Skip to content
SafetyRecord logoSafetyRecord

Ajc Montana Creek Plant

Metal/Non-Metal, SurfaceConstruction Sand and GravelJuneau, AlaskaMine ID 5002024

Operator Alaska Juneau ConstructionController not shownMSHA status Intermittent since Jul 15, 2026

What MSHA has on file for this mine

Citations and orders
23
since Jul 22, 2015 · 23 to the operator, 0 to contractors · 7 marked S&S
Contested citations
None on record
Imminent danger orders, section 107(a)
None on record
MSHA's list starts July 1, 2010
Accident, injury or illness reports
None on record
MSHA's file starts January 2000
Yearly employment and hours
6 years
one row per part of the mine

MSHA records as of Nov 13, 2026. Having MSHA inspection records is common for operating mines. Data and methodology

Inspections

Regular Safety and Health Inspection
Oct 13, 2026Inspectors 1 | Hours on site 6

The inspection

BeganINSPECTION_BEGIN_DT
Oct 13, 2026
Closed outINSPECTION_END_DT
Oct 13, 2026
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
F03820B
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
6
Total inspection hoursSUM_TOTAL_INSP_HOURS
8

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Mine IDMINE_ID
5002024
Calendar yearCAL_YR
2026
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2027
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jun 8, 2024Inspectors 1 | Hours on site 0

The inspection

BeganINSPECTION_BEGIN_DT
Jun 8, 2024
Closed outINSPECTION_END_DT
Jun 8, 2024
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6876600
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Total inspection hoursSUM_TOTAL_INSP_HOURS
0.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Mine IDMINE_ID
5002024
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (14)

Hours on siteSUM_TOTAL_ON_SITE_HOURS, Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 25 to May 26, 2023Inspectors 1 | Hours on site 3

The inspection

BeganINSPECTION_BEGIN_DT
May 25, 2023
Closed outINSPECTION_END_DT
May 26, 2023
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6876086
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
3
Total inspection hoursSUM_TOTAL_INSP_HOURS
12

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Mine IDMINE_ID
5002024
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Special Emphasis Programs
May 14, 2023Inspectors 1 | Hours on site 0.25

The inspection

BeganINSPECTION_BEGIN_DT
May 14, 2023
Closed outINSPECTION_END_DT
May 14, 2023
ActivityACTIVITY
Special Emphasis Programs
Activity codeACTIVITY_CODE
E17
Program areaPROGRAM_AREA
M/NM--Special Emphasis Programs
Event numberEVENT_NO
1146995
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
5.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Mine IDMINE_ID
5002024
Calendar yearCAL_YR
2023
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2023
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Mine Idle Activity
Jul 7, 2022Inspectors 1 | Hours on site 0.25

The inspection

BeganINSPECTION_BEGIN_DT
Jul 7, 2022
Closed outINSPECTION_END_DT
Jul 7, 2022
ActivityACTIVITY
Mine Idle Activity
Activity codeACTIVITY_CODE
E28
Program areaPROGRAM_AREA
M/NM--Mine Idle Activity
Event numberEVENT_NO
1146936
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
2.25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Mine IDMINE_ID
5002024
Calendar yearCAL_YR
2022
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2022
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Mine Idle Activity
Sep 1 to Sep 2, 2021Inspectors 1 | Hours on site 0.5

The inspection

BeganINSPECTION_BEGIN_DT
Sep 1, 2021
Closed outINSPECTION_END_DT
Sep 2, 2021
ActivityACTIVITY
Mine Idle Activity
Activity codeACTIVITY_CODE
E28
Program areaPROGRAM_AREA
M/NM--Mine Idle Activity
Event numberEVENT_NO
1124976
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
0.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
9.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Mine IDMINE_ID
5002024
Calendar yearCAL_YR
2021
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2021
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Mine Idle Activity
Jul 11 to Jul 12, 2020Inspectors 1 | Hours on site 1

The inspection

BeganINSPECTION_BEGIN_DT
Jul 11, 2020
Closed outINSPECTION_END_DT
Jul 12, 2020
ActivityACTIVITY
Mine Idle Activity
Activity codeACTIVITY_CODE
E28
Program areaPROGRAM_AREA
M/NM--Mine Idle Activity
Event numberEVENT_NO
1153190
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
1
Total inspection hoursSUM_TOTAL_INSP_HOURS
2

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Mine IDMINE_ID
5002024
Calendar yearCAL_YR
2020
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2020
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
May 24, 2019Inspectors 1 | Hours on site 4.5

The inspection

BeganINSPECTION_BEGIN_DT
May 24, 2019
Closed outINSPECTION_END_DT
May 24, 2019
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1153892
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
6

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Mine IDMINE_ID
5002024
Calendar yearCAL_YR
2019
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2019
MSHA fiscal quarterFISCAL_QTR
3
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Oct 28, 2017Inspectors 1 | Hours on site 4.5

The inspection

BeganINSPECTION_BEGIN_DT
Oct 28, 2017
Closed outINSPECTION_END_DT
Oct 28, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1153794
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
4.5
Total inspection hoursSUM_TOTAL_INSP_HOURS
9.5

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Mine IDMINE_ID
5002024
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
4
MSHA fiscal yearFISCAL_YR
2018
MSHA fiscal quarterFISCAL_QTR
1
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 19 to Jul 20, 2017Inspectors 1 | Hours on site 11

The inspection

BeganINSPECTION_BEGIN_DT
Jul 19, 2017
Closed outINSPECTION_END_DT
Jul 20, 2017
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6723049
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7861
Hours on siteSUM_TOTAL_ON_SITE_HOURS
11
Total inspection hoursSUM_TOTAL_INSP_HOURS
25

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Mine IDMINE_ID
5002024
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Mar 29 to Mar 31, 2016Inspectors 1 | Hours on site 8.25

The inspection

BeganINSPECTION_BEGIN_DT
Mar 29, 2016
Closed outINSPECTION_END_DT
Mar 31, 2016
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
1140358
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
8.25
Total inspection hoursSUM_TOTAL_INSP_HOURS
20

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Mine IDMINE_ID
5002024
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

Regular Safety and Health Inspection
Jul 22 to Jul 24, 2015Inspectors 1 | Hours on site 10

The inspection

BeganINSPECTION_BEGIN_DT
Jul 22, 2015
Closed outINSPECTION_END_DT
Jul 24, 2015
ActivityACTIVITY
Regular Safety and Health Inspection
Activity codeACTIVITY_CODE
E01
Program areaPROGRAM_AREA
M/NM--Regular Safety and Health Inspection
Event numberEVENT_NO
6662183
InspectorsNBR_INSPECTOR
1
Inspector's office codeINSPECT_OFFICE_CD
M7641
Hours on siteSUM_TOTAL_ON_SITE_HOURS
10
Total inspection hoursSUM_TOTAL_INSP_HOURS
18

Who and when, as recorded

Operator at the timeOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Mine IDMINE_ID
5002024
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Recorded as 0 (13)

Active working sectionsACTIVE_SECTIONS, Idle working sectionsIDLE_SECTIONS, Shaft or slope sinking areasSHAFT_SLOPE_SINK, Impoundment constructionIMPOUND_CONSTR, Building construction sitesBLDG_CONSTR_SITES, Dragline or shovel constructionDRAGLINES, Other construction areasUNCLASSIFIED_CONSTR, Air samplesSAMPLE_CNT_AIR, Spot dust samplesSAMPLE_CNT_DUSTSPOT, Survey samplesSAMPLE_CNT_DUSTSURVEY, Respiratory dust samplesSAMPLE_CNT_RESPDUST, Noise samplesSAMPLE_CNT_NOISE, Other samplesSAMPLE_CNT_OTHER

Recorded as N (10)

Company recordsCO_RECORDS, Surface area or underground mineSURF_UG_MINE, Surface mine or facilitySURF_FACILITY_MINE, Refuse pilesREFUSE_PILES, Explosives storageEXPLOSIVE_STORAGE, Outby areasOUTBY_AREAS, Major constructionMAJOR_CONSTR, Shafts or slopesSHAFTS_SLOPES, ImpoundmentsIMPOUNDMENTS, Coal areas not elsewhere classifiedMISC_AREA

Not recorded by MSHA (3)

Supervisor or trainee hours, on siteSUM_TOTAL_ON_SITE_HRS_SPVR_TRAINEE, Supervisor or trainee hours, totalSUM_TOTAL_INSP_HRS_SPVR_TRAINEE, Controller at the timeCONTROLLER_NAME

12 inspections and other MSHA visits since Jul 22, 2015; activity names are MSHA's own text. Full list: MSHA Mine Data Retrieval System.

Citations and orders

Issued: Jun 8, 2024
Type: Citation
Standard: 50.30(a)
S&S: N
Negligence: NoNegligence
Issued to: Operator
Proposed penalty: $147.00
Details

The citation

Citation or order numberVIOLATION_NO
9687819
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jun 8, 2024
Time issuedVIOLATION_ISSUE_TIME
1515
Date of occurrenceVIOLATION_OCCUR_DT
Jun 8, 2024
30 CFR part and sectionPART_SECTION
50.30(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
NoNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jun 8, 2024
Originally due, timeORIG_TERM_DUE_TIME
1530
Latest dueLATEST_TERM_DUE_DT
Jun 8, 2024
Latest due, timeLATEST_TERM_DUE_TIME
1530
TerminatedTERMINATION_DT
Jun 8, 2024
Terminated, timeTERMINATION_TIME
1520
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
147
Current proposed assessmentAMOUNT_DUE
147
Amount paidAMOUNT_PAID
147
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Final order dateFINAL_ORDER_ISSUE_DT
Nov 21, 2024
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 30, 2024
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Inspection eventEVENT_NO
6876600
Inspection beganINSPECTION_BEGIN_DT
Jun 8, 2024
Inspection closed outINSPECTION_END_DT
Jun 8, 2024
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2024
Calendar quarterCAL_QTR
2
MSHA fiscal yearFISCAL_YR
2024
MSHA fiscal quarterFISCAL_QTR
3

Recorded as 0 (2)

Persons potentially affectedNO_AFFECTED, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT

Recorded as N (5)

From a 103(g) written noticeWRITTEN_NOTICE, Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (13)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 19, 2017
Type: Citation
Standard: 56.4501
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
9371413
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 19, 2017
Time issuedVIOLATION_ISSUE_TIME
1125
Date of occurrenceVIOLATION_OCCUR_DT
Jul 19, 2017
30 CFR part and sectionPART_SECTION
56.4501
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 20, 2017
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jul 20, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jul 20, 2017
Terminated, timeTERMINATION_TIME
1250
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Sep 13, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Nov 14, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 14, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Inspection eventEVENT_NO
6723049
Inspection beganINSPECTION_BEGIN_DT
Jul 19, 2017
Inspection closed outINSPECTION_END_DT
Jul 20, 2017
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 19, 2017
Type: Citation
Standard: 56.14130(g)
S&S: Y
Negligence: HighNegligence
Issued to: Operator
Proposed penalty: $3,700.00
Details

The citation

Citation or order numberVIOLATION_NO
9371417
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 19, 2017
Time issuedVIOLATION_ISSUE_TIME
1330
Date of occurrenceVIOLATION_OCCUR_DT
Jul 19, 2017
30 CFR part and sectionPART_SECTION
56.14130(g)
Section of the Act, primarySECTION_OF_ACT_1
104(d)(1)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
HighNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 19, 2017
Originally due, timeORIG_TERM_DUE_TIME
1335
Latest dueLATEST_TERM_DUE_DT
Jul 19, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1335
TerminatedTERMINATION_DT
Jul 19, 2017
Terminated, timeTERMINATION_TIME
1336
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
3700
Current proposed assessmentAMOUNT_DUE
3700
Amount paidAMOUNT_PAID
3700
Bill first printedBILL_PRINT_DT
Dec 6, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Feb 5, 2018
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
May 23, 2018
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Inspection eventEVENT_NO
6723049
Inspection beganINSPECTION_BEGIN_DT
Jul 19, 2017
Inspection closed outINSPECTION_END_DT
Jul 20, 2017
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (2)

Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 19, 2017
Type: Citation
Standard: 56.11001
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $280.00
Details

The citation

Citation or order numberVIOLATION_NO
9371416
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 19, 2017
Time issuedVIOLATION_ISSUE_TIME
1300
Date of occurrenceVIOLATION_OCCUR_DT
Jul 19, 2017
30 CFR part and sectionPART_SECTION
56.11001
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 20, 2017
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jul 20, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jul 20, 2017
Terminated, timeTERMINATION_TIME
1019
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
280
Current proposed assessmentAMOUNT_DUE
280
Amount paidAMOUNT_PAID
280
Bill first printedBILL_PRINT_DT
Sep 13, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Nov 14, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 14, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Inspection eventEVENT_NO
6723049
Inspection beganINSPECTION_BEGIN_DT
Jul 19, 2017
Inspection closed outINSPECTION_END_DT
Jul 20, 2017
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 19, 2017
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
9371414
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 19, 2017
Time issuedVIOLATION_ISSUE_TIME
1150
Date of occurrenceVIOLATION_OCCUR_DT
Jul 19, 2017
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 20, 2017
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jul 20, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jul 20, 2017
Terminated, timeTERMINATION_TIME
1018
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Sep 13, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Nov 14, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 14, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Inspection eventEVENT_NO
6723049
Inspection beganINSPECTION_BEGIN_DT
Jul 19, 2017
Inspection closed outINSPECTION_END_DT
Jul 20, 2017
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 19, 2017
Type: Citation
Standard: 56.12004
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $280.00
Details

The citation

Citation or order numberVIOLATION_NO
9371411
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 19, 2017
Time issuedVIOLATION_ISSUE_TIME
1110
Date of occurrenceVIOLATION_OCCUR_DT
Jul 19, 2017
30 CFR part and sectionPART_SECTION
56.12004
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 19, 2017
Originally due, timeORIG_TERM_DUE_TIME
1140
Latest dueLATEST_TERM_DUE_DT
Jul 19, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1140
TerminatedTERMINATION_DT
Jul 19, 2017
Terminated, timeTERMINATION_TIME
1135
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
280
Current proposed assessmentAMOUNT_DUE
280
Amount paidAMOUNT_PAID
280
Bill first printedBILL_PRINT_DT
Sep 13, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Nov 14, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 14, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Inspection eventEVENT_NO
6723049
Inspection beganINSPECTION_BEGIN_DT
Jul 19, 2017
Inspection closed outINSPECTION_END_DT
Jul 20, 2017
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 19, 2017
Type: Citation
Standard: 56.12008
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
9371415
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 19, 2017
Time issuedVIOLATION_ISSUE_TIME
1210
Date of occurrenceVIOLATION_OCCUR_DT
Jul 19, 2017
30 CFR part and sectionPART_SECTION
56.12008
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 19, 2017
Originally due, timeORIG_TERM_DUE_TIME
1240
Latest dueLATEST_TERM_DUE_DT
Jul 19, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1240
TerminatedTERMINATION_DT
Jul 19, 2017
Terminated, timeTERMINATION_TIME
1233
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Sep 13, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Nov 14, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 14, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Inspection eventEVENT_NO
6723049
Inspection beganINSPECTION_BEGIN_DT
Jul 19, 2017
Inspection closed outINSPECTION_END_DT
Jul 20, 2017
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (1)

Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 19, 2017
Type: Citation
Standard: 56.4201(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $116.00
Details

The citation

Citation or order numberVIOLATION_NO
9371412
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 19, 2017
Time issuedVIOLATION_ISSUE_TIME
1115
Date of occurrenceVIOLATION_OCCUR_DT
Jul 19, 2017
30 CFR part and sectionPART_SECTION
56.4201(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 20, 2017
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jul 20, 2017
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jul 20, 2017
Terminated, timeTERMINATION_TIME
1010
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
116
Current proposed assessmentAMOUNT_DUE
116
Amount paidAMOUNT_PAID
116
Bill first printedBILL_PRINT_DT
Sep 13, 2017
Final order dateFINAL_ORDER_ISSUE_DT
Nov 14, 2017
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Dec 14, 2017
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0125461
Inspection eventEVENT_NO
6723049
Inspection beganINSPECTION_BEGIN_DT
Jul 19, 2017
Inspection closed outINSPECTION_END_DT
Jul 20, 2017
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2017
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2017
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Persons potentially affectedNO_AFFECTED, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 29, 2016
Type: Citation
Standard: 56.4101
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6356369
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 29, 2016
Time issuedVIOLATION_ISSUE_TIME
1109
Date of occurrenceVIOLATION_OCCUR_DT
Mar 29, 2016
30 CFR part and sectionPART_SECTION
56.4101
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 30, 2016
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Mar 30, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Mar 31, 2016
Terminated, timeTERMINATION_TIME
0919
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Aug 16, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 28, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
1140358
Inspection beganINSPECTION_BEGIN_DT
Mar 29, 2016
Inspection closed outINSPECTION_END_DT
Mar 31, 2016
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 29, 2016
Type: Citation
Standard: 56.12030
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6356370
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 29, 2016
Time issuedVIOLATION_ISSUE_TIME
1124
Date of occurrenceVIOLATION_OCCUR_DT
Mar 29, 2016
30 CFR part and sectionPART_SECTION
56.12030
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 29, 2016
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Mar 29, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Mar 31, 2016
Terminated, timeTERMINATION_TIME
0903
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Aug 16, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 28, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
1140358
Inspection beganINSPECTION_BEGIN_DT
Mar 29, 2016
Inspection closed outINSPECTION_END_DT
Mar 31, 2016
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 29, 2016
Type: Citation
Standard: 56.14132(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6356373
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 29, 2016
Time issuedVIOLATION_ISSUE_TIME
1328
Date of occurrenceVIOLATION_OCCUR_DT
Mar 29, 2016
30 CFR part and sectionPART_SECTION
56.14132(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 30, 2016
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Mar 30, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Mar 31, 2016
Terminated, timeTERMINATION_TIME
0749
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Aug 16, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 28, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
1140358
Inspection beganINSPECTION_BEGIN_DT
Mar 29, 2016
Inspection closed outINSPECTION_END_DT
Mar 31, 2016
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 29, 2016
Type: Citation
Standard: 56.14100(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6356374
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 29, 2016
Time issuedVIOLATION_ISSUE_TIME
1341
Date of occurrenceVIOLATION_OCCUR_DT
Mar 29, 2016
30 CFR part and sectionPART_SECTION
56.14100(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence
Special assessmentSPECIAL_ASSESS
Y

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 30, 2016
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Mar 30, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Mar 31, 2016
Terminated, timeTERMINATION_TIME
0917
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Aug 16, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 28, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
1140358
Inspection beganINSPECTION_BEGIN_DT
Mar 29, 2016
Inspection closed outINSPECTION_END_DT
Mar 31, 2016
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (3)

Significant and substantialSIG_SUB, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 29, 2016
Type: Citation
Standard: 56.14107(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $108.00
Details

The citation

Citation or order numberVIOLATION_NO
6356368
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 29, 2016
Time issuedVIOLATION_ISSUE_TIME
1010
Date of occurrenceVIOLATION_OCCUR_DT
Mar 29, 2016
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 29, 2016
Originally due, timeORIG_TERM_DUE_TIME
1700
Latest dueLATEST_TERM_DUE_DT
Mar 29, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Mar 31, 2016
Terminated, timeTERMINATION_TIME
0745
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
108
Current proposed assessmentAMOUNT_DUE
108
Amount paidAMOUNT_PAID
108
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Aug 16, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 28, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
1140358
Inspection beganINSPECTION_BEGIN_DT
Mar 29, 2016
Inspection closed outINSPECTION_END_DT
Mar 31, 2016
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 29, 2016
Type: Citation
Standard: 56.9300(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $108.00
Details

The citation

Citation or order numberVIOLATION_NO
6356371
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 29, 2016
Time issuedVIOLATION_ISSUE_TIME
1148
Date of occurrenceVIOLATION_OCCUR_DT
Mar 29, 2016
30 CFR part and sectionPART_SECTION
56.9300(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 29, 2016
Originally due, timeORIG_TERM_DUE_TIME
1300
Latest dueLATEST_TERM_DUE_DT
Mar 29, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1300
TerminatedTERMINATION_DT
Mar 29, 2016
Terminated, timeTERMINATION_TIME
1222
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
108
Current proposed assessmentAMOUNT_DUE
108
Amount paidAMOUNT_PAID
108
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Aug 16, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 28, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
1140358
Inspection beganINSPECTION_BEGIN_DT
Mar 29, 2016
Inspection closed outINSPECTION_END_DT
Mar 31, 2016
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Mar 29, 2016
Type: Citation
Standard: 56.13015(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
6356372
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Mar 29, 2016
Time issuedVIOLATION_ISSUE_TIME
1300
Date of occurrenceVIOLATION_OCCUR_DT
Mar 29, 2016
30 CFR part and sectionPART_SECTION
56.13015(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Mar 30, 2016
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jun 15, 2016
Latest due, timeLATEST_TERM_DUE_TIME
1700
TerminatedTERMINATION_DT
Jun 14, 2016
Terminated, timeTERMINATION_TIME
0620
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Final order dateFINAL_ORDER_ISSUE_DT
Aug 16, 2016
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Jul 28, 2016
Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
1140358
Inspection beganINSPECTION_BEGIN_DT
Mar 29, 2016
Inspection closed outINSPECTION_END_DT
Mar 31, 2016
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2016
Calendar quarterCAL_QTR
1
MSHA fiscal yearFISCAL_YR
2016
MSHA fiscal quarterFISCAL_QTR
2

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 22, 2015
Type: Citation
Standard: 56.12028
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8786765
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 22, 2015
Time issuedVIOLATION_ISSUE_TIME
1450
Date of occurrenceVIOLATION_OCCUR_DT
Jul 22, 2015
30 CFR part and sectionPART_SECTION
56.12028
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 23, 2015
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jul 23, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jul 23, 2015
Terminated, timeTERMINATION_TIME
1405
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 24, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 30, 2015

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
6662183
Inspection beganINSPECTION_BEGIN_DT
Jul 22, 2015
Inspection closed outINSPECTION_END_DT
Jul 24, 2015
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 22, 2015
Type: Citation
Standard: 56.14107(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8786761
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 22, 2015
Time issuedVIOLATION_ISSUE_TIME
1120
Date of occurrenceVIOLATION_OCCUR_DT
Jul 22, 2015
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 22, 2015
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 22, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 23, 2015
Terminated, timeTERMINATION_TIME
1025
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 24, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 30, 2015

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
6662183
Inspection beganINSPECTION_BEGIN_DT
Jul 22, 2015
Inspection closed outINSPECTION_END_DT
Jul 24, 2015
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 22, 2015
Type: Citation
Standard: 56.18002(b)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8786763
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 22, 2015
Time issuedVIOLATION_ISSUE_TIME
1145
Date of occurrenceVIOLATION_OCCUR_DT
Jul 22, 2015
30 CFR part and sectionPART_SECTION
56.18002(b)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
NoLikelihood
Expected injury or illnessINJ_ILLNESS
NoLostDays
Persons potentially affectedNO_AFFECTED
2
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 22, 2015
Originally due, timeORIG_TERM_DUE_TIME
1200
Latest dueLATEST_TERM_DUE_DT
Jul 22, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1200
TerminatedTERMINATION_DT
Jul 22, 2015
Terminated, timeTERMINATION_TIME
1150
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 24, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 30, 2015

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
6662183
Inspection beganINSPECTION_BEGIN_DT
Jul 22, 2015
Inspection closed outINSPECTION_END_DT
Jul 24, 2015
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 22, 2015
Type: Citation
Standard: 56.12016
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $243.00
Details

The citation

Citation or order numberVIOLATION_NO
8786758
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 22, 2015
Time issuedVIOLATION_ISSUE_TIME
1025
Date of occurrenceVIOLATION_OCCUR_DT
Jul 22, 2015
30 CFR part and sectionPART_SECTION
56.12016
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Fatal
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 22, 2015
Originally due, timeORIG_TERM_DUE_TIME
1030
Latest dueLATEST_TERM_DUE_DT
Jul 22, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1030
TerminatedTERMINATION_DT
Jul 22, 2015
Terminated, timeTERMINATION_TIME
1030
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
243
Current proposed assessmentAMOUNT_DUE
243
Amount paidAMOUNT_PAID
243
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 24, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 30, 2015

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
6662183
Inspection beganINSPECTION_BEGIN_DT
Jul 22, 2015
Inspection closed outINSPECTION_END_DT
Jul 24, 2015
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 22, 2015
Type: Citation
Standard: 56.12018
S&S: N
Negligence: LowNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8786762
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 22, 2015
Time issuedVIOLATION_ISSUE_TIME
1130
Date of occurrenceVIOLATION_OCCUR_DT
Jul 22, 2015
30 CFR part and sectionPART_SECTION
56.12018
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
LowNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 22, 2015
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 22, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 23, 2015
Terminated, timeTERMINATION_TIME
1330
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 24, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 30, 2015

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
6662183
Inspection beganINSPECTION_BEGIN_DT
Jul 22, 2015
Inspection closed outINSPECTION_END_DT
Jul 24, 2015
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 22, 2015
Type: Citation
Standard: 56.14107(a)
S&S: Y
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $108.00
Details

The citation

Citation or order numberVIOLATION_NO
8786759
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 22, 2015
Time issuedVIOLATION_ISSUE_TIME
1035
Date of occurrenceVIOLATION_OCCUR_DT
Jul 22, 2015
30 CFR part and sectionPART_SECTION
56.14107(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

Significant and substantialSIG_SUB
Y
LikelihoodLIKELIHOOD
Reasonably
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 22, 2015
Originally due, timeORIG_TERM_DUE_TIME
1045
Latest dueLATEST_TERM_DUE_DT
Jul 22, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1045
TerminatedTERMINATION_DT
Jul 22, 2015
Terminated, timeTERMINATION_TIME
1045
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
108
Current proposed assessmentAMOUNT_DUE
108
Amount paidAMOUNT_PAID
108
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 24, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 30, 2015

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
6662183
Inspection beganINSPECTION_BEGIN_DT
Jul 22, 2015
Inspection closed outINSPECTION_END_DT
Jul 24, 2015
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (3)

Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 22, 2015
Type: Citation
Standard: 56.9300(a)
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8786764
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 22, 2015
Time issuedVIOLATION_ISSUE_TIME
1155
Date of occurrenceVIOLATION_OCCUR_DT
Jul 22, 2015
30 CFR part and sectionPART_SECTION
56.9300(a)
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
Permanent
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 23, 2015
Originally due, timeORIG_TERM_DUE_TIME
1500
Latest dueLATEST_TERM_DUE_DT
Jul 23, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1500
TerminatedTERMINATION_DT
Jul 23, 2015
Terminated, timeTERMINATION_TIME
1010
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 24, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 30, 2015

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
6662183
Inspection beganINSPECTION_BEGIN_DT
Jul 22, 2015
Inspection closed outINSPECTION_END_DT
Jul 24, 2015
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

Issued: Jul 22, 2015
Type: Citation
Standard: 56.11027
S&S: N
Negligence: ModNegligence
Issued to: Operator
Proposed penalty: $100.00
Details

The citation

Citation or order numberVIOLATION_NO
8786760
TypeCIT_ORD_SAFE
Citation
IssuedVIOLATION_ISSUE_DT
Jul 22, 2015
Time issuedVIOLATION_ISSUE_TIME
1110
Date of occurrenceVIOLATION_OCCUR_DT
Jul 22, 2015
30 CFR part and sectionPART_SECTION
56.11027
Section of the Act, primarySECTION_OF_ACT_1
104(a)
Primary mine or millPRIMARY_OR_MILL
Primary

Gravity and negligence, as the inspector recorded them

LikelihoodLIKELIHOOD
Unlikely
Expected injury or illnessINJ_ILLNESS
LostDays
Persons potentially affectedNO_AFFECTED
1
NegligenceNEGLIGENCE
ModNegligence

Abatement

Originally dueORIG_TERM_DUE_DT
Jul 22, 2015
Originally due, timeORIG_TERM_DUE_TIME
1600
Latest dueLATEST_TERM_DUE_DT
Jul 22, 2015
Latest due, timeLATEST_TERM_DUE_TIME
1600
TerminatedTERMINATION_DT
Jul 23, 2015
Terminated, timeTERMINATION_TIME
1045
Termination typeTERMINATION_TYPE
Terminated

Penalty and contest

Proposed penaltyPROPOSED_PENALTY
100
Current proposed assessmentAMOUNT_DUE
100
Amount paidAMOUNT_PAID
100
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Final order dateFINAL_ORDER_ISSUE_DT
Oct 24, 2015
Last actionLAST_ACTION_CD
Paid
Last action dateLAST_ACTION_DT
Oct 30, 2015

Who, inspection and period

Issued toVIOLATOR_TYPE_CD
Operator
Operator at the timeVIOLATOR_NAME
Alaska Juneau Construction
Operator IDVIOLATOR_ID
0135113
Controller IDCONTROLLER_ID
0115021
Inspection eventEVENT_NO
6662183
Inspection beganINSPECTION_BEGIN_DT
Jul 22, 2015
Inspection closed outINSPECTION_END_DT
Jul 24, 2015
Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine type in this fileMINE_TYPE
Surface
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Calendar yearCAL_YR
2015
Calendar quarterCAL_QTR
3
MSHA fiscal yearFISCAL_YR
2015
MSHA fiscal quarterFISCAL_QTR
4

Recorded as 0 (2)

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Operator's inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT

Recorded as N (4)

Significant and substantialSIG_SUB, Special assessmentSPECIAL_ASSESS, Assessment generated indicatorASMT_GENERATED_IND, ContestedCONTESTED_IND

Not recorded by MSHA (14)

Section of the ActSECTION_OF_ACT, Section of the Act, secondarySECTION_OF_ACT_2, Enforcement areaENFORCEMENT_AREA, From a 103(g) written noticeWRITTEN_NOTICE, Preceding citationINITIAL_VIOL_NO, Replaced by orderREPLACED_BY_ORDER_NO, VacatedVACATE_DT, Vacated, timeVACATE_TIME, Advised of right to a conferenceRIGHT_TO_CONF_DT, Most recent docket status dateCONTESTED_DT, Docket numberDOCKET_NO, Docket statusDOCKET_STATUS_CD, Contractor IDCONTRACTOR_ID, Controller at the timeCONTROLLER_NAME

23 citations and orders since Jul 22, 2015: 23 issued to the operator, 0 to contractors working at the mine. Proposed penalty is MSHA's original proposed amount, before any change from a contested case. Citations can be contested, modified or vacated.

Penalties as assessed

Issued: Jun 8, 2024
Citation number: 9687819
Standard: 50.30(a)
Proposed penalty: $147.00
Current assessment: $147.00
Paid against proposed penalty: $147.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9687819
Assessment control numberASSESS_CASE_NO
000606997
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 30, 2024
Citation issuedISSUE_DT
Jun 8, 2024
Date of occurrenceOCCURRENCE_DT
Jun 8, 2024
Final order dateFINAL_ORDER_DT
Nov 21, 2024
Bill first printedBILL_PRINT_DT
Oct 16, 2024
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2025
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 21, 2024
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
50.30(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
147.00
Current assessmentCURRENT_ASSESSMENT_AMT
147.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
147.00

Inputs to the penalty calculation

Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
1437
Size of mineSIZE_OF_MINE
1437
Controller hours workedCONTROLLER_HRS
12282
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
12282
History period startHISTORY_START_DT
Mar 8, 2023
History period endHISTORY_END_DT
Jun 7, 2024

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6876600
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (21)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Violation history pointsPENALTY_POINTS, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Negligence pointsNEGLIGENCE_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 19, 2017
Citation number: 9371413
Standard: 56.4501
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9371413
Assessment control numberASSESS_CASE_NO
000448491
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 14, 2017
Citation issuedISSUE_DT
Jul 19, 2017
Date of occurrenceOCCURRENCE_DT
Jul 19, 2017
Final order dateFINAL_ORDER_DT
Nov 14, 2017
Bill first printedBILL_PRINT_DT
Sep 13, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 14, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4501
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator hours worked at the mineVIOLATOR_MINE_HRS
1124
Size of mineSIZE_OF_MINE
1124
Controller hours workedCONTROLLER_HRS
5030
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5030
History period startHISTORY_START_DT
Apr 19, 2016
History period endHISTORY_END_DT
Jul 18, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6723049
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 19, 2017
Citation number: 9371412
Standard: 56.4201(b)
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9371412
Assessment control numberASSESS_CASE_NO
000448491
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 14, 2017
Citation issuedISSUE_DT
Jul 19, 2017
Date of occurrenceOCCURRENCE_DT
Jul 19, 2017
Final order dateFINAL_ORDER_DT
Nov 14, 2017
Bill first printedBILL_PRINT_DT
Sep 13, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 14, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4201(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
20
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator hours worked at the mineVIOLATOR_MINE_HRS
1124
Size of mineSIZE_OF_MINE
1124
Controller hours workedCONTROLLER_HRS
5030
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5030
History period startHISTORY_START_DT
Apr 19, 2016
History period endHISTORY_END_DT
Jul 18, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6723049
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (19)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 19, 2017
Citation number: 9371411
Standard: 56.12004
Proposed penalty: $280.00
Current assessment: $280.00
Paid against proposed penalty: $280.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9371411
Assessment control numberASSESS_CASE_NO
000448491
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 14, 2017
Citation issuedISSUE_DT
Jul 19, 2017
Date of occurrenceOCCURRENCE_DT
Jul 19, 2017
Final order dateFINAL_ORDER_DT
Nov 14, 2017
Bill first printedBILL_PRINT_DT
Sep 13, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 14, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12004
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
280.00
Current assessmentCURRENT_ASSESSMENT_AMT
280.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
280.00

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator hours worked at the mineVIOLATOR_MINE_HRS
1124
Size of mineSIZE_OF_MINE
1124
Controller hours workedCONTROLLER_HRS
5030
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5030
History period startHISTORY_START_DT
Apr 19, 2016
History period endHISTORY_END_DT
Jul 18, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6723049
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 19, 2017
Citation number: 9371417
Standard: 56.14130(g)
Proposed penalty: $3,700.00
Current assessment: $3,700.00
Paid against proposed penalty: $3,700.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9371417
Assessment control numberASSESS_CASE_NO
000454186
Assessment typeASSESS_TYPE_CD
Special
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
May 1, 2018
Citation issuedISSUE_DT
Jul 19, 2017
Date of occurrenceOCCURRENCE_DT
Jul 19, 2017
Final order dateFINAL_ORDER_DT
Feb 5, 2018
Bill first printedBILL_PRINT_DT
Dec 6, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2018
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Feb 5, 2018
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14130(g)
Section of the Act, primaryPRIMARY_ACTION_CD
104(d)(1)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
3700.00
Current assessmentCURRENT_ASSESSMENT_AMT
3700.00
Mine Act interestMINEACT_INTEREST_AMT
5.64
Excessive late payment interestEXLATE_INTEREST_AMT
3.27
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
3700.00
Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT
0.56

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator hours worked at the mineVIOLATOR_MINE_HRS
1124
Size of mineSIZE_OF_MINE
1124
Controller hours workedCONTROLLER_HRS
5030
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5030
History period startHISTORY_START_DT
Apr 19, 2016
History period endHISTORY_END_DT
Jul 18, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6723049
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (7)

Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (12)

Mine Act sectionMINE_ACT_SECTION_CD, Violation history pointsPENALTY_POINTS, Persons potentially affected pointsGRAVITY_PERSONS_POINTS, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Negligence pointsNEGLIGENCE_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS

Issued: Jul 19, 2017
Citation number: 9371414
Standard: 56.14107(a)
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9371414
Assessment control numberASSESS_CASE_NO
000448491
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 14, 2017
Citation issuedISSUE_DT
Jul 19, 2017
Date of occurrenceOCCURRENCE_DT
Jul 19, 2017
Final order dateFINAL_ORDER_DT
Nov 14, 2017
Bill first printedBILL_PRINT_DT
Sep 13, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 14, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
1124
Size of mineSIZE_OF_MINE
1124
Controller hours workedCONTROLLER_HRS
5030
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5030
History period startHISTORY_START_DT
Apr 19, 2016
History period endHISTORY_END_DT
Jul 18, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6723049
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (15)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 19, 2017
Citation number: 9371415
Standard: 56.12008
Proposed penalty: $116.00
Current assessment: $116.00
Paid against proposed penalty: $116.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9371415
Assessment control numberASSESS_CASE_NO
000448491
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 14, 2017
Citation issuedISSUE_DT
Jul 19, 2017
Date of occurrenceOCCURRENCE_DT
Jul 19, 2017
Final order dateFINAL_ORDER_DT
Nov 14, 2017
Bill first printedBILL_PRINT_DT
Sep 13, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 14, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12008
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
116.00
Current assessmentCURRENT_ASSESSMENT_AMT
116.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
116.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator hours worked at the mineVIOLATOR_MINE_HRS
1124
Size of mineSIZE_OF_MINE
1124
Controller hours workedCONTROLLER_HRS
5030
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5030
History period startHISTORY_START_DT
Apr 19, 2016
History period endHISTORY_END_DT
Jul 18, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6723049
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 19, 2017
Citation number: 9371416
Standard: 56.11001
Proposed penalty: $280.00
Current assessment: $280.00
Paid against proposed penalty: $280.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
9371416
Assessment control numberASSESS_CASE_NO
000448491
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Dec 14, 2017
Citation issuedISSUE_DT
Jul 19, 2017
Date of occurrenceOCCURRENCE_DT
Jul 19, 2017
Final order dateFINAL_ORDER_DT
Nov 14, 2017
Bill first printedBILL_PRINT_DT
Sep 13, 2017
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2017
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Nov 14, 2017
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11001
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
280.00
Current assessmentCURRENT_ASSESSMENT_AMT
280.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
280.00

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
7
Operator hours worked at the mineVIOLATOR_MINE_HRS
1124
Size of mineSIZE_OF_MINE
1124
Controller hours workedCONTROLLER_HRS
5030
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
5030
History period startHISTORY_START_DT
Apr 19, 2016
History period endHISTORY_END_DT
Jul 18, 2017

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6723049
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (16)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 29, 2016
Citation number: 6356370
Standard: 56.12030
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6356370
Assessment control numberASSESS_CASE_NO
000412983
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 14, 2016
Citation issuedISSUE_DT
Mar 29, 2016
Date of occurrenceOCCURRENCE_DT
Mar 29, 2016
Final order dateFINAL_ORDER_DT
Aug 16, 2016
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 16, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12030
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
3093
Size of mineSIZE_OF_MINE
3093
Controller hours workedCONTROLLER_HRS
6684
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6684
History period startHISTORY_START_DT
Dec 29, 2014
History period endHISTORY_END_DT
Mar 28, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140358
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 29, 2016
Citation number: 6356369
Standard: 56.4101
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6356369
Assessment control numberASSESS_CASE_NO
000412983
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 14, 2016
Citation issuedISSUE_DT
Mar 29, 2016
Date of occurrenceOCCURRENCE_DT
Mar 29, 2016
Final order dateFINAL_ORDER_DT
Aug 16, 2016
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 16, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.4101
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
3093
Size of mineSIZE_OF_MINE
3093
Controller hours workedCONTROLLER_HRS
6684
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6684
History period startHISTORY_START_DT
Dec 29, 2014
History period endHISTORY_END_DT
Mar 28, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140358
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 29, 2016
Citation number: 6356374
Standard: 56.14100(b)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6356374
Assessment control numberASSESS_CASE_NO
000412983
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 14, 2016
Citation issuedISSUE_DT
Mar 29, 2016
Date of occurrenceOCCURRENCE_DT
Mar 29, 2016
Final order dateFINAL_ORDER_DT
Aug 16, 2016
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 16, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14100(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
3093
Size of mineSIZE_OF_MINE
3093
Controller hours workedCONTROLLER_HRS
6684
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6684
History period startHISTORY_START_DT
Dec 29, 2014
History period endHISTORY_END_DT
Mar 28, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140358
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 29, 2016
Citation number: 6356373
Standard: 56.14132(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6356373
Assessment control numberASSESS_CASE_NO
000412983
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 14, 2016
Citation issuedISSUE_DT
Mar 29, 2016
Date of occurrenceOCCURRENCE_DT
Mar 29, 2016
Final order dateFINAL_ORDER_DT
Aug 16, 2016
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 16, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14132(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
3093
Size of mineSIZE_OF_MINE
3093
Controller hours workedCONTROLLER_HRS
6684
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6684
History period startHISTORY_START_DT
Dec 29, 2014
History period endHISTORY_END_DT
Mar 28, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140358
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 29, 2016
Citation number: 6356371
Standard: 56.9300(a)
Proposed penalty: $108.00
Current assessment: $108.00
Paid against proposed penalty: $108.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6356371
Assessment control numberASSESS_CASE_NO
000412983
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 14, 2016
Citation issuedISSUE_DT
Mar 29, 2016
Date of occurrenceOCCURRENCE_DT
Mar 29, 2016
Final order dateFINAL_ORDER_DT
Aug 16, 2016
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 16, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
108.00
Current assessmentCURRENT_ASSESSMENT_AMT
108.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
108.00

Penalty points

Violation history pointsPENALTY_POINTS
61
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
4
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
1
Repeat violations per inspection dayRPID
0.5
Operator hours worked at the mineVIOLATOR_MINE_HRS
3093
Size of mineSIZE_OF_MINE
3093
Controller hours workedCONTROLLER_HRS
6684
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6684
History period startHISTORY_START_DT
Dec 29, 2014
History period endHISTORY_END_DT
Mar 28, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140358
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 29, 2016
Citation number: 6356368
Standard: 56.14107(a)
Proposed penalty: $108.00
Current assessment: $108.00
Paid against proposed penalty: $108.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6356368
Assessment control numberASSESS_CASE_NO
000412983
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 14, 2016
Citation issuedISSUE_DT
Mar 29, 2016
Date of occurrenceOCCURRENCE_DT
Mar 29, 2016
Final order dateFINAL_ORDER_DT
Aug 16, 2016
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 16, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
108.00
Current assessmentCURRENT_ASSESSMENT_AMT
108.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
108.00

Penalty points

Violation history pointsPENALTY_POINTS
61
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
4
Repeat violationsVIOLATOR_REPEATED_VIOL_CNT
2
Repeat violations per inspection dayRPID
1
Operator hours worked at the mineVIOLATOR_MINE_HRS
3093
Size of mineSIZE_OF_MINE
3093
Controller hours workedCONTROLLER_HRS
6684
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6684
History period startHISTORY_START_DT
Dec 29, 2014
History period endHISTORY_END_DT
Mar 28, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140358
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (12)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Mar 29, 2016
Citation number: 6356372
Standard: 56.13015(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
6356372
Assessment control numberASSESS_CASE_NO
000412983
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Jul 14, 2016
Citation issuedISSUE_DT
Mar 29, 2016
Date of occurrenceOCCURRENCE_DT
Mar 29, 2016
Final order dateFINAL_ORDER_DT
Aug 16, 2016
Bill first printedBILL_PRINT_DT
Jun 15, 2016
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2016
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Aug 16, 2016
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.13015(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Assessed violations in the history periodVIOLATOR_VIOLATION_CNT
8
Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT
2
Violations per inspection dayVPID
4
Operator hours worked at the mineVIOLATOR_MINE_HRS
3093
Size of mineSIZE_OF_MINE
3093
Controller hours workedCONTROLLER_HRS
6684
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
6684
History period startHISTORY_START_DT
Dec 29, 2014
History period endHISTORY_END_DT
Mar 28, 2016

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
1140358
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (14)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 22, 2015
Citation number: 8786758
Standard: 56.12016
Proposed penalty: $243.00
Current assessment: $243.00
Paid against proposed penalty: $243.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8786758
Assessment control numberASSESS_CASE_NO
000392104
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 30, 2015
Citation issuedISSUE_DT
Jul 22, 2015
Date of occurrenceOCCURRENCE_DT
Jul 22, 2015
Final order dateFINAL_ORDER_DT
Oct 24, 2015
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 24, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12016
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
243.00
Current assessmentCURRENT_ASSESSMENT_AMT
243.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
243.00

Penalty points

Violation history pointsPENALTY_POINTS
71
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
2466
Size of mineSIZE_OF_MINE
2466
Controller hours workedCONTROLLER_HRS
4762
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
4762
History period startHISTORY_START_DT
Sep 23, 2014
History period endHISTORY_END_DT
Jul 21, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6662183
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 22, 2015
Citation number: 8786762
Standard: 56.12018
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8786762
Assessment control numberASSESS_CASE_NO
000392104
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 30, 2015
Citation issuedISSUE_DT
Jul 22, 2015
Date of occurrenceOCCURRENCE_DT
Jul 22, 2015
Final order dateFINAL_ORDER_DT
Oct 24, 2015
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 24, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12018
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
31
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
10

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
2466
Size of mineSIZE_OF_MINE
2466
Controller hours workedCONTROLLER_HRS
4762
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
4762
History period startHISTORY_START_DT
Sep 23, 2014
History period endHISTORY_END_DT
Jul 21, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6662183
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 22, 2015
Citation number: 8786764
Standard: 56.9300(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8786764
Assessment control numberASSESS_CASE_NO
000392104
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 30, 2015
Citation issuedISSUE_DT
Jul 22, 2015
Date of occurrenceOCCURRENCE_DT
Jul 22, 2015
Final order dateFINAL_ORDER_DT
Oct 24, 2015
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 24, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.9300(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
41
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
2466
Size of mineSIZE_OF_MINE
2466
Controller hours workedCONTROLLER_HRS
4762
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
4762
History period startHISTORY_START_DT
Sep 23, 2014
History period endHISTORY_END_DT
Jul 21, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6662183
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 22, 2015
Citation number: 8786759
Standard: 56.14107(a)
Proposed penalty: $108.00
Current assessment: $108.00
Paid against proposed penalty: $108.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8786759
Assessment control numberASSESS_CASE_NO
000392104
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 30, 2015
Citation issuedISSUE_DT
Jul 22, 2015
Date of occurrenceOCCURRENCE_DT
Jul 22, 2015
Final order dateFINAL_ORDER_DT
Oct 24, 2015
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 24, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Significant and substantialSIG_SUB_IND
Y
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
108.00
Current assessmentCURRENT_ASSESSMENT_AMT
108.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
108.00

Penalty points

Violation history pointsPENALTY_POINTS
61
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
10
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
30
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
2466
Size of mineSIZE_OF_MINE
2466
Controller hours workedCONTROLLER_HRS
4762
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
4762
History period startHISTORY_START_DT
Sep 23, 2014
History period endHISTORY_END_DT
Jul 21, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6662183
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (1)

Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 22, 2015
Citation number: 8786765
Standard: 56.12028
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8786765
Assessment control numberASSESS_CASE_NO
000392104
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 30, 2015
Citation issuedISSUE_DT
Jul 22, 2015
Date of occurrenceOCCURRENCE_DT
Jul 22, 2015
Final order dateFINAL_ORDER_DT
Oct 24, 2015
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 24, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.12028
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
2466
Size of mineSIZE_OF_MINE
2466
Controller hours workedCONTROLLER_HRS
4762
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
4762
History period startHISTORY_START_DT
Sep 23, 2014
History period endHISTORY_END_DT
Jul 21, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6662183
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 22, 2015
Citation number: 8786760
Standard: 56.11027
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8786760
Assessment control numberASSESS_CASE_NO
000392104
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 30, 2015
Citation issuedISSUE_DT
Jul 22, 2015
Date of occurrenceOCCURRENCE_DT
Jul 22, 2015
Final order dateFINAL_ORDER_DT
Oct 24, 2015
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 24, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.11027
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
36
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
5
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
2466
Size of mineSIZE_OF_MINE
2466
Controller hours workedCONTROLLER_HRS
4762
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
4762
History period startHISTORY_START_DT
Sep 23, 2014
History period endHISTORY_END_DT
Jul 21, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6662183
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 22, 2015
Citation number: 8786763
Standard: 56.18002(b)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8786763
Assessment control numberASSESS_CASE_NO
000392104
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 30, 2015
Citation issuedISSUE_DT
Jul 22, 2015
Date of occurrenceOCCURRENCE_DT
Jul 22, 2015
Final order dateFINAL_ORDER_DT
Oct 24, 2015
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 24, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.18002(b)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
22
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
2
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
2466
Size of mineSIZE_OF_MINE
2466
Controller hours workedCONTROLLER_HRS
4762
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
4762
History period startHISTORY_START_DT
Sep 23, 2014
History period endHISTORY_END_DT
Jul 21, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6662183
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (19)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Injury severity pointsGRAVITY_INJURY_POINTS, Likelihood pointsGRAVITY_LIKELIHOOD_POINTS, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

Issued: Jul 22, 2015
Citation number: 8786761
Standard: 56.14107(a)
Proposed penalty: $100.00
Current assessment: $100.00
Paid against proposed penalty: $100.00
Case status: Closed
Details

The assessment

Citation or order numberVIOLATION_NO
8786761
Assessment control numberASSESS_CASE_NO
000392104
Assessment typeASSESS_TYPE_CD
Regular
Case statusASSESS_CASE_STATUS_CD
Closed
Case status dateASSESS_CASE_STATUS_DT
Oct 30, 2015
Citation issuedISSUE_DT
Jul 22, 2015
Date of occurrenceOCCURRENCE_DT
Jul 22, 2015
Final order dateFINAL_ORDER_DT
Oct 24, 2015
Bill first printedBILL_PRINT_DT
Sep 16, 2015
Bill print fiscal yearBILL_PRINT_FISCAL_YR
2015
Delinquent date set by MSHA (not by itself a delinquency)DELINQUENT_DT
Oct 24, 2015
Citation typeCITATION_TYPE_CD
Citation
30 CFR standardCFR_STANDARD_CD
56.14107(a)
Section of the Act, primaryPRIMARY_ACTION_CD
104(a)
Good faith reduction appliedGOOD_FAITH_IND
Y

Amounts

Proposed penaltyPROPOSED_PENALTY_AMT
100.00
Current assessmentCURRENT_ASSESSMENT_AMT
100.00
Paid against proposed penaltyPAID_PROPOSED_PENALTY_AMT
100.00

Penalty points

Violation history pointsPENALTY_POINTS
51
Persons potentially affected pointsGRAVITY_PERSONS_POINTS
1
Injury severity pointsGRAVITY_INJURY_POINTS
20
Likelihood pointsGRAVITY_LIKELIHOOD_POINTS
10
Negligence pointsNEGLIGENCE_POINTS
20

Inputs to the penalty calculation

Operator hours worked at the mineVIOLATOR_MINE_HRS
2466
Size of mineSIZE_OF_MINE
2466
Controller hours workedCONTROLLER_HRS
4762
Size of controlling entitySIZE_OF_CONTROLLING_ENTITY
4762
History period startHISTORY_START_DT
Sep 23, 2014
History period endHISTORY_END_DT
Jul 21, 2015

Who

Issued toVIOLATOR_TYPE_CD
Operator
Name at the time of the assessmentVIOLATOR_NAME
Alaska Juneau Construction
IDVIOLATOR_ID
0135113
Operator start at the mine, as assessedVIOLATOR_START_DT
Sep 23, 2014
Operator end at the mine, as assessedVIOLATOR_END_DT
Sep 9, 9999 (as recorded by MSHA, after the file date)
Inspection eventEVENT_NBR
6662183
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
MSHA office codeOFFICE_CD
M7861

Recorded as 0 (17)

Mine Act interestMINEACT_INTEREST_AMT, Excessive late payment interestEXLATE_INTEREST_AMT, Paid against Mine Act interestPAID_MINEACT_INTEREST_AMT, Paid against late payment interestPAID_EXLATE_INTEREST_AMT, Contractor size pointsCONTRACTOR_SIZE_POINTS, Good faith pointsGOOD_FAITH_POINTS, Violations per inspection day pointsVIOLATION_PER_INSP_DAY_POINTS, Repeated violation pointsVIOLATOR_REPEATED_VIOL_POINTS, Mine size pointsMINE_SIZE_POINTS, Controller size pointsCONTROLLER_SIZE_POINTS, Assessed violations in the history periodVIOLATOR_VIOLATION_CNT, Inspections in the history periodVIOLATOR_INSPECTION_DAY_CNT, Violations per inspection dayVPID, Repeat violationsVIOLATOR_REPEATED_VIOL_CNT, Repeat violations per inspection dayRPID, Operator tonnageVIOLATOR_PRODUCTION_AMT, Controller tonnageCONTROLLER_PRODUCTION_AMT

Recorded as N (2)

Significant and substantialSIG_SUB_IND, Excessive history indicatorEXCESSIVE_HISTORY_IND

Not recorded by MSHA (1)

Mine Act sectionMINE_ACT_SECTION_CD

23 assessed citations and orders. Amounts are MSHA's per-citation values; case status is MSHA's own (Closed, Invalid, Printed or Received).

Employment and hours worked

Year: 2026
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 400
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
400
Average hours per employeeAVG_EMPLOYEE_HOURS
200

Mine

Mine IDMINE_ID
5002024
Mine name in this fileCURR_MINE_NM
AJC Montana Creek Plant
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2026
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 961
Details

The report

YearCALENDAR_YR
2026
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
961
Average hours per employeeAVG_EMPLOYEE_HOURS
320

Mine

Mine IDMINE_ID
5002024
Mine name in this fileCURR_MINE_NM
AJC Montana Creek Plant
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 850
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
850
Average hours per employeeAVG_EMPLOYEE_HOURS
425

Mine

Mine IDMINE_ID
5002024
Mine name in this fileCURR_MINE_NM
AJC Montana Creek Plant
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2025
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 3,461
Details

The report

YearCALENDAR_YR
2025
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
3461
Average hours per employeeAVG_EMPLOYEE_HOURS
865

Mine

Mine IDMINE_ID
5002024
Mine name in this fileCURR_MINE_NM
AJC Montana Creek Plant
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 590
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
590
Average hours per employeeAVG_EMPLOYEE_HOURS
295

Mine

Mine IDMINE_ID
5002024
Mine name in this fileCURR_MINE_NM
AJC Montana Creek Plant
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2024
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 1,916
Details

The report

YearCALENDAR_YR
2024
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
1916
Average hours per employeeAVG_EMPLOYEE_HOURS
639

Mine

Mine IDMINE_ID
5002024
Mine name in this fileCURR_MINE_NM
AJC Montana Creek Plant
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 222
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
222
Average hours per employeeAVG_EMPLOYEE_HOURS
222

Mine

Mine IDMINE_ID
5002024
Mine name in this fileCURR_MINE_NM
AJC Montana Creek Plant
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2023
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 3
Hours worked: 1,437
Details

The report

YearCALENDAR_YR
2023
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
3
Hours workedANNUAL_HRS
1437
Average hours per employeeAVG_EMPLOYEE_HOURS
479

Mine

Mine IDMINE_ID
5002024
Mine name in this fileCURR_MINE_NM
AJC Montana Creek Plant
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 2
Hours worked: 159
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
2
Hours workedANNUAL_HRS
159
Average hours per employeeAVG_EMPLOYEE_HOURS
80

Mine

Mine IDMINE_ID
5002024
Mine name in this fileCURR_MINE_NM
AJC Montana Creek Plant
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2022
Part of mine: STRIP, QUARY, OPEN PIT
Average employees: 4
Hours worked: 2,930
Details

The report

YearCALENDAR_YR
2022
Part of the mineSUBUNIT_DESC
STRIP, QUARY, OPEN PIT
Part of the mine codeSUBUNIT_CD
03
Average employeesAVG_ANNUAL_EMPL
4
Hours workedANNUAL_HRS
2930
Average hours per employeeAVG_EMPLOYEE_HOURS
733

Mine

Mine IDMINE_ID
5002024
Mine name in this fileCURR_MINE_NM
AJC Montana Creek Plant
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

Year: 2019
Part of mine: OFFICE WORKERS AT MINE SITE
Average employees: 1
Hours worked: 2
Details

The report

YearCALENDAR_YR
2019
Part of the mineSUBUNIT_DESC
OFFICE WORKERS AT MINE SITE
Part of the mine codeSUBUNIT_CD
99
Average employeesAVG_ANNUAL_EMPL
1
Hours workedANNUAL_HRS
2
Average hours per employeeAVG_EMPLOYEE_HOURS
2

Mine

Mine IDMINE_ID
5002024
Mine name in this fileCURR_MINE_NM
AJC Montana Creek Plant
StateSTATE_ABBR
AK
Coal or Metal/Non-MetalC_M_IND
M

Recorded as 0 (1)

Coal productionANNUAL_COAL_PROD

What the operator reported to MSHA for the 6 most recent years, one row per part of the mine, as MSHA files them. Rows are not added together.

Mine details

MSHA field office
Anchorage AK Field Office
Nearest town
Juneau
Days worked per week
5
Hours per shift
8
Production shifts per day
1
Maintenance shifts per day
0
Employees, current record
4
Tailing ponds
0
Safety committee
N
Portable operation
N
Every field in MSHA's mine record

The mine

Mine nameCURRENT_MINE_NAME
AJC Montana Creek Plant
Mine IDMINE_ID
5002024
Coal or Metal/Non-MetalCOAL_METAL_IND
M
Mine typeCURRENT_MINE_TYPE
Surface
Current statusCURRENT_MINE_STATUS
Intermittent
Status sinceCURRENT_STATUS_DT
Jul 15, 2026
Legal entity typeCOMPANY_TYPE
Partnership

Operator and controller

OperatorCURRENT_OPERATOR_NAME
Alaska Juneau Construction
Operator IDCURRENT_OPERATOR_ID
0135113
Controller IDCURRENT_CONTROLLER_ID
0125461
Start of the operating periodCURRENT_CONTROLLER_BEGIN_DT
Sep 23, 2014

Location and MSHA office

StateSTATE
AK
Bureau of Mines state codeBOM_STATE_CD
50
FIPS county codeFIPS_CNTY_CD
110
FIPS county nameFIPS_CNTY_NM
Juneau
Nearest townNEAREST_TOWN
Juneau
MSHA districtDISTRICT
M7
MSHA office codeOFFICE_CD
M7861
MSHA officeOFFICE_NAME
Anchorage AK Field Office
Most recent assessment control numberASSESS_CTRL_NO
000606997

Commodity

Primary commodity (SIC)PRIMARY_SIC
Construction Sand and Gravel
Primary commodity codePRIMARY_SIC_CD
144200
Primary SIC codePRIMARY_SIC_CD_1
1442
Primary SIC suffixPRIMARY_SIC_CD_SFX
00
Primary industry groupPRIMARY_CANVASS
SandAndGravel
Primary industry group codePRIMARY_CANVASS_CD
5

Operations, from the Mine Information Form

Days operating per weekDAYS_PER_WEEK
5
Hours per shiftHOURS_PER_SHIFT
8
Production shifts per dayPROD_SHIFTS_PER_DAY
1
Workers employedNO_EMPLOYEES
4
MSHA restricted from enforcing Part 48 trainingPART48_TRAINING
Y

Recorded as 0 (3)

Driving miles from the MSHA officeMILES_FROM_OFFICE, Maintenance-only shifts per dayMAINT_SHIFTS_PER_DAY, Tailing pondsNO_TAILING_PONDS

Recorded as N (5)

Portable minePORTABLE_OPERATION, Pillar recovery usedPILLAR_RECOVERY_USED, Highwall miner usedHIGHWALL_MINER_USED, Multiple pitsMULTIPLE_PITS, Safety committeeSAFETY_COMMITTEE_IND

Not recorded by MSHA (16)

Portable mine FIPS state codePORTABLE_FIPS_ST_CD, ControllerCURRENT_CONTROLLER_NAME, Congressional districtCONG_DIST_CD, Secondary commodity (SIC)SECONDARY_SIC, Secondary commodity codeSECONDARY_SIC_CD, Secondary SIC codeSECONDARY_SIC_CD_1, Secondary SIC suffixSECONDARY_SIC_CD_SFX, Secondary industry groupSECONDARY_CANVASS, Secondary industry group codeSECONDARY_CANVASS_CD, Average mining height, inchesAVG_MINE_HEIGHT, Mine gas categoryMINE_GAS_CATEGORY_CD, Methane liberation, cu ft per 24 hMETHANE_LIBERATION, Producing pitsNO_PRODUCING_PITS, Non-producing pitsNO_NONPRODUCING_PITS, 103(i) statusCURRENT_103I, 103(i) status sinceCURRENT_103I_DT

Operator and controller history

Operator: Alaska Juneau Construction
From: Sep 23, 2014
To: No end date
Controller: Not shown
From : May 1, 2016
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Operator fromOPERATOR_START_DT
Sep 23, 2014

Controller

Controller IDCONTROLLER_ID
0125461
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
May 1, 2016

Mine

Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Alaska Juneau Construction
From: Sep 23, 2014
To: No end date
Controller: Not shown
From : May 1, 2016
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Operator fromOPERATOR_START_DT
Sep 23, 2014

Controller

Controller IDCONTROLLER_ID
0125461
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
May 1, 2016

Mine

Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Alaska Juneau Construction
From: Sep 23, 2014
To: No end date
Controller: Not shown
From : May 1, 2016
To : No end date
Details

Operator

OperatorOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Operator fromOPERATOR_START_DT
Sep 23, 2014

Controller

Controller IDCONTROLLER_ID
0125461
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
May 1, 2016

Mine

Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (3)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME, Controller toCONTROLLER_END_DT

Operator: Alaska Juneau Construction
From: Sep 23, 2014
To: No end date
Controller: Not shown
From : Jul 1, 2014
To : Apr 30, 2016
Details

Operator

OperatorOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Operator fromOPERATOR_START_DT
Sep 23, 2014

Controller

Controller IDCONTROLLER_ID
0115021
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jul 1, 2014
Controller toCONTROLLER_END_DT
Apr 30, 2016

Mine

Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME

Operator: Alaska Juneau Construction
From: Sep 23, 2014
To: No end date
Controller: Not shown
From : Jul 1, 2014
To : Apr 30, 2016
Details

Operator

OperatorOPERATOR_NAME
Alaska Juneau Construction
Operator IDOPERATOR_ID
0135113
Operator fromOPERATOR_START_DT
Sep 23, 2014

Controller

Controller IDCONTROLLER_ID
0115021
Company or personCONTROLLER_TYPE
PERSON
Controller fromCONTROLLER_START_DT
Jul 1, 2014
Controller toCONTROLLER_END_DT
Apr 30, 2016

Mine

Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Mine status at this pointMINE_STATUS
Intermittent
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (2)

Operator toOPERATOR_END_DT, ControllerCONTROLLER_NAME

As MSHA records it, newest operator first.

Address of record

Alaska Juneau Construction·Contact title Partner·Street not recorded, Juneau AK 99801

MSHA says an address of record "does not represent the actual mine location."

Every field in the address record

Address

Business nameBUSINESS_NAME
Alaska Juneau Construction
Contact titleCONTACT_TITLE
Partner
CityCITY
Juneau
StateSTATE_ABBR
AK
State nameSTATE
Alaska
ZIP codeZIP_CD
99801
CountryCOUNTRY
USA
FIPS state codeFIPS_STATE_CD
02

Mine

Mine IDMINE_ID
5002024
Mine name in this fileMINE_NAME
AJC Montana Creek Plant
Nearest townNEAREST_TOWN
Juneau
Mine typeMINE_TYPE_CD
Surface
Mine statusMINE_STATUS
Intermittent
Status sinceMINE_STATUS_DT
Jul 15, 2026
Primary commodity (SIC)PRIMARY_SIC_CD
Construction Sand and Gravel
Coal or Metal/Non-MetalCOAL_METAL_IND
M

Not recorded by MSHA (4)

StreetSTREET, PO boxPO_BOX, ProvincePROVINCE, Foreign postal codePOSTAL_CD

Sources. MSHA open government data files: Mines, Inspections, Violations, AssessedViolations, ContestedViolations, 107(a)OrdersIssued, Accidents, MinesProdYearly, ControllerOperatorHistory, AddressOfRecord. Field labels are shortened from MSHA's definition files, with MSHA's column name beside each. MSHA Mine Data Retrieval System·MSHA fatality report search·MSHA open government data

These are U.S. Department of Labor, Mine Safety and Health Administration records, reproduced as published. Citations can be contested, modified or vacated, and records that are contested or not yet final are included. SafetyRecord.org is not a consumer reporting agency. MSHA records as of Nov 13, 2026. Data and methodology