6700 W. ALLISON RD., CHANDLER, AZ 85226
NAICS 327331: Concrete Block and Brick Manufacturing - Records current through Jul 23, 2021
ACKER-STONE has had 7 OSHA inspections since Jul 1, 2015, resulting in 45 violations and $196,003 in penalties on record.
As reported in the U.S. Department of Labor OSHA enforcement database. Having inspection records is common for businesses in regulated industries. Penalty amounts may differ from final amounts after settlement or judicial review.
Data sourced from the U.S. Department of Labor OSHA enforcement database. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts after informal conferences, settlements, or adjudication. Having an inspection record is common in regulated industries and does not by itself indicate unsafe conditions. This is not an official OSHA resource and does not constitute legal advice.
| Standard | Citations | Penalties |
|---|---|---|
| 1910.28Duty to Have Fall Protection | 4 | $15,900 |
| 1910.303Electrical - General Requirements | 4 | $4,000 |
| 1910.212General Requirements for All Machines (Machine Guarding) | 4 | $71,000 |
| 1910.1053Respirable Crystalline Silica | 4 | $10,390 |
| 1910.305Electrical - Wiring Methods, Components, and Equipment | 3 | $2,000 |
| 1910.147Control of Hazardous Energy (Lockout/Tagout) | 3 | $65,000 |
| 1910.215Abrasive Wheel Machinery | 2 | $2,100 |
| 1910.151Medical Services and First Aid | 2 | $2,000 |
| 1910.178Powered Industrial Trucks | 2 | $2,600 |
| 1910.23Ladders | 2 | $0 |
| ID | Opened | Type | Scope | Viol. | Penalties |
|---|---|---|---|---|---|
| #345440945 | Jul 23, 2021 | Programmed Other | Complete | 2 | $4,000 |
| #345440986 | Jul 23, 2021 | Programmed Other | Complete | 2 | $11,000 |
| #344771662 | Jun 2, 2020 | Follow-Up | Complete | 3 | $8,313 |
| #344773718 |
Incident investigation summaries linked to this employer through OSHA accident and injury enforcement data.
Employees injures arm when caught in automatic rotary press
View inspection #344012547 →Source: U.S. Department of Labor OSHA incident investigation data. See data reference for matching and methodology details.
NAICS 327331: Cement and Concrete Product Manufacturing / Manufacturing
This industry group comprises establishments manufacturing cement, ready-mix concrete, concrete block, concrete pipe, and other concrete products. These operations transform limestone, clay, and other minerals into construction materials.
Common workplace hazards include respirable crystalline silica exposure, chemical burns from wet cement, and noise-induced hearing loss from crushing and mixing equipment. Workers may also face risks from conveyor entanglement, heavy vehicle traffic, and dust exposure.
Process Safety Management (PSM, 29 CFR 1910.119) applies to manufacturers that handle highly hazardous chemicals above threshold quantities. PSM requires employers to develop and maintain comprehensive safety programs including process hazard analyses, operating procedures, employee training, mechanical integrity programs, and emergency planning. Chemical and petroleum manufacturers are most commonly subject to PSM requirements.
Data Source and Methodology
Data synced dailyData on this page comes from the U.S. Department of Labor's OSHA enforcement database, accessed via the DOL public data API. Records are updated daily. We strive for accuracy, but errors in data processing or establishment matching are possible. Penalty amounts reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts after informal conference, settlement, or judicial review. Establishment matching is based on employer name and location as reported in inspection records; some establishments may appear under multiple name variations. If you believe any record is inaccurate, please report it and we will investigate. This product uses the DOL Data API but is not endorsed or certified by the DOL. For official and authoritative records, visit osha.gov.
| Jun 2, 2020 |
| Follow-Up |
| Complete |
| 5 |
| $10,390 |
| #344012547 | May 15, 2019 | Referral | Partial | 21 | $150,000 |
| #343194627 | May 31, 2018 | Planned | Complete | 5 | $8,100 |
| #340815547 | Jul 1, 2015 | Planned | Complete | 7 | $4,200 |