Skip to content
SafetyRecord logoSafetyRecord
KEUSCH GLASS INCORPORATED
$150
penalties
4
viol.
5
insp.

KEUSCH GLASS INCORPORATED

403 E 23RD ST, JASPER, IN 47546

Inspections
5
Sep 1996 to May 2013 · 5 safety, 0 health
Violations
4
across 5 inspections
Penalties on record
$150
latest amounts in DOL records
By classification
Serious 3Willful 0Repeat 0Other 1

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

May 8, 2013Programmed Related (I) · Complete scope, Safety#316894948$00 viol.

Inspection #316894948

Dates

Opened
May 8, 2013
Closing Conference Date
May 9, 2013
Closed
May 10, 2013

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
4

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
1600 St. Charles Street, Jasper, IN 47546
Industry
238150 Glass and Glazing Contractors

Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

Jun 5, 2008Planned (H) · Complete scope, Safety#312089220$00 viol.

Inspection #312089220

Dates

Opened
Jun 5, 2008
Closing Conference Date
Jun 6, 2008
Closed
Jul 10, 2008

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
3

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
1600 Royal Street, Jasper, IN 47546
Industry
238150 Glass and Glazing Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Apr 21, 2003Planned (H) · Complete scope, Safety#306154147$00 viol.

Inspection #306154147

Dates

Opened
Apr 21, 2003
Closing Conference Date
Apr 25, 2003
Closed
Jul 22, 2003

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
4

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Middle School, Jasper, IN 47546
Industry
238150 Glass and Glazing Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Nov 13, 2002Planned (H) · Complete scope, Safety#305921355$01 viol.

Inspection #305921355

Dates

Opened
Nov 13, 2002
Closing Conference Date
Nov 19, 2002
Closed
Apr 3, 2003

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
4

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
Jasper Middle School, Jasper, IN 47546
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.25
Housekeeping
OSHA citation code: 19260025 A
Other12$0$0Mar 8, 2003--
Sep 27, 1996Planned (H) · Complete scope, Safety#125323717$1503 viol.

Inspection #125323717

Dates

Opened
Sep 27, 1996
Closing Conference Date
Sep 27, 1996
Closed
Dec 2, 1996

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
15

Violations and Penalties

Total Violations
3
Violation Types
3 serious
Initial Penalties
$300
Penalties on Record
$150
Site Address
403 E 23rd St, Jasper, IN 47546
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 H03
Serious12$100$50Nov 1, 1996--
010021910.303
Electrical - General Requirements
OSHA citation code: 19100303 G02 I
Serious11$100$50Nov 2, 1996--
010031910.304
Electrical - Wiring Design and Protection
OSHA citation code: 19100304 F05 V
Serious11$100$50Nov 2, 1996--
Inspections 1 to 5 of 5, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.213Woodworking Machinery Requirements1 citation · $50
1910.303Electrical - General Requirements1 citation · $50
1910.304Electrical - Wiring Design and Protection1 citation · $50

Industry comparison

BLS 2024 survey: glass and glazing contractors reported 2.7 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 18.7%; NAICS 23815 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in JASPER, IN

All employers in JASPER →