Skip to content
SafetyRecord logoSafetyRecord
AVON PLASTICS, INC. DBA MASTER MARK PLASTIC PROD.
$4,970
penalties
27
viol.
6
insp.

AVON PLASTICS, INC. DBA MASTER MARK PLASTIC PROD.

30 RAILROAD AVENUE, ALBANY, MN 56307

Inspections
6
Apr 1989 to Mar 2013 · 6 safety, 0 health
Violations
27
across 6 inspections
Penalties on record
$4,970
latest amounts in DOL records
By classification
Serious 15Willful 0Repeat 0Other 12

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Mar 20, 2013Planned (H) · No Inspection scope, Safety#317022556$00 viol.

Inspection #317022556

Dates

Opened
Mar 20, 2013
Closing Conference Date
Mar 20, 2013
Closed
Mar 29, 2013

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
7

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
30 Railroad Ave, Albany, MN 56307
Industry
326199 All Other Plastics Product Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Dec 15, 2009Planned (H) · Complete scope, Safety#314041740$1,5755 viol.

Inspection #314041740

Dates

Opened
Dec 15, 2009
Closing Conference Date
Dec 15, 2009
Closed
Jan 26, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
15

Violations and Penalties

Total Violations
5
Violation Types
4 serious, 1 other-than-serious
Initial Penalties
$2,250
Penalties on Record
$1,575
Site Address
30 Railroad Avenue, Albany, MN 56307
Industry
326199 All Other Plastics Product Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 5 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C04 I
Serious12$450$315Jan 30, 2010--
010021910.151
Medical Services and First Aid
OSHA citation code: 19100151 C
Serious11$600$420Jan 30, 2010--
010031910.305
Electrical - Wiring Methods, Components, and Equipment
OSHA citation code: 19100305 B02I
Serious11$600$420Jan 10, 2010--
010045205067502Serious22$450$315Jan 23, 2010--
020011910.23
Ladders
OSHA citation code: 19100023 A08
Other31$150$105Jan 30, 2010--
Mar 9, 2005Planned (H) · Complete scope, Safety#308631787$2,4158 viol.

Inspection #308631787

Dates

Opened
Mar 9, 2005
Closing Conference Date
Mar 9, 2005
Closed
Apr 19, 2005

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
38

Violations and Penalties

Total Violations
8
Violation Types
7 serious, 1 other-than-serious
Initial Penalties
$3,450
Penalties on Record
$2,415
Site Address
30 Railroad Ave, Albany, MN 56307
Industry
326199 All Other Plastics Product Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (8 of 8 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1910.146
Permit-Required Confined Spaces
OSHA citation code: 19100146 C02
Serious130$600$420Apr 22, 2005--
01001B1910.146
Permit-Required Confined Spaces
OSHA citation code: 19100146 C04
Serious130$0$0Apr 22, 2005--
010021910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C04 I
Serious130$600$420Apr 22, 2005--
010031910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C06 I
Serious130$450$315Apr 22, 2005--
010041910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C07 IIIA
Serious130$450$315Apr 22, 2005--
010051910.303
Electrical - General Requirements
OSHA citation code: 19100303 G01 I
Serious230$600$420Apr 8, 2005--
010065205011601Serious130$600$420Apr 8, 2005--
020015206070001
OSHA citation code: 5206070001 G
Other130$150$105Apr 22, 2005--
Jan 27, 1997Planned (H) · Complete scope, Safety#120397005$9807 viol.

Inspection #120397005

Dates

Opened
Jan 27, 1997
Closing Conference Date
Jan 27, 1997
Closed
Mar 24, 1997

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
50

Violations and Penalties

Total Violations
7
Violation Types
4 serious, 3 other-than-serious
Initial Penalties
$1,400
Penalties on Record
$980
Site Address
30 Railroad Avenue, Albany, MN 56307
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (7 of 7 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A01
Serious11$300$210Mar 24, 1997--
010021910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 B
Serious11$300$210Mar 24, 1997--
010031910.304
Electrical - Wiring Design and Protection
OSHA citation code: 19100304 F05 IVA
Serious11$300$210Mar 4, 1997--
010041910.305
Electrical - Wiring Methods, Components, and Equipment
OSHA citation code: 19100305 B01
Serious11$400$280Mar 4, 1997--
020011910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A05
Other11$0$0Mar 4, 1997--
020021910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 B09
Other11$100$70Mar 10, 1997--
020031910.303
Electrical - General Requirements
OSHA citation code: 19100303 G01 II
Other11$0$0Mar 4, 1997--
Jun 21, 1989Follow-Up (F) · Partial scope, Safety#107754574$00 viol.

Inspection #107754574

Dates

Opened
Jun 21, 1989
Closing Conference Date
Jun 21, 1989
Closed
Jul 6, 1989

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
70

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
30 Railroad Avenue, Albany, MN 56307
Industry
Not classified in OSHA's inspection record.

Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.

Apr 20, 1989Planned (H) · Complete scope, Safety#107754335$07 viol.

Inspection #107754335

Dates

Opened
Apr 20, 1989
Closing Conference Date
Apr 20, 1989
Closed
May 29, 1989

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
70

Violations and Penalties

Total Violations
7
Violation Types
7 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
30 Railroad Avenue, Albany, MN 56307
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (7 of 7 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.304
Electrical - Wiring Design and Protection
OSHA citation code: 19100304 F05 V
Other11$0$0May 22, 1989--
010025205.1210Other11$0$0Jun 12, 1989--
010031910.178
Powered Industrial Trucks
OSHA citation code: 19100178 P01
Other11$0$0Jun 12, 1989--
010041910.305
Electrical - Wiring Methods, Components, and Equipment
OSHA citation code: 19100305 G01 III
Other11$0$0May 22, 1989--
010051910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 B
Other21$0$0Jun 12, 1989--
010061910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 B09
Other11$0$0May 14, 1989--
010071910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 D01
Other11$0$0Jun 12, 1989--
Inspections 1 to 6 of 6, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.147Control of Hazardous Energy (Lockout/Tagout)4 citations · $1,365
1910.212General Requirements for All Machines (Machine Guarding)4 citations · $420
1910.305Electrical - Wiring Methods, Components, and Equipment3 citations · $700

Other inspected employers in ALBANY, MN

All employers in ALBANY →