Skip to content
SafetyRecord logoSafetyRecord
GRAND RIVER CONSTRUCTION INC
$250
penalties
3
viol.
3
insp.

GRAND RIVER CONSTRUCTION INC

300 S RIVER AVE, HOLLAND, MI 49424

Inspections
3
Oct 1998 to May 2015 · 2 safety, 1 health
Violations
3
across 3 inspections
Penalties on record
$250
latest amounts in DOL records
By classification
Serious 0Willful 0Repeat 0Other 3

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

May 29, 2015Planned (H) · Partial scope, Health#340668060$2502 viol.

Inspection #340668060

Dates

Opened
May 29, 2015
Closing Conference Date
Jul 13, 2015
Contested
Sep 3, 2015
Final Order
Aug 8, 2016
Closed
Feb 18, 2016

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
3

Violations and Penalties

Total Violations
2
Violation Types
2 other-than-serious
Initial Penalties
$2,500
Penalties on Record
$250
Site Address
Us 31 Southbound @ Washington Ave, Holland, MI 49423
Industry
238110 Poured Concrete Foundation and Structure Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.62
Lead
OSHA citation code: 19260062 D01 I
Other11$1,250$125Jul 30, 2015Sep 3, 2015Aug 8, 2016
010021926.62
Lead
OSHA citation code: 19260062 D02 V
Other11$1,250$125Jul 30, 2015Sep 3, 2015Aug 8, 2016
May 22, 2015Planned (H) · Complete scope, Safety#340653831$01 viol.

Inspection #340653831

Dates

Opened
May 22, 2015
Closing Conference Date
Jun 1, 2015
Final Order
Jul 24, 2015
Closed
Jul 22, 2015

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
3

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
Us 31 Southbound @ Washington Ave, Holland, MI 49423
Industry
238110 Poured Concrete Foundation and Structure Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.502
Fall Protection Systems Criteria and Practices
OSHA citation code: 19260502 D08
Other13$0$0-Jul 24, 2015
Oct 6, 1998Planned (H) · Complete scope, Safety#127249167$00 viol.

Inspection #127249167

Dates

Opened
Oct 6, 1998
Closing Conference Date
Oct 7, 1998
Closed
Oct 7, 1998

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
20

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
300 S River Ave, Holland, MI 49424
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Inspections 1 to 3 of 3, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.62Lead2 citations · $250
1926.502Fall Protection Systems Criteria and Practices1 citation · $0

Industry comparison

BLS 2024 survey: poured concrete foundation and structure contractors reported 2.8 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 10.7%; NAICS 23811 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in HOLLAND, MI

All employers in HOLLAND →