Skip to content
SafetyRecord logoSafetyRecord
IMPERIAL COUNTERS, INC.
$3,302
penalties
32
viol.
13
insp.

IMPERIAL COUNTERS, INC.

725 SPIRAL BLVD, Hastings, MN 55033

Inspections
13
Apr 1983 to Apr 2011 · 9 safety, 4 health
Violations
32
across 13 inspections
Penalties on record
$3,302
latest amounts in DOL records
By classification
Serious 15Willful 0Repeat 0Other 17

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Apr 19, 2011Planned (H) · Complete scope, Safety#315495457$4383 viol.

Inspection #315495457

Dates

Opened
Apr 19, 2011
Closing Conference Date
Apr 19, 2011
Closed
May 12, 2011

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
20

Violations and Penalties

Total Violations
3
Violation Types
1 serious, 2 other-than-serious
Initial Penalties
$625
Penalties on Record
$438
Site Address
725 Spiral Blvd., Hastings, MN 55033
Industry
337110 Wood Kitchen Cabinet and Countertop Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A03 II
Serious11$375$263May 9, 2011--
020011910.22
Walking-Working Surfaces - General Requirements
OSHA citation code: 19100022 A01
Other13$150$105May 15, 2011--
020025205120003Other11$100$70May 15, 2011--
Nov 16, 2006Planned (H) · Complete scope, Safety#310648639$4902 viol.

Inspection #310648639

Dates

Opened
Nov 16, 2006
Closing Conference Date
Nov 16, 2006
Closed
Jan 8, 2007

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
40

Violations and Penalties

Total Violations
2
Violation Types
2 serious
Initial Penalties
$700
Penalties on Record
$490
Site Address
725 Spiral Blvd., Hastings, MN 55033
Industry
337110 Wood Kitchen Cabinet and Countertop Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.106
Flammable Liquids
OSHA citation code: 19100106 E06 II
Serious11$400$280Jan 1, 2007--
010021910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 C05
Serious11$300$210Jan 1, 2007--
Nov 16, 2006Planned (H) · Complete scope, Health#310648613$7005 viol.

Inspection #310648613

Dates

Opened
Nov 16, 2006
Closing Conference Date
Nov 16, 2006
Closed
Jan 8, 2007

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
40

Violations and Penalties

Total Violations
5
Violation Types
1 serious, 4 other-than-serious
Initial Penalties
$1,000
Penalties on Record
$700
Site Address
725 Spiral Blvd., Hastings, MN 55033
Industry
337110 Wood Kitchen Cabinet and Countertop Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 5 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 G02
Serious15$600$420Jan 5, 2007--
020011910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 B05 I
Other11$200$140Dec 12, 2006--
02002A1910.132
Personal Protective Equipment - General Requirements
OSHA citation code: 19100132 D01
Other18$200$140Jan 5, 2007--
02002B1910.133
Eye and Face Protection
OSHA citation code: 19100133 A01
Other18$0$0Jan 5, 2007--
02002C1910.138
Hand Protection
OSHA citation code: 19100138 A
Other18$0$0Jan 5, 2007--
May 14, 2003Planned (H) · Complete scope, Safety#306289885$7003 viol.

Inspection #306289885

Dates

Opened
May 14, 2003
Closing Conference Date
May 28, 2003
Closed
Aug 20, 2003

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
52

Violations and Penalties

Total Violations
3
Violation Types
2 serious, 1 other-than-serious
Initial Penalties
$1,000
Penalties on Record
$700
Site Address
725 Spiral Blvd., Hastings, MN 55033
Industry
337110 Wood Kitchen Cabinet and Countertop Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 G02
Serious11$600$420Jul 25, 2003--
010021910.334
Electrical - Use of Equipment
OSHA citation code: 19100334 A01
Serious11$300$210Jul 5, 2003--
020011910.303
Electrical - General Requirements
OSHA citation code: 19100303 G01 II
Other11$100$70Jul 10, 2003--
Dec 8, 1999Planned (H) · Complete scope, Health#303296511$00 viol.

Inspection #303296511

Dates

Opened
Dec 8, 1999
Closing Conference Date
Jan 4, 2000
Closed
Jan 5, 2011

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
45

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
725 Spiral Blvd., Hastings, MN 55033
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Dec 8, 1999Planned (H) · Complete scope, Health#302912274$00 viol.

Inspection #302912274

Dates

Opened
Dec 8, 1999
Closing Conference Date
Dec 8, 1999
Closed
Jan 20, 2000

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
45

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
725 Spiral Blvd., Hastings, MN 55033
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Mar 2, 1998Planned (H) · Complete scope, Safety#302086483$2801 viol.

Inspection #302086483

Dates

Opened
Mar 2, 1998
Closing Conference Date
Apr 7, 1998
Closed
May 27, 1998

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
37

Violations and Penalties

Total Violations
1
Violation Types
1 serious
Initial Penalties
$400
Penalties on Record
$280
Site Address
725 Spiral Blvd., Hastings, MN 55033
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A03 II
Serious11$400$280May 14, 1998--
Nov 7, 1995Planned (H) · No Inspection scope, Safety#126572072$00 viol.

Inspection #126572072

Dates

Opened
Nov 7, 1995
Closing Conference Date
Nov 7, 1995
Closed
Nov 7, 1995

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
32

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
725 Spiral Blvd., Hastings, MN 55033
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Oct 9, 1995Planned (H) · Complete scope, Health#126561091$6188 viol.

Inspection #126561091

Dates

Opened
Oct 9, 1995
Closing Conference Date
Oct 27, 1995
Contested
Nov 6, 1995
Closed
Apr 18, 1996

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
32

Violations and Penalties

Total Violations
8
Violation Types
7 serious, 1 other-than-serious
Initial Penalties
$2,000
Penalties on Record
$618
Site Address
725 Spiral Blvd., Hastings, MN 55033
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Enforcement Outcome

Citation contest activity appears on Nov 6, 1995. Final orders are recorded through Apr 11, 1996. Penalty changes shown on this page reflect the latest amounts published in OSHA's enforcement data.

Violations

Violation list (5 of 8 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.303
Electrical - General Requirements
OSHA citation code: 19100303 G02 I
Serious11$400$113Dec 31, 1995Nov 6, 1995Apr 11, 1996
01002A1910.305
Electrical - Wiring Methods, Components, and Equipment
OSHA citation code: 19100305 A02 IIIG
Serious718$600$113Dec 31, 1995Nov 6, 1995Apr 11, 1996
01002B1910.305
Electrical - Wiring Methods, Components, and Equipment
OSHA citation code: 19100305 G01 I
Serious118$0$0Dec 31, 1995--
01002C1910.305
Electrical - Wiring Methods, Components, and Equipment
OSHA citation code: 19100305 G02 II
Serious718$0$0Dec 31, 1995--
010031910.305
Electrical - Wiring Methods, Components, and Equipment
OSHA citation code: 19100305 G02 III
Serious21$300$113Dec 31, 1995Nov 6, 1995Apr 11, 1996

Showing the 5 violations listed first by citation identifier. This inspection has 8 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Mar 9, 1990Planned (H) · Complete scope, Safety#107736613$04 viol.

Inspection #107736613

Dates

Opened
Mar 9, 1990
Closing Conference Date
Mar 9, 1990
Closed
May 1, 1990

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
23

Violations and Penalties

Total Violations
4
Violation Types
4 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
725 Spiral Blvd., Hastings, MN 55033
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (4 of 4 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.303
Electrical - General Requirements
OSHA citation code: 19100303 B01 III
Other32$0$0Apr 23, 1990--
010025206070002Other123$0$0Apr 23, 1990--
010031910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 D01
Other11$0$0Apr 16, 1990--
010041910.23
Ladders
OSHA citation code: 19100023 C01
Other13$0$0Apr 16, 1990--
Inspections 1 to 10 of 13, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.107Spray Finishing Using Flammable and Combustible Materials4 citations · $1,190
1910.305Electrical - Wiring Methods, Components, and Equipment4 citations · $226
1910.303Electrical - General Requirements3 citations · $183

Industry comparison

BLS 2024 survey: wood kitchen cabinet and countertop manufacturing reported 3.5 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 13.2%; NAICS 33711 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in Hastings, MN

All employers in Hastings →