Skip to content
SafetyRecord logoSafetyRecord
RICE-CLEVELAND
$1,200
penalties
6
viol.
3
insp.

RICE-CLEVELAND

HARBINSON BLVD., COLUMBIA, SC 29210

Inspections
3
Aug 1990 to Aug 1992 · 3 safety, 0 health
Violations
6
across 3 inspections
Penalties on record
$1,200
latest amounts in DOL records
By classification
Serious 1Willful 0Repeat 0Other 5

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Aug 26, 1992Planned (H) · No Inspection scope, Safety#115687907$00 viol.

Inspection #115687907

Dates

Opened
Aug 26, 1992
Closing Conference Date
Aug 26, 1992
Closed
Aug 28, 1992

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
1

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
300 Outlet Pointe Blvd., Columbia, SC 29210
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

May 8, 1992Planned (H) · Complete scope, Safety#120466420$1,2006 viol.

Inspection #120466420

Dates

Opened
May 8, 1992
Closing Conference Date
May 8, 1992
Closed
Jul 27, 1992

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
2

Violations and Penalties

Total Violations
6
Violation Types
1 serious, 5 other-than-serious
Initial Penalties
$3,000
Penalties on Record
$1,200
Site Address
300 Outlet Pointe Blvd., Columbia, SC 29210
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (6 of 6 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
050011926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 B02
Serious12$3,000$1,200May 22, 1992--
060011926.50
Medical services and first aid
OSHA citation code: 19260050 C
Other12$0$0Jun 22, 1992--
060021926.350
Gas Welding and Cutting
OSHA citation code: 19260350 A09
Other13$0$0May 22, 1992--
060031926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 I
Other12$0$0May 22, 1992--
060041926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 A02 IIB
Other21$0$0May 22, 1992--
060051926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 A02 IIE
Other153$0$0May 22, 1992--
Aug 7, 1990Planned (H) · No Inspection scope, Safety#111013975$00 viol.

Inspection #111013975

Dates

Opened
Aug 7, 1990
Closing Conference Date
Aug 7, 1990
Closed
Aug 15, 1990

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Not recorded
Number of Employees
Not recorded

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Harbinson Blvd., Columbia, SC 29210
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Inspections 1 to 3 of 3, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.405Electrical - Wiring Methods (Construction)3 citations · $1,200
1926.50Medical services and first aid1 citation · $0
1926.350Gas Welding and Cutting1 citation · $0

Other inspected employers in COLUMBIA, SC

All employers in COLUMBIA →