Skip to content
SafetyRecord logoSafetyRecord
COLUMBIA GENERATING STATION
$2,400
penalties
14
viol.
5
insp.

COLUMBIA GENERATING STATION

NORTH POWER LOOP, RICHLAND, WA 99352NAICS 221113 Nuclear Electric Power Generation

Inspections
5
Mar 2004 to Jun 2012 · 5 safety, 0 health
Violations
14
across 5 inspections
Penalties on record
$2,400
latest amounts in DOL records
By classification
Serious 5Willful 0Repeat 0Other 9

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Jun 6, 2012Referral (C) · Partial scope, Safety#316252634$06 viol.

Inspection #316252634

Dates

Opened
Jun 6, 2012
Closing Conference Date
Aug 14, 2012
Contested
Oct 22, 2012
Final Order
Dec 21, 2012
Closed
May 6, 2013

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
1,153
Related Activity
1 referral

Violations and Penalties

Total Violations
6
Violation Types
6 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
76 North Power Plant Loop, Richland, WA 99352
Industry
221113 Nuclear Electric Power Generation

Referral Inspection: This inspection record is categorized as a referral inspection in the DOL OSHA enforcement data. Referral inspections can result from another agency, another OSHA activity, or another source referring a potential hazard to OSHA.

Violations

Violation list (6 of 6 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001062095300101Other112$0$0Feb 6, 2013Oct 22, 2012Dec 21, 2012
01002A062095300102Other112$0$0Feb 6, 2013Oct 22, 2012Dec 21, 2012
01002B062095400102Other112$0$0Feb 6, 2013Oct 22, 2012Dec 21, 2012
01002C062095400101Other112$0$0Feb 6, 2013Oct 22, 2012Dec 21, 2012
010030620956001Other112$0$0Feb 6, 2013Oct 22, 2012Dec 21, 2012
010040620956002Other112$0$0Feb 6, 2013Oct 22, 2012Dec 21, 2012
Dec 7, 2011Complaint (B) · Partial scope, Safety#315577098$2,4008 viol.

Inspection #315577098

Dates

Opened
Dec 7, 2011
Closing Conference Date
Feb 1, 2012
Contested
Apr 30, 2012
Final Order
Jul 3, 2012
Closed
Jul 18, 2012

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
1,140
Related Activity
1 complaint

Violations and Penalties

Total Violations
8
Violation Types
5 serious, 3 other-than-serious
Initial Penalties
$22,000
Penalties on Record
$2,400
Site Address
North Power Loop Wppss, Richland, WA 99352
Industry
221113 Nuclear Electric Power Generation

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

Violations

Violation list (8 of 8 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010018001.6005Serious1148$5,500$600Jul 11, 2012Apr 30, 2012Jul 3, 2012
010028001.6020Serious1148$5,500$600Apr 21, 2012Apr 30, 2012Jul 3, 2012
010038001.6040Serious1148$5,500$600Jul 11, 2012Apr 30, 2012Jul 3, 2012
01004A8001601501Serious1148$5,500$600Apr 21, 2012Apr 30, 2012Jul 3, 2012
01004B8001601502Serious1148$0$0Jul 11, 2012Apr 30, 2012Jul 3, 2012
020018001.6025Other1148$0$0Jul 18, 2012Apr 30, 2012Jul 3, 2012
020028001.6035Other1148$0$0Jul 11, 2012Apr 30, 2012Jul 3, 2012
020038001.6010Other1148$0$0Jul 11, 2012Apr 30, 2012Jul 3, 2012
Oct 6, 2011Unprogrammed Related (G) · Partial scope, Safety#315249748$00 viol.

Inspection #315249748

Dates

Opened
Oct 6, 2011
Closing Conference Date
Oct 20, 2011
Closed
Oct 20, 2011

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
1,000
Related Activity
1 referral

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
76 North Power Plant, Richland, WA 99352
Industry
221113 Nuclear Electric Power Generation

Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

May 7, 2010Referral (C) · Partial scope, Safety#314392507$00 viol.

Inspection #314392507

Dates

Opened
May 7, 2010
Closing Conference Date
May 7, 2010
Closed
May 7, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
900
Related Activity
1 referral

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
North Power Loop, Richland, WA 99352
Industry
221113 Nuclear Electric Power Generation

Referral Inspection: This inspection record is categorized as a referral inspection in the DOL OSHA enforcement data. Referral inspections can result from another agency, another OSHA activity, or another source referring a potential hazard to OSHA.

Mar 10, 2004FatalityAccident (A) · Partial scope, Safety#307429480$00 viol.

Inspection #307429480

Dates

Opened
Mar 10, 2004
Closing Conference Date
Mar 11, 2004
Closed
Mar 11, 2004

Inspection

Advance Notice
Yes
Owner Type
Private
Union Status
No
Number of Employees
1,000
Related Activity
1 accident

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
North Power Loop, Richland, WA 99352
Industry
221113 Nuclear Electric Power Generation

Accident Inspection: This inspection record is categorized as an accident inspection in the U.S. Department of Labor OSHA enforcement data. Employers must report work-related fatalities within 8 hours, and work-related inpatient hospitalizations, amputations, or losses of an eye within 24 hours. An accident-related inspection does not by itself determine fault.

Incident Investigation Summaries

Incident investigation summaries linked to this inspection through OSHA's accident and injury enforcement data. These summaries describe the reported incident. The enforcement outcome for the linked inspection is in the inspection details above.

FatalityMar 10, 2004

Employee dies from apparent heart attack

Injury: OtherBody part: Other Body SystemSource: OtherEvent: Cardiovascular/Respiratory Failure
Inspections 1 to 5 of 5, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Source: U.S. Department of Labor OSHA incident investigation data (`osha_accident` + `osha_accident_injury`). Linked via `rel_insp_nr` to the inspection activity number (exact government key). Injury, body part, source and event values are OSHA's own codes. OSHA states that these fields are not coded according to the requirements under the Occupational Injury and Illness Classification System (OIICS). Only the values present in the OSHA record are listed; an incident with no value that resolves in OSHA's code table shows "Injury details not recorded". Where a record covers several people, each field lists every value recorded across them.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

0620953001011 citation · $0
0620953001021 citation · $0
0620954001011 citation · $0

Industry comparison

Violations per inspection
This employer2.8
Industry average2.0
Penalties per inspection
This employer$480
Industry average$2,032

Utilities, 14,301 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: nuclear electric power generation reported 0.2 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 15.4%). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in RICHLAND, WA

All employers in RICHLAND →