Skip to content
SafetyRecord logoSafetyRecord
NELSON CONSTRUCTION CO OF CALEDONIA
$560
penalties
6
viol.
2
insp.

NELSON CONSTRUCTION CO OF CALEDONIA

902 HOUSTON ST NW (FILLMORE CO COURTHOUSE ANNEX), PRESTON, MN 55965

Inspections
2
Aug 1991 to Mar 1999 · 2 safety, 0 health
Violations
6
across 2 inspections
Penalties on record
$560
latest amounts in DOL records
By classification
Serious 3Willful 0Repeat 0Other 3

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Mar 11, 1999Planned (H) · Complete scope, Safety#126595719$5603 viol.

Inspection #126595719

Dates

Opened
Mar 11, 1999
Closing Conference Date
Mar 11, 1999
Closed
Apr 29, 1999

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
13

Violations and Penalties

Total Violations
3
Violation Types
3 serious
Initial Penalties
$800
Penalties on Record
$560
Site Address
902 Houston St Nw (fillmore Co Courthouse Annex), Preston, MN 55965
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.153
Liquefied Petroleum Gas (LP-Gas)
OSHA citation code: 19260153 O
Serious118$200$140Mar 29, 1999--
010021926.501
Fall Protection - Duty to Have Fall Protection
OSHA citation code: 19260501 B10
Serious16$400$280Mar 29, 1999--
010035207.310Serious14$200$140Mar 29, 1999--
Aug 26, 1991Planned (H) · Complete scope, Safety#111641296$03 viol.

Inspection #111641296

Dates

Opened
Aug 26, 1991
Closing Conference Date
Aug 26, 1991
Closed
Oct 6, 1991

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
6

Violations and Penalties

Total Violations
3
Violation Types
3 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
700 Chatfield St (elementary School), Preston, MN 55965
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 A02
Other11$0$0Oct 6, 1991--
010021926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 I
Other11$0$0Oct 6, 1991--
010031926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 A02 III
Other11$0$0Oct 6, 1991--
Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.404Electrical - Wiring Design and Protection (Construction)2 citations · $0
1926.153Liquefied Petroleum Gas (LP-Gas)1 citation · $140
1926.405Electrical - Wiring Methods (Construction)1 citation · $0

Other inspected employers in PRESTON, MN

All employers in PRESTON →