WHITLEY PRODUCTS INC.
1403 STANLEY DRIVE, Plymouth, IN 46563
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Jan 27, 2011#314815788Jan 27, 2011Planned (H) · Complete scope, Safety#314815788$03 viol.3 violations$0 in penalties
Inspection #314815788
Dates
- Opened
- Jan 27, 2011
- Closing Conference Date
- Jan 27, 2011
- Closed
- May 2, 2011
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 97
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 3 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 1403 Stanley Dr, Plymouth, IN 46563
- Industry
- 332996 Fabricated Pipe and Pipe Fitting Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.147 The control of hazardous energy (lockout/tagout) OSHA citation code: 19100147 C06 I | Other | 1 | 10 | $0 | $0 | Mar 28, 2011 | - | - |
| 01002 | 1910.178 Powered Industrial Trucks OSHA citation code: 19100178 G02 | Other | 1 | 6 | $0 | $0 | Feb 11, 2011 | - | - |
| 01003 | 1910.1200 Hazard Communication OSHA citation code: 19101200 F05 II | Other | 1 | 9 | $0 | $0 | Feb 11, 2011 | - | - |
Feb 27, 2006#309562965Feb 27, 2006Planned (H) · Complete scope, Safety#309562965$5691 viol.1 violation$569 in penalties
Inspection #309562965
Dates
- Opened
- Feb 27, 2006
- Closing Conference Date
- Feb 27, 2006
- Closed
- Apr 3, 2006
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 83
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 serious
- Initial Penalties
- $875
- Penalties on Record
- $569
- Site Address
- 1403 Stanley Drive, Plymouth, IN 46563
- Industry
- 332996 Fabricated Pipe and Pipe Fitting Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.303 OSHA citation code: 19100303 G02 I | Serious | 2 | 2 | $875 | $569 | Mar 20, 2006 | - | - |
Aug 26, 1998#124011081Aug 26, 1998Planned (H) · Complete scope, Safety#124011081$7004 viol.4 violations$700 in penalties
Inspection #124011081
Dates
- Opened
- Aug 26, 1998
- Closing Conference Date
- Aug 27, 1998
- Closed
- May 24, 2005
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 85
Violations and Penalties
- Total Violations
- 4
- Violation Types
- 1 serious, 3 other-than-serious
- Initial Penalties
- $1,400
- Penalties on Record
- $700
- Site Address
- 1403 Stanley Drive, Plymouth, IN 46563
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (4 of 4 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1910.147 The control of hazardous energy (lockout/tagout) OSHA citation code: 19100147 C04 II | Serious | 1 | 2 | $1,400 | $700 | Nov 22, 1998 | - | - |
| 02001 | 1910.23 OSHA citation code: 19100023 C01 | Other | 1 | 1 | $0 | $0 | Nov 22, 1998 | - | - |
| 02002 | 1910.159 Automatic Sprinkler Systems OSHA citation code: 19100159 C10 | Other | 1 | 1 | $0 | $0 | Nov 22, 1998 | - | - |
| 02003 | 1910.335 Electrical - Safeguards OSHA citation code: 19100335 A01 I | Other | 1 | 2 | $0 | $0 | Nov 22, 1998 | - | - |
Mar 24, 1992#115018251Mar 24, 1992Planned (H) · Partial scope, Safety#115018251$00 viol.0 violations$0 in penalties
Inspection #115018251
Dates
- Opened
- Mar 24, 1992
- Closing Conference Date
- Mar 24, 1992
- Closed
- Jun 11, 1992
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 60
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 1403 Stanley Drive, Plymouth, IN 46563
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Feb 4, 1988#104000807Feb 4, 1988Planned (H) · Complete scope, Safety#104000807$01 viol.1 violation$0 in penalties
Inspection #104000807
Dates
- Opened
- Feb 4, 1988
- Closing Conference Date
- Feb 5, 1988
- Closed
- Apr 12, 1988
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 93
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 1403 Stanley Drive, Plymouth, IN 46563
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.22 OSHA citation code: 19100022 D01 | Other | 1 | 40 | $0 | $0 | Mar 10, 1988 | - | - |
Apr 18, 1983#215172339Apr 18, 1983Planned (H) · Complete scope, Safety#215172339$02 viol.2 violations$0 in penalties
Inspection #215172339
Dates
- Opened
- Apr 18, 1983
- Closing Conference Date
- Apr 18, 1983
- Closed
- Jun 8, 1983
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 43
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 1403 Stanley Drive, Plymouth, IN 46563
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.215 Abrasive Wheel Machinery OSHA citation code: 19100215 B09 | Other | 2 | - | $0 | $0 | May 4, 1983 | - | - |
| 01002 | 1910.242 Hand and Portable Powered Tools and Equipment, General OSHA citation code: 19100242 B | Other | 1 | - | $0 | $0 | May 2, 1983 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
6 inspections, 1983 to 2011. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Industry comparison
BLS 2024 survey: fabricated pipe and pipe fitting manufacturing reported 2.1 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 16.7%). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source