Skip to content
SafetyRecord logoSafetyRecord
DUNLAP GENERAL & MECHANICAL CONTRACTORS
$1,495
penalties
45
viol.
10
insp.

DUNLAP GENERAL & MECHANICAL CONTRACTORS

(ALLIED SPORTING GOODS) 2380 25TH ST, COLUMBUS, IN 47201

Inspections
10
Jan 1987 to Aug 1993 · 10 safety, 0 health
Violations
45
across 10 inspections
Penalties on record
$1,495
latest amounts in DOL records
By classification
Serious 20Willful 0Repeat 0Other 25

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Aug 17, 1993Planned (H) · Complete scope, Safety#124050477$00 viol.

Inspection #124050477

Dates

Opened
Aug 17, 1993
Closing Conference Date
Aug 17, 1993
Closed
Sep 7, 1993

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
2

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
(indpls Museum Of Art-Columbus) 302 Washington St, Columbus, IN 47201
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Sep 5, 1990Follow-Up (F) · Partial scope, Safety#108592304$00 viol.

Inspection #108592304

Dates

Opened
Sep 5, 1990
Closing Conference Date
Sep 7, 1990
Closed
Sep 21, 1990

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
19

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
(ntn Driveshaft Inc) 713 Pushville Rd, Columbus, IN 47201
Industry
Not classified in OSHA's inspection record.

Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.

May 31, 1990Planned (H) · Complete scope, Safety#108585688$05 viol.

Inspection #108585688

Dates

Opened
May 31, 1990
Closing Conference Date
Jun 13, 1990
Closed
Sep 21, 1990

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
14

Violations and Penalties

Total Violations
5
Violation Types
1 serious, 4 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
(ntn Driveshaft Inc) 713 Pushville Rd, Columbus, IN 47201
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 5 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001B1926.103
Respiratory Protection (Construction)
OSHA citation code: 19260103 A01
Serious12$0$0Aug 1, 1990--
020011926.251
Rigging Equipment for Material Handling
OSHA citation code: 19260251 A01
Other14$0$0Aug 1, 1990--
020021926.350
Gas Welding and Cutting
OSHA citation code: 19260350 A09
Other14$0$0Jul 29, 1990--
020031926.350
Gas Welding and Cutting
OSHA citation code: 19260350 J
Other14$0$0Jul 29, 1990--
020041926.500
Fall Protection - Scope, Application, and Definitions
OSHA citation code: 19260500 E01 V
Other35$0$0Jul 29, 1990--
May 25, 1990Planned (H) · Complete scope, Safety#108585555$06 viol.

Inspection #108585555

Dates

Opened
May 25, 1990
Closing Conference Date
May 30, 1990
Closed
Aug 30, 1990

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
11

Violations and Penalties

Total Violations
6
Violation Types
6 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
(allied Sporting Goods) 2380 25th St, Columbus, IN 47201
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 6 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.304
Woodworking Tools
OSHA citation code: 19260304 F
Other16$0$0Jul 6, 1990--
010021926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 A02
Other11$0$0Jul 2, 1990--
010031926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 F06
Other11$0$0Jul 6, 1990--
010041926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 G02 IV
Other11$0$0Jul 2, 1990--
010051926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 A04
Other11$0$0Jul 6, 1990--

Showing the 5 violations listed first by citation identifier. This inspection has 6 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Mar 1, 1990Planned (H) · Complete scope, Safety#108585100$1354 viol.

Inspection #108585100

Dates

Opened
Mar 1, 1990
Closing Conference Date
Mar 2, 1990
Closed
May 30, 1990

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
8

Violations and Penalties

Total Violations
4
Violation Types
3 serious, 1 other-than-serious
Initial Penalties
$180
Penalties on Record
$135
Site Address
(building 63 Ionitriding Room) 5th Street, Columbus, IN 47201
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (4 of 4 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 I
Serious11$180$135Apr 17, 1990--
01001B1926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 F06
Serious14$0$0Apr 17, 1990--
01001C1926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 G02 IV
Serious24$0$0Apr 17, 1990--
020011926.403
Electrical - General Requirements (Construction)
OSHA citation code: 19260403 A
Other14$0$0Apr 17, 1990--
Jan 9, 1990Planned (H) · Complete scope, Safety#107995789$2705 viol.

Inspection #107995789

Dates

Opened
Jan 9, 1990
Closing Conference Date
Jan 12, 1990
Closed
May 30, 1990

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
26

Violations and Penalties

Total Violations
5
Violation Types
3 serious, 2 other-than-serious
Initial Penalties
$180
Penalties on Record
$270
Site Address
(toyota Indus Equip Mfg) 5555 Inwood Drive, Columbus, IN 47201
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 5 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001B1926.556
Aerial Tramways
OSHA citation code: 19260556 B02 V
Serious11$0$135Apr 10, 1990--
01002A1926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 I
Serious11$180$135Apr 10, 1990--
01002B1926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 F06
Serious11$0$0Apr 10, 1990--
020011926.150
Fire Protection (Construction)
OSHA citation code: 19260150 C01 VIII
Other11$0$0Apr 10, 1990--
020021926.350
Gas Welding and Cutting
OSHA citation code: 19260350 F06
Other13$0$0Apr 10, 1990--
Apr 14, 1989Planned (H) · Partial scope, Safety#104018726$00 viol.

Inspection #104018726

Dates

Opened
Apr 14, 1989
Closing Conference Date
Apr 14, 1989
Closed
May 12, 1989

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
8

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
(arvin Co Headquarters) 1215 Cottage Ave, Columbus, IN 47201
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Mar 13, 1989Planned (H) · Complete scope, Safety#104018551$28012 viol.

Inspection #104018551

Dates

Opened
Mar 13, 1989
Closing Conference Date
Mar 15, 1989
Closed
Jun 22, 1989

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
25

Violations and Penalties

Total Violations
12
Violation Types
3 serious, 9 other-than-serious
Initial Penalties
$560
Penalties on Record
$280
Site Address
(arvin Co Headquarters) 1215 Cottage Ave, Columbus, IN 47201
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 12 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.28
Personal Protective Equipment
OSHA citation code: 19260028 A
Serious11$240$120Apr 15, 1989--
01002A1926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 I
Serious12$320$160Apr 18, 1989--
01002B1926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 F06
Serious42$0$0Apr 15, 1989--
020011910.184
Slings
OSHA citation code: 19100184 I09
Other12$0$0Apr 15, 1989--
020021926.100
Head Protection (Construction)
OSHA citation code: 19260100 B
Other23$0$0Apr 15, 1989--

Showing the 5 violations listed first by citation identifier. This inspection has 12 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Feb 10, 1989Planned (H) · Complete scope, Safety#104018528$901 viol.

Inspection #104018528

Dates

Opened
Feb 10, 1989
Closing Conference Date
Feb 14, 1989
Closed
Jul 17, 1989

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
3

Violations and Penalties

Total Violations
1
Violation Types
1 serious
Initial Penalties
$180
Penalties on Record
$90
Site Address
(lnp Engineering Plastics) 945 South Marr Road, Columbus, IN 47201
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 I
Serious21$180$90Mar 24, 1989--
Jan 6, 1987Planned (H) · Complete scope, Safety#101985505$72012 viol.

Inspection #101985505

Dates

Opened
Jan 6, 1987
Closing Conference Date
Jan 7, 1987
Closed
Aug 20, 1987

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
24

Violations and Penalties

Total Violations
12
Violation Types
9 serious, 3 other-than-serious
Initial Penalties
$720
Penalties on Record
$720
Site Address
(library) 536 5th St, Columbus, IN 47201
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 12 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.100
Head Protection (Construction)
OSHA citation code: 19260100 A
Serious12$180$180Feb 6, 1987--
010021926.102
Eye and Face Protection (Construction)
OSHA citation code: 19260102 A01
Serious12$180$180Feb 6, 1987--
01003A1926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 I
Serious11$180$180Feb 6, 1987--
01003B1926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 F07 IV
Serious321$0$0Feb 6, 1987--
01003C1926.416
Electrical - Safety Requirements (Construction)
OSHA citation code: 19260416 E01
Serious621$0$0Feb 6, 1987--

Showing the 5 violations listed first by citation identifier. This inspection has 12 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Inspections 1 to 10 of 10, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.404Electrical - Wiring Design and Protection (Construction)11 citations · $700
1926.451Scaffolding - General Requirements6 citations · $180
1926.350Gas Welding and Cutting4 citations · $0

Other inspected employers in COLUMBUS, IN

All employers in COLUMBUS →