Skip to content
SafetyRecord logoSafetyRecord
THE DAYTON FORGING AND HEAT TREATING COMPANY
$89,538
penalties
71
viol.
14
insp.

THE DAYTON FORGING AND HEAT TREATING COMPANY

215 NORTH FINDLAY ST., DAYTON, OH 45402NAICS 332111 Iron and Steel Forging

Inspections
14
Dec 1985 to Sep 2018 · 12 safety, 2 health
Violations
71
across 14 inspections
Penalties on record
$89,538
latest amounts in DOL records
By classification
Serious 43Willful 1Repeat 4Other 23

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Sep 26, 2018Complaint (B) · Partial scope, Safety#343492658$00 viol.

Inspection #343492658

Dates

Opened
Sep 26, 2018
Closing Conference Date
Oct 19, 2018
Closed
Nov 2, 2018

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
45
Related Activity
1 complaint

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
215 North Findlay Street, Dayton, OH 45403
Industry
332811 Metal Heat Treating

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

Apr 27, 2011Planned (H) · Complete scope, Safety#315496356$10,96015 viol.

Inspection #315496356

Dates

Opened
Apr 27, 2011
Closing Conference Date
Jun 8, 2011
Closed
Sep 16, 2011

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
90

Violations and Penalties

Total Violations
15
Violation Types
10 serious, 5 other-than-serious
Initial Penalties
$34,130
Penalties on Record
$10,960
Site Address
215 North Findlay St., Dayton, OH 45402
Industry
332111 Iron and Steel Forging

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 15 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010015A0001
General Duty Clause, Section 5(a)(1)
Serious25$2,975$1,370Aug 9, 2011--
010021910.22
Walking-Working Surfaces - General Requirements
OSHA citation code: 19100022 B01
Other125$2,380$0Jul 12, 2011--
010061910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A01
Serious11$2,380$1,370Jun 28, 2011--
010071910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A05
Other12$2,380$0Jun 28, 2011--
010081910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 B09
Serious11$1,785$1,370Jun 28, 2011--

Showing the 5 violations listed first by citation identifier. This inspection has 15 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Nov 18, 2009Planned (H) · Partial scope, Safety#313991770$3,5008 viol.

Inspection #313991770

Dates

Opened
Nov 18, 2009
Closing Conference Date
Nov 20, 2009
Closed
Jan 8, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
62

Violations and Penalties

Total Violations
8
Violation Types
7 serious, 1 other-than-serious
Initial Penalties
$5,000
Penalties on Record
$3,500
Site Address
215 North Findlay St., Dayton, OH 45402
Industry
332111 Iron and Steel Forging

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 8 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C04 I
Serious14$1,250$875Jan 2, 2010--
01001B1910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C06 I
Serious14$0$0Jan 2, 2010--
01002A1910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C07 I
Serious15$1,250$875Dec 8, 2009--
01002B1910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C05 I
Serious22$0$0Dec 18, 2009--
01003A1910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 D03
Serious22$1,250$875Dec 8, 2009--

Showing the 5 violations listed first by citation identifier. This inspection has 8 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Aug 25, 2006Complaint (B) · Partial scope, Safety#310298385$6,2503 viol.

Inspection #310298385

Dates

Opened
Aug 25, 2006
Closing Conference Date
Sep 1, 2006
Closed
Mar 12, 2007

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
80
Related Activity
1 complaint

Violations and Penalties

Total Violations
3
Violation Types
3 serious
Initial Penalties
$6,250
Penalties on Record
$6,250
Site Address
215 North Findlay St., Dayton, OH 45402
Industry
332111 Iron and Steel Forging

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

Incident Investigation Summaries

Incident investigation summaries linked to this inspection through OSHA's accident and injury enforcement data. These summaries describe the reported incident. The enforcement outcome for the linked inspection is in the inspection details above.

HospitalizationJul 14, 2006

Employee is injured in fall from furnace cart

Injury: FractureBody part: Body SystemSource: Working SurfaceEvent: Fall (From Elevation)

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.24
Step Bolts and Manhole Steps
OSHA citation code: 19100024 H
Serious13$2,500$2,500Sep 14, 2006--
010021910.132
Personal Protective Equipment - General Requirements
OSHA citation code: 19100132 A
Serious13$2,500$2,500Oct 5, 2006--
010031910.132
Personal Protective Equipment - General Requirements
OSHA citation code: 19100132 A
Serious13$1,250$1,250Oct 5, 2006--
Aug 20, 1999Complaint (B) · Partial scope, Safety#121980221$1,5001 viol.

Inspection #121980221

Dates

Opened
Aug 20, 1999
Closing Conference Date
Aug 23, 1999
Closed
Sep 30, 1999

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
67
Related Activity
1 complaint

Violations and Penalties

Total Violations
1
Violation Types
1 serious
Initial Penalties
$3,000
Penalties on Record
$1,500
Site Address
215 North Findlay St., Dayton, OH 45402
Industry
332111 Iron and Steel Forging

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C04 I
Serious1-$3,000$1,500Sep 7, 1999--
Jun 19, 1998Planned (H) · Complete scope, Health#302011861$2,7388 viol.

Inspection #302011861

Dates

Opened
Jun 19, 1998
Closing Conference Date
Jun 24, 1998
Closed
Aug 13, 1998

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
81

Violations and Penalties

Total Violations
8
Violation Types
4 serious, 4 other-than-serious
Initial Penalties
$4,275
Penalties on Record
$2,738
Site Address
215 North Findlay St., Dayton, OH 45402
Industry
332111 Iron and Steel Forging

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Chemical Exposure Sampling1 substance sampled

Air monitoring samples collected by OSHA during this inspection. Results grouped by substance.

SubstanceSamplesResult RangeUnit
Gravimetric DeterminationQC20.6118 - 6.4085mg/m³
Particulates not otherwise regulated (Total Dust)20.6118 - 6.4085mg/m³
Sample WeightQC30 - 5.601mg

Violations

Violation list (5 of 8 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.242
Hand and Portable Powered Tools and Equipment, General
OSHA citation code: 19100242 B
Serious12$900$500Jul 20, 1998--
010021910.303
Electrical - General Requirements
OSHA citation code: 19100303 C
Serious1-$1,125$700Jul 20, 1998--
010031910.303
Electrical - General Requirements
OSHA citation code: 19100303 G02 I
Serious1-$1,125$700Jul 20, 1998--
010041910.305
Electrical - Wiring Methods, Components, and Equipment
OSHA citation code: 19100305 G01 III
Serious110$1,125$838Jul 20, 1998--
020011910.132
Personal Protective Equipment - General Requirements
OSHA citation code: 19100132 D02
Other150$0$0Aug 3, 1998--

Showing the 5 violations listed first by citation identifier. This inspection has 8 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Jun 19, 1998Planned (H) · Complete scope, Safety#121983522$3,0008 viol.

Inspection #121983522

Dates

Opened
Jun 19, 1998
Closing Conference Date
Jun 23, 1998
Closed
Sep 14, 1998

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
81

Violations and Penalties

Total Violations
8
Violation Types
6 serious, 2 other-than-serious
Initial Penalties
$7,200
Penalties on Record
$3,000
Site Address
215 North Findlay St., Dayton, OH 45402
Industry
332111 Iron and Steel Forging

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 8 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.23
Ladders
OSHA citation code: 19100023 C01
Serious12$1,125$500Aug 17, 1998--
010021910.27
Scaffolds and Rope Descent Systems
OSHA citation code: 19100027 C04
Serious11$1,125$500Aug 17, 1998--
010031910.36
Design and Construction Requirements for Exit Routes
OSHA citation code: 19100036 B04
Serious12$1,125$500Aug 17, 1998--
010041910.178
Powered Industrial Trucks
OSHA citation code: 19100178 P01
Serious11$1,575$500Jul 20, 1998--
010051910.332
Electrical Safety-Related Work Practices - Training
OSHA citation code: 19100332 B01
Serious11$1,125$500Aug 31, 1998--

Showing the 5 violations listed first by citation identifier. This inspection has 8 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Mar 24, 1997Follow-Up (F) · Partial scope, Safety#103274791$00 viol.

Inspection #103274791

Dates

Opened
Mar 24, 1997
Closing Conference Date
Mar 24, 1997
Closed
Mar 24, 1997

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
88

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
215 North Findlay St., Dayton, OH 45402
Industry
332111 Iron and Steel Forging

Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.

Aug 22, 1996FatalityAccident (A) · Partial scope, Safety#103127726$15,7506 viol.

Inspection #103127726

Dates

Opened
Aug 22, 1996
Closing Conference Date
Nov 14, 1996
Closed
Apr 2, 1997

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
90
Related Activity
1 accident

Violations and Penalties

Total Violations
6
Violation Types
6 serious
Initial Penalties
$15,750
Penalties on Record
$15,750
Site Address
215 North Findlay St., Dayton, OH 45402
Industry
332111 Iron and Steel Forging

Accident Inspection: This inspection record is categorized as an accident inspection in the U.S. Department of Labor OSHA enforcement data. Employers must report work-related fatalities within 8 hours, and work-related inpatient hospitalizations, amputations, or losses of an eye within 24 hours. An accident-related inspection does not by itself determine fault.

Incident Investigation Summaries

Incident investigation summaries linked to this inspection through OSHA's accident and injury enforcement data. These summaries describe the reported incident. The enforcement outcome for the linked inspection is in the inspection details above.

FatalityAug 22, 1996

Employee killed when struck by cylinder cover

Injury: ConcussionBody part: HeadSource: MachineEvent: Struck By

Violations

Violation list (5 of 6 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.23
Ladders
OSHA citation code: 19100023 C01
Serious11$3,150$3,150Dec 9, 1996--
010021910.179
Overhead and Gantry Cranes
OSHA citation code: 19100179 N03 V
Serious11$3,150$3,150Dec 9, 1996--
01003A1910.218
Forging Machines
OSHA citation code: 19100218 A02 I
Serious110$3,150$3,150Dec 24, 1996--
01003B1910.218
Forging Machines
OSHA citation code: 19100218 A02 I
Serious110$0$0Dec 22, 1996--
010041910.218
Forging Machines
OSHA citation code: 19100218 A02 III
Serious110$3,150$3,150Dec 24, 1996--

Showing the 5 violations listed first by citation identifier. This inspection has 6 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Sep 1, 1994Complaint (B) · Partial scope, Safety#103384038$40,0005 viol.

Inspection #103384038

Dates

Opened
Sep 1, 1994
Closing Conference Date
Sep 8, 1994
Contested
Feb 13, 1995
Final Order
Jan 15, 1996
Closed
Jan 17, 1996

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
82
Related Activity
1 complaint

Violations and Penalties

Total Violations
5
Violation Types
1 willful, 4 repeat
Initial Penalties
$280,000
Penalties on Record
$40,000
Site Address
215 North Findlay St., Dayton, OH 45402
Industry
332111 Iron and Steel Forging

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

Violations

Violation list (5 of 5 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.179
Overhead and Gantry Cranes
OSHA citation code: 19100179 N01
Willful12$56,000$8,000Feb 1, 1995Feb 13, 1995Jan 15, 1996
020011910.179
Overhead and Gantry Cranes
OSHA citation code: 19100179 F06 III
Repeat11$56,000$8,000Feb 24, 1995Mar 17, 1995Jan 15, 1996
020021910.179
Overhead and Gantry Cranes
OSHA citation code: 19100179 M01
Repeat118$56,000$8,000Feb 24, 1995Mar 17, 1995Jan 15, 1996
020031910.179
Overhead and Gantry Cranes
OSHA citation code: 19100179 N04 I
Repeat118$56,000$8,000Feb 24, 1995Mar 17, 1995Jan 15, 1996
020041910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A01
Repeat18-$56,000$8,000Mar 26, 1995Mar 17, 1995Jan 15, 1996
Inspections 1 to 10 of 14, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Source: U.S. Department of Labor OSHA incident investigation data (`osha_accident` + `osha_accident_injury`). Linked via `rel_insp_nr` to the inspection activity number (exact government key). Injury, body part, source and event values are OSHA's own codes. OSHA states that these fields are not coded according to the requirements under the Occupational Injury and Illness Classification System (OIICS). Only the values present in the OSHA record are listed; an incident with no value that resolves in OSHA's code table shows "Injury details not recorded". Where a record covers several people, each field lists every value recorded across them.

Source: OSHA chemical exposure sampling data (OSHA Information System). P = Personal (worker breathing zone), A = Area (general air). Rows marked QC are analytical quality control measurements, not chemical exposures. OSHA PEL (Permissible Exposure Limit) values from the OSHA Occupational Chemical Database, matched via IMIS substance code (analyte code) (exact government key).

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.147Control of Hazardous Energy (Lockout/Tagout)10 citations · $7,995
1910.179Overhead and Gantry Cranes8 citations · $37,150
1910.22Walking-Working Surfaces - General Requirements6 citations · $900

Chemical exposure sampling

Samples
9
Substances
4
Inspections
2

Sample results are listed in the record of each inspection that collected them.

Industry comparison

Violations per inspection
This employer5.1
Industry average3.3
Penalties per inspection
This employer$6,396
Industry average$2,287

Fabricated Metal Product Manufacturing, 48,574 employers with OSHA inspections. Arithmetic from DOL records.

Other inspected employers in DAYTON, OH

All employers in DAYTON →