MARYLAND DEPARTMENT OF TRANSPORTATION
JFK HWY MAINTENANCE SHOP #1, 2819 BELCAMP RD, Bel Air, MD 21015 · NAICS 926120
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Jan 22, 2025#347995771Jan 22, 2025Planned (H) · Complete scope, Safety#347995771$08 viol.8 violations$0 in penalties
Inspection #347995771
Dates
- Opened
- Jan 22, 2025
- Closing Conference Date
- Mar 21, 2025
- Final Order
- Jun 2, 2025
- Closed
- May 19, 2026
Inspection
- Advance Notice
- No
- Owner Type
- State government
- Union Status
- Yes
- Number of Employees
- 1,541
Violations and Penalties
- Total Violations
- 8
- Violation Types
- 2 serious, 6 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 3001 Riverside Parkway, Bel Air, MD 21015
- Industry
- 926120
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (8 of 8 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.147 The control of hazardous energy (lockout/tagout) OSHA citation code: 19100147 C04 I | Serious | 1 | 3 | $0 | $0 | Jun 10, 2025 | - | Jun 2, 2025 |
| 01002 | 1910.147 The control of hazardous energy (lockout/tagout) OSHA citation code: 19100147 C06 I | Serious | 1 | 3 | $0 | $0 | Jun 10, 2025 | - | Jun 2, 2025 |
| 02001 | 1910.147 The control of hazardous energy (lockout/tagout) OSHA citation code: 19100147 C06 II | Other | 1 | 3 | $0 | $0 | Jun 10, 2025 | - | Jun 2, 2025 |
| 02002 | 1910.147 The control of hazardous energy (lockout/tagout) OSHA citation code: 19100147 C07 IV | Other | 1 | 3 | $0 | $0 | Jun 10, 2025 | - | Jun 2, 2025 |
| 02003 | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 A04 | Other | 1 | 3 | $0 | $0 | - | Jun 2, 2025 | |
| 02004 | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 B09 | Other | 1 | 3 | $0 | $0 | May 15, 2025 | - | Jun 2, 2025 |
| 02005 | 1910.305 Wiring methods, components, and equipment for general use OSHA citation code: 19100305 B01 II | Other | 1 | 1 | $0 | $0 | - | Jun 2, 2025 | |
| 02006 | 1910.1200 Hazard Communication OSHA citation code: 19101200 E03 | Other | 1 | 68 | $0 | $0 | May 15, 2025 | - | Jun 2, 2025 |
Sep 13, 2013#317284750Sep 13, 2013Planned (H) · Complete scope, Health#317284750$08 viol.8 violations$0 in penalties
Inspection #317284750
Dates
- Opened
- Sep 13, 2013
- Closing Conference Date
- Sep 18, 2013
- Closed
- Jan 2, 2014
Inspection
- Advance Notice
- No
- Owner Type
- State government
- Union Status
- Yes
- Number of Employees
- 55
Violations and Penalties
- Total Violations
- 8
- Violation Types
- 8 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Jfk Hwy Maintenance Shop #1, 2819 Belcamp Rd, Bel Air, MD 21015
- Industry
- 811111 General Automotive Repair
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (8 of 8 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.134 Respiratory Protection OSHA citation code: 19100134 C03 | Other | 2 | 7 | $0 | $0 | Dec 4, 2013 | - | - |
| 01002 | 1910.134 Respiratory Protection OSHA citation code: 19100134 D03 IIIB2 | Other | 2 | 7 | $0 | $0 | Dec 12, 2013 | - | - |
| 01003 | 1910.134 Respiratory Protection OSHA citation code: 19100134 F02 | Other | 1 | 1 | $0 | $0 | Dec 12, 2013 | - | - |
| 01004 | 1910.134 Respiratory Protection OSHA citation code: 19100134 K05 | Other | 1 | 1 | $0 | $0 | Dec 12, 2013 | - | - |
| 01005 | 1910.134 Respiratory Protection OSHA citation code: 19100134 L01 | Other | 2 | 7 | $0 | $0 | Dec 12, 2013 | - | - |
| 01006 | 1910.134 Respiratory Protection OSHA citation code: 19100134 L02 | Other | 2 | 7 | $0 | $0 | Dec 12, 2013 | - | - |
| 01007 | 50405 OSHA citation code: 50405 C01 | Other | 1 | 55 | $0 | $0 | Dec 12, 2013 | - | - |
| 01008 | 912.3302 OSHA citation code: 09123302 A01 | Other | 1 | 55 | $0 | $0 | Dec 4, 2013 | - | - |
Oct 1, 1999#302885983Oct 1, 1999Planned (H) · Complete scope, Safety#302885983$07 viol.7 violations$0 in penalties
Inspection #302885983
Dates
- Opened
- Oct 1, 1999
- Closing Conference Date
- Oct 4, 1999
- Closed
- Jan 24, 2000
Inspection
- Advance Notice
- No
- Owner Type
- State government
- Union Status
- Yes
- Number of Employees
- 57
Violations and Penalties
- Total Violations
- 7
- Violation Types
- 1 serious, 6 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Jfk Hwy Maintenance Shop #1, 2819 Belcamp Rd, Bel Air, MD 21015
- Industry
- 926120
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (7 of 7 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.334 Electrical - Use of Equipment OSHA citation code: 19100334 A02 I | Serious | 1 | 10 | $0 | $0 | Nov 21, 1999 | - | - |
| 02001 | 1910.132 General requirements OSHA citation code: 19100132 D02 | Other | 1 | 10 | $0 | $0 | Nov 21, 1999 | - | - |
| 02002 | 1910.305 Wiring methods, components, and equipment for general use OSHA citation code: 19100305 G01 III | Other | 1 | 1 | $0 | $0 | Nov 21, 1999 | - | - |
| 02003 | 1910.305 Wiring methods, components, and equipment for general use OSHA citation code: 19100305 G02 III | Other | 1 | 10 | $0 | $0 | Nov 21, 1999 | - | - |
| 02004 | 1910.305 Wiring methods, components, and equipment for general use OSHA citation code: 19100305 J01 IV | Other | 1 | 10 | $0 | $0 | Nov 21, 1999 | - | - |
| 02005 | 50405 OSHA citation code: 50405 C | Other | 1 | 10 | $0 | $0 | Nov 21, 1999 | - | - |
| 02006 | 912.3302 OSHA citation code: 09123302 A | Other | 1 | 10 | $0 | $0 | Nov 21, 1999 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
3 inspections, 1999 to 2025. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Standards cited
Industry comparison
Public Administration, 4,039 employers with OSHA inspections. Arithmetic from DOL records.