CLIMATE CONTROL INC.
4550 SW MACADAM, PORTLAND, OR 97219
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
May 1, 2012#316424100May 1, 2012Planned (H) · Partial scope, Safety#316424100$4802 viol.2 violations$480 in penalties
Inspection #316424100
Dates
- Opened
- May 1, 2012
- Closing Conference Date
- May 1, 2012
- Closed
- Aug 14, 2012
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 20
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 serious
- Initial Penalties
- $480
- Penalties on Record
- $480
- Site Address
- 740 Nw 114th Ave, Portland, OR 97229
- Industry
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 703040403 OSHA citation code: 703040403 C | Serious | 1 | 2 | $180 | $180 | May 2, 2012 | - | - |
| 01002 | 1926.350 Gas Welding and Cutting OSHA citation code: 19260350 H | Serious | 2 | 1 | $300 | $300 | May 2, 2012 | - | - |
Apr 27, 2012#316423862Apr 27, 2012Planned (H) · Complete scope, Safety#316423862$02 viol.2 violations$0 in penalties
Inspection #316423862
Dates
- Opened
- Apr 27, 2012
- Closing Conference Date
- Apr 27, 2012
- Closed
- Aug 14, 2012
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 20
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 16500 Sw 72nd Ave, Portland, OR 97224
- Industry
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.334 Electrical - Use of Equipment OSHA citation code: 19100334 A02 II | Other | 1 | 3 | $0 | $0 | Apr 27, 2012 | - | - |
| 01002 | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 G01 II | Other | 1 | 3 | $0 | $0 | Apr 27, 2012 | - | - |
Feb 1, 2011#314974890Feb 1, 2011Accident (A) · Partial scope, Safety#314974890$2,2503 viol.3 violations$2,250 in penalties
Inspection #314974890
Dates
- Opened
- Feb 1, 2011
- Closing Conference Date
- Mar 31, 2011
- Closed
- Dec 7, 2011
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 27
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 3 serious
- Initial Penalties
- $2,250
- Penalties on Record
- $2,250
- Site Address
- 16500 Sw 72nd Ave, Portland, OR 97224
- Industry
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Accident Inspection: This inspection record is categorized as an accident inspection in the U.S. Department of Labor OSHA enforcement data. Employers must report work-related fatalities within 8 hours, and work-related inpatient hospitalizations, amputations, or losses of an eye within 24 hours. An accident-related inspection does not by itself determine fault.
Incident Investigation Summaries
Incident investigation summaries linked to this inspection through OSHA's accident and injury enforcement data. These summaries describe the reported incident. The enforcement outcome for the linked inspection is in the inspection details above.
Employee falls from ladder and fractures legs
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.1053 Ladders (Construction) OSHA citation code: 19261053 B05 I | Serious | 1 | 1 | $1,250 | $1,250 | May 5, 2011 | - | - |
| 01002 | 701076505 | Serious | 1 | 30 | $500 | $500 | Apr 28, 2011 | - | - |
| 01003 | 1926.1053 Ladders (Construction) OSHA citation code: 19261053 B16 | Serious | 1 | 20 | $500 | $500 | Apr 28, 2011 | - | - |
Oct 29, 2009#313951097Oct 29, 2009Planned (H) · Complete scope, Safety#313951097$5704 viol.4 violations$570 in penalties
Inspection #313951097
Dates
- Opened
- Oct 29, 2009
- Closing Conference Date
- Dec 15, 2009
- Closed
- May 18, 2010
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 25
Violations and Penalties
- Total Violations
- 4
- Violation Types
- 3 serious, 1 other-than-serious
- Initial Penalties
- $570
- Penalties on Record
- $570
- Site Address
- 16500 Sw 72nd Ave, Portland, OR 97224
- Industry
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (4 of 4 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 B09 | Serious | 2 | 1 | $300 | $300 | Oct 29, 2009 | - | - |
| 01001B | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 A04 | Serious | 2 | 1 | $0 | $0 | Oct 29, 2009 | - | - |
| 01002 | 703050301 OSHA citation code: 703050301 A | Serious | 8 | 8 | $270 | $270 | Jan 23, 2010 | - | - |
| 02003 | 702018702 | Other | 2 | 10 | $0 | $0 | Dec 21, 2009 | - | - |
Oct 21, 1993#123770190Oct 21, 1993Planned (H) · Complete scope, Safety#123770190$01 viol.1 violation$0 in penalties
Inspection #123770190
Dates
- Opened
- Oct 21, 1993
- Closing Conference Date
- Oct 21, 1993
- Closed
- Oct 2, 1995
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 4
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 4550 Sw Macadam, Portland, OR 97219
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 B01 IIIG | Other | 2 | 4 | $0 | $0 | Dec 17, 1993 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Source: U.S. Department of Labor OSHA incident investigation data (`osha_accident` + `osha_accident_injury`). Linked via `rel_insp_nr` to the inspection activity number (exact government key). Injury, body part, source and event values are OSHA's own codes. OSHA states that these fields are not coded according to the requirements under the Occupational Injury and Illness Classification System (OIICS). Only the values present in the OSHA record are listed; an incident with no value that resolves in OSHA's code table shows "Injury details not recorded". Where a record covers several people, each field lists every value recorded across them.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
5 inspections, 1993 to 2012. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Standards cited
Industry comparison
BLS 2024 survey: plumbing, heating, and air-conditioning contractors reported 3.0 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 5.2%; NAICS 23822 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source