Skip to content
SafetyRecord logoSafetyRecord
DEKALB CO CENTRAL UNITED SCHOOL DISTRICT
$0
penalties
11
viol.
4
insp.

DEKALB CO CENTRAL UNITED SCHOOL DISTRICT

RR 2, WATERLOO, IN 46793

Inspections
4
Jan 1985 to Jan 1985 · 4 safety, 0 health
Violations
11
across 4 inspections
Penalties on record
$0
latest amounts in DOL records
By classification
Serious 8Willful 0Repeat 0Other 3

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Jan 9, 1985Planned (H) · Complete scope, Safety#15356512$02 viol.

Inspection #15356512

Dates

Opened
Jan 9, 1985
Closing Conference Date
Jan 10, 1985
Closed
May 20, 1985

Inspection

Advance Notice
No
Owner Type
Local government
Union Status
Yes
Number of Employees
4

Violations and Penalties

Total Violations
2
Violation Types
1 serious, 1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
E Maple St, Waterloo, IN 46793
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.304
Electrical - Wiring Design and Protection
OSHA citation code: 19100304 F04
Serious14$0$0Jan 25, 1985--
020011910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 B09
Other14$0$0Feb 19, 1985--
Jan 9, 1985Planned (H) · Complete scope, Safety#15356504$01 viol.

Inspection #15356504

Dates

Opened
Jan 9, 1985
Closing Conference Date
Jan 10, 1985
Closed
May 20, 1985

Inspection

Advance Notice
No
Owner Type
Local government
Union Status
Yes
Number of Employees
40

Violations and Penalties

Total Violations
1
Violation Types
1 serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
E Douglas St, Waterloo, IN 46793
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.304
Electrical - Wiring Design and Protection
OSHA citation code: 19100304 F04
Serious12$0$0Jan 25, 1985--
Jan 9, 1985Planned (H) · Complete scope, Safety#15356496$01 viol.

Inspection #15356496

Dates

Opened
Jan 9, 1985
Closing Conference Date
Jan 10, 1985
Closed
Oct 1, 1985

Inspection

Advance Notice
No
Owner Type
Local government
Union Status
Yes
Number of Employees
65

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
Rr 2, Waterloo, IN 46793
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 B03
Other12$0$0Feb 19, 1985--

Failure to Abate Penalties1 citation

OSHA's enforcement record shows Failure to Abate (FTA) activity recorded against 1 citation issued in this inspection. An FTA penalty is assessed during a follow-up inspection when OSHA's records indicate a previously cited hazard was not corrected by the abatement date. Each row below shows the FTA fields published on the original citation record: the follow-up inspection number, the FTA issuance date, the FTA penalty amount, and any FTA contest or final order date on record.

CitationFTA InspectionFTA IssuanceFTA PenaltyFTA ContestFTA Final Order
01001#2735868May 20, 1985---
Jan 9, 1985Planned (H) · Complete scope, Safety#15356488$07 viol.

Inspection #15356488

Dates

Opened
Jan 9, 1985
Closing Conference Date
Jan 10, 1985
Closed
Oct 1, 1985

Inspection

Advance Notice
No
Owner Type
Local government
Union Status
Yes
Number of Employees
120

Violations and Penalties

Total Violations
7
Violation Types
6 serious, 1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
Rr 2, Waterloo, IN 46793
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (7 of 7 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 A01
Serious12$0$0Feb 19, 1985--
01001B1910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 A02
Serious12$0$0Feb 19, 1985--
01002A1910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 D01
Serious12$0$0Feb 19, 1985--
01002B1910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 E03 I
Serious12$0$0Feb 19, 1985--
01003A1910.304
Electrical - Wiring Design and Protection
OSHA citation code: 19100304 F04
Serious22$0$0Jan 25, 1985--
01003B1910.304
Electrical - Wiring Design and Protection
OSHA citation code: 19100304 F05 V
Serious414$0$0Jan 25, 1985--
020011910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 H04
Other12$0$0Feb 19, 1985--

Failure to Abate Penalties1 citation

OSHA's enforcement record shows Failure to Abate (FTA) activity recorded against 1 citation issued in this inspection. An FTA penalty is assessed during a follow-up inspection when OSHA's records indicate a previously cited hazard was not corrected by the abatement date. Each row below shows the FTA fields published on the original citation record: the follow-up inspection number, the FTA issuance date, the FTA penalty amount, and any FTA contest or final order date on record.

CitationFTA InspectionFTA IssuanceFTA PenaltyFTA ContestFTA Final Order
02001#2735850May 20, 1985---
Inspections 1 to 4 of 4, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Source: U.S. Department of Labor OSHA enforcement data, violations table fields fta_insp_nr, fta_issuance_date, fta_penalty, fta_contest_date, fta_final_order_date. The FTA follow-up inspection is linked via fta_insp_nr to the inspection activity number (exact government key). When the follow-up inspection is not currently on record in SafetyRecord, the inspection number is shown without a link.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.304Electrical - Wiring Design and Protection4 citations · $0
1910.215Abrasive Wheel Machinery3 citations · $0
1910.213Woodworking Machinery Requirements2 citations · $0

Other inspected employers in WATERLOO, IN

All employers in WATERLOO →