HENNEPIN COUNTY PUBLIC WORKS TRANSPORTATION DEPT
4TH ST SE BRIDGE EAST OF 15TH AVE S, Minneapolis, MN 55414 · NAICS 237310 Highway, Street, and Bridge Construction
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Oct 11, 2021#345590087Oct 11, 2021Planned (H) · Complete scope, Safety#345590087$00 viol.0 violations$0 in penalties
Inspection #345590087
Dates
- Opened
- Oct 11, 2021
- Closing Conference Date
- Oct 11, 2021
- Closed
- Mar 14, 2022
Inspection
- Advance Notice
- No
- Owner Type
- Local government
- Union Status
- Yes
- Number of Employees
- 3
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- W Broadway Ave Bridge - Lowry Ave, Minneapolis, MN 55422
- Industry
- 237310 Highway, Street, and Bridge Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Aug 30, 2012#316680610Aug 30, 2012Planned (H) · Partial scope, Safety#316680610$3,1851 viol.1 violation$3,185 in penalties
Inspection #316680610
Dates
- Opened
- Aug 30, 2012
- Closing Conference Date
- Nov 8, 2012
- Contested
- Dec 19, 2012
- Final Order
- May 13, 2013
- Closed
- May 13, 2013
Inspection
- Advance Notice
- No
- Owner Type
- Local government
- Union Status
- Yes
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 serious
- Initial Penalties
- $4,900
- Penalties on Record
- $3,185
- Site Address
- 4th St Se Bridge East Of 15th Ave S, Minneapolis, MN 55414
- Industry
- 237310 Highway, Street, and Bridge Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01002 | 1926.416 Electrical - Safety Requirements (Construction) OSHA citation code: 19260416 A03 | Serious | 1 | 6 | $4,900 | $3,185 | Dec 1, 2012 | Dec 19, 2012 | May 13, 2013 |
Jul 25, 2012#316611300Jul 25, 2012Planned (H) · Partial scope, Safety#316611300$3,4301 viol.1 violation$3,430 in penalties
Inspection #316611300
Dates
- Opened
- Jul 25, 2012
- Closing Conference Date
- Jul 26, 2012
- Closed
- Sep 5, 2012
Inspection
- Advance Notice
- No
- Owner Type
- Local government
- Union Status
- No
- Number of Employees
- 5
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 serious
- Initial Penalties
- $4,900
- Penalties on Record
- $3,430
- Site Address
- Lowry Ave Bridge At 2nd Street N, Minneapolis, MN 55411
- Industry
- 237310 Highway, Street, and Bridge Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 B01 | Serious | 1 | 2 | $4,900 | $3,430 | Aug 25, 2012 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
3 inspections, 2012 to 2021. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Industry comparison
Heavy and Civil Engineering Construction, 69,167 employers with OSHA inspections. Arithmetic from DOL records.
BLS 2024 survey: highway, street, and bridge construction reported 2.5 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 5.2%; NAICS 2373 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source