Skip to content
SafetyRecord logoSafetyRecord
WINN CONSTRUCTION SERVICES INC.
$61,302
penalties
8
viol.
1
insp.

WINN CONSTRUCTION SERVICES INC.

TABORTON RD BRIDGE OVER HORSE HEAVEN BROOK, SAND LAKE, NY 12153NAICS 237310 Highway, Street, and Bridge Construction

Inspections
1
Oct 2023 to Oct 2023 · 1 safety, 0 health
Violations
8
across 1 inspection
Penalties on record
$61,302
latest amounts in DOL records
By classification
Serious 8Willful 0Repeat 0Other 0

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Oct 13, 2023OpenComplaint (B) · Partial scope, Safety#347031874$61,3028 viol.

Inspection #347031874

Dates

Opened
Oct 13, 2023
Closing Conference Date
Oct 13, 2023
Contested
Mar 18, 2024
Closed
Open

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
28
Related Activity
1 complaint

Violations and Penalties

Total Violations
8
Violation Types
8 serious
Initial Penalties
$61,302
Penalties on Record
$61,302
Site Address
Taborton Rd Bridge Over Horse Heaven Brook, Sand Lake, NY 12153
Industry
237310 Highway, Street, and Bridge Construction

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

OSHA's inspection record does not currently show a close date for this case. Citation-level records on this page may still show later contest, penalty, or failure-to-abate activity.

Violations

Violation list (8 of 8 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.651
Excavations - Specific Excavation Requirements
OSHA citation code: 19260651 C02
Serious15$11,292$11,292Feb 29, 2024Mar 18, 2024-
010021926.651
Excavations - Specific Excavation Requirements
OSHA citation code: 19260651 H01
Serious15$11,292$11,292Feb 29, 2024Mar 18, 2024-
010031926.651
Excavations - Specific Excavation Requirements
OSHA citation code: 19260651 K01
Serious15$11,292$11,292Feb 29, 2024Mar 18, 2024-
010041926.652
Excavations - Protection of Employees
OSHA citation code: 19260652 A01
Serious15$11,292$11,292Feb 29, 2024Mar 18, 2024-
010051926.701
Concrete and Masonry Construction - General Requirements
OSHA citation code: 19260701 B
Serious15$8,067$8,067Mar 18, 2024-
01006A1926.1053
Ladders (Construction)
OSHA citation code: 19261053 B01
Serious15$8,067$8,067Feb 29, 2024Mar 18, 2024-
01006B1926.1053
Ladders (Construction)
OSHA citation code: 19261053 B04
Serious15$0$0Feb 29, 2024Mar 18, 2024-
01006C1926.1060
Stairways and Ladders - Training (Construction)
OSHA citation code: 19261060 A
Serious15$0$0Feb 29, 2024Mar 18, 2024-
Inspections 1 to 1 of 1, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.651Excavations - Specific Excavation Requirements3 citations · $33,876
1926.1053Ladders (Construction)2 citations · $8,067
1926.652Excavations - Protection of Employees1 citation · $11,292

Industry comparison

Violations per inspection
This employer8.0
Industry average1.6
Penalties per inspection
This employer$61,302
Industry average$2,261

Heavy and Civil Engineering Construction, 69,142 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: highway, street, and bridge construction reported 2.5 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 5.2%; NAICS 2373 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in SAND LAKE, NY

All employers in SAND LAKE →