Skip to content
SafetyRecord logoSafetyRecord
INTERNATIONAL PAPER - SANTUC MILL
$1,080
penalties
3
viol.
2
insp.

INTERNATIONAL PAPER - SANTUC MILL

177 STROTHER RD., UNION, SC 29379

Inspections
2
Nov 1997 to Jan 2009 · 2 safety, 0 health
Violations
3
across 2 inspections
Penalties on record
$1,080
latest amounts in DOL records
By classification
Serious 3Willful 0Repeat 0Other 0

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Jan 21, 2009Planned (H) · Complete scope, Safety#312819519$1,0803 viol.

Inspection #312819519

Dates

Opened
Jan 21, 2009
Closing Conference Date
Jan 22, 2009
Closed
Mar 16, 2009

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
7

Violations and Penalties

Total Violations
3
Violation Types
3 serious
Initial Penalties
$2,700
Penalties on Record
$1,080
Site Address
177 Strother Rd., Union, SC 29379
Industry
321113 Sawmills

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.23
OSHA citation code: 19100023 C01
Serious44$900$360Feb 24, 2009--
010021910.304
Wiring design and protection
OSHA citation code: 19100304 G06 VIC5
Serious12$900$360Feb 24, 2009--
010031910.305
Wiring methods, components, and equipment for general use
OSHA citation code: 19100305 J02 IV
Serious14$900$360Feb 24, 2009--
Nov 19, 1997Planned (H) · Complete scope, Safety#126495738$00 viol.

Inspection #126495738

Dates

Opened
Nov 19, 1997
Closing Conference Date
Nov 19, 1997
Closed
Dec 1, 1997

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
5

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
177 Strother Rd., Union, SC 29379
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.231 citation · $360
1910.304Wiring design and protection1 citation · $360
1910.305Wiring methods, components, and equipment for general use1 citation · $360

Industry comparison

BLS 2024 survey: sawmills reported 4.2 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 7.9%). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in UNION, SC

All employers in UNION →