PACIFIC PINE PRODUCTS INC
17634 HIGHWAY 395 N, LAKEVIEW, OR 97630 · NAICS 321911 Wood Window and Door Manufacturing
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Dec 28, 2023#347320467Dec 28, 2023Planned (H) · Complete scope, Safety#347320467$7,74030 viol.30 violations$7,740 in penalties
Inspection #347320467
Dates
- Opened
- Dec 28, 2023
- Closing Conference Date
- Mar 25, 2024
- Final Order
- Jun 2, 2024
- Closed
- Mar 21, 2026
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 75
Violations and Penalties
- Total Violations
- 30
- Violation Types
- 21 serious, 9 other-than-serious
- Initial Penalties
- $7,740
- Penalties on Record
- $7,740
- Site Address
- 17634 Highway 395 N, Lakeview, OR 97630
- Industry
- 321911 Wood Window and Door Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (30 of 30 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.219 Mechanical Power-Transmission Apparatus OSHA citation code: 19100219 F01 | Serious | 2 | 3 | $450 | $450 | May 17, 2024 | - | Jun 2, 2024 |
| 01002 | 1910.242 Hand and Portable Powered Tools and Equipment, General OSHA citation code: 19100242 B | Serious | 1 | 14 | $180 | $180 | Dec 28, 2023 | - | Jun 2, 2024 |
| 01003 | 1910.212 General Requirements for All Machines (Machine Guarding) OSHA citation code: 19100212 A03 II | Serious | 1 | 8 | $450 | $450 | May 17, 2024 | - | Jun 2, 2024 |
| 01004 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 K03 | Serious | 1 | 2 | $180 | $180 | May 17, 2024 | - | Jun 2, 2024 |
| 01005 | 1910.212 General Requirements for All Machines (Machine Guarding) OSHA citation code: 19100212 A01 | Serious | 1 | 5 | $180 | $180 | May 17, 2024 | - | Jun 2, 2024 |
| 01006 | 1910.28 Duty to Have Fall Protection OSHA citation code: 19100028 B01 I | Serious | 1 | 2 | $180 | $180 | Dec 28, 2023 | - | Jun 2, 2024 |
| 01007 | 1910.29 Fall Protection Systems and Criteria OSHA citation code: 19100029 B01 | Serious | 1 | 1 | $180 | $180 | May 17, 2024 | - | Jun 2, 2024 |
| 01008 | 1910.219 Mechanical Power-Transmission Apparatus OSHA citation code: 19100219 C04 I | Serious | 1 | 2 | $180 | $180 | May 17, 2024 | - | Jun 2, 2024 |
| 01009 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 B01 II | Serious | 1 | 1 | $2,250 | $2,250 | Dec 28, 2023 | - | Jun 2, 2024 |
| 01010 | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 B09 | Serious | 1 | 2 | $180 | $180 | May 17, 2024 | - | Jun 2, 2024 |
| 01011 | 1910.1200 Hazard Communication OSHA citation code: 19101200 F06 II | Serious | 1 | 2 | $180 | $180 | May 17, 2024 | - | Jun 2, 2024 |
| 01012 | OAR OSHA citation code: OAR 437-002-0134(8)(A) | Serious | 1 | 2 | $450 | $450 | Dec 28, 2023 | - | Jun 2, 2024 |
| 01013 | OAR OSHA citation code: OAR 437-002-0134(12)(A) | Serious | 1 | 2 | $450 | $450 | Dec 28, 2023 | - | Jun 2, 2024 |
| 01014 | 1910.1200 Hazard Communication OSHA citation code: 19101200 H01 | Serious | 1 | 2 | $180 | $180 | May 17, 2024 | - | Jun 2, 2024 |
| 01015 | OAR OSHA citation code: OAR 437-002-0161(5)(A) | Serious | 1 | 2 | $450 | $450 | May 17, 2024 | - | Jun 2, 2024 |
| 01016 | 1910.147 Control of Hazardous Energy (Lockout/Tagout) OSHA citation code: 19100147 C04 I | Serious | 1 | 1 | $450 | $450 | May 17, 2024 | - | Jun 2, 2024 |
| 01017 | 1910.147 Control of Hazardous Energy (Lockout/Tagout) OSHA citation code: 19100147 C07 III B | Serious | 1 | 5 | $450 | $450 | May 17, 2024 | - | Jun 2, 2024 |
| 01018 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 C01 | Serious | 1 | 2 | $180 | $180 | May 17, 2024 | - | Jun 2, 2024 |
| 01019 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 I01 | Serious | 1 | 1 | $180 | $180 | Dec 28, 2023 | - | Jun 2, 2024 |
| 01020 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 C03 | Serious | 1 | 2 | $180 | $180 | May 17, 2024 | - | Jun 2, 2024 |
| 01021 | 1910.213 Woodworking Machinery Requirements OSHA citation code: 19100213 K01 | Serious | 1 | 1 | $180 | $180 | May 17, 2024 | - | Jun 2, 2024 |
| 02022 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 G01 IV A | Other | 1 | 11 | $0 | $0 | May 17, 2024 | - | Jun 2, 2024 |
| 02023 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 G02 III | Other | 1 | 1 | $0 | $0 | Dec 28, 2023 | - | Jun 2, 2024 |
| 02024 | 1910.334 Electrical - Use of Equipment OSHA citation code: 19100334 A02 II | Other | 1 | 3 | $0 | $0 | Dec 28, 2023 | - | Jun 2, 2024 |
| 02025 | 1910.304 Electrical - Wiring Design and Protection OSHA citation code: 19100304 G05 | Other | 1 | 1 | $0 | $0 | Dec 28, 2023 | - | Jun 2, 2024 |
| 02026 | 1910.303 Electrical - General Requirements OSHA citation code: 19100303 F02 | Other | 1 | 1 | $0 | $0 | Dec 28, 2023 | - | Jun 2, 2024 |
| 02027 | OAR OSHA citation code: OAR 437-002-0187(2)-2 | Other | 1 | 20 | $0 | $0 | Dec 28, 2023 | - | Jun 2, 2024 |
| 02028 | OAR OSHA citation code: OAR 437-002-0187(4)-2 | Other | 1 | 75 | $0 | $0 | May 17, 2024 | - | Jun 2, 2024 |
| 02029 | OAR OSHA citation code: OAR 437-002-0134(4)(A) | Other | 1 | 75 | $0 | $0 | May 17, 2024 | - | Jun 2, 2024 |
| 02030 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 C04 | Other | 1 | 3 | $0 | $0 | Dec 28, 2023 | - | Jun 2, 2024 |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
Standards cited
Industry comparison
Wood Product Manufacturing, 19,564 employers with OSHA inspections. Arithmetic from DOL records.
BLS 2024 survey: wood window and door manufacturing reported 3.3 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 8.1%). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source