Skip to content
SafetyRecord logoSafetyRecord
POPPEMA-SIKMA CONSTRUCTION, INC.
$4,030
penalties
16
viol.
4
insp.

POPPEMA-SIKMA CONSTRUCTION, INC.

1425 E. 9TH, SHELDON, IA 51201

Inspections
4
Jan 1988 to Nov 2013 · 4 safety, 0 health
Violations
16
across 4 inspections
Penalties on record
$4,030
latest amounts in DOL records
By classification
Serious 8Willful 0Repeat 2Other 6

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Nov 5, 2013Planned (H) · Complete scope, Safety#317404564$8002 viol.

Inspection #317404564

Dates

Opened
Nov 5, 2013
Closing Conference Date
Nov 5, 2013
Closed
Dec 30, 2013

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
2

Violations and Penalties

Total Violations
2
Violation Types
1 repeat, 1 other-than-serious
Initial Penalties
$1,200
Penalties on Record
$800
Site Address
2501 E 6th St, Sheldon, IA 51201
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.416
Electrical - Safety Requirements (Construction)
OSHA citation code: 19260416 E01
Repeat12$800$800Dec 13, 2013--
020011926.403
Electrical - General Requirements (Construction)
OSHA citation code: 19260403 H
Other12$400$0Dec 13, 2013--
Aug 7, 2006Complaint (B) · Partial scope, Safety#310081021$2,8506 viol.

Inspection #310081021

Dates

Opened
Aug 7, 2006
Closing Conference Date
Aug 18, 2006
Closed
Oct 2, 2006

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
23
Related Activity
1 complaint

Violations and Penalties

Total Violations
6
Violation Types
6 serious
Initial Penalties
$5,700
Penalties on Record
$2,850
Site Address
118 N. 7th Avenue, Sheldon, IA 51201
Industry
236220 Commercial and Institutional Building Construction

Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.

Violations

Violation list (6 of 6 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.20
General Safety and Health Provisions
OSHA citation code: 19260020 B02
Serious11$1,500$750Sep 29, 2006--
01002A1926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 A02 IIJ
Serious11$600$300Sep 22, 2006--
01002B1926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 G02 III
Serious11$0$0Sep 22, 2006--
010031926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E05 I
Serious11$1,500$750Sep 29, 2006--
010041926.760
Steel Erection - Fall Protection
OSHA citation code: 19260760 A02
Serious11$1,500$750Sep 29, 2006--
010051926.1053
Ladders (Construction)
OSHA citation code: 19261053 B16
Serious11$600$300Sep 29, 2006--
Jul 6, 1989Planned (H) · Complete scope, Safety#104237672$2003 viol.

Inspection #104237672

Dates

Opened
Jul 6, 1989
Closing Conference Date
Jul 6, 1989
Closed
Aug 9, 1989

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
15

Violations and Penalties

Total Violations
3
Violation Types
1 serious, 1 repeat, 1 other-than-serious
Initial Penalties
$200
Penalties on Record
$200
Site Address
118 N. 7th Avenue, Sheldon, IA 51201
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.304
Woodworking Tools
OSHA citation code: 19260304 F
Serious11$120$120Jul 29, 1989--
020011926.152
Flammable Liquids
OSHA citation code: 19260152 A01
Repeat11$80$80Jul 24, 1989--
030011926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 F06
Other110$0$0Jul 24, 1989--
Jan 29, 1988Planned (H) · Complete scope, Safety#104208764$1805 viol.

Inspection #104208764

Dates

Opened
Jan 29, 1988
Closing Conference Date
Jan 29, 1988
Closed
Feb 19, 1988

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
4

Violations and Penalties

Total Violations
5
Violation Types
1 serious, 4 other-than-serious
Initial Penalties
$180
Penalties on Record
$180
Site Address
1425 E. 9th, Sheldon, IA 51201
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 5 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.102
Eye and Face Protection (Construction)
OSHA citation code: 19260102 A01
Serious12$180$180Feb 14, 1988--
020011926.152
Flammable Liquids
OSHA citation code: 19260152 A01
Other14$0$0Feb 14, 1988--
020021926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 A02 IIE
Other144$0$0Feb 16, 1988--
020031926.700
Concrete and Masonry Construction - Scope, Application, and Definitions
OSHA citation code: 19260700 A
Other12$0$0Feb 20, 1988--
02004120.6
OSHA citation code: 1200006 3
Other14$0$0Mar 14, 1988--
Inspections 1 to 4 of 4, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.405Electrical - Wiring Methods (Construction)3 citations · $300
1926.152Flammable Liquids2 citations · $80
1926.102Eye and Face Protection (Construction)1 citation · $180

Industry comparison

BLS 2024 survey: nonresidential building construction reported 1.9 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 6.8%; NAICS 2362 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in SHELDON, IA

All employers in SHELDON →