BATEMAN BUILDERS
(HOLSET ENGINEERING CO INC) WILSON AVENUE, MADISON, IN 47250
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Sep 14, 1992#108579772Sep 14, 1992Planned (H) · Complete scope, Safety#108579772$09 viol.9 violations$0 in penalties
Inspection #108579772
Dates
- Opened
- Sep 14, 1992
- Closing Conference Date
- Sep 14, 1992
- Closed
- Nov 30, 1992
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 4
Violations and Penalties
- Total Violations
- 9
- Violation Types
- 9 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- (collins Tool And Die) Wilson Avenue, Madison, IN 47250
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (9 of 9 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.50 Medical Services and First Aid (Construction) OSHA citation code: 19260050 F | Other | 1 | 4 | $0 | $0 | Nov 24, 1992 | - | - |
| 01002 | 1926.150 Fire Protection (Construction) OSHA citation code: 19260150 C01 I | Other | 1 | 4 | $0 | $0 | Nov 24, 1992 | - | - |
| 01003 | 1926.403 Electrical - General Requirements (Construction) OSHA citation code: 19260403 H | Other | 1 | 4 | $0 | $0 | Nov 24, 1992 | - | - |
| 01004 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 E01 I | Other | 1 | 4 | $0 | $0 | Nov 24, 1992 | - | - |
| 01005 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 F06 | Other | 1 | 4 | $0 | $0 | Nov 24, 1992 | - | - |
| 01006 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 A02 IIA | Other | 1 | 4 | $0 | $0 | Nov 24, 1992 | - | - |
| 01007 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 A02 IIE | Other | 1 | 4 | $0 | $0 | Nov 24, 1992 | - | - |
| 01008 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 A02 III | Other | 1 | 4 | $0 | $0 | Nov 24, 1992 | - | - |
| 01009 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 F | Other | 1 | 4 | $0 | $0 | Nov 24, 1992 | - | - |
Jan 29, 1991#108571340Jan 29, 1991Follow-Up (F) · Partial scope, Safety#108571340$00 viol.0 violations$0 in penalties
Inspection #108571340
Dates
- Opened
- Jan 29, 1991
- Closing Conference Date
- Feb 28, 1991
- Closed
- Mar 4, 1991
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- (holset Engineering Co Inc) Wilson Avenue, Madison, IN 47250
- Industry
- Not classified in OSHA's inspection record.
Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.
Nov 8, 1990#108570953Nov 8, 1990Planned (H) · Complete scope, Safety#108570953$2,1006 viol.6 violations$2,100 in penalties
Inspection #108570953
Dates
- Opened
- Nov 8, 1990
- Closing Conference Date
- Nov 9, 1990
- Closed
- Mar 4, 1991
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 6
- Violation Types
- 3 repeat, 3 other-than-serious
- Initial Penalties
- $2,100
- Penalties on Record
- $2,100
- Site Address
- (holset Engineering Co Inc) Wilson Avenue, Madison, IN 47250
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (6 of 6 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.59 Hazard Communication OSHA citation code: 19260059 E01 | Repeat | 1 | 6 | $700 | $700 | Jan 9, 1991 | - | - |
| 01002 | 1926.59 Hazard Communication OSHA citation code: 19260059 G01 | Repeat | 1 | 6 | $700 | $700 | Jan 9, 1991 | - | - |
| 01003 | 1926.59 Hazard Communication OSHA citation code: 19260059 H | Repeat | 1 | 6 | $700 | $700 | Jan 9, 1991 | - | - |
| 02001 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 J02 II | Other | 1 | 6 | $0 | $0 | Jan 5, 1991 | - | - |
| 02002 | 1926.602 Material Handling Equipment OSHA citation code: 19260602 A02 I | Other | 1 | 1 | $0 | $0 | Jan 9, 1991 | - | - |
| 02003 | 1926.602 Material Handling Equipment OSHA citation code: 19260602 A09 I | Other | 2 | 6 | $0 | $0 | Jan 9, 1991 | - | - |
May 30, 1985#2712941May 30, 1985Programmed Related (I) · Complete scope, Safety#2712941$00 viol.0 violations$0 in penalties
Inspection #2712941
Dates
- Opened
- May 30, 1985
- Closing Conference Date
- May 30, 1985
- Closed
- Jun 6, 1985
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Clifty Engineering & Land Co Inc 2949 Clifty Dr, Madison, IN 47250
- Industry
- Not classified in OSHA's inspection record.
Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Jul 16, 1984#14746556Jul 16, 1984Planned (H) · Complete scope, Safety#14746556$903 viol.3 violations$90 in penalties
Inspection #14746556
Dates
- Opened
- Jul 16, 1984
- Closing Conference Date
- Jul 16, 1984
- Closed
- Aug 27, 1984
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 8
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 1 serious, 2 other-than-serious
- Initial Penalties
- $90
- Penalties on Record
- $90
- Site Address
- K E Y Mfg Inc N Wilson Ave, Madison, IN 47250
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.100 Head Protection (Construction) OSHA citation code: 19260100 A | Serious | 1 | 8 | $90 | $90 | Jul 16, 1984 | - | - |
| 02001 | 1926.150 Fire Protection (Construction) OSHA citation code: 19260150 C01 I | Other | 1 | 8 | $0 | $0 | Jul 16, 1984 | - | - |
| 02002 | 1926.400 Introduction (Electrical - Construction) OSHA citation code: 19260400 A | Other | 4 | 8 | $0 | $0 | Jul 16, 1984 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
5 inspections, 1984 to 1992. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.