Skip to content
SafetyRecord logoSafetyRecord
SOLAR ELECTRICAL CONSTRUCTION
$60
penalties
6
viol.
2
insp.

SOLAR ELECTRICAL CONSTRUCTION

PORTER SQUARE STATION PROJECT, Cambridge, MA 02140

Inspections
2
Jun 1980 to Jan 1986 · 2 safety, 0 health
Violations
6
across 2 inspections
Penalties on record
$60
latest amounts in DOL records
By classification
Serious 2Willful 0Repeat 0Other 4

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Jan 15, 1986Programmed Related (I) · Complete scope, Safety#100434406$02 viol.

Inspection #100434406

Dates

Opened
Jan 15, 1986
Closing Conference Date
Jan 15, 1986
Closed
Nov 21, 1986

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
5

Violations and Penalties

Total Violations
2
Violation Types
2 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
200 Walker Street, Cambridge, MA 02138
Industry
Not classified in OSHA's inspection record.

Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.400
Introduction (Electrical - Construction)
OSHA citation code: 19260400 A
Other61$0$0Feb 12, 1986--
010021926.402
Applicability (Electrical - Construction)
OSHA citation code: 19260402 C03
Other11$0$0Feb 12, 1986--
Jun 25, 1980Unprogrammed Related (G) · Complete scope, Safety#10131696$604 viol.

Inspection #10131696

Dates

Opened
Jun 25, 1980
Closing Conference Date
Jul 9, 1980
Closed
Oct 1, 1980

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Yes
Number of Employees
4

Violations and Penalties

Total Violations
4
Violation Types
2 serious, 2 other-than-serious
Initial Penalties
$60
Penalties on Record
$60
Site Address
Porter Square Station Project, Cambridge, MA 02140
Industry
Not classified in OSHA's inspection record.

Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

Violations

Violation list (4 of 4 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1926.21
Safety Training and Education
OSHA citation code: 19260021 B02
Serious2-$60$60Aug 11, 1980--
01001B1926.800
Underground Construction
OSHA citation code: 19260800 B03
Serious1-$0$0Aug 11, 1980--
020011926.400
Introduction (Electrical - Construction)
OSHA citation code: 19260400 A 011016
Other1-$0$0Aug 11, 1980--
020021926.402
Applicability (Electrical - Construction)
OSHA citation code: 19260402 C03
Other1-$0$0Aug 11, 1980--
Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.400Introduction (Electrical - Construction)2 citations · $0
1926.402Applicability (Electrical - Construction)2 citations · $0
1926.21Safety Training and Education1 citation · $60

Other inspected employers in Cambridge, MA

All employers in Cambridge →