Skip to content
SafetyRecord logoSafetyRecord
LANDMARK BUILDERS
$4,700
penalties
8
viol.
7
insp.

LANDMARK BUILDERS

8800 SILAS CREEK EXTENSION, Winston Salem, NC 27104

Inspections
7
Jan 1983 to Jul 2025 · 6 safety, 1 health
Violations
8
across 7 inspections
Penalties on record
$4,700
latest amounts in DOL records
By classification
Serious 3Willful 0Repeat 0Other 5

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Jul 30, 2025OpenPlanned (H) · Complete scope, Safety#348416066$4,5002 viol.

Inspection #348416066

Dates

Opened
Jul 30, 2025
Closing Conference Date
Jul 30, 2025
Contested
Dec 16, 2025
Closed
Open

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
191

Violations and Penalties

Total Violations
2
Violation Types
2 serious
Initial Penalties
$4,500
Penalties on Record
$4,500
Site Address
1912 Bethabara Road, Winston Salem, NC 27106
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

OSHA's inspection record does not currently show a close date for this case. Citation-level records on this page may still show later contest, penalty, or failure-to-abate activity.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1926.20
General Safety and Health Provisions
OSHA citation code: 19260020 B02
Serious13$4,500$4,500Dec 11, 2025Dec 16, 2025-
01001B1926.501
Fall Protection - Duty to Have Fall Protection
OSHA citation code: 19260501 B11
Serious13$0$0Dec 8, 2025Dec 16, 2025-
May 8, 2023Planned (H) · Complete scope, Health#346699614$00 viol.

Inspection #346699614

Dates

Opened
May 8, 2023
Closing Conference Date
May 24, 2023
Closed
Jun 19, 2023

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
177

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Burke Mill Road At Kimel Park Drive, Winston Salem, NC 27103
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Mar 12, 2020Planned (H) · Complete scope, Safety#344695333$00 viol.

Inspection #344695333

Dates

Opened
Mar 12, 2020
Closing Conference Date
Mar 12, 2020
Closed
Mar 20, 2020

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
174

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
807 North Trade Strret, Winston Salem, NC 27101
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Oct 31, 2018Unprogrammed Related (G) · Partial scope, Safety#343574232$00 viol.

Inspection #343574232

Dates

Opened
Oct 31, 2018
Closing Conference Date
Jan 9, 2019
Closed
Mar 12, 2019

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
2
Related Activity
1 referral

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
3760 Industrial Avenue, Winston Salem, NC 27105
Industry
236220 Commercial and Institutional Building Construction

Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

Jun 26, 1986Planned (H) · Complete scope, Safety#3021847$2004 viol.

Inspection #3021847

Dates

Opened
Jun 26, 1986
Closing Conference Date
Jun 26, 1986
Closed
Sep 15, 1986

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
89

Violations and Penalties

Total Violations
4
Violation Types
1 serious, 3 other-than-serious
Initial Penalties
$200
Penalties on Record
$200
Site Address
3411 Healy Drive, Winston Salem, NC 27103
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (4 of 4 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E10
Serious12$200$200Sep 15, 1986--
020011926.150
Fire Protection (Construction)
OSHA citation code: 19260150 C01 I
Other13$0$0Sep 15, 1986--
020021926.402
Applicability (Electrical - Construction)
OSHA citation code: 19260402 A11
Other13$0$0Sep 7, 1986--
020031926.500
Fall Protection - Scope, Application, and Definitions
OSHA citation code: 19260500 E01 III
Other13$0$0Sep 7, 1986--
Jun 24, 1986Planned (H) · Complete scope, Safety#3001674$01 viol.

Inspection #3001674

Dates

Opened
Jun 24, 1986
Closing Conference Date
Jun 24, 1986
Closed
Sep 9, 1986

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
50

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
5109 North Causeway Drive, Winston Salem, NC 27106
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.150
Fire Protection (Construction)
OSHA citation code: 19260150 A01
Other14$0$0Aug 30, 1986--
Jan 3, 1983Planned (H) · Complete scope, Safety#14201768$01 viol.

Inspection #14201768

Dates

Opened
Jan 3, 1983
Closing Conference Date
Jan 3, 1983
Closed
Feb 8, 1983

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
3

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
8800 Silas Creek Extension, Winston Salem, NC 27104
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.500
Fall Protection - Scope, Application, and Definitions
OSHA citation code: 19260500 E01 III
Other1-$0$0Feb 4, 1983--
Inspections 1 to 7 of 7, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.150Fire Protection (Construction)2 citations · $0
1926.500Fall Protection - Scope, Application, and Definitions2 citations · $0
1926.20General Safety and Health Provisions1 citation · $4,500

Industry comparison

BLS 2024 survey: nonresidential building construction reported 1.9 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 6.8%; NAICS 2362 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in Winston Salem, NC

All employers in Winston Salem →