GONZALES CONSTRUCTION
$1,316
penalties
9
viol.
1
insp.

GONZALES CONSTRUCTION

FM 2243 AT IH 35, GEORGETOWN, TX 78626

Inspections
1
Aug 1999 to Aug 1999 · 1 safety, 0 health
Violations
9
across 1 inspection
Penalties on record
$1,316
latest amounts in DOL records
By classification
Serious 8Willful 0Repeat 0Other 1

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Aug 31, 1999Planned (H) · Partial scope, Safety#302344379$1,3169 viol.

Inspection #302344379

Dates

Opened
Aug 31, 1999
Closing Conference Date
Sep 1, 1999
Closed
Jul 31, 2000

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
5
Related Activity
1 referral

Violations and Penalties

Total Violations
9
Violation Types
8 serious, 1 other-than-serious
Initial Penalties
$2,632
Penalties on Record
$1,316
Site Address
Fm 2243 At Ih 35, Georgetown, TX 78626
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (9 of 9 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.100
Head Protection (Construction)
OSHA citation code: 19260100 A
Serious15$382$191Oct 21, 1999--
01002A1926.307
Mechanical Power-Transmission Apparatus
OSHA citation code: 19260307 D01
Serious11$450$225Oct 21, 1999--
01002B1926.307
Mechanical Power-Transmission Apparatus
OSHA citation code: 19260307 E01 I
Serious11$0$0Oct 21, 1999--
01003A1926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 B01
Serious15$600$300Oct 21, 1999--
01003B1926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 G01
Serious15$0$0Oct 21, 1999--
01004A1926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 C02
Serious15$600$300Oct 21, 1999--
01004B1926.452
Additional Requirements for Specific Scaffold Types
OSHA citation code: 19260452 C03
Serious15$0$0Oct 21, 1999--
010051926.602
Material Handling Equipment
OSHA citation code: 19260602 C01 VIIIA
Serious11$600$300Oct 21, 1999--
020011926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 G02 IV
Other15$0$0Oct 21, 1999--
Inspections 1 to 1 of 1, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.451Scaffolding - General Requirements3 citations · $600
1926.307Mechanical Power-Transmission Apparatus2 citations · $225
1926.100Head Protection (Construction)1 citation · $191