citation issuedISSUE_DT
Jun 17, 2026
Date of occurrenceOCCURRENCE_DT
Jun 17, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11003
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
37
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
9300
Size of mineSIZE_OF_MINE
9300
Controller hours workedCONTROLLER_HRS
9300
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9300
History period startHISTORY_START_DT
Mar 17, 2025
History period endHISTORY_END_DT
Jun 16, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Quasar Gold Corp
IDVIOLATOR_ID
0197393
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 12, 2024
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03B9AA
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 17, 2026
Citation number: 5100880
Standard: 56.4101
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5100880
Assessment control numberASSESS_CASE_NO
000646141
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 22, 2026
Citation issuedISSUE_DT
Jun 17, 2026
Date of occurrenceOCCURRENCE_DT
Jun 17, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
37
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
9300
Size of mineSIZE_OF_MINE
9300
Controller hours workedCONTROLLER_HRS
9300
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9300
History period startHISTORY_START_DT
Mar 17, 2025
History period endHISTORY_END_DT
Jun 16, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Quasar Gold Corp
IDVIOLATOR_ID
0197393
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 12, 2024
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03B9AA
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jun 17, 2026
Citation number: 5100879
Standard: 56.4402
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
5100879
Assessment control numberASSESS_CASE_NO
000646141
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Aug 22, 2026
Citation issuedISSUE_DT
Jun 17, 2026
Date of occurrenceOCCURRENCE_DT
Jun 17, 2026
Final order dateFINAL_ORDER_DT
Sep 9, 2026
Bill first printedBILL_PRINT_DT
Aug 4, 2026
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Sep 9, 2026
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4402
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
37
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
1
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Violations per inspection dayVPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
9300
Size of mineSIZE_OF_MINE
9300
Controller hours workedCONTROLLER_HRS
9300
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
9300
History period startHISTORY_START_DT
Mar 17, 2025
History period endHISTORY_END_DT
Jun 16, 2026

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Quasar Gold Corp
IDVIOLATOR_ID
0197393
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 12, 2024
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F03B9AA
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 11, 2025
Citation number: 9890815
Standard: 57.12006
Proposed penalty: $151.00
Current assessment: $151.00
Paid against proposed penalty: $151.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9890815
Assessment control numberASSESS_CASE_NO
000630311
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 5, 2025
Citation issuedISSUE_DT
Aug 11, 2025
Date of occurrenceOCCURRENCE_DT
Aug 11, 2025
Final order dateFINAL_ORDER_DT
Dec 24, 2025
Bill first printedBILL_PRINT_DT
Nov 14, 2025
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2026
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Dec 24, 2025
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
57.12006
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
151.00
Current assessmentCURRENT_ASSESSMENT_AMT
151.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
151.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
3260
Size of mineSIZE_OF_MINE
3260
Controller hours workedCONTROLLER_HRS
3260
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
3260
History period startHISTORY_START_DT
Aug 12, 2024
History period endHISTORY_END_DT
Aug 10, 2025

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Quasar Gold Corp
IDVIOLATOR_ID
0197393
Operator start at the mine, as assessedVIOLATOR_START_DT
Aug 12, 2024
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
F022F39
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 3, 2019
Citation number: 6334448
Standard: 56.4201(a)(2)
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6334448
Assessment control numberASSESS_CASE_NO
000499927
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 1, 2019
Citation issuedISSUE_DT
Aug 3, 2019
Date of occurrenceOCCURRENCE_DT
Aug 3, 2019
Final order dateFINAL_ORDER_DT
Oct 23, 2019
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 23, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(a)(2)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
38
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
12400
Size of mineSIZE_OF_MINE
12400
Controller hours workedCONTROLLER_HRS
12400
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12400
History period startHISTORY_START_DT
May 3, 2018
History period endHISTORY_END_DT
Aug 2, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1124566
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 3, 2019
Citation number: 6334451
Standard: 56.12028
Proposed penalty: $230.00
Current assessment: $230.00
Paid against proposed penalty: $230.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6334451
Assessment control numberASSESS_CASE_NO
000499927
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 1, 2019
Citation issuedISSUE_DT
Aug 3, 2019
Date of occurrenceOCCURRENCE_DT
Aug 3, 2019
Final order dateFINAL_ORDER_DT
Oct 23, 2019
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 23, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
230.00
Current assessmentCURRENT_ASSESSMENT_AMT
230.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
230.00

Penalty points

Violation history pointsPENALTY_POINTS
68
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
2
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.333
Operator hours worked at the mineVIOLATOR_MINE_HRS
12400
Size of mineSIZE_OF_MINE
12400
Controller hours workedCONTROLLER_HRS
12400
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12400
History period startHISTORY_START_DT
May 3, 2018
History period endHISTORY_END_DT
Aug 2, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1124566
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 3, 2019
Citation number: 6334449
Standard: 56.4102
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6334449
Assessment control numberASSESS_CASE_NO
000499927
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 1, 2019
Citation issuedISSUE_DT
Aug 3, 2019
Date of occurrenceOCCURRENCE_DT
Aug 3, 2019
Final order dateFINAL_ORDER_DT
Oct 23, 2019
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 23, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4102
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
38
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
12400
Size of mineSIZE_OF_MINE
12400
Controller hours workedCONTROLLER_HRS
12400
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12400
History period startHISTORY_START_DT
May 3, 2018
History period endHISTORY_END_DT
Aug 2, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1124566
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 3, 2019
Citation number: 6334447
Standard: 56.14130(g)
Proposed penalty: $344.00
Current assessment: $344.00
Paid against proposed penalty: $344.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6334447
Assessment control numberASSESS_CASE_NO
000499927
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 1, 2019
Citation issuedISSUE_DT
Aug 3, 2019
Date of occurrenceOCCURRENCE_DT
Aug 3, 2019
Final order dateFINAL_ORDER_DT
Oct 23, 2019
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 23, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14130(g)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
344.00
Current assessmentCURRENT_ASSESSMENT_AMT
344.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
344.00

Penalty points

Violation history pointsPENALTY_POINTS
73
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
12400
Size of mineSIZE_OF_MINE
12400
Controller hours workedCONTROLLER_HRS
12400
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12400
History period startHISTORY_START_DT
May 3, 2018
History period endHISTORY_END_DT
Aug 2, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1124566
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 3, 2019
Citation number: 6334446
Standard: 50.30(a)
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6334446
Assessment control numberASSESS_CASE_NO
000499927
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 1, 2019
Citation issuedISSUE_DT
Aug 3, 2019
Date of occurrenceOCCURRENCE_DT
Aug 3, 2019
Final order dateFINAL_ORDER_DT
Oct 23, 2019
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 23, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
12
Negligence pointsNEGLIGENCE_POINTS
10
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
2
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
2
Repeat violations per inspection dayRPID
0.667
Operator hours worked at the mineVIOLATOR_MINE_HRS
12400
Size of mineSIZE_OF_MINE
12400
Controller hours workedCONTROLLER_HRS
12400
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12400
History period startHISTORY_START_DT
May 3, 2018
History period endHISTORY_END_DT
Aug 2, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1124566
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 3, 2019
Citation number: 6334450
Standard: 56.4601
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6334450
Assessment control numberASSESS_CASE_NO
000499927
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 1, 2019
Citation issuedISSUE_DT
Aug 3, 2019
Date of occurrenceOCCURRENCE_DT
Aug 3, 2019
Final order dateFINAL_ORDER_DT
Oct 23, 2019
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 23, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4601
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
38
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
12400
Size of mineSIZE_OF_MINE
12400
Controller hours workedCONTROLLER_HRS
12400
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12400
History period startHISTORY_START_DT
May 3, 2018
History period endHISTORY_END_DT
Aug 2, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1124566
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 3, 2019
Citation number: 6334445
Standard: 56.1000
Proposed penalty: $121.00
Current assessment: $121.00
Paid against proposed penalty: $121.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6334445
Assessment control numberASSESS_CASE_NO
000499927
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 1, 2019
Citation issuedISSUE_DT
Aug 3, 2019
Date of occurrenceOCCURRENCE_DT
Aug 3, 2019
Final order dateFINAL_ORDER_DT
Oct 23, 2019
Bill first printedBILL_PRINT_DT
Sep 18, 2019
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2019
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 23, 2019
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.1000
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
121.00
Current assessmentCURRENT_ASSESSMENT_AMT
121.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
121.00

Penalty points

Violation history pointsPENALTY_POINTS
22
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
2
Operator hours worked at the mineVIOLATOR_MINE_HRS
12400
Size of mineSIZE_OF_MINE
12400
Controller hours workedCONTROLLER_HRS
12400
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12400
History period startHISTORY_START_DT
May 3, 2018
History period endHISTORY_END_DT
Aug 2, 2019

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1124566
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 7, 2018
Citation number: 8992966
Standard: 50.30(a)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8992966
Assessment control numberASSESS_CASE_NO
000473330
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 25, 2018
Citation issuedISSUE_DT
Aug 7, 2018
Date of occurrenceOCCURRENCE_DT
Aug 7, 2018
Final order dateFINAL_ORDER_DT
Oct 17, 2018
Bill first printedBILL_PRINT_DT
Sep 12, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 17, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
21
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
1.2
Operator hours worked at the mineVIOLATOR_MINE_HRS
5820
Size of mineSIZE_OF_MINE
5820
Controller hours workedCONTROLLER_HRS
5820
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5820
History period startHISTORY_START_DT
May 7, 2017
History period endHISTORY_END_DT
Aug 6, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6722773
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 7, 2018
Citation number: 8992967
Standard: 50.30(a)
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8992967
Assessment control numberASSESS_CASE_NO
000473330
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 25, 2018
Citation issuedISSUE_DT
Aug 7, 2018
Date of occurrenceOCCURRENCE_DT
Aug 7, 2018
Final order dateFINAL_ORDER_DT
Oct 17, 2018
Bill first printedBILL_PRINT_DT
Sep 12, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 17, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
21
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
1.2
Operator hours worked at the mineVIOLATOR_MINE_HRS
5820
Size of mineSIZE_OF_MINE
5820
Controller hours workedCONTROLLER_HRS
5820
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5820
History period startHISTORY_START_DT
May 7, 2017
History period endHISTORY_END_DT
Aug 6, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6722773
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 7, 2018
Citation number: 8992965
Standard: 56.12028
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8992965
Assessment control numberASSESS_CASE_NO
000473330
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 25, 2018
Citation issuedISSUE_DT
Aug 7, 2018
Date of occurrenceOCCURRENCE_DT
Aug 7, 2018
Final order dateFINAL_ORDER_DT
Oct 17, 2018
Bill first printedBILL_PRINT_DT
Sep 12, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 17, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
42
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
5
Violations per inspection dayVPID
1.2
Operator hours worked at the mineVIOLATOR_MINE_HRS
5820
Size of mineSIZE_OF_MINE
5820
Controller hours workedCONTROLLER_HRS
5820
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5820
History period startHISTORY_START_DT
May 7, 2017
History period endHISTORY_END_DT
Aug 6, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6722773
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 6, 2018
Citation number: 8992964
Standard: 56.14107(a)
Proposed penalty: $138.00
Current assessment: $138.00
Paid against proposed penalty: $138.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8992964
Assessment control numberASSESS_CASE_NO
000473330
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 25, 2018
Citation issuedISSUE_DT
Aug 6, 2018
Date of occurrenceOCCURRENCE_DT
Aug 6, 2018
Final order dateFINAL_ORDER_DT
Oct 17, 2018
Bill first printedBILL_PRINT_DT
Sep 12, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 17, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
138.00
Current assessmentCURRENT_ASSESSMENT_AMT
138.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
138.00

Penalty points

Violation history pointsPENALTY_POINTS
62
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
1.5
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.25
Operator hours worked at the mineVIOLATOR_MINE_HRS
5820
Size of mineSIZE_OF_MINE
5820
Controller hours workedCONTROLLER_HRS
5820
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5820
History period startHISTORY_START_DT
May 6, 2017
History period endHISTORY_END_DT
Aug 5, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6722773
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 6, 2018
Citation number: 8992963
Standard: 56.4101
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8992963
Assessment control numberASSESS_CASE_NO
000473330
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 25, 2018
Citation issuedISSUE_DT
Aug 6, 2018
Date of occurrenceOCCURRENCE_DT
Aug 6, 2018
Final order dateFINAL_ORDER_DT
Oct 17, 2018
Bill first printedBILL_PRINT_DT
Sep 12, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 17, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
37
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
1.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
5820
Size of mineSIZE_OF_MINE
5820
Controller hours workedCONTROLLER_HRS
5820
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5820
History period startHISTORY_START_DT
May 6, 2017
History period endHISTORY_END_DT
Aug 5, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6722773
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Aug 6, 2018
Citation number: 8992962
Standard: 56.12032
Proposed penalty: $118.00
Current assessment: $118.00
Paid against proposed penalty: $118.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8992962
Assessment control numberASSESS_CASE_NO
000473330
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Sep 25, 2018
Citation issuedISSUE_DT
Aug 6, 2018
Date of occurrenceOCCURRENCE_DT
Aug 6, 2018
Final order dateFINAL_ORDER_DT
Oct 17, 2018
Bill first printedBILL_PRINT_DT
Sep 12, 2018
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 17, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12032
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
118.00
Current assessmentCURRENT_ASSESSMENT_AMT
118.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
118.00

Penalty points

Violation history pointsPENALTY_POINTS
37
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
1

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
6
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
4
Violations per inspection dayVPID
1.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
5820
Size of mineSIZE_OF_MINE
5820
Controller hours workedCONTROLLER_HRS
5820
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5820
History period startHISTORY_START_DT
May 6, 2017
History period endHISTORY_END_DT
Aug 5, 2018

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6722773
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 17, 2017
Citation number: 6392927
Standard: 56.9300(a)
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6392927
Assessment control numberASSESS_CASE_NO
000450843
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 7, 2017
Citation issuedISSUE_DT
Sep 17, 2017
Date of occurrenceOCCURRENCE_DT
Sep 17, 2017
Final order dateFINAL_ORDER_DT
Nov 23, 2017
Bill first printedBILL_PRINT_DT
Oct 18, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 23, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
38
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.67
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.333
Operator hours worked at the mineVIOLATOR_MINE_HRS
13600
Size of mineSIZE_OF_MINE
13600
Controller hours workedCONTROLLER_HRS
13600
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
13600
History period startHISTORY_START_DT
Jul 1, 2016
History period endHISTORY_END_DT
Sep 16, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1146244
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 17, 2017
Citation number: 6392930
Standard: 56.14132(a)
Proposed penalty: $220.00
Current assessment: $220.00
Paid against proposed penalty: $220.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6392930
Assessment control numberASSESS_CASE_NO
000450843
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 7, 2017
Citation issuedISSUE_DT
Sep 17, 2017
Date of occurrenceOCCURRENCE_DT
Sep 17, 2017
Final order dateFINAL_ORDER_DT
Nov 23, 2017
Bill first printedBILL_PRINT_DT
Oct 18, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 23, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
220.00
Current assessmentCURRENT_ASSESSMENT_AMT
220.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
220.00

Penalty points

Violation history pointsPENALTY_POINTS
68
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
35
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.67
Operator hours worked at the mineVIOLATOR_MINE_HRS
13600
Size of mineSIZE_OF_MINE
13600
Controller hours workedCONTROLLER_HRS
13600
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
13600
History period startHISTORY_START_DT
Jul 1, 2016
History period endHISTORY_END_DT
Sep 16, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1146244
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (13)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Sep 17, 2017
Citation number: 6392928
Standard: 56.9300(a)
Proposed penalty: $148.00
Current assessment: $148.00
Paid against proposed penalty: $148.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6392928
Assessment control numberASSESS_CASE_NO
000450843
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Nov 7, 2017
Citation issuedISSUE_DT
Sep 17, 2017
Date of occurrenceOCCURRENCE_DT
Sep 17, 2017
Final order dateFINAL_ORDER_DT
Nov 23, 2017
Bill first printedBILL_PRINT_DT
Oct 18, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 23, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
148.00
Current assessmentCURRENT_ASSESSMENT_AMT
148.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
148.00

Penalty points

Violation history pointsPENALTY_POINTS
63
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20
Mine size pointsMINE_SIZE_POINTS
2

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
2
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
3
Violations per inspection dayVPID
0.67
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.333
Operator hours worked at the mineVIOLATOR_MINE_HRS
13600
Size of mineSIZE_OF_MINE
13600
Controller hours workedCONTROLLER_HRS
13600
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
13600
History period startHISTORY_START_DT
Jul 1, 2016
History period endHISTORY_END_DT
Sep 16, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
North Star Mining
IDVIOLATOR_ID
0146255
Operator start at the mine, as assessedVIOLATOR_START_DT
Jul 1, 2016
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1146244
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (11)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

25 most recent of 31 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Employment and hours worked

Year: 2026
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 0
Hours worked: 0
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30

Mine

Mine IDMINE_ID
5001957
Mine name in this fileCURR_MINE_NM
Wild Goose
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (4)

Average employeesAVG_ANNUAL_EMPL, Hours workedANNUAL_HRS, Average hours per employeeAVG_EMPLOYEE_HOURS, Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 300
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
300
Average hours per employeeAVG_EMPLOYEE_HOURS
300

Mine

Mine IDMINE_ID
5001957
Mine name in this fileCURR_MINE_NM
Wild Goose
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 5
Hours worked: 10,800
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
5
Hours workedANNUAL_HRS
10800
Average hours per employeeAVG_EMPLOYEE_HOURS
2160

Mine

Mine IDMINE_ID
5001957
Mine name in this fileCURR_MINE_NM
Wild Goose
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 325
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
325
Average hours per employeeAVG_EMPLOYEE_HOURS
325

Mine

Mine IDMINE_ID
5001957
Mine name in this fileCURR_MINE_NM
Wild Goose
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 6
Hours worked: 9,300
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
6
Hours workedANNUAL_HRS
9300
Average hours per employeeAVG_EMPLOYEE_HOURS
1550

Mine

Mine IDMINE_ID
5001957
Mine name in this fileCURR_MINE_NM
Wild Goose
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 2
Hours worked: 180
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
180
Average hours per employeeAVG_EMPLOYEE_HOURS
90

Mine

Mine IDMINE_ID
5001957
Mine name in this fileCURR_MINE_NM
Wild Goose
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 5
Hours worked: 3,080
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
5
Hours workedANNUAL_HRS
3080
Average hours per employeeAVG_EMPLOYEE_HOURS
616

Mine

Mine IDMINE_ID
5001957
Mine name in this fileCURR_MINE_NM
Wild Goose
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: MILL OPERATION/PREPARATION PLANT
Average employees: 3
Hours worked: 900
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
MILL OPERATION/PREPARATION PLANT
Part of the mine codeSUBUNIT_CD
30
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
900
Average hours per employeeAVG_EMPLOYEE_HOURS
300

Mine

Mine IDMINE_ID
5001957
Mine name in this fileCURR_MINE_NM
Wild Goose
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 4 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Anchorage AK Field Office
Nearest town
Manley
Days worked per week
7
Hours per shift
10
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
10
Tailing ponds
0
103(i) spot inspection status
Never Had 103I Status
Safety committee
N
Portable operation
N
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
Wild Goose
Mine IDMINE_ID
5001957
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Intermittent
Status sinceCURRENT_STATUS_DT
Oct 1, 2024
Legal entity typeCOMPANY_TYPE
Corporation

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Quasar Gold Corp
Operator IDCURRENT_OPERATOR_ID
0197393
Controller IDCURRENT_CONTROLLER_ID
0186681
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Aug 12, 2024

Location and MSHA office

StateSTATE
AK
Bureau of Mines state codeBOM_STATE_CD
50
FIPS county codeFIPS_CNTY_CD
090
FIPS county nameFIPS_CNTY_NM
Fairbanks North Star
Nearest townNEAREST_TOWN
Manley
MSHA districtDISTRICT
M7
MSHA office codeOFFICE_CD
M7861
MSHA officeOFFICE_NAME
Anchorage AK Field Office
Most recent assessment control numberASSESS_CTRL_NO
000646141

Commodity

Primary commodity (SIC)PRIMARY_SIC
Gold Ore
Primary commodity codePRIMARY_SIC_CD
104100
Primary SIC codePRIMARY_SIC_CD_1
1041
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
Metal
Primary industry group codePRIMARY_CANVASS_CD
8

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
7
Hours per shiftHOURS_PER_SHIFT
10
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
10
103(i) statusCURRENT_103I
Never Had 103I Status

Recorded as 0 (3)

Driving miles from the MSHA officeMILES_FROM_OFFICE, Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (6)

Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND, MSHA restricted from enforcing Part 48 trainingPART48_TRAINING

Not recorded by MSHA (15)

Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: Quasar Gold Corp
From: Aug 12, 2024
To: No end date
Controller: Not shown
From : Aug 12, 2024
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Quasar Gold Corp
Operator IDOPERATOR_ID
0197393
Operator fromOPERATOR_START_DT
Aug 12, 2024

Controller

Controller IDCONTROLLER_ID
0186681
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Aug 12, 2024

Mine

Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: North Star Mining
From: Jul 1, 2016
To: Aug 11, 2024
Controller: Noble Casing, Inc et al
From : Jan 1, 2017
To : No end date
Details

Operator

OperatorOPERATOR_NAME
North Star Mining
Operator IDOPERATOR_ID
0146255
Operator fromOPERATOR_START_DT
Jul 1, 2016
Operator toOPERATOR_END_DT
Aug 11, 2024

Controller

ControllerCONTROLLER_NAME
Noble Casing, Inc et al
Controller IDCONTROLLER_ID
0133661
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Jan 1, 2017

Mine

Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Controller toCONTROLLER_END_DT

Operator: North Star Mining
From: Jul 1, 2016
To: Aug 11, 2024
Controller: Arowe, Inc et al
From : Jan 1, 2017
To : No end date
Details

Operator

OperatorOPERATOR_NAME
North Star Mining
Operator IDOPERATOR_ID
0146255
Operator fromOPERATOR_START_DT
Jul 1, 2016
Operator toOPERATOR_END_DT
Aug 11, 2024

Controller

ControllerCONTROLLER_NAME
Arowe, Inc et al
Controller IDCONTROLLER_ID
0133661
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Jan 1, 2017

Mine

Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Controller toCONTROLLER_END_DT

Operator: North Star Mining
From: Jul 1, 2016
To: Aug 11, 2024
Controller: Shirley Bar Gold Group, LLC et al
From : Jan 1, 2017
To : No end date
Details

Operator

OperatorOPERATOR_NAME
North Star Mining
Operator IDOPERATOR_ID
0146255
Operator fromOPERATOR_START_DT
Jul 1, 2016
Operator toOPERATOR_END_DT
Aug 11, 2024

Controller

ControllerCONTROLLER_NAME
Shirley Bar Gold Group, LLC et al
Controller IDCONTROLLER_ID
0133661
Company or personCONTROLLER_TYPE
COMPANY
Controller fromCONTROLLER_START_DT
Jan 1, 2017

Mine

Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

Controller toCONTROLLER_END_DT

Operator: North Star Mining
From: Jul 1, 2016
To: Aug 11, 2024
Controller: Not shown
From : Jul 1, 2016
To : Dec 31, 2016
Details

Operator

OperatorOPERATOR_NAME
North Star Mining
Operator IDOPERATOR_ID
0146255
Operator fromOPERATOR_START_DT
Jul 1, 2016
Operator toOPERATOR_END_DT
Aug 11, 2024

Controller

Controller IDCONTROLLER_ID
0127281
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jul 1, 2016
Controller toCONTROLLER_END_DT
Dec 31, 2016

Mine

Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

ControllerCONTROLLER_NAME

Operator: North Star Mining
From: Jul 1, 2016
To: Aug 11, 2024
Controller: Not shown
From : Jul 1, 2016
To : Dec 31, 2016
Details

Operator

OperatorOPERATOR_NAME
North Star Mining
Operator IDOPERATOR_ID
0146255
Operator fromOPERATOR_START_DT
Jul 1, 2016
Operator toOPERATOR_END_DT
Aug 11, 2024

Controller

Controller IDCONTROLLER_ID
0127281
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jul 1, 2016
Controller toCONTROLLER_END_DT
Dec 31, 2016

Mine

Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (1)

ControllerCONTROLLER_NAME

Operator: Billy M Dobson
From: May 21, 2012
To: Jun 30, 2016
Controller: Not shown
From : May 21, 2012
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Billy M Dobson
Operator IDOPERATOR_ID
0123090
Operator fromOPERATOR_START_DT
May 21, 2012
Operator toOPERATOR_END_DT
Jun 30, 2016

Controller

Controller IDCONTROLLER_ID
0104533
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
May 21, 2012

Mine

Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

As MSHA records it, newest operator first.

Address of record

Quasar Gold Corp·Contact title Secretary·Street not recorded, Fort Collins CO 80521

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Quasar Gold Corp
Contact titleCONTACT_TITLE
Secretary
CityCITY
Fort Collins
StateSTATE_ABBR
CO
State nameSTATE
Colorado
ZIP codeZIP_CD
80521
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
08

Mine

Mine IDMINE_ID
5001957
Mine name in this fileMINE_NAME
Wild Goose
Nearest townNEAREST_TOWN
Manley
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Intermittent
Status sinceMINE_STATUS_DT
Oct 1, 2024
Primary commodity (SIC)PRIMARY_SIC_CD
Gold Ore
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 13, 2026. Data and methodology