Skip to content
SafetyRecord logoSafetyRecord
ARMY DIRECTORATE OF PLANS, TRAINING, MOBILIZATION & SECURITY
$0
penalties
6
viol.
2
insp.

ARMY DIRECTORATE OF PLANS, TRAINING, MOBILIZATION & SECURITY

1010 LEGGETT AVE BOX 339500 MAIL STOP 1AA, Joint Base Lewis Mcchord, WA 98433NAICS 928110

Inspections
2
Feb 2013 to Feb 2013 · 1 safety, 1 health
Violations
6
across 2 inspections
Penalties on record
$0
latest amounts in DOL records
By classification
Serious 3Willful 0Repeat 0Other 3

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Feb 26, 2013Planned (H) · Complete scope, Health#338932239$01 viol.

Inspection #338932239

Dates

Opened
Feb 26, 2013
Closing Conference Date
Feb 26, 2013
Final Order
May 9, 2013
Closed
May 8, 2013

Inspection

Advance Notice
No
Owner Type
Federal
Union Status
Yes
Number of Employees
191

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
1010 Leggett Ave Box 339500 Mail Stop 1aa, Joint Base Lewis Mcchord, WA 98433
Industry
928110

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.1200
Hazard Communication
OSHA citation code: 19101200 F05
Other11$0$0-May 9, 2013
Feb 26, 2013Planned (H) · Complete scope, Safety#338922099$05 viol.

Inspection #338922099

Dates

Opened
Feb 26, 2013
Closing Conference Date
Feb 26, 2013
Final Order
May 9, 2013
Closed
May 14, 2013

Inspection

Advance Notice
No
Owner Type
Federal
Union Status
Yes
Number of Employees
191

Violations and Penalties

Total Violations
5
Violation Types
3 serious, 2 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
1010 Leggett Ave Box 339500 Mail Stop 1aa, Joint Base Lewis Mcchord, WA 98433
Industry
928110

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 5 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 H01
Serious11$0$0May 31, 2013-May 9, 2013
010021910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 H04
Serious11$0$0May 31, 2013-May 9, 2013
010031910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 B01
Serious11$0$0-May 9, 2013
020011910.242
Hand and Portable Powered Tools and Equipment, General
OSHA citation code: 19100242 B
Other11$0$0-May 9, 2013
020021910.303
OSHA citation code: 19100303 B02
Other19$0$0-May 9, 2013
Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.213Woodworking Machinery Requirements2 citations · $0
1910.219Mechanical Power-Transmission Apparatus1 citation · $0
1910.242Hand and Portable Powered Tools and Equipment, General1 citation · $0

Industry comparison

Violations per inspection
This employer3.0
Industry average1.9
Penalties per inspection
This employer$0
Industry average$59

Public Administration, 1,888 employers with OSHA inspections. Arithmetic from DOL records.

Other inspected employers in Joint Base Lewis Mcchord, WA

All employers in Joint Base Lewis Mcchord →