Skip to content
SafetyRecord logoSafetyRecord
NEWBERN CONCRETE, INC.
$0
penalties
3
viol.
3
insp.

NEWBERN CONCRETE, INC.

240 E VOGEL AVE, PHOENIX, AZ 85020

Inspections
3
Mar 1988 to May 1993 · 3 safety, 0 health
Violations
3
across 3 inspections
Penalties on record
$0
latest amounts in DOL records
By classification
Serious 0Willful 0Repeat 0Other 3

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

May 11, 1993Planned (H) · Complete scope, Safety#115580391$01 viol.

Inspection #115580391

Dates

Opened
May 11, 1993
Closing Conference Date
May 11, 1993
Closed
Jun 3, 1993

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
3

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
3040 N Yucca, Phoenix, AZ 85029
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.701
Concrete and Masonry Construction - General Requirements
OSHA citation code: 19260701 B
Other11$0$0Jun 1, 1993--
Apr 19, 1993Planned (H) · Complete scope, Safety#115580284$02 viol.

Inspection #115580284

Dates

Opened
Apr 19, 1993
Closing Conference Date
Apr 19, 1993
Closed
May 19, 1993

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
3

Violations and Penalties

Total Violations
2
Violation Types
2 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
240 E Vogel Ave, Phoenix, AZ 85020
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.602
Material Handling Equipment
OSHA citation code: 19260602 A09 I
Other13$0$0May 3, 1993--
010021926.701
Concrete and Masonry Construction - General Requirements
OSHA citation code: 19260701 B
Other14$0$0May 3, 1993--
Mar 16, 1988Planned (H) · Complete scope, Safety#103752002$00 viol.

Inspection #103752002

Dates

Opened
Mar 16, 1988
Closing Conference Date
Mar 16, 1988
Closed
Mar 18, 1988

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
1

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
2702 East Osborn Road, Phoenix, AZ 85016
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Inspections 1 to 3 of 3, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.701Concrete and Masonry Construction - General Requirements2 citations · $0
1926.602Material Handling Equipment1 citation · $0

Other inspected employers in PHOENIX, AZ

All employers in PHOENIX →