MORLEY CUSTOM SHIRT CO.
402-412 ROUTE 23 NORTH, FRANKLIN, NJ 07416
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Jan 11, 1994#107199515Jan 11, 1994Complaint (B) · Partial scope, Health#107199515$13,75020 viol.20 violations$13,750 in penalties
Inspection #107199515
Dates
- Opened
- Jan 11, 1994
- Closing Conference Date
- Feb 15, 1994
- Closed
- Jul 29, 1994
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 350
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 20
- Violation Types
- 15 serious, 5 other-than-serious
- Initial Penalties
- $34,850
- Penalties on Record
- $13,750
- Site Address
- 402-412 Route 23 North, Franklin, NJ 07416
- Industry
- Not classified in OSHA's inspection record.
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
Violations
Violation list (20 of 20 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.37 OSHA citation code: 19100037 K02 | Other | 1 | 35 | $1,600 | $0 | Mar 31, 1994 | - | - |
| 01002 | 1910.146 Permit-Required Confined Spaces OSHA citation code: 19100146 C01 | Serious | 1 | 2 | $2,250 | $1,125 | Apr 10, 1994 | - | - |
| 01003 | 1910.146 Permit-Required Confined Spaces OSHA citation code: 19100146 C04 | Serious | 1 | 2 | $2,250 | $1,125 | Apr 20, 1994 | - | - |
| 01004 | 1910.147 The control of hazardous energy (lockout/tagout) OSHA citation code: 19100147 C04 I | Serious | 1 | 4 | $1,800 | $900 | Apr 20, 1994 | - | - |
| 01005A | 1910.147 The control of hazardous energy (lockout/tagout) OSHA citation code: 19100147 C05 IIC2 | Serious | 1 | 4 | $1,600 | $800 | Mar 31, 1994 | - | - |
| 01005B | 1910.333 Electrical - Selection and Use of Work Practices OSHA citation code: 19100333 B02 IIIB | Serious | 1 | 2 | $0 | $0 | Mar 31, 1994 | - | - |
| 01006 | 1910.147 The control of hazardous energy (lockout/tagout) OSHA citation code: 19100147 C05 IID | Serious | 1 | 4 | $1,600 | $800 | Mar 31, 1994 | - | - |
| 01007 | 1910.147 The control of hazardous energy (lockout/tagout) OSHA citation code: 19100147 C05 III | Serious | 1 | 4 | $1,800 | $900 | Mar 31, 1994 | - | - |
| 01008 | 1910.147 The control of hazardous energy (lockout/tagout) OSHA citation code: 19100147 C07 I | Serious | 1 | 4 | $1,800 | $900 | May 6, 1994 | - | - |
| 01009 | 1910.151 Medical Services and First Aid OSHA citation code: 19100151 C | Serious | 1 | 2 | $2,250 | $1,125 | Apr 30, 1994 | - | - |
| 01010 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 H01 | Serious | 1 | 1 | $2,250 | $1,125 | Apr 20, 1994 | - | - |
| 01011 | 1910.1030 Bloodborne Pathogens OSHA citation code: 19101030 C01 I | Serious | 1 | 2 | $2,250 | $450 | Apr 30, 1994 | - | - |
| 01012 | 1910.1030 Bloodborne Pathogens OSHA citation code: 19101030 F01 IIA | Serious | 1 | 2 | $2,250 | $1,125 | May 6, 1994 | - | - |
| 01013 | 1910.1030 Bloodborne Pathogens OSHA citation code: 19101030 G02 I | Serious | 1 | 2 | $2,250 | $1,125 | Apr 30, 1994 | - | - |
| 01014 | 1910.1200 Hazard Communication OSHA citation code: 19101200 E01 | Serious | 1 | 86 | $2,250 | $1,125 | Apr 30, 1994 | - | - |
| 01015 | 1910.1200 Hazard Communication OSHA citation code: 19101200 H | Serious | 1 | 80 | $2,250 | $1,125 | Jul 30, 1994 | - | - |
| 02001 | 1903.2 Posting of Notices; Availability of the Act, Regulations and Applicable Standards OSHA citation code: 19030002 A01 | Other | 1 | 350 | $800 | $0 | Mar 31, 1994 | - | - |
| 02002 | 1904.5 OSHA citation code: 19040005 C | Other | 1 | 350 | $3,600 | $0 | Apr 20, 1994 | - | - |
| 02003 | 1910.134 Respiratory Protection OSHA citation code: 19100134 B05 | Other | 1 | 2 | $0 | $0 | Apr 1, 1994 | - | - |
| 02004 | 1910.157 Portable Fire Extinguishers OSHA citation code: 19100157 C01 | Other | 1 | 35 | $0 | $0 | Mar 31, 1994 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.