Skip to content
SafetyRecord logoSafetyRecord
CHAPMAN EXCAVATING CO
$5,300
penalties
15
viol.
2
insp.

CHAPMAN EXCAVATING CO

5405 DARROW RD, Hudson, OH 44236

Inspections
2
May 1976 to Apr 1997 · 2 safety, 0 health
Violations
15
across 2 inspections
Penalties on record
$5,300
latest amounts in DOL records
By classification
Serious 13Willful 0Repeat 0Other 2

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Apr 23, 1997Planned (H) · Complete scope, Safety#103007712$5,30015 viol.

Inspection #103007712

Dates

Opened
Apr 23, 1997
Closing Conference Date
Apr 23, 1997
Closed
Jun 16, 1997

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Yes
Number of Employees
6

Violations and Penalties

Total Violations
15
Violation Types
13 serious, 2 other-than-serious
Initial Penalties
$13,750
Penalties on Record
$5,300
Site Address
8135 Valley View Rd., Hudson, OH 44423
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (15 of 15 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.403
Electrical - General Requirements (Construction)
OSHA citation code: 19260403 G
Serious11$825$600Jun 2, 1997--
010021926.403
Electrical - General Requirements (Construction)
OSHA citation code: 19260403 I02 I
Serious36$825$0May 26, 1997--
010031926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 II
Serious16$1,375$800May 26, 1997--
010041926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 F03 IA
Other16$1,375$100May 26, 1997--
01005A1926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 B01
Serious36$1,375$800May 26, 1997--
01005B1926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 B02
Serious36$0$0May 26, 1997--
010061926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 E01
Serious56$1,100$700May 26, 1997--
010071926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 G02 IV
Serious26$1,100$0May 26, 1997--
010081926.651
Excavations - Specific Excavation Requirements
OSHA citation code: 19260651 D
Serious66$825$600May 23, 1997--
010091926.651
Excavations - Specific Excavation Requirements
OSHA citation code: 19260651 J02
Serious11$825$100May 24, 1997--
010101926.651
Excavations - Specific Excavation Requirements
OSHA citation code: 19260651 K01
Serious46$1,375$800May 23, 1997--
01011A1926.652
Excavations - Protection of Employees
OSHA citation code: 19260652 A02
Serious11$1,375$800May 23, 1997--
01011B1926.652
Excavations - Protection of Employees
OSHA citation code: 19260652 D02
Serious11$0$0May 23, 1997--
010121926.652
Excavations - Protection of Employees
OSHA citation code: 19260652 E02 I
Serious11$1,375$0May 23, 1997--
020011926.50
Medical Services and First Aid (Construction)
OSHA citation code: 19260050 D01
Other16$0$0May 26, 1997--
May 10, 1976Planned (H) · Complete scope, Safety#214851578$00 viol.

Inspection #214851578

Dates

Opened
May 10, 1976
Closing Conference Date
May 10, 1976
Closed
Mar 10, 1984

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Yes
Number of Employees
3

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
5405 Darrow Rd, Hudson, OH 44236
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.405Electrical - Wiring Methods (Construction)4 citations · $1,500
1926.651Excavations - Specific Excavation Requirements3 citations · $1,500
1926.652Excavations - Protection of Employees3 citations · $800

Other inspected employers in Hudson, OH

All employers in Hudson →