M. DEMATTEO CONSTRUCTION COMPANY/FLATIRON CONSTRUC
C07D2, CENTRAL ARTERY, Boston, MA 02128
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Jan 19, 1999#302060603Jan 19, 1999Planned (H) · Complete scope, Health#302060603$5,7006 viol.6 violations$5,700 in penalties
Inspection #302060603
Dates
- Opened
- Jan 19, 1999
- Closing Conference Date
- Jan 22, 1999
- Contested
- Apr 16, 1999
- Final Order
- Jul 22, 1999
- Closed
- Aug 12, 1999
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 160
Violations and Penalties
- Total Violations
- 6
- Violation Types
- 6 serious
- Initial Penalties
- $7,200
- Penalties on Record
- $5,700
- Site Address
- C07d2, Central Artery, Boston, MA 02128
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (6 of 6 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.134 Respiratory Protection OSHA citation code: 19100134 D01 | Serious | 1 | 1 | $1,500 | $950 | Apr 2, 1999 | Apr 16, 1999 | Jul 22, 1999 |
| 01003A | 1910.146 Permit-Required Confined Spaces OSHA citation code: 19100146 C04 | Serious | 1 | 1 | $2,850 | $950 | Mar 29, 1999 | Apr 16, 1999 | Jul 22, 1999 |
| 01004A | 1910.146 Permit-Required Confined Spaces OSHA citation code: 19100146 D04 IX | Serious | 1 | 1 | $0 | $950 | Mar 29, 1999 | Apr 16, 1999 | Jul 22, 1999 |
| 01006A | 1910.146 Permit-Required Confined Spaces OSHA citation code: 19100146 D08 | Serious | 1 | - | $950 | $950 | May 16, 1999 | Apr 16, 1999 | Jul 22, 1999 |
| 01008 | 1910.147 The control of hazardous energy (lockout/tagout) OSHA citation code: 19100147 C06 I | Serious | 1 | 1 | $950 | $950 | May 14, 1999 | Apr 16, 1999 | Jul 22, 1999 |
| 01009 | 1910.147 The control of hazardous energy (lockout/tagout) OSHA citation code: 19100147 C07 IIIA | Serious | 1 | 1 | $950 | $950 | May 14, 1999 | Apr 16, 1999 | Jul 22, 1999 |
Jan 19, 1999#302060496Jan 19, 1999Planned (H) · Complete scope, Safety#302060496$13,5008 viol.8 violations$13,500 in penalties
Inspection #302060496
Dates
- Opened
- Jan 19, 1999
- Closing Conference Date
- Jan 22, 1999
- Contested
- Apr 21, 1999
- Closed
- Apr 15, 1999
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 160
Violations and Penalties
- Total Violations
- 8
- Violation Types
- 3 serious, 1 repeat, 4 other-than-serious
- Initial Penalties
- $29,775
- Penalties on Record
- $13,500
- Site Address
- C07d2, Central Artery, Boston, MA 02128
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (8 of 8 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 5A0001 General Duty Clause, Section 5(a)(1) | Serious | 1 | 1 | $5,000 | $3,500 | Mar 31, 1999 | Apr 21, 1999 | - |
| 01002 | 1926.403 Electrical - General Requirements (Construction) OSHA citation code: 19260403 B02 | Other | 1 | 2 | $1,275 | $500 | Feb 12, 1999 | Apr 21, 1999 | - |
| 01003 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 G01 | Serious | 2 | 1 | $2,000 | $2,000 | Feb 16, 1999 | Apr 21, 1999 | - |
| 01004 | 1926.550 OSHA citation code: 19260550 A14 I | Other | 1 | 2 | $1,500 | $500 | Feb 16, 1999 | Apr 21, 1999 | - |
| 01005 | 1926.652 Excavations - Protection of Employees OSHA citation code: 19260652 A01 | Serious | 2 | 1 | $5,000 | $5,000 | Feb 16, 1999 | Apr 21, 1999 | - |
| 02001 | 1926.701 Concrete and Masonry Construction - General Requirements OSHA citation code: 19260701 B | Other | 100 | 10 | $7,500 | $500 | Feb 12, 1999 | Apr 21, 1999 | - |
| 02002 | 1926.1053 Ladders (Construction) OSHA citation code: 19261053 B01 | Repeat | 1 | 1 | $7,500 | $1,500 | Feb 16, 1999 | Apr 21, 1999 | - |
| 03001 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 F07 IVC | Other | 1 | 2 | $0 | $0 | Feb 12, 1999 | Apr 21, 1999 | - |
Nov 19, 1997#300344819Nov 19, 1997Planned (H) · Complete scope, Safety#300344819$4,00210 viol.10 violations$4,002 in penalties
Inspection #300344819
Dates
- Opened
- Nov 19, 1997
- Closing Conference Date
- Nov 25, 1997
- Closed
- Jan 12, 1998
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 125
Violations and Penalties
- Total Violations
- 10
- Violation Types
- 5 serious, 5 other-than-serious
- Initial Penalties
- $8,000
- Penalties on Record
- $4,002
- Site Address
- C07d2, Central Artery, Boston, MA 02128
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (10 of 10 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.251 Rigging Equipment for Material Handling OSHA citation code: 19260251 A01 | Serious | 2 | 1 | $675 | $338 | Dec 12, 1997 | - | - |
| 01002 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 G01 III | Other | 2 | 2 | $675 | $338 | Dec 12, 1997 | - | - |
| 01003 | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 B01 | Other | 2 | 10 | $900 | $450 | Dec 12, 1997 | - | - |
| 01004 | 1926.502 Fall Protection Systems Criteria and Practices OSHA citation code: 19260502 B03 | Serious | 1 | 3 | $3,500 | $1,750 | Dec 12, 1997 | - | - |
| 01005 | 1926.701 Concrete and Masonry Construction - General Requirements OSHA citation code: 19260701 B | Serious | 10 | 3 | $675 | $338 | Dec 12, 1997 | - | - |
| 01006 | 1926.1051 Stairways - General Requirements (Construction) OSHA citation code: 19261051 A | Serious | 1 | 4 | $900 | $450 | Dec 12, 1997 | - | - |
| 01007 | 1926.1053 Ladders (Construction) OSHA citation code: 19261053 B01 | Serious | 1 | 4 | $675 | $338 | Dec 12, 1997 | - | - |
| 02001 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 F06 | Other | 1 | 2 | $0 | $0 | Dec 12, 1997 | - | - |
| 02002 | 1926.502 Fall Protection Systems Criteria and Practices OSHA citation code: 19260502 I03 | Other | 1 | 4 | $0 | $0 | Dec 12, 1997 | - | - |
| 02003 | 1926.502 Fall Protection Systems Criteria and Practices OSHA citation code: 19260502 I04 | Other | 1 | 4 | $0 | $0 | Dec 12, 1997 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
3 inspections, 1997 to 1999. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.