Skip to content
SafetyRecord logoSafetyRecord
CRITICAL PATH METALWORKS, INC.
$540
penalties
3
viol.
2
insp.

CRITICAL PATH METALWORKS, INC.

614 CLIFF ST., WESTCLIFFE, CO 81252NAICS 332312 Fabricated Structural Metal Manufacturing

Inspections
2
Jun 2016 to Nov 2018 · 2 safety, 0 health
Violations
3
across 2 inspections
Penalties on record
$540
latest amounts in DOL records
By classification
Serious 0Willful 0Repeat 0Other 3

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Nov 13, 2018Planned (H) · No Inspection scope, Safety#343577730$00 viol.

Inspection #343577730

Dates

Opened
Nov 13, 2018
Closing Conference Date
Nov 13, 2018
Closed
Nov 13, 2018

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
0 reported

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
614 Cliff St., Westcliffe, CO 81252
Industry
332312 Fabricated Structural Metal Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Jun 30, 2016Planned (H) · Complete scope, Safety#341592020$5403 viol.

Inspection #341592020

Dates

Opened
Jun 30, 2016
Closing Conference Date
Jun 30, 2016
Final Order
Sep 19, 2016
Closed
Sep 26, 2016

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
15

Violations and Penalties

Total Violations
3
Violation Types
3 other-than-serious
Initial Penalties
$900
Penalties on Record
$540
Site Address
614 Cliff St., Westcliffe, CO 81252
Industry
332312 Fabricated Structural Metal Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.134
Respiratory Protection
OSHA citation code: 19100134 H02 I
Other12$300$180Sep 2, 2016-Sep 19, 2016
010021910.178
Powered Industrial Trucks
OSHA citation code: 19100178 Q07
Other12$300$180Sep 2, 2016-Sep 19, 2016
010031910.1200
Hazard Communication
OSHA citation code: 19101200 G08
Other14$300$180Sep 2, 2016-Sep 19, 2016
Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.134Respiratory Protection1 citation · $180
1910.178Powered Industrial Trucks1 citation · $180
1910.1200Hazard Communication1 citation · $180

Industry comparison

Violations per inspection
This employer1.5
Industry average3.3
Penalties per inspection
This employer$270
Industry average$2,300

Fabricated Metal Product Manufacturing, 45,899 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: fabricated structural metal manufacturing reported 3.4 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 7.9%). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in WESTCLIFFE, CO

All employers in WESTCLIFFE →