DORANCO, INCORPORATED
200 GILBERT STREET, MANSFIELD, MA 02048
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Aug 21, 2003#306806860Aug 21, 2003Planned (H) · Records Only scope, Safety#306806860$00 viol.0 violations$0 in penalties
Inspection #306806860
Dates
- Opened
- Aug 21, 2003
- Closing Conference Date
- Aug 21, 2003
- Closed
- Aug 21, 2003
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 60
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 200 Gilbert Street, Mansfield, MA 02048
- Industry
- 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Sep 30, 1997#116302621Sep 30, 1997Planned (H) · Partial scope, Safety#116302621$7002 viol.2 violations$700 in penalties
Inspection #116302621
Dates
- Opened
- Sep 30, 1997
- Closing Conference Date
- Sep 30, 1997
- Closed
- Nov 5, 1997
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 155
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 other-than-serious
- Initial Penalties
- $1,925
- Penalties on Record
- $700
- Site Address
- 200 Gilbert Street, Mansfield, MA 02048
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.217 Mechanical Power Presses OSHA citation code: 19100217 C03 VIII | Other | 3 | 2 | $1,100 | $400 | Nov 25, 1997 | - | - |
| 01002 | 1910.217 Mechanical Power Presses OSHA citation code: 19100217 D09 II | Other | 2 | 2 | $825 | $300 | Nov 25, 1997 | - | - |
Jul 30, 1996#116299082Jul 30, 1996Planned (H) · Complete scope, Safety#116299082$3,02516 viol.16 violations$3,025 in penalties
Inspection #116299082
Dates
- Opened
- Jul 30, 1996
- Closing Conference Date
- Jul 30, 1996
- Closed
- Sep 20, 1996
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 170
Violations and Penalties
- Total Violations
- 16
- Violation Types
- 16 serious
- Initial Penalties
- $6,050
- Penalties on Record
- $3,025
- Site Address
- 200 Gilbert Street, Mansfield, MA 02048
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (16 of 16 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1910.106 Flammable Liquids OSHA citation code: 19100106 E02 IVD | Serious | 2 | 6 | $825 | $412 | Sep 20, 1996 | - | - |
| 01001B | 1910.106 Flammable Liquids OSHA citation code: 19100106 E06 I | Serious | 2 | 6 | $0 | $0 | Sep 20, 1996 | - | - |
| 01001C | 1910.106 Flammable Liquids OSHA citation code: 19100106 E06 II | Serious | 2 | 6 | $0 | $0 | Sep 20, 1996 | - | - |
| 01002A | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 B05 IV | Serious | 6 | 10 | $825 | $413 | Oct 20, 1996 | - | - |
| 01002B | 1910.107 Spray Finishing Using Flammable and Combustible Materials OSHA citation code: 19100107 E03 | Serious | 3 | 10 | $0 | $0 | Sep 20, 1996 | - | - |
| 01003 | 1910.212 General Requirements for All Machines (Machine Guarding) OSHA citation code: 19100212 B | Serious | 4 | 5 | $825 | $412 | Sep 20, 1996 | - | - |
| 01004 | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 B09 | Serious | 2 | 4 | $825 | $413 | Sep 20, 1996 | - | - |
| 01005A | 1910.217 Mechanical Power Presses OSHA citation code: 19100217 B06 I | Serious | 1 | 4 | $1,100 | $550 | Sep 20, 1996 | - | - |
| 01005B | 1910.217 Mechanical Power Presses OSHA citation code: 19100217 B08 III | Serious | 1 | 4 | $0 | $0 | Sep 20, 1996 | - | - |
| 01005C | 1910.217 Mechanical Power Presses OSHA citation code: 19100217 E01 I | Serious | 1 | 4 | $0 | $0 | Sep 20, 1996 | - | - |
| 01006A | 1910.219 Mechanical Power-Transmission Apparatus OSHA citation code: 19100219 C04 I | Serious | 1 | 4 | $825 | $412 | Sep 20, 1996 | - | - |
| 01006B | 1910.219 Mechanical Power-Transmission Apparatus OSHA citation code: 19100219 D01 | Serious | 3 | 8 | $0 | $0 | Sep 20, 1996 | - | - |
| 01007A | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 G02 I | Serious | 1 | 3 | $825 | $413 | Sep 20, 1996 | - | - |
| 01007B | 1910.304 Electrical - Wiring Design and Protection OSHA citation code: 19100304 F05 V | Serious | 1 | 4 | $0 | $0 | Sep 20, 1996 | - | - |
| 01007C | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 G01 I | Serious | 6 | 40 | $0 | $0 | Sep 20, 1996 | - | - |
| 01007D | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 G01 III | Serious | 3 | 30 | $0 | $0 | Sep 20, 1996 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
3 inspections, 1996 to 2003. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.