Skip to content
SafetyRecord logoSafetyRecord
RIETH-RILEY CONSTRUCTION INC.
$6,700
penalties
17
viol.
6
insp.

RIETH-RILEY CONSTRUCTION INC.

(US HWY. 12 RICE STREET) WALBASH ST., MICHIGAN CITY, IN 46360

Inspections
6
Jun 1991 to May 2008 · 6 safety, 0 health
Violations
17
across 6 inspections
Penalties on record
$6,700
latest amounts in DOL records
By classification
Serious 2Willful 0Repeat 5Other 10

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

May 5, 2008Planned (H) · Complete scope, Safety#310370655$00 viol.

Inspection #310370655

Dates

Opened
May 5, 2008
Closing Conference Date
May 5, 2008
Closed
Jun 6, 2008

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
4

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Kieffer Rd & Us 421, Michigan City, IN 46360
Industry
237310 Highway, Street, and Bridge Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Jul 30, 1998Planned (H) · Complete scope, Safety#125371104$3,0007 viol.

Inspection #125371104

Dates

Opened
Jul 30, 1998
Closing Conference Date
Aug 7, 1998
Closed
Dec 3, 1998

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
90

Violations and Penalties

Total Violations
7
Violation Types
1 serious, 2 repeat, 4 other-than-serious
Initial Penalties
$6,000
Penalties on Record
$3,000
Site Address
(i94 Hwy From Us 421 To Us 35, Michigan City, IN 46360
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (7 of 7 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.153
Liquefied Petroleum Gas (LP-Gas)
OSHA citation code: 19260153 J
Serious172$2,000$1,500Nov 16, 1998--
020011910.1200
Hazard Communication
OSHA citation code: 19101200 F05 I
Repeat172$2,000$1,500Nov 16, 1998--
020021910.1200
Hazard Communication
OSHA citation code: 19101200 F05 II
Repeat172$2,000$0Nov 16, 1998--
030011926.152
Flammable Liquids
OSHA citation code: 19260152 D04
Other12$0$0Nov 16, 1998--
030021926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 J01 III
Other14$0$0Nov 16, 1998--
030031926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 J01 IIIB
Other14$0$0Nov 16, 1998--
030041926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 J01 IIIC
Other14$0$0Nov 16, 1998--
Oct 28, 1997Planned (H) · Partial scope, Safety#125412387$3,7007 viol.

Inspection #125412387

Dates

Opened
Oct 28, 1997
Closing Conference Date
Oct 31, 1997
Closed
Feb 17, 1998

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
25

Violations and Penalties

Total Violations
7
Violation Types
1 serious, 3 repeat, 3 other-than-serious
Initial Penalties
$11,000
Penalties on Record
$3,700
Site Address
(four Bridges) East Bound Side I-94, Michigan City, IN 46360
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (7 of 7 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.351
Arc Welding and Cutting
OSHA citation code: 19260351 B03
Other15$1,500$0Jan 16, 1998--
010021926.501
Fall Protection - Duty to Have Fall Protection
OSHA citation code: 19260501 B01
Serious11$3,500$2,100Jan 16, 1998--
02001A1910.1200
Hazard Communication
OSHA citation code: 19101200 F05 I
Repeat17$1,000$100Jan 16, 1998--
02001B1910.1200
Hazard Communication
OSHA citation code: 19101200 F05 II
Repeat17$0$0Jan 16, 1998--
020021926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 II
Repeat12$5,000$1,500Jan 16, 1998--
030011926.152
Flammable Liquids
OSHA citation code: 19260152 A01
Other17$0$0Jan 16, 1998--
030021926.350
Gas Welding and Cutting
OSHA citation code: 19260350 A09
Other16$0$0Jan 16, 1998--
May 21, 1996Planned (H) · Complete scope, Safety#123984346$03 viol.

Inspection #123984346

Dates

Opened
May 21, 1996
Closing Conference Date
May 21, 1996
Closed
Jul 1, 1996

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
30

Violations and Penalties

Total Violations
3
Violation Types
3 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
(us Hwy. 12 Rice Street) Walbash St., Michigan City, IN 46360
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.59
Hazard Communication
OSHA citation code: 19260059 G01
Other27$0$0Jun 16, 1996--
010021926.59
Hazard Communication
OSHA citation code: 19260059 E01 I
Other27$0$0Jun 16, 1996--
020011926.59
Hazard Communication
OSHA citation code: 19260059 E01 I
Other27$0$0Jun 16, 1996--
May 19, 1992Planned (H) · Complete scope, Safety#115006652$00 viol.

Inspection #115006652

Dates

Opened
May 19, 1992
Closing Conference Date
May 19, 1992
Closed
Aug 11, 1992

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
8

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
(gainer Bank) Us12 & Karwick Road, Michigan City, IN 46350
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Jun 3, 1991Planned (H) · Complete scope, Safety#115010654$00 viol.

Inspection #115010654

Dates

Opened
Jun 3, 1991
Closing Conference Date
Jun 4, 1991
Closed
Jul 23, 1991

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
6

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
(restaurant) 3956 S Franklin, Michigan City, IN 46360
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Inspections 1 to 6 of 6, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.1200Hazard Communication4 citations · $1,600
1926.59Hazard Communication3 citations · $0
1926.405Electrical - Wiring Methods (Construction)3 citations · $0

Industry comparison

BLS 2024 survey: highway, street, and bridge construction reported 2.5 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 5.2%; NAICS 2373 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in MICHIGAN CITY, IN

All employers in MICHIGAN CITY →