DAYSTAR CONST., DBA DAYSTAR MASONRY DIV.
$6,500
penalties
13
viol.
1
insp.

DAYSTAR CONST., DBA DAYSTAR MASONRY DIV.

RED MESA PUBLIC SCHOOL, TEEC NOS POS, AZ 86514

Inspections
1
Nov 1991 to Nov 1991 · 1 safety, 0 health
Violations
13
across 1 inspection
Penalties on record
$6,500
latest amounts in DOL records
By classification
Serious 12Willful 0Repeat 0Other 1

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Nov 13, 1991Planned (H) · Complete scope, Safety#102317542$6,50013 viol.

Inspection #102317542

Dates

Opened
Nov 13, 1991
Closing Conference Date
Nov 15, 1991
Contested
Jun 4, 1992
Closed
Jan 29, 1993

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
9

Violations and Penalties

Total Violations
13
Violation Types
12 serious, 1 other-than-serious
Initial Penalties
$13,800
Penalties on Record
$6,500
Site Address
Red Mesa Public School, Teec Nos Pos, AZ 86514
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (13 of 13 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1926.59
Hazard Communication
OSHA citation code: 19260059 E01
Serious121$750$0Jun 3, 1992Jun 4, 1992-
01001B1926.59
Hazard Communication
OSHA citation code: 19260059 G01
Serious321$0$0Jun 3, 1992Jun 4, 1992-
01001C1926.59
Hazard Communication
OSHA citation code: 19260059 H
Serious121$0$0Jun 3, 1992Jun 4, 1992-
010021926.100
Head Protection (Construction)
OSHA citation code: 19260100 A
Serious1010$1,500$750May 18, 1992Jun 4, 1992-
010031926.403
Electrical - General Requirements (Construction)
OSHA citation code: 19260403 I02 I
Serious15$1,500$750May 18, 1992Jun 4, 1992-
010041926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 I
Serious44$1,500$750May 18, 1992Jun 4, 1992-
010051926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 A08
Serious225$1,500$750May 18, 1992Jun 4, 1992-
010061926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 A14
Serious65$750$400May 18, 1992Jun 4, 1992-
010071926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 D10
Serious95$1,500$750May 18, 1992Jun 4, 1992-
010081926.701
Concrete and Masonry Construction - General Requirements
OSHA citation code: 19260701 B
Serious5810$1,500$750May 18, 1992Jun 4, 1992-
010091926.706
Concrete and Masonry - Masonry Construction
OSHA citation code: 19260706 A01
Serious415$1,500$750May 18, 1992Jun 4, 1992-
010101926.706
Concrete and Masonry - Masonry Construction
OSHA citation code: 19260706 B
Serious49$1,500$750May 18, 1992Jun 4, 1992-
020011903.2
Posting of Notices; Availability of the Act, Regulations and Applicable Standards
OSHA citation code: 19030002 A01
Other121$300$100May 18, 1992Jun 4, 1992-
Inspections 1 to 1 of 1, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.451Scaffolding - General Requirements3 citations · $1,900
1926.59Hazard Communication3 citations · $0
1926.706Concrete and Masonry - Masonry Construction2 citations · $1,500