RIVERSIDE SPLINE & GEAR INC
$8,850
penalties
47
viol.
12
insp.

RIVERSIDE SPLINE & GEAR INC

521 ALGER, Marine City, MI 48039NAICS 332111 Iron and Steel Forging

Inspections
12
Apr 1991 to Feb 2023 · 11 safety, 1 health
Violations
47
across 12 inspections
Penalties on record
$8,850
latest amounts in DOL records
By classification
Serious 18Willful 0Repeat 0Other 29

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Feb 16, 2023Referral (C) · Partial scope, Safety#346512189$01 viol.

Inspection #346512189

Dates

Opened
Feb 16, 2023
Closing Conference Date
Apr 27, 2023
Final Order
Jun 9, 2023
Closed
Jun 9, 2023

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
50
Related Activity
1 referral

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
1390 S Parker, Marine City, MI 48039
Industry
336350 Motor Vehicle Transmission and Power Train Parts Manufacturing

Referral Inspection: This inspection record is categorized as a referral inspection in the DOL OSHA enforcement data. Referral inspections can result from another agency, another OSHA activity, or another source referring a potential hazard to OSHA.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001408.14965(1)Other21$0$0-Jun 9, 2023
Aug 7, 2019Planned (H) · Complete scope, Safety#344213095$1,5008 viol.

Inspection #344213095

Dates

Opened
Aug 7, 2019
Closing Conference Date
Aug 12, 2019
Final Order
Oct 24, 2019
Closed
Feb 24, 2020

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
52

Violations and Penalties

Total Violations
8
Violation Types
2 serious, 6 other-than-serious
Initial Penalties
$3,000
Penalties on Record
$1,500
Site Address
1390 S Parker, Marine City, MI 48039
Industry
336350 Motor Vehicle Transmission and Power Train Parts Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 8 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001408.10727(1)Serious110$1,500$750-Oct 24, 2019
01002408.10731(1)Serious11$1,500$750-Oct 24, 2019
02001408.10187(1)Other210$0$0-Oct 24, 2019
020021910.23
OSHA citation code: 19100023 B10
Other11$0$0-Oct 24, 2019
02003408.10716Other11$0$0-Oct 24, 2019

Showing the 5 violations listed first by citation identifier. This inspection has 8 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Aug 4, 2010Follow-Up (F) · Partial scope, Safety#312077837$00 viol.

Inspection #312077837

Dates

Opened
Aug 4, 2010
Closing Conference Date
Aug 4, 2010
Closed
Aug 31, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
27

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
1390 S Parker, Marine City, MI 48039
Industry
336350 Motor Vehicle Transmission and Power Train Parts Manufacturing

Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.

Jan 15, 2010Planned (H) · Complete scope, Safety#312005051$4,20013 viol.

Inspection #312005051

Dates

Opened
Jan 15, 2010
Closing Conference Date
Jan 19, 2010
Closed
Aug 31, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
27

Violations and Penalties

Total Violations
13
Violation Types
8 serious, 5 other-than-serious
Initial Penalties
$4,200
Penalties on Record
$4,200
Site Address
1390 S Parker, Marine City, MI 48039
Industry
336350 Motor Vehicle Transmission and Power Train Parts Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 13 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010014081.716Serious11$600$600Mar 2, 2010--
010024081072701Serious44$600$600Mar 2, 2010--
010034081111501Serious11$600$600Mar 2, 2010--
010044081185401Serious22$600$600Mar 2, 2010--
010054081187201Serious12$600$600Mar 2, 2010--

Showing the 5 violations listed first by citation identifier. This inspection has 13 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

May 25, 2004Follow-Up (F) · Partial scope, Safety#304850654$00 viol.

Inspection #304850654

Dates

Opened
May 25, 2004
Closing Conference Date
May 25, 2004
Closed
Jun 1, 2004

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
24

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
1390 S Parker, Marine City, MI 48039
Industry
332111 Iron and Steel Forging

Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.

Jan 27, 2004Planned (H) · Complete scope, Safety#127059004$8005 viol.

Inspection #127059004

Dates

Opened
Jan 27, 2004
Closing Conference Date
Jan 28, 2004
Closed
Jun 1, 2004

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
28

Violations and Penalties

Total Violations
5
Violation Types
2 serious, 3 other-than-serious
Initial Penalties
$800
Penalties on Record
$800
Site Address
521 Alger, Marine City, MI 48039
Industry
332111 Iron and Steel Forging

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 5 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010014081072701Serious11$400$400Mar 3, 2004--
010021910.303
OSHA citation code: 19100303 G02 I
Serious11$400$400Mar 3, 2004--
020011910.304
Wiring design and protection
OSHA citation code: 19100304 F05 VC1
Other11$0$0Mar 3, 2004--
020021910.305
Wiring methods, components, and equipment for general use
OSHA citation code: 19100305 G02 III
Other11$0$0Mar 3, 2004--
020031910.106
OSHA citation code: 19100106 E06 I
Other11$0$0Mar 3, 2004--
Nov 13, 2002Planned (H) · Complete scope, Health#125137257$05 viol.

Inspection #125137257

Dates

Opened
Nov 13, 2002
Closing Conference Date
Nov 15, 2002
Closed
Feb 25, 2004

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
30

Violations and Penalties

Total Violations
5
Violation Types
5 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
1390 S Parker Po Box 340, Marine City, MI 48039
Industry
332111 Iron and Steel Forging

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 5 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010013254720103Other11$0$0Feb 25, 2003--
01002A3256000801Other11$0$0Feb 25, 2003--
01002B3256000501Other11$0$0Feb 25, 2003--
010031910.1200
Hazard Communication
OSHA citation code: 19101200 H01
Other11$0$0Feb 25, 2003--
010041910.134
Respiratory Protection
OSHA citation code: 19100134 C01
Other11$0$0Feb 25, 2003--
Aug 18, 2000Follow-Up (F) · Partial scope, Safety#127170942$00 viol.

Inspection #127170942

Dates

Opened
Aug 18, 2000
Closing Conference Date
Aug 18, 2000
Closed
Sep 6, 2000

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
40

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
1390 S Parker, Marine City, MI 48039
Industry
332111 Iron and Steel Forging

Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.

Feb 29, 2000Planned (H) · Complete scope, Safety#127207512$1,8007 viol.

Inspection #127207512

Dates

Opened
Feb 29, 2000
Closing Conference Date
Feb 29, 2000
Closed
Sep 6, 2000

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
40

Violations and Penalties

Total Violations
7
Violation Types
3 serious, 4 other-than-serious
Initial Penalties
$1,800
Penalties on Record
$1,800
Site Address
1390 S Parker, Marine City, MI 48039
Industry
332111 Iron and Steel Forging

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 7 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010014081003407Serious11$600$600May 9, 2000--
010024081072701Serious11$600$600Jun 15, 2000--
010034081331201Serious14$600$600Jun 15, 2000--
020014081213101Other11$0$0Jun 15, 2000--
020021910.304
Wiring design and protection
OSHA citation code: 19100304 F05 VC1
Other11$0$0Jun 15, 2000--

Showing the 5 violations listed first by citation identifier. This inspection has 7 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Jun 17, 1996Planned (H) · Complete scope, Safety#125095612$5503 viol.

Inspection #125095612

Dates

Opened
Jun 17, 1996
Closing Conference Date
Jun 19, 1996
Closed
Sep 27, 1996

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
40

Violations and Penalties

Total Violations
3
Violation Types
3 serious
Initial Penalties
$1,100
Penalties on Record
$550
Site Address
1390 S Parker, Marine City, MI 48039
Industry
332111 Iron and Steel Forging

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010014081072701Serious31$400$200Aug 6, 1996--
010024081331201Serious13$300$150Aug 6, 1996--
010031910.147
The control of hazardous energy (lockout/tagout)
OSHA citation code: 19100147 C04 I
Serious15$400$200Aug 6, 1996--
Inspections 1 to 10 of 12, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.147The control of hazardous energy (lockout/tagout)6 citations · $800
40810727015 citations · $1,800
1910.1200Hazard Communication3 citations · $0

Industry comparison

Violations per inspection
This employer3.9
Industry average3.3
Penalties per inspection
This employer$738
Industry average$2,302

Fabricated Metal Product Manufacturing, 45,931 employers with OSHA inspections. Arithmetic from DOL records.

Other inspected employers in Marine City, MI

All employers in Marine City →