2835 N KERBY, Portland, OR 97227
CITY OF PORTLAND has had 202 OSHA inspections since Jul 27, 1982, resulting in 312 violations and $92,655 in penalties on record.
As reported in the U.S. Department of Labor OSHA enforcement database. Having inspection records is common for businesses in regulated industries. Penalty amounts may differ from final amounts after settlement or judicial review.
Data sourced from the U.S. Department of Labor OSHA enforcement database. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts after informal conferences, settlements, or adjudication. Having an inspection record is common in regulated industries and does not by itself indicate unsafe conditions. This is not an official OSHA resource and does not constitute legal advice.
| Standard | Citations | Penalties |
|---|---|---|
| 1910.215Abrasive Wheel Machinery | 14 | $1,540 |
| 1910.1025Lead | 13 | $1,850 |
| 1910.1030Bloodborne Pathogens | 11 | $625 |
| 1910.212General Requirements for All Machines (Machine Guarding) | 9 | $580 |
| 1910.1200Hazard Communication | 8 | $820 |
| 1910.213Woodworking Machinery Requirements | 8 | $1,430 |
| 1926.651Excavations - Specific Excavation Requirements | 8 | $2,690 |
| 1910.219Mechanical Power-Transmission Apparatus | 7 | $900 |
| 1910.134Respiratory Protection | 7 | $195 |
| 1910.242Hand and Portable Powered Tools and Equipment, General | 6 | $1,320 |
| ID | Opened | Type | Scope | Viol. | Penalties |
|---|---|---|---|---|---|
| #317703239 | Sep 4, 2014 | Complaint | Partial | 5 | $3,915 |
| #317698967 | May 30, 2014 | Planned | Partial | 0 | $0 |
| #317698959 | May 30, 2014 | Planned | Complete | 0 | $0 |
| #317698611 |
Incident investigation summaries linked to this employer through OSHA accident and injury enforcement data.
Fire fighter is injured in fall
Firefighter injured in fall from ladder during training
Employee injured when sidearm accidentally discharged
Employee exposed to chlorine gas
Employee injured when struck by vehicle
Employee injured in excavation cave-in
Employee amputates finger with table saw
Employee killed during 19 ft fall from tree
Source: U.S. Department of Labor OSHA incident investigation data. See data reference for matching and methodology details.
Oregon operates its own OSHA-approved state plan through Oregon OSHA (OR-OSHA), a division of the Department of Consumer and Business Services. The plan covers both private and public sector workers and enforces standards at least as effective as federal OSHA.
Data Source and Methodology
Data synced dailyData on this page comes from the U.S. Department of Labor's OSHA enforcement database, accessed via the DOL public data API. Records are updated daily. We strive for accuracy, but errors in data processing or establishment matching are possible. Penalty amounts reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts after informal conference, settlement, or judicial review. Establishment matching is based on employer name and location as reported in inspection records; some establishments may appear under multiple name variations. If you believe any record is inaccurate, please report it and we will investigate. This product uses the DOL Data API but is not endorsed or certified by the DOL. For official and authoritative records, visit osha.gov.
| May 22, 2014 |
| Programmed Related |
| Partial |
| 0 |
| $0 |
| #317698603 | May 22, 2014 | Planned | Complete | 0 | $0 |
| #317697381 | Apr 28, 2014 | Planned | Complete | 0 | $0 |
| #317339133 | Oct 15, 2013 | Follow-Up | Partial | 0 | $0 |
| #317073708 | Aug 29, 2013 | Follow-Up | Partial | 0 | $0 |
| #317071496 | Jul 30, 2013 | Planned | Complete | 3 | $600 |
| #317071504 | Jul 30, 2013 | Programmed Related | Partial | 0 | $0 |
| #317069920 | Jun 26, 2013 | Planned | Complete | 3 | $300 |
| #317068153 | May 28, 2013 | Planned | Complete | 7 | $900 |
| #317068179 | May 28, 2013 | Programmed Related | Partial | 0 | $0 |
| #317064640 | Mar 27, 2013 | Referral | Partial | 0 | $0 |
| #316718436 | Mar 13, 2013 | Planned | Complete | 2 | $600 |
| #316799121 | Mar 13, 2013 | Programmed Related | Partial | 0 | $0 |
| #316717693 | Feb 27, 2013 | Planned | Complete | 1 | $0 |
| #316713254 | Dec 4, 2012 | Planned | Complete | 0 | $0 |
| #316711704 | Nov 8, 2012 | Referral | Partial | 1 | $250 |
| #316710516 | Oct 11, 2012 | Planned | Partial | 0 | $0 |
| #316708932 | Sep 13, 2012 | Programmed Related | Partial | 0 | $0 |
| #316708924 | Sep 12, 2012 | Planned | Complete | 3 | $0 |
| #316708536 | Sep 10, 2012 | Programmed Related | Partial | 0 | $0 |
| #316708502 | Sep 7, 2012 | Planned | Complete | 2 | $0 |
| #316424621 | May 23, 2012 | Planned | Complete | 0 | $0 |
| #315949156 | Dec 7, 2011 | Planned | Complete | 0 | $0 |
| #315948174 | Nov 8, 2011 | Complaint | Partial | 1 | $5,000 |
| #314969296 | Nov 1, 2010 | Accident | Partial | 0 | $0 |
| #314967423 | Oct 4, 2010 | Complaint | Partial | 3 | $325 |
| #314966383 | Sep 22, 2010 | Complaint | Partial | 2 | $810 |
| #314436999 | Jul 20, 2010 | Planned | Partial | 2 | $13,500 |
| #314435710 | Jun 24, 2010 | Planned | No Inspection | 0 | $0 |
| #314432071 | Apr 27, 2010 | Complaint | Partial | 1 | $7,500 |
| #313958670 | Mar 5, 2010 | Referral | Partial | 1 | $1,750 |
| #313958613 | Mar 4, 2010 | Complaint | Partial | 1 | $105 |
| #313952103 | Nov 16, 2009 | Referral | Partial | 4 | $4,960 |
| #313476517 | Sep 1, 2009 | Planned | Complete | 6 | $1,270 |
| #313475279 | Aug 17, 2009 | Planned | No Inspection | 0 | $0 |
| #313475246 | Aug 17, 2009 | Planned | Complete | 2 | $0 |
| #313458820 | Aug 6, 2009 | Referral | Partial | 1 | $210 |
| #313471112 | Jun 17, 2009 | Planned | Partial | 1 | $200 |
| #312845944 | May 13, 2009 | Accident | Partial | 1 | $250 |
| #312843980 | Apr 7, 2009 | Planned | Complete | 2 | $210 |
| #312304785 | Nov 4, 2008 | Planned | Complete | 0 | $0 |
| #312295520 | May 15, 2008 | Complaint | Partial | 0 | $0 |
| #311696017 | Feb 26, 2008 | Planned | Complete | 2 | $105 |
| #311695233 | Feb 12, 2008 | Planned | No Inspection | 0 | $0 |
| #311695258 | Feb 12, 2008 | Planned | No Inspection | 0 | $0 |
| #311693113 | Jan 10, 2008 | Planned | Partial | 2 | $210 |
| #311174353 | Oct 19, 2007 | Planned | Partial | 0 | $0 |
| #310684014 | Feb 8, 2007 | Planned | Partial | 0 | $0 |
| #310681556 | Dec 22, 2006 | Complaint | Partial | 0 | $0 |
| #310680582 | Dec 8, 2006 | Planned | Complete | 13 | $1,410 |
| #310275086 | Sep 28, 2006 | Follow-Up | Partial | 0 | $0 |
| #310275094 | Sep 28, 2006 | Complaint | Partial | 1 | $0 |
| #310270467 | Jul 12, 2006 | Referral | Partial | 0 | $0 |
| #309831816 | Jun 21, 2006 | Planned | Partial | 0 | $0 |
| #309829372 | May 16, 2006 | Referral | Partial | 1 | $0 |
| #309828671 | Apr 26, 2006 | Complaint | Partial | 2 | $325 |
| #308752229 | Jul 21, 2005 | Referral | Partial | 1 | $0 |
| #308742980 | Mar 28, 2005 | Complaint | Partial | 4 | $325 |
| #308247089 | Nov 30, 2004 | Planned | No Inspection | 0 | $0 |
| #308247063 | Nov 30, 2004 | Planned | No Inspection | 0 | $0 |
| #308247097 | Nov 30, 2004 | Planned | No Inspection | 0 | $0 |
| #308247071 | Nov 30, 2004 | Planned | No Inspection | 0 | $0 |
| #307828319 | Jul 29, 2004 | Referral | Partial | 1 | $500 |
| #307827253 | Jul 16, 2004 | Follow-Up | Partial | 0 | $0 |
| #307822031 | May 27, 2004 | Planned | Partial | 2 | $500 |
| #307091975 | Feb 19, 2004 | Complaint | Partial | 3 | $100 |
| #306005182 | Dec 2, 2002 | Accident | Partial | 0 | $0 |
| #306004557 | Nov 21, 2002 | Complaint | Partial | 1 | $210 |
| #305559106 | Aug 27, 2002 | Complaint | Partial | 1 | $0 |
| #304947831 | Nov 29, 2001 | Complaint | Partial | 0 | $0 |
| #304617210 | Aug 28, 2001 | Complaint | No Inspection | 0 | $0 |
| #304108996 | Apr 30, 2001 | Planned | Complete | 0 | $0 |
| #304108988 | Apr 27, 2001 | Planned | Complete | 0 | $0 |
| #304108178 | Apr 17, 2001 | Planned | Complete | 0 | $0 |
| #304108038 | Apr 16, 2001 | Planned | Complete | 1 | $0 |
| #304107931 | Apr 12, 2001 | Planned | Complete | 0 | $0 |
| #304108483 | Apr 12, 2001 | Planned | Complete | 1 | $0 |
| #304107139 | Mar 20, 2001 | Complaint | Partial | 0 | $0 |
| #304106602 | Mar 20, 2001 | Complaint | Partial | 4 | $390 |
| #304106396 | Mar 19, 2001 | Complaint | Partial | 2 | $300 |
| #303603146 | Nov 16, 2000 | Planned | Complete | 6 | $195 |
| #303593685 | Apr 27, 2000 | Accident | Partial | 0 | $0 |
| #303136568 | Apr 10, 2000 | Unprogrammed Related | Partial | 0 | $0 |
| #303136444 | Apr 7, 2000 | Complaint | Partial | 6 | $0 |
| #303136436 | Apr 7, 2000 | Unprogrammed Related | Partial | 0 | $0 |
| #303134654 | Feb 24, 2000 | Planned | Partial | 0 | $0 |
| #302831565 | Sep 17, 1999 | Complaint | Partial | 0 | $0 |
| #302823935 | Jun 7, 1999 | Complaint | Partial | 0 | $0 |
| #302521075 | Mar 30, 1999 | Complaint | Partial | 0 | $0 |
| #302520176 | Mar 11, 1999 | Follow-Up | Partial | 0 | $0 |
| #302520135 | Mar 11, 1999 | Accident | Partial | 0 | $0 |
| #302513965 | Nov 10, 1998 | Planned | Complete | 0 | $0 |
| #302147665 | Sep 23, 1998 | Referral | Partial | 0 | $0 |
| #302147632 | Sep 23, 1998 | Complaint | Partial | 0 | $0 |
| #301862348 | Oct 9, 1997 | Complaint | Partial | 0 | $0 |
| #123746729 | Oct 3, 1997 | Accident | Partial | 0 | $0 |
| #301239596 | Jun 5, 1997 | Planned | Complete | 0 | $0 |
| #301239141 | May 29, 1997 | Planned | Complete | 0 | $0 |
| #301233474 | Jan 6, 1997 | Complaint | No Inspection | 0 | $0 |
| #301232203 | Dec 12, 1996 | Planned | Complete | 0 | $0 |
| #124726357 | Jun 27, 1996 | Complaint | Partial | 0 | $0 |
| #124717364 | Jun 18, 1996 | Accident | Partial | 1 | $250 |
| #124726035 | May 24, 1996 | Complaint | Partial | 0 | $0 |
| #124719725 | May 21, 1996 | Planned | Complete | 0 | $0 |
| #124714197 | Mar 5, 1996 | Unprogrammed Related | Partial | 0 | $0 |
| #124726217 | Mar 5, 1996 | Unprogrammed Related | Partial | 0 | $0 |
| #124725656 | Feb 29, 1996 | Unprogrammed Related | Partial | 2 | $100 |
| #124725649 | Feb 29, 1996 | Unprogrammed Related | Partial | 2 | $100 |
| #124717745 | Feb 27, 1996 | Planned | Complete | 0 | $0 |
| #124725623 | Feb 21, 1996 | Complaint | Partial | 7 | $100 |
| #124711094 | Oct 12, 1995 | Accident | Partial | 0 | $0 |
| #124710245 | Oct 4, 1995 | Complaint | Partial | 8 | $800 |
| #126235258 | Apr 11, 1995 | Planned | Complete | 16 | $150 |
| #126235241 | Apr 11, 1995 | Planned | Complete | 7 | $960 |
| #124705088 | Mar 23, 1995 | Planned | Complete | 4 | $250 |
| #124789256 | Dec 28, 1994 | Planned | Complete | 0 | $0 |
| #126233402 | Nov 7, 1994 | Planned | Complete | 2 | $100 |
| #123762353 | Oct 28, 1994 | Complaint | Partial | 3 | $0 |
| #123770976 | Sep 20, 1994 | Planned | Complete | 1 | $0 |
| #124805250 | Jul 11, 1994 | Planned | Complete | 1 | $0 |
| #124809641 | Mar 11, 1994 | Complaint | Partial | 1 | $0 |
| #124809914 | Mar 11, 1994 | Complaint | Partial | 1 | $0 |
| #123742868 | Oct 19, 1993 | Accident | Partial | 2 | $150 |
| #123713125 | Jun 15, 1993 | Complaint | Complete | 0 | $0 |
| #123772584 | Jun 7, 1993 | Planned | Complete | 1 | $75 |
| #123761439 | May 27, 1993 | Follow-Up | Partial | 0 | $0 |
| #123772501 | May 5, 1993 | Planned | Complete | 0 | $0 |
| #123774994 | May 5, 1993 | Planned | Complete | 0 | $0 |
| #123712192 | Apr 30, 1993 | Complaint | Partial | 5 | $525 |
| #123720666 | Mar 19, 1993 | Planned | Complete | 3 | $1,000 |
| #123761496 | Mar 2, 1993 | Complaint | Partial | 5 | $2,100 |
| #123761132 | Feb 25, 1993 | Planned | Partial | 1 | $50 |
| #123733263 | Sep 30, 1992 | Accident | Complete | 4 | $20,000 |
| #123757007 | Sep 15, 1992 | Complaint | Complete | 0 | $0 |
| #123757049 | Sep 15, 1992 | Complaint | Complete | 1 | $300 |
| #123710030 | Sep 11, 1992 | Planned | Complete | 2 | $500 |
| #115757783 | Aug 12, 1992 | Complaint | Partial | 3 | $120 |
| #115723678 | Apr 23, 1992 | Referral | Partial | 0 | $0 |
| #115759094 | Apr 10, 1992 | Accident | Complete | 4 | $4,000 |
| #115754160 | Mar 31, 1992 | Complaint | Partial | 1 | $150 |
| #115754210 | Mar 31, 1992 | Complaint | Partial | 1 | $50 |
| #115721045 | Oct 16, 1991 | Unprogrammed Related | Partial | 0 | $0 |
| #115769556 | Jul 10, 1991 | Complaint | Partial | 5 | $310 |
| #115724932 | Jun 25, 1991 | Complaint | Partial | 1 | $0 |
| #115771776 | May 13, 1991 | Planned | Complete | 1 | $50 |
| #115725483 | May 1, 1991 | Planned | Complete | 1 | $0 |
| #115771743 | May 1, 1991 | Complaint | Partial | 0 | $0 |
| #108274531 | Nov 21, 1990 | Planned | Partial | 0 | $0 |
| #108268467 | Oct 26, 1990 | Complaint | Partial | 0 | $0 |
| #108273459 | Sep 28, 1990 | Follow-Up | Partial | 0 | $0 |
| #108270091 | Sep 20, 1990 | Planned | Complete | 1 | $120 |
| #108223694 | Sep 10, 1990 | Complaint | Partial | 12 | $1,850 |
| #108241936 | Jul 19, 1990 | Planned | Partial | 0 | $0 |
| #105280416 | Jan 19, 1990 | Unprogrammed Related | Partial | 2 | $0 |
| #105277222 | Aug 25, 1989 | Planned | Complete | 3 | $325 |
| #105198006 | Aug 23, 1989 | Planned | Partial | 1 | $500 |
| #105277164 | Aug 11, 1989 | Planned | Partial | 0 | $0 |
| #105243281 | Jan 9, 1989 | Complaint | Partial | 1 | $0 |
| #105243232 | Oct 28, 1988 | Complaint | Partial | 1 | $150 |
| #105245328 | Oct 25, 1988 | Complaint | Complete | 0 | $0 |
| #105243141 | Sep 21, 1988 | Complaint | Partial | 0 | $0 |
| #105243158 | Sep 21, 1988 | Complaint | Partial | 0 | $0 |
| #105270037 | Aug 3, 1988 | Complaint | Partial | 2 | $150 |
| #105355606 | Jul 28, 1988 | Planned | Complete | 1 | $0 |
| #105271696 | Jun 8, 1988 | Complaint | Partial | 0 | $0 |
| #105355754 | May 11, 1988 | Accident | Partial | 0 | $0 |
| #105190599 | Apr 7, 1988 | Accident | Complete | 1 | $2,500 |
| #105191399 | Feb 8, 1988 | Planned | Complete | 0 | $0 |
| #105356539 | Feb 3, 1988 | Complaint | Partial | 10 | $2,870 |
| #105353817 | Dec 18, 1987 | Complaint | Partial | 5 | $770 |
| #105354955 | Nov 24, 1987 | Planned | Complete | 6 | $380 |
| #105353049 | Nov 12, 1987 | Planned | Complete | 6 | $1,200 |
| #105357404 | Sep 30, 1987 | Planned | Complete | 0 | $0 |
| #105311831 | Sep 18, 1987 | Planned | Complete | 0 | $0 |
| #105321996 | Aug 4, 1987 | Follow-Up | Partial | 0 | $0 |
| #105204077 | Jun 4, 1987 | Planned | Complete | 1 | $260 |
| #105321764 | May 12, 1987 | Complaint | Partial | 4 | $0 |
| #105320493 | Mar 30, 1987 | Planned | Complete | 1 | $0 |
| #105321269 | Jan 22, 1987 | Complaint | Complete | 1 | $0 |
| #105327563 | Jan 20, 1987 | Complaint | Complete | 11 | $1,010 |
| #105324081 | Jan 20, 1987 | Planned | Complete | 9 | $300 |
| #105327555 | Jan 20, 1987 | Complaint | Complete | 7 | $0 |
| #105225643 | Dec 2, 1986 | Unprogrammed Related | Partial | 2 | $180 |
| #3121290 | Dec 18, 1985 | Planned | Complete | 1 | $0 |
| #3093184 | Nov 8, 1985 | Complaint | Partial | 3 | $0 |
| #3117744 | Oct 2, 1985 | Planned | Partial | 0 | $0 |
| #3106952 | Sep 11, 1985 | Planned | Complete | 0 | $0 |
| #3106283 | Jul 19, 1985 | Complaint | Partial | 4 | $150 |
| #510792 | Mar 7, 1984 | Planned | Complete | 0 | $0 |
| #510453 | Mar 6, 1984 | Complaint | Partial | 2 | $120 |
| #509968 | Jan 23, 1984 | Planned | Complete | 8 | $405 |
| #218439818 | Jan 10, 1984 | Planned | Partial | 0 | $0 |
| #218436343 | Mar 10, 1983 | Planned | Partial | 0 | $0 |
| #218439180 | Oct 11, 1982 | Planned | Complete | 0 | $0 |
| #218441681 | Sep 24, 1982 | Planned | Complete | 0 | $0 |
| #218441640 | Sep 21, 1982 | Planned | Complete | 0 | $0 |
| #218439032 | Sep 21, 1982 | Planned | Complete | 0 | $0 |
| #218441293 | Aug 3, 1982 | Planned | Complete | 0 | $0 |
| #218441210 | Jul 27, 1982 | Planned | Complete | 0 | $0 |