Skip to content
SafetyRecord logoSafetyRecord
HIGHLAND GROUP INDUSTRIES, INC.
$8,425
penalties
48
viol.
7
insp.

HIGHLAND GROUP INDUSTRIES, INC.

35 SAWMILL ROAD, SHEFFIELD, PA 16347NAICS 336399

Inspections
7
Aug 1983 to Feb 2005 · 6 safety, 1 health
Violations
48
across 7 inspections
Penalties on record
$8,425
latest amounts in DOL records
By classification
Serious 21Willful 0Repeat 0Other 27

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Feb 7, 2005Planned (H) · Partial scope, Safety#306456609$01 viol.

Inspection #306456609

Dates

Opened
Feb 7, 2005
Closing Conference Date
Feb 7, 2005
Closed
May 18, 2012

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
103

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
35 Mill Street, Sheffield, PA 16347
Industry
336399

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.147
The control of hazardous energy (lockout/tagout)
OSHA citation code: 19100147 C06 I
Other13$0$0Mar 29, 2005--
Oct 31, 2002Complaint (B) · Partial scope, Health#303710537$00 viol.

Inspection #303710537

Dates

Opened
Oct 31, 2002
Closing Conference Date
Oct 31, 2002
Closed
Nov 19, 2002

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
190
Related Activity
1 complaint

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
35 Mill Street, Sheffield, PA 16347
Industry
336399

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

May 4, 1999Planned (H) · Partial scope, Safety#300281185$02 viol.

Inspection #300281185

Dates

Opened
May 4, 1999
Closing Conference Date
May 4, 1999
Closed
Jun 4, 1999

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
105

Violations and Penalties

Total Violations
2
Violation Types
2 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
35 Mill Street, Sheffield, PA 16347
Industry
336399

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.147
The control of hazardous energy (lockout/tagout)
OSHA citation code: 19100147 C06 I
Other21$0$0May 25, 1999--
010021910.147
The control of hazardous energy (lockout/tagout)
OSHA citation code: 19100147 C04 I
Other21$0$0May 25, 1999--
May 4, 1999Planned (H) · Partial scope, Safety#300281177$00 viol.

Inspection #300281177

Dates

Opened
May 4, 1999
Closing Conference Date
May 4, 1999
Closed
May 4, 1999

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
105

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
35 Mill Street, Sheffield, PA 16347
Industry
336399

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Mar 3, 1995Complaint (B) · Partial scope, Safety#113334296$2,6256 viol.

Inspection #113334296

Dates

Opened
Mar 3, 1995
Closing Conference Date
Mar 3, 1995
Closed
Apr 24, 1995

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
50
Related Activity
1 complaint

Violations and Penalties

Total Violations
6
Violation Types
3 serious, 3 other-than-serious
Initial Penalties
$2,625
Penalties on Record
$2,625
Site Address
35 Sawmill Road, Sheffield, PA 16347
Industry
336399

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

Violations

Violation list (6 of 6 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.217
Mechanical Power Presses
OSHA citation code: 19100217 E01 I
Serious240$675$675Apr 13, 1995--
010021910.217
Mechanical Power Presses
OSHA citation code: 19100217 E01 II
Serious140$675$675Apr 13, 1995--
010031910.217
Mechanical Power Presses
OSHA citation code: 19100217 E01 II
Serious1-$675$675Apr 13, 1995--
020011904.2
OSHA citation code: 19040002 A
Other350$600$600Apr 13, 1995--
020021910.217
Mechanical Power Presses
OSHA citation code: 19100217 C03 IVD
Other11$0$0Apr 13, 1995--
020031910.217
Mechanical Power Presses
OSHA citation code: 19100217 G
Other13$0$0Apr 13, 1995--
Jan 20, 1993Complaint (B) · Complete scope, Safety#113345532$5,60031 viol.

Inspection #113345532

Dates

Opened
Jan 20, 1993
Closing Conference Date
Jan 20, 1993
Closed
Jun 11, 1993

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
41
Related Activity
1 complaint

Violations and Penalties

Total Violations
31
Violation Types
14 serious, 17 other-than-serious
Initial Penalties
$5,600
Penalties on Record
$5,600
Site Address
35 Sawmill Road, Sheffield, PA 16347
Industry
336399

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

Violations

Violation list (7 of 31 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1910.147
The control of hazardous energy (lockout/tagout)
OSHA citation code: 19100147 C01
Serious11$450$450Mar 15, 1993--
01001B1910.333
Electrical - Selection and Use of Work Practices
OSHA citation code: 19100333 B02 I
Serious11$0$0Mar 15, 1993--
010021910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A01
Serious11$450$450Apr 22, 1993--
010031910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A03 II
Serious36$450$450Mar 5, 1993--
01004A1910.217
Mechanical Power Presses
OSHA citation code: 19100217 B04 I
Serious11$700$700Feb 21, 1993--
01004B1910.217
Mechanical Power Presses
OSHA citation code: 19100217 C01 I
Serious11$0$0Feb 21, 1993--
010051910.217
Mechanical Power Presses
OSHA citation code: 19100217 B08 VI
Serious66$700$700Mar 21, 1993--

Showing the 7 violations listed first by citation identifier. This inspection has 31 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Aug 25, 1983Planned (H) · Complete scope, Safety#12931820$2008 viol.

Inspection #12931820

Dates

Opened
Aug 25, 1983
Closing Conference Date
Aug 25, 1983
Closed
Oct 24, 1983

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
50

Violations and Penalties

Total Violations
8
Violation Types
4 serious, 4 other-than-serious
Initial Penalties
$200
Penalties on Record
$200
Site Address
35 Mill St, Sheffield, PA 16347
Industry
336399

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (7 of 8 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1910.178
Powered Industrial Trucks
OSHA citation code: 19100178 L
Serious6-$100$100Oct 5, 1983--
01001B1910.178
Powered Industrial Trucks
OSHA citation code: 19100178 M05 I
Serious1-$0$0Aug 25, 1983--
010021910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A01
Serious1-$50$50Sep 20, 1983--
010031910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 I01
Serious1-$50$50Sep 20, 1983--
02001A1910.106
OSHA citation code: 19100106 D03 II
Other1-$0$0Oct 5, 1983--
02001B1910.106
OSHA citation code: 19100106 D03 II
Other1-$0$0Oct 5, 1983--
020021910.157
Portable Fire Extinguishers
OSHA citation code: 19100157 G01
Other1-$0$0Oct 5, 1983--

Showing the 7 violations listed first by citation identifier. This inspection has 8 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Inspections 1 to 7 of 7, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.217Mechanical Power Presses12 citations · $4,125
1910.305Wiring methods, components, and equipment for general use4 citations · $1,150
1910.147The control of hazardous energy (lockout/tagout)4 citations · $450

Industry comparison

Violations per inspection
This employer6.9
Industry average3.0
Penalties per inspection
This employer$1,204
Industry average$2,719

Transportation Equipment Manufacturing, 15,829 employers with OSHA inspections. Arithmetic from DOL records.

Other inspected employers in SHEFFIELD, PA

All employers in SHEFFIELD →