Skip to content
SafetyRecord logoSafetyRecord
CENTRAL CONSTRUCTION INDUSTRIES, LLC.
$6,165
penalties
36
viol.
4
insp.

CENTRAL CONSTRUCTION INDUSTRIES, LLC.

78 HIGHLAND DRIVE, PUTNAM, CT 06260NAICS 332312 Fabricated Structural Metal Manufacturing

Inspections
4
Apr 2005 to Dec 2010 · 3 safety, 1 health
Violations
36
across 4 inspections
Penalties on record
$6,165
latest amounts in DOL records
By classification
Serious 27Willful 0Repeat 0Other 9

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Dec 28, 2010Follow-Up (F) · No Inspection scope, Health#314403072$00 viol.

Inspection #314403072

Dates

Opened
Dec 28, 2010
Closing Conference Date
Dec 29, 2010
Closed
Dec 29, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
15

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
30 Harris Street, Putnam, CT 06260
Industry
332312 Fabricated Structural Metal Manufacturing

Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.

Sep 10, 2007Complaint (B) · Partial scope, Safety#310187307$5,00024 viol.

Inspection #310187307

Dates

Opened
Sep 10, 2007
Closing Conference Date
Sep 12, 2007
Contested
Dec 19, 2007
Final Order
Aug 18, 2008
Closed
Feb 23, 2009

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
15
Related Activity
1 complaint

Violations and Penalties

Total Violations
24
Violation Types
15 serious, 9 other-than-serious
Initial Penalties
$20,400
Penalties on Record
$5,000
Site Address
30 Harris Street, Putnam, CT 06260
Industry
332312 Fabricated Structural Metal Manufacturing

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

Violations

Violation list (12 of 24 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1910.22
OSHA citation code: 19100022 A01
Other46$1,400$500Jan 16, 2008Dec 19, 2007Aug 18, 2008
01001B1910.303
OSHA citation code: 19100303 G01 III
Other16$0$0Dec 3, 2007Dec 19, 2007Aug 18, 2008
01002B1910.36
OSHA citation code: 19100036 H03
Other16$0$0Jan 16, 2008Dec 19, 2007Aug 11, 2008
01002C1910.37
OSHA citation code: 19100037 B02
Other26$0$0Jan 16, 2008Dec 19, 2007Aug 18, 2008
010031910.106
OSHA citation code: 19100106 E02 IIB2
Serious16$1,400$500Jan 16, 2008Dec 19, 2007Aug 18, 2008
01004A1910.106
OSHA citation code: 19100106 E02 IVA
Serious12$2,000$900Jan 16, 2008Dec 19, 2007Aug 18, 2008
01004B1910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 C06
Serious16$0$0Jan 16, 2008Dec 19, 2007Aug 18, 2008
01004C1910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 C09 I
Serious16$0$0Jan 16, 2008Dec 19, 2007Aug 18, 2008
01004D1910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 E05
Serious16$0$0Jan 16, 2008Dec 19, 2007Aug 18, 2008
01004E1910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 E09
Serious16$0$0Jan 16, 2008Dec 19, 2007Aug 18, 2008
01004F1910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 G02
Serious16$0$0Jan 16, 2008Dec 19, 2007Aug 18, 2008
01004G1910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 G05
Serious12$0$0Jan 16, 2008Dec 19, 2007Aug 18, 2008

Showing the 12 violations listed first by citation identifier. This inspection has 24 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Oct 5, 2005Programmed Related (I) · Complete scope, Safety#308274364$00 viol.

Inspection #308274364

Dates

Opened
Oct 5, 2005
Closing Conference Date
Oct 5, 2005
Closed
Nov 8, 2005

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
22

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
78 Highland Drive, Putnam, CT 06260
Industry
238120 Structural Steel and Precast Concrete Contractors

Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

Apr 19, 2005Planned (H) · Complete scope, Safety#308271105$1,16512 viol.

Inspection #308271105

Dates

Opened
Apr 19, 2005
Closing Conference Date
Apr 19, 2005
Closed
Jun 23, 2005

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
24

Violations and Penalties

Total Violations
12
Violation Types
12 serious
Initial Penalties
$2,325
Penalties on Record
$1,165
Site Address
30 Harris Street, Putnam, CT 06260
Industry
332312 Fabricated Structural Metal Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (12 of 12 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.110
Storage and Handling of Liquefied Petroleum Gases
OSHA citation code: 19100110 E04 III
Serious11$225$113Jun 10, 2005--
01002A1910.147
The control of hazardous energy (lockout/tagout)
OSHA citation code: 19100147 C04 I
Serious21$300$150Jun 10, 2005--
01002B1910.147
The control of hazardous energy (lockout/tagout)
OSHA citation code: 19100147 C06 I
Serious14$0$0Jun 10, 2005--
010031910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A03 II
Serious11$300$150Jun 10, 2005--
010041910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 B
Serious21$225$113Jun 10, 2005--
01005A1910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 A04
Serious21$225$113Jun 10, 2005--
01005B1910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 B09
Serious21$0$0Jun 10, 2005--
01006A1910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 D01
Serious21$300$150Jun 10, 2005--
01006B1910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 E03 I
Serious21$0$0Jun 10, 2005--
010071910.253
Oxygen-Fuel Gas Welding and Cutting
OSHA citation code: 19100253 B04 III
Serious11$225$113Jun 10, 2005--
010081910.304
Wiring design and protection
OSHA citation code: 19100304 A02
Serious31$300$150Jun 10, 2005--
010091910.305
Wiring methods, components, and equipment for general use
OSHA citation code: 19100305 G01 I
Serious21$225$113Jun 10, 2005--
Inspections 1 to 4 of 4, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.107Spray Finishing Using Flammable and Combustible Materials7 citations · $0
1910.212General Requirements for All Machines (Machine Guarding)3 citations · $1,263
1910.253Oxygen-Fuel Gas Welding and Cutting3 citations · $713

Industry comparison

Violations per inspection
This employer9.0
Industry average3.3
Penalties per inspection
This employer$1,541
Industry average$2,300

Fabricated Metal Product Manufacturing, 45,910 employers with OSHA inspections. Arithmetic from DOL records.

Other inspected employers in PUTNAM, CT

All employers in PUTNAM →